36C26118B0235 00001 36C26118B0235- RFI No. 002.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name: Advanced Technology Construction
Address: 3828 East Portland Ave, Tacoma, WA 98404
Phone/eMail: 253-203-7013 / estimator@atcbuilder.com
Send to: Pastaveia.st.john@va.gov AND Karen.smith3@va.gov
RFI
(REQUEST FOR INFORMATION)
PROJECT NO.:
662-17-016 CONTRACTOR
RFI NO.:
PROJECT NAME:
Emergency
Department
Saferoom Remodel
DATE
REQUESTED:
3/15/2018
SOLICITATION
NO.:
36C26118B0235 REFERENCE: Price Schedule
DRAWING:
SPECIFICATION
SECTION:
Section B
DESCRIPTION OF PROBLEM OR INFORMATION BEING
REQUESTED
Reference Section B:
1) This price schedule does not provide for equipment costs, or other ancillary costs (i.e.
field office overhead, safety, bridge tolls, administration, etc.). Is it acceptable to modify this price schedule to include other types of cost categories (equipment and other) and additional line items as needed? If not, please advise on where we are to include these categories of costs, and line items that are not accounted for on the price schedule (i.e admin).
2) There is a line item under Division 01 for “Emergency Department Saferoom
Remodel”. This seems to encompass two of the four rooms on this project, and isn’t necessarily a General Condition. Please clarify what we are to include in this line item.
VA PROJECT MANAGER’S RESPONSE
mailto:estimator@atcbuilder.com mailto:Pastaveia.st.john@va.gov mailto:Karen.smith3@va.gov
1) This price schedule does not provide for equipment costs, or other ancillary costs (i.e.
field office overhead, safety, bridge tolls, administration, etc.). Is it acceptable to modify this price schedule to include other types of cost categories (equipment and other) and additional line items as needed? If not, please advise on where we are to include these categories of costs, and line items that are not accounted for on the price schedule (i.e admin).
Yes. It is acceptable to modify the price schedule to include all cost categories.
2) There is a line item under Division 01 for “Emergency Department Saferoom
Remodel”. This seems to encompass two of the four rooms on this project, and isn’t necessarily a General Condition. Please clarify what we are to include in this line item.
Division 01 should read, “General Requirements”
VA TRACKING # FOR ALL RFI’S: AMENDMENT NO.:
A00001
VA PROJECT ENGINEER/MANAGER: Travis Dilts DATE: 20 March 2018