36C26118B0235-00002003.pdf

PDF 138 KB Posted

Attached to
Emergency Department Safe Room| 662-18-1-6451-0005 | NRM Project #662-17-016
Solicitation number
36C26118B0235
Issued by

About this file

36C26118B0235 00002 36C26118B0235- ATC RFI No. 005.pdf

View the file

Other files

File Type Posted
36C26118C0065-000.docx DOCX document
36C26118B0235-00003000.docx DOCX document
36C26118B0235-00003001.docx DOCX document
36C26118B0235-00003002.pdf PDF
36C26118B0235-00002002.pdf PDF
36C26118B0235-00002004.pdf PDF
36C26118B0235-00002001.pdf PDF
36C26118B0235-00002000.docx DOCX document
36C26118B0235-00001000.docx DOCX document
36C26118B0235-00001001.pdf PDF
36C26118B0235-00001002.pdf PDF
36C26118B0235-019.docx DOCX document
36C26118B0235-010.docx DOCX document
36C26118B0235-011.pdf PDF
36C26118B0235-017.pdf PDF
36C26118B0235-022.docx DOCX document
36C26118B0235-021.docx DOCX document
36C26118B0235-026.pdf PDF
36C26118B0235-025.docx DOCX document
36C26118B0235-004.doc DOC document
36C26118B0235-013.docx DOCX document
36C26118B0235-006.docx DOCX document
36C26118B0235-016.pdf PDF
36C26118B0235-012.pdf PDF
36C26118B0235-001.docx DOCX document
36C26118B0235-007.docx DOCX document
36C26118B0235-009.docx DOCX document
36C26118B0235-002.docx DOCX document
36C26118B0235-008.docx DOCX document
36C26118B0235-003.docx DOCX document
36C26118B0235-015.pdf PDF
36C26118B0235-023.docx DOCX document
36C26118B0235-020.docx DOCX document
36C26118B0235-014.pdf PDF
36C26118B0235-024.docx DOCX document
36C26118B0235-018.docx DOCX document
36C26118B0235-005.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

Contractor Name: Advanced Technology Construction

Address: 3828 East Portland Ave, Tacoma, WA 98404

Phone/eMail: 253-203-7013 / estimator@atcbuilder.com

Send to: Pastaveia.st.john@va.gov AND Karen.smith3@va.gov

RFI

(REQUEST FOR INFORMATION)

PROJECT NO.:

662-17-016 CONTRACTOR

RFI NO.:

PROJECT NAME:

Emergency

Department Saferoom

Remodel

DATE

REQUESTED:

3/23/2018

SOLICITATION

NO.:

36C26118B0235 REFERENCE: ICRA

DRAWING:

SPECIFICATION

SECTION:

01 00 00

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Para 1.8 lists some general infection control procedures, including hard barriers, and notes that fire rated plastic may be used where dust is the only concern. Please clarify the Infection Control Class (I – IV) and related requirements to that class that will be required for work on this project.

VA PROJECT MANAGER’S RESPONSE

This would depend on the type of work that will occur, as well as location to determine the type of barrier to install. Scope of work location, located in fully functional department 24 hours/7 days. The COR and Infection Control personnel will review submitted demo plans and procedure.

VA TRACKING # FOR ALL RFI’S: 005 AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER: E. Begay DATE: 03/27/2018 mailto:estimator@atcbuilder.com mailto:Pastaveia.st.john@va.gov mailto:Karen.smith3@va.gov