B65 Chillers Mechanical Plan.pdf
PDF 348 KB Posted
- Attached to
- Y1DA--CON NRM 653-25-101 Replace Bldg 65 Chillers Federal contract opportunity
- Solicitation number
- 36C26025R0025
About this file
This document is a mechanical engineering piping plan drawing for Building 65 at the Roseburg VA Medical Center, part of a campus-wide HVAC system replacement project. The detailed plan shows a first-floor piping layout with multiple technical specifications, including connections for chilled water and condenser water systems, new pump installations, and control panel replacements. Key technical details include:
Specific technical notes outline requirements such as connecting 8" and 10" carbon steel (CS) and chrome (CR) pipes, replacing chiller control panels with new Trane AdaptiView panels, installing a new 24" Onicon flow meter, and routing makeup water and drain lines. The plan includes modifications to existing cooling towers (CT-3, CT-4) and chillers, with provisions for heat tracing outdoor piping, revising piping drops to accommodate new larger pumps, and integrating new equipment with existing Johnson Controls (JCI) control systems. The project is for the Department of Veterans Affairs at the Roseburg, Oregon medical center, with the drawing prepared by IMEG Corporation and dated October 9, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B65 Generator Addition Mechanical Plan.pdf | ||
| B65 Generator Addition Electrical One-Line.pdf | ||
| B65 Electrical Study Table 3.1 - Protective Device Evaluation - 2015.pdf | ||
| B65 Electrical Study One-Line - 2015.pdf | ||
| B65 Chiller Rooms Electrical Floor Plan.pdf | ||
| RFI for Building 65 Replace Chillers at Roseburg COR and Contracting Responses.pdf | ||
| 36C26025R0025 0002.docx | DOCX document | |
| B65 Generator Addition Electrical Plan.pdf | ||
| 653-25-101 - 100 Pecent Specifications-Full Set R3.pdf | ||
| 36C26025R0025 0001.docx | DOCX document | |
| 653-25-101 Chiller Bldg 65 Sign-In Sheet.pdf | ||
| 653-25-101 - 100P Drawings -Full Set.pdf | ||
| CON SOW - 653-25-101 _ Remodel Bldg 65 to Replace Chillers_12.pdf | ||
| Wage Determination Douglas County January 3 2025.pdf | ||
| 36C26025R0025_2.docx | DOCX document | |
| 653-25-101 100 Specifications Full Set R2.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
1. DRAWINGS PREPARED FROM EXISTING PLANS
AND FIELD OBSERVATION. NOT ALL PIPING,
FITTINGS, EQUIPMENT ETC MAY BE SHOWN.
CONTRACTOR SHALL FIELD VERIFY
CONDITIONS.
DIESEL
TANKS
2. REFER TO ARCHITECTURAL PLANS FOR DETAIL
ON COOLING TOWER SUPPORT FOUNDATION.
3. ALSO REFER TO CHILLED WATER (M803) AND
CONDENSER WATER (M801) FLOW DIAGRAMS
FOR ADDITIONAL INFORMATION ON PIPING
CONNECTIONS.
KEYNOTES:STORAGE
1 03
1. CONNECT 8"CS AND CR TO NEW 10"CS AND CR.
2. NEW 10" CS&CR CONNECTIONS TO EXISTING
10"CS&CR SERVING CT-4.
3. 6" CONNECTIONS TO MAIN CHILLED WATER
RETURN FROM HEAT EXCHANGER.
4. 6" CONNECTIONS TO CONDENSER WATER
HEADER FROM HEAT EXCHANGER.
5.
UP
CONDENSER WATER PIPING LOCATED AT
ELEVATED HEIGHT. BOP AT APPROXIMATELY
8-2" TO MATCH EXISTING CONDENSER WATER
PIPING HEIGHT WITHIN CHILLER ROOM.
SUPPORT OUTDOOR PIPING ON STRUCTURAL
STANDS.
6. REPLACE EXISTING CHILLER CONTROL PANEL
WITH NEW TRANE ADAPTIVIEW PANELS AND
CONNECT TO EXISTING JCI CONTROL SYSTEM.
PROVIDE OUTPUT OPTION FOR HEAD
PRESSURE CONTROL AND CONTROL OF
THREE-WAY VALVE ON CONDENSER PIPING.
7.
1 02
NEW PUMPS ARE DIMENSIONALLY LARGER
THAN EXISTING INLINE PUMPS. REVISE PIPING
DROPS AS REQUIRED TO ACCOMMODATE
CONNECTIONS FOR NEW PUMPS.
GENERATOR RM.
8. 1-1/2" CHILLED WATER MAKEUP CONNECTION
FROM EXISTING MAKEUP LINE INSIDE
MECHANICAL ROOM TO NEW TOWER. HEAT
TRACE OUTDOOR PORTION OF MAKEUP
WATER LINE. ROUTE 2" DRAIN AND 3"
OVERFLOW DRAIN FROM TOWER BASIN TO
AREA DRAIN.
C T- 4
CT-3
CT-4
C T- 1
(N EW )
1 NPW
AD
NPW
10"CR
10"CS
C T- 3
10"CS
4 10"CR AD
8"CS
UP
CWP-1
ET
CH-4
P-3
UPCHILLER RM.
101 DECOUPLER
CHP-1
P-6
P-9 P-7
P-11 6"CWR
HE-1 8"CWS
P-10
6"CWS
DN
8"CWS
6"CWR
VFD P-9 VFD P-6 VFD P-3
SEAL
FD
1 0 0A
PUMP & CHILLER RM.
P-8
FD
FD P-4 FD P-1
P-5
8"CWR
WORK RM.
100A
P-2
FD
8"CWR
8"CWS
FD
7 6
CH-3
CH-2
CH-1
AIR SEPARATOR
NPW
EF-4
NC
8"CWS
EF
NPW
ET
8"CR
CT-1
R
BLDG. 65- FIRST FLOOR, PIPING PLAN
1/8" = 1'-0" DRAWN
APPROVED
A/E's PROJ NO
DATE
14755 PRESTON ROAD, SUITE 845
DALLAS, TX 75254
972.239.6100 FAX: 972.239.6102
www.imegcorp.com
PROJECT # 20000109.01
TBPE# F-18632
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.
REFERENCE SCALE IN INCHES
1 2 3
SHEET
10/09/2020
STATUS
SHEET NO.
65-M101
WADE R.
PAUL L.
17-124 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
Pr oj ec t N um be r
/7
/2
3:
:2
PM
P ro je ct
N am e on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot 6" on e an d on e ha lf fo ot
6" in ch es o ne
"C
S
N
PW
8" C
W R
6" C
W R6"
C W
S N
PW
N
PW
8" C
R
8" C
S
D R
AW
IN
G T
IT
LE M
EC
H A
N
IC
A L-
B
LD
G . 6
5, F
IR
ST
FL
O
O R
, P
IP
IN
G
P
LA
N
VA
P
R O
JE
C
T N
U M
BE
R
3-
-1
PR
O
JE
C
T
TI
TL
E
R
EP
LA
C
E H
VA
C
S
YS
TE
M
S C
AM
PU
S W
ID
E
- R O
SE
BU
R G
D ep ar tm en t o f Ve te ra ns A ffa irs
9M ed ic al
C en te r
N
W G
AR
D
EN
V
AL
LE
Y
BL
VD
R O
SE
BU
R G
, O R
EN
G
IN
EE
R
IN
G
P R
O
JE
C
TS
VA
M
C M
AI
N
O
FF
IC
E
(5
) 4
-7
FA
X (5
) 4
-7
R
EV
D
AT
E w w w .b an cr of t-a e.
co m w w w
.b an cr of t-a e.
co m
VA
C
O N
TR
AC
T N
O : 3
6C
8D
N ic ho la s Bl vd . S ui te
El k
G ro ve V illa ge
, I L
T:
7.
2.
N O HT
M
IN
M
IN 24
NEW ONICON
FT-3000 FLOW
VFD CHP-1
100% CONSTRUCTION
SET DOCUMENTS for BID-R1
METER
File details come from the government source that posted it. Updated .