B65 Chillers Mechanical Plan.pdf

PDF 348 KB Posted

Attached to
Y1DA--CON NRM 653-25-101 Replace Bldg 65 Chillers Federal contract opportunity
Solicitation number
36C26025R0025
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This document is a mechanical engineering piping plan drawing for Building 65 at the Roseburg VA Medical Center, part of a campus-wide HVAC system replacement project. The detailed plan shows a first-floor piping layout with multiple technical specifications, including connections for chilled water and condenser water systems, new pump installations, and control panel replacements. Key technical details include:

Specific technical notes outline requirements such as connecting 8" and 10" carbon steel (CS) and chrome (CR) pipes, replacing chiller control panels with new Trane AdaptiView panels, installing a new 24" Onicon flow meter, and routing makeup water and drain lines. The plan includes modifications to existing cooling towers (CT-3, CT-4) and chillers, with provisions for heat tracing outdoor piping, revising piping drops to accommodate new larger pumps, and integrating new equipment with existing Johnson Controls (JCI) control systems. The project is for the Department of Veterans Affairs at the Roseburg, Oregon medical center, with the drawing prepared by IMEG Corporation and dated October 9, 2020.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

1. DRAWINGS PREPARED FROM EXISTING PLANS

AND FIELD OBSERVATION. NOT ALL PIPING,

FITTINGS, EQUIPMENT ETC MAY BE SHOWN.

CONTRACTOR SHALL FIELD VERIFY

CONDITIONS.

DIESEL

TANKS

2. REFER TO ARCHITECTURAL PLANS FOR DETAIL

ON COOLING TOWER SUPPORT FOUNDATION.

3. ALSO REFER TO CHILLED WATER (M803) AND

CONDENSER WATER (M801) FLOW DIAGRAMS

FOR ADDITIONAL INFORMATION ON PIPING

CONNECTIONS.

KEYNOTES:STORAGE

1 03

1. CONNECT 8"CS AND CR TO NEW 10"CS AND CR.

2. NEW 10" CS&CR CONNECTIONS TO EXISTING

10"CS&CR SERVING CT-4.

3. 6" CONNECTIONS TO MAIN CHILLED WATER

RETURN FROM HEAT EXCHANGER.

4. 6" CONNECTIONS TO CONDENSER WATER

HEADER FROM HEAT EXCHANGER.

5.

UP

CONDENSER WATER PIPING LOCATED AT

ELEVATED HEIGHT. BOP AT APPROXIMATELY

8-2" TO MATCH EXISTING CONDENSER WATER

PIPING HEIGHT WITHIN CHILLER ROOM.

SUPPORT OUTDOOR PIPING ON STRUCTURAL

STANDS.

6. REPLACE EXISTING CHILLER CONTROL PANEL

WITH NEW TRANE ADAPTIVIEW PANELS AND

CONNECT TO EXISTING JCI CONTROL SYSTEM.

PROVIDE OUTPUT OPTION FOR HEAD

PRESSURE CONTROL AND CONTROL OF

THREE-WAY VALVE ON CONDENSER PIPING.

7.

1 02

NEW PUMPS ARE DIMENSIONALLY LARGER

THAN EXISTING INLINE PUMPS. REVISE PIPING

DROPS AS REQUIRED TO ACCOMMODATE

CONNECTIONS FOR NEW PUMPS.

GENERATOR RM.

8. 1-1/2" CHILLED WATER MAKEUP CONNECTION

FROM EXISTING MAKEUP LINE INSIDE

MECHANICAL ROOM TO NEW TOWER. HEAT

TRACE OUTDOOR PORTION OF MAKEUP

WATER LINE. ROUTE 2" DRAIN AND 3"

OVERFLOW DRAIN FROM TOWER BASIN TO

AREA DRAIN.

C T- 4

CT-3

CT-4

C T- 1

(N EW )

1 NPW

AD

NPW

10"CR

10"CS

C T- 3

10"CS

4 10"CR AD

8"CS

UP

CWP-1

ET

CH-4

P-3

UPCHILLER RM.

101 DECOUPLER

CHP-1

P-6

P-9 P-7

P-11 6"CWR

HE-1 8"CWS

P-10

6"CWS

DN

8"CWS

6"CWR

VFD P-9 VFD P-6 VFD P-3

SEAL

FD

1 0 0A

PUMP & CHILLER RM.

P-8

FD

FD P-4 FD P-1

P-5

8"CWR

WORK RM.

100A

P-2

FD

8"CWR

8"CWS

FD

7 6

CH-3

CH-2

CH-1

AIR SEPARATOR

NPW

EF-4

NC

8"CWS

EF

NPW

ET

8"CR

CT-1

R

BLDG. 65- FIRST FLOOR, PIPING PLAN

1/8" = 1'-0" DRAWN

APPROVED

A/E's PROJ NO

DATE

14755 PRESTON ROAD, SUITE 845

DALLAS, TX 75254

972.239.6100 FAX: 972.239.6102

www.imegcorp.com

PROJECT # 20000109.01

TBPE# F-18632

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

REFERENCE SCALE IN INCHES

1 2 3

SHEET

10/09/2020

STATUS

SHEET NO.

65-M101

WADE R.

PAUL L.

17-124 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot

Pr oj ec t N um be r

/7

/2

3:

:2

PM

P ro je ct

N am e on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6" on e in ch o ne fo ot 6" on e an d on e ha lf fo ot

6" in ch es o ne

"C

S

N

PW

8" C

W R

6" C

W R6"

C W

S N

PW

N

PW

8" C

R

8" C

S

D R

AW

IN

G T

IT

LE M

EC

H A

N

IC

A L-

B

LD

G . 6

5, F

IR

ST

FL

O

O R

, P

IP

IN

G

P

LA

N

VA

P

R O

JE

C

T N

U M

BE

R

3-

-1

PR

O

JE

C

T

TI

TL

E

R

EP

LA

C

E H

VA

C

S

YS

TE

M

S C

AM

PU

S W

ID

E

- R O

SE

BU

R G

D ep ar tm en t o f Ve te ra ns A ffa irs

9M ed ic al

C en te r

N

W G

AR

D

EN

V

AL

LE

Y

BL

VD

R O

SE

BU

R G

, O R

EN

G

IN

EE

R

IN

G

P R

O

JE

C

TS

VA

M

C M

AI

N

O

FF

IC

E

(5

) 4

-7

FA

X (5

) 4

-7

R

EV

D

AT

E w w w .b an cr of t-a e.

co m w w w

.b an cr of t-a e.

co m

VA

C

O N

TR

AC

T N

O : 3

6C

8D

N ic ho la s Bl vd . S ui te

El k

G ro ve V illa ge

, I L

T:

7.

2.

N O HT

M

IN

M

IN 24

NEW ONICON

FT-3000 FLOW

VFD CHP-1

100% CONSTRUCTION

SET DOCUMENTS for BID-R1

METER

File details come from the government source that posted it. Updated .