B65 Chiller Rooms Electrical Floor Plan.pdf
PDF 270 KB Posted
- Attached to
- Y1DA--CON NRM 653-25-101 Replace Bldg 65 Chillers Federal contract opportunity
- Solicitation number
- 36C26025R0025
About this file
This document is an electrical floor plan drawing for Building 65 at the Roseburg VA Medical Center, showing the first floor power plan for HVAC systems replacement. The drawing details the HVAC circuiting schedule, including specific circuit breaker specifications, branch conductor information, and disconnect switch details for various equipment such as pumps (P-3, P-6, P-9, P-11) and chillers (CHP-1). Key notes indicate that new Variable Frequency Drives (VFDs) will be furnished by the mechanical contractor and installed by the electrical contractor next to the existing motor control center. The existing cooling tower and GE Evolution Series 9000 motor control center are to remain in place. The project is part of a campus-wide HVAC system replacement for the Department of Veterans Affairs, with the contract number 36C26018D0044, and was drawn by IMEG Corp with a project number of 20000109.01.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B65 Generator Addition Mechanical Plan.pdf | ||
| B65 Generator Addition Electrical One-Line.pdf | ||
| B65 Electrical Study Table 3.1 - Protective Device Evaluation - 2015.pdf | ||
| B65 Electrical Study One-Line - 2015.pdf | ||
| RFI for Building 65 Replace Chillers at Roseburg COR and Contracting Responses.pdf | ||
| 36C26025R0025 0002.docx | DOCX document | |
| B65 Generator Addition Electrical Plan.pdf | ||
| B65 Chillers Mechanical Plan.pdf | ||
| 653-25-101 - 100 Pecent Specifications-Full Set R3.pdf | ||
| 36C26025R0025 0001.docx | DOCX document | |
| 653-25-101 Chiller Bldg 65 Sign-In Sheet.pdf | ||
| 653-25-101 - 100P Drawings -Full Set.pdf | ||
| CON SOW - 653-25-101 _ Remodel Bldg 65 to Replace Chillers_12.pdf | ||
| Wage Determination Douglas County January 3 2025.pdf | ||
| 36C26025R0025_2.docx | DOCX document | |
| 653-25-101 100 Specifications Full Set R2.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT DESIGNATION
CT-1 FAN #1 (25HP)
CT-1 FAN #2 (15HP)
CT-1 HEATER
CT-1 SPRAY PUMP
CT-1 VIBRATION SWITCH
CT-1 HEAT TRACE
CHILLER CONTROLS
P-3
P-6
P-9
CHP-1
P-10
P-11
VOLTAGE
3P/480V
3P/480V
3P/480V
3P/480V
1P/120V
1P/120V
1P/120V
3P/480V
3P/480V
3P/480V
3P/480V
3P/480V
3P/480V
CIRCUIT
MCC-2
NOTE #8
NOTE #5
NOTE #6
XCP-16
XCP-18
XCP-14
NOTE #2
NOTE #2
NOTE #2
NOTE #3
NOTE #3
NOTE #3
HVAC CIRCUITING SCHEDULE
BREAKER
60A/3P
40A/3P
25A/3P
25A/3P
20A/1P
20A/1P
20A/1P
70A/3P
70A/3P
70A/3P
60A/3P
20A/3P
20A/3P
BRANCH COND.
(3)#6,#10G-1"C
(3)#8,#10G-1"C
(3)#10#10G-3/'4"C
(3)#10#10G-3/'4"C
(2)#12,#12G-3/4"C
(2)#12,#12G-3/4"C
(2)#12,#12G-3/4"C
(3)#4,#8G-1"C
(3)#4,#8G-1"C
(3)#4,#8G-1"C
(3)#10,#10G-3/4"C
(3)#12,#12G-3/4"C
(3)#12,#12G-3/4"C
DISCONNECT NOTES
3P/100AS/NF/NEMA 3R
3P/60AS/NF/NEMA 3R
3P/30AS/NF/NEMA3R
3P/30AS/NF/NEMA3R
1P/30AS/N/NEMA 3R
1P/30AS/N/NEMA 3R
N/A
1,7
1,7
1,7
1,7
1,7
1,7
3P/70AS/NF/NEMA 1/NEMA 3
3P/60AS/NF
3P/30AS/NF
3P/30AS/NF
1,2
1,2
1,2
1,3
1,4
1,4
NOTES:
1. REFER TO SHEET 65-E-101 FOR PANEL LOCATION.
2. FURNISH AND INSTALL NEW 70A/3P BREAKER IN SPACE MADE AVAILABLE BY DEMOLITION OF EXISTING CIRCUIT BREAKER SERVING PUMP TO BE DEMOLISHED.
3. FURNISH AND INSTALL NEW 60A/3P OVER CURRENT PROTECTION DEVICE IN EXISTING MOTOR CONTROL CENTER IN SPACE MADE AVAILABLE THRU DEMOLITION OF EXISTING PUMP. REFER TO
NOTE BY SYMBOL #4 SHEET 65-E101 FOR MORE INFORMATION.
4. FURNISH AND INSTALL NEW 20A/3P OVER CURRENT PROTECTION DEVICE IN EXISTING SPARE IN EXISTING MOTOR CONTROL CENTER. REFER TO NOTE BY SYMBOL
#4 SHEET 65-E101 FOR MORE INFORMATION.
5. FURNISH AND INSTALL NEW 3P/25A BREAKER (MATCH EXSITING) IN AVAILABLE SPACE IN PANEL MCC.
6. FURNISH AND INSTALL NEW 3P/25A BREAKER (MATCH EXISTING) IN AVAILABLE SPACE IN PANEL MCC.
7. DISCONNECT SWITCHES TO BE MOUNTED ON COOLING TOWER. COORDINATE DISCONNECT LOCATION WITH EQUIPMENT PROVIDER.
STORAGE
GENERAL NOTES:
1. MECHANICAL EQUIPMENT SHOWN FOR COORDINATION
ONLY. REFER TO MECHANICAL PLANS FOR EXACT
LOCATION OF ALL EQUIPMENT.
2. REFER TO DUCT DUCT IONIZATION SMOKE DETECTOR
NOTE SHEET E000 FOR ADDITIONAL REQUIREMENTS.
NOTES BY SYMBOL " # "
1. EXISTING PANEL 'MCC' TO REMAIN.
2. EXISTING PANEL 'XCP' TO REMAIN.
F.E.
UP
3. NEW VFDS FURNISHED BY MECHANICAL CONTRACTOR,
INSTALLED BY ELECTRICAL CONTRACTOR NEXT TO
MOTOR CONTROL CENTER.
4. EXISTING GE EVOLUTION SERIES 9000 MOTOR CONTROL
CENTER TO REMAIN. REFER TO DETAIL 3/E601 FOR MORE
INFORMATION.
1 02
GENERATOR RM.
102 F.D.
C T- 4 ct-1: 12' x 18'-see mech
F.D. EXISTING COOLING TOWER
TO REMAIN
C T- 1
(N EW )
F.E. CT-1
F.E.C
C T- 2
E.W.
F.D.
UP
1 01
E.W.
F.D.
UP
1 0
CHILLER RM.
F.D.
P-11
F.E.C
P-10
F.D.
DN
DRAWN
APPROVED
A/E's PROJ NO
R
BLDG. 65 - FIRST FLOOR POWER PLAN
1/8" = 1'-0" 14755 PRESTON ROAD, SUITE 845
DALLAS, TX 75254
972.239.6100 FAX: 972.239.6102
www.imegcorp.com
PROJECT # 20000109.01
TBPE# F-18632
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.
REFERENCE SCALE IN INCHES
1 2 3
DATE
04/07/2021
STATUS
SHEET NO.
SHEET 120
65-E101
OF 125
MA
SK
17-124
CHP-1
P-6
P-9
1 0 0A
PUMP & CHILLER RM.
F.D. F.D.
WORK RM.
100A
SEAL
P-3 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
Pr oj ec t N um be r
4/ 7/
:1
0:
A M
Pr oj ec t N am e on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot 6" on e an d on e ha lf fo ot
6" in ch es o ne
D R
AW
IN
G T
IT
LE EL
EC
TR
IC
A
L
- B
LD
G
. 6
FI
R
ST
FL
O O
R P
O W
ER
P
LA
N
VA
P
R O
JE
C
T N
U M
BE
R
3-
-1
PR
O
JE
C
T
TI
TL
E
R
EP
LA
C
E H
VA
C
S
YS
TE
M
S C
AM
PU
S W
ID
E
- R O
SE
BU
R G
D ep ar tm en t o f Ve te ra ns A ffa irs
9M ed ic al
C en te r
N
W G
AR
D
EN
V
AL
LE
Y
BL
VD
R O
SE
BU
R G
, O R
EN
G
IN
EE
R
IN
G
P R
O
JE
C
TS
VA
M
C M
AI
N
O
FF
IC
E
(5
) 4
-7
FA
X (5
) 4
-7
R
EV
D
AT
E w w w .b an cr of t-a e.
co m w w w
.b an cr of t-a e.
co m
VA
C
O N
TR
AC
T N
O : 3
6C
8D
N ic ho la s Bl vd . S ui te
El k
G ro ve V illa ge
, I L
T:
7.
2.
N O HT
VFD CHP-1
20HP FOR
NEW PUMP
RECORD DRAWINGS
VFD WITH DISCONNECT
VFD WITH DISCONNECT
VFD
P-9
VFD
P-6
VFD
P-3