B65 Chiller Rooms Electrical Floor Plan.pdf

PDF 270 KB Posted

Attached to
Y1DA--CON NRM 653-25-101 Replace Bldg 65 Chillers Federal contract opportunity
Solicitation number
36C26025R0025
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This document is an electrical floor plan drawing for Building 65 at the Roseburg VA Medical Center, showing the first floor power plan for HVAC systems replacement. The drawing details the HVAC circuiting schedule, including specific circuit breaker specifications, branch conductor information, and disconnect switch details for various equipment such as pumps (P-3, P-6, P-9, P-11) and chillers (CHP-1). Key notes indicate that new Variable Frequency Drives (VFDs) will be furnished by the mechanical contractor and installed by the electrical contractor next to the existing motor control center. The existing cooling tower and GE Evolution Series 9000 motor control center are to remain in place. The project is part of a campus-wide HVAC system replacement for the Department of Veterans Affairs, with the contract number 36C26018D0044, and was drawn by IMEG Corp with a project number of 20000109.01.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT DESIGNATION

CT-1 FAN #1 (25HP)

CT-1 FAN #2 (15HP)

CT-1 HEATER

CT-1 SPRAY PUMP

CT-1 VIBRATION SWITCH

CT-1 HEAT TRACE

CHILLER CONTROLS

P-3

P-6

P-9

CHP-1

P-10

P-11

VOLTAGE

3P/480V

3P/480V

3P/480V

3P/480V

1P/120V

1P/120V

1P/120V

3P/480V

3P/480V

3P/480V

3P/480V

3P/480V

3P/480V

CIRCUIT

MCC-2

NOTE #8

NOTE #5

NOTE #6

XCP-16

XCP-18

XCP-14

NOTE #2

NOTE #2

NOTE #2

NOTE #3

NOTE #3

NOTE #3

HVAC CIRCUITING SCHEDULE

BREAKER

60A/3P

40A/3P

25A/3P

25A/3P

20A/1P

20A/1P

20A/1P

70A/3P

70A/3P

70A/3P

60A/3P

20A/3P

20A/3P

BRANCH COND.

(3)#6,#10G-1"C

(3)#8,#10G-1"C

(3)#10#10G-3/'4"C

(3)#10#10G-3/'4"C

(2)#12,#12G-3/4"C

(2)#12,#12G-3/4"C

(2)#12,#12G-3/4"C

(3)#4,#8G-1"C

(3)#4,#8G-1"C

(3)#4,#8G-1"C

(3)#10,#10G-3/4"C

(3)#12,#12G-3/4"C

(3)#12,#12G-3/4"C

DISCONNECT NOTES

3P/100AS/NF/NEMA 3R

3P/60AS/NF/NEMA 3R

3P/30AS/NF/NEMA3R

3P/30AS/NF/NEMA3R

1P/30AS/N/NEMA 3R

1P/30AS/N/NEMA 3R

N/A

1,7

1,7

1,7

1,7

1,7

1,7

3P/70AS/NF/NEMA 1/NEMA 3

3P/60AS/NF

3P/30AS/NF

3P/30AS/NF

1,2

1,2

1,2

1,3

1,4

1,4

NOTES:

1. REFER TO SHEET 65-E-101 FOR PANEL LOCATION.

2. FURNISH AND INSTALL NEW 70A/3P BREAKER IN SPACE MADE AVAILABLE BY DEMOLITION OF EXISTING CIRCUIT BREAKER SERVING PUMP TO BE DEMOLISHED.

3. FURNISH AND INSTALL NEW 60A/3P OVER CURRENT PROTECTION DEVICE IN EXISTING MOTOR CONTROL CENTER IN SPACE MADE AVAILABLE THRU DEMOLITION OF EXISTING PUMP. REFER TO

NOTE BY SYMBOL #4 SHEET 65-E101 FOR MORE INFORMATION.

4. FURNISH AND INSTALL NEW 20A/3P OVER CURRENT PROTECTION DEVICE IN EXISTING SPARE IN EXISTING MOTOR CONTROL CENTER. REFER TO NOTE BY SYMBOL

#4 SHEET 65-E101 FOR MORE INFORMATION.

5. FURNISH AND INSTALL NEW 3P/25A BREAKER (MATCH EXSITING) IN AVAILABLE SPACE IN PANEL MCC.

6. FURNISH AND INSTALL NEW 3P/25A BREAKER (MATCH EXISTING) IN AVAILABLE SPACE IN PANEL MCC.

7. DISCONNECT SWITCHES TO BE MOUNTED ON COOLING TOWER. COORDINATE DISCONNECT LOCATION WITH EQUIPMENT PROVIDER.

STORAGE

GENERAL NOTES:

1. MECHANICAL EQUIPMENT SHOWN FOR COORDINATION

ONLY. REFER TO MECHANICAL PLANS FOR EXACT

LOCATION OF ALL EQUIPMENT.

2. REFER TO DUCT DUCT IONIZATION SMOKE DETECTOR

NOTE SHEET E000 FOR ADDITIONAL REQUIREMENTS.

NOTES BY SYMBOL " # "

1. EXISTING PANEL 'MCC' TO REMAIN.

2. EXISTING PANEL 'XCP' TO REMAIN.

F.E.

UP

3. NEW VFDS FURNISHED BY MECHANICAL CONTRACTOR,

INSTALLED BY ELECTRICAL CONTRACTOR NEXT TO

MOTOR CONTROL CENTER.

4. EXISTING GE EVOLUTION SERIES 9000 MOTOR CONTROL

CENTER TO REMAIN. REFER TO DETAIL 3/E601 FOR MORE

INFORMATION.

1 02

GENERATOR RM.

102 F.D.

C T- 4 ct-1: 12' x 18'-see mech

F.D. EXISTING COOLING TOWER

TO REMAIN

C T- 1

(N EW )

F.E. CT-1

F.E.C

C T- 2

E.W.

F.D.

UP

1 01

E.W.

F.D.

UP

1 0

CHILLER RM.

F.D.

P-11

F.E.C

P-10

F.D.

DN

DRAWN

APPROVED

A/E's PROJ NO

R

BLDG. 65 - FIRST FLOOR POWER PLAN

1/8" = 1'-0" 14755 PRESTON ROAD, SUITE 845

DALLAS, TX 75254

972.239.6100 FAX: 972.239.6102

www.imegcorp.com

PROJECT # 20000109.01

TBPE# F-18632

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

REFERENCE SCALE IN INCHES

1 2 3

DATE

04/07/2021

STATUS

SHEET NO.

SHEET 120

65-E101

OF 125

MA

SK

17-124

CHP-1

P-6

P-9

1 0 0A

PUMP & CHILLER RM.

F.D. F.D.

WORK RM.

100A

SEAL

P-3 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot

Pr oj ec t N um be r

4/ 7/

:1

0:

A M

Pr oj ec t N am e on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6" on e in ch o ne fo ot 6" on e an d on e ha lf fo ot

6" in ch es o ne

D R

AW

IN

G T

IT

LE EL

EC

TR

IC

A

L

- B

LD

G

. 6

FI

R

ST

FL

O O

R P

O W

ER

P

LA

N

VA

P

R O

JE

C

T N

U M

BE

R

3-

-1

PR

O

JE

C

T

TI

TL

E

R

EP

LA

C

E H

VA

C

S

YS

TE

M

S C

AM

PU

S W

ID

E

- R O

SE

BU

R G

D ep ar tm en t o f Ve te ra ns A ffa irs

9M ed ic al

C en te r

N

W G

AR

D

EN

V

AL

LE

Y

BL

VD

R O

SE

BU

R G

, O R

EN

G

IN

EE

R

IN

G

P R

O

JE

C

TS

VA

M

C M

AI

N

O

FF

IC

E

(5

) 4

-7

FA

X (5

) 4

-7

R

EV

D

AT

E w w w .b an cr of t-a e.

co m w w w

.b an cr of t-a e.

co m

VA

C

O N

TR

AC

T N

O : 3

6C

8D

N ic ho la s Bl vd . S ui te

El k

G ro ve V illa ge

, I L

T:

7.

2.

N O HT

VFD CHP-1

20HP FOR

NEW PUMP

RECORD DRAWINGS

VFD WITH DISCONNECT

VFD WITH DISCONNECT

VFD

P-9

VFD

P-6

VFD

P-3

File details come from the government source that posted it. Updated .