B65 Generator Addition Electrical One-Line.pdf

PDF 2 MB Posted

Attached to
Y1DA--CON NRM 653-25-101 Replace Bldg 65 Chillers Federal contract opportunity
Solicitation number
36C26025R0025
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This document is an electrical one-line diagram for the B65 Chiller Building Generator Addition project, prepared by Balzheiser & Hubbard Engineers for the Department of Veterans Affairs. The detailed schematic shows the electrical power distribution system, including a primary power line, transformers, panel A circuit directory, and a comprehensive feeder schedule. The diagram depicts the electrical infrastructure for Building 65, with technical details such as voltage specifications, phase information, and circuit breaker configurations. The drawing is marked as "As Built" and includes an electrical symbols list, providing a technical blueprint for the facility's electrical system design and connections.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .