This is Amendment 0003 to Solicitation 36C25926R0047 for the Miles City VA Campus Demolition project, issued by the Department of Veterans Affairs Network Contracting Office on May 27, 2026. The amendment provides clarification regarding Question 55b concerning the scope of work for footings, foundations, piers, and pilings at the facility.

The key modification clarifies the pile removal requirements in the Statement of Work. The original response indicated that pile removal is excluded unless piles are one foot above existing basement soil elevations. The revised clarification specifies that pile removal is excluded unless piles are above one foot below grade, in which case they shall be demolished to one foot below grade. Contractors are directed to reference as-built drawings for known pile locations and to confirm whether Building 1 contains driven piles and deep foundations. All offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation by completing the required items, acknowledging receipt on each offer copy, or submitting separate written communication that references both the solicitation and amendment numbers.

View the file

Other files

File Type Posted
UCS_Asbestos_Bulk_Results_Bldg_1_Miles_City.pdf PDF
36C25926R0047 0002.docx DOCX document
Miles City VA Asbestos Abatement Final Drawings - May 2013 - Volume 1 of 2.pdf PDF
Miles City Asbestos Inspection Report Addendum 4-20-13.pdf PDF
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf PDF
Section 01 33 23 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf PDF
Veterans Hospital_Part2.pdf PDF
Veterans Hospital_Part4.pdf PDF
Veterans Hospital_Part6.pdf PDF
Veterans Hospital_Part10.pdf PDF
Veterans Hospital_Part13.pdf PDF
Veterans Hospital_Part18.pdf PDF
S04 436-24-105 Miles City VA Campus Demolition Site Visit Attendance.pdf PDF
10_436GJ_20_TT110_BUILDING 20 FLOOR PLANS.pdf PDF
0_436GJ_1_TT100_COVER SHEET.pdf PDF
Veterans Hospital_Part1.pdf PDF
Veterans Hospital_Part3.pdf PDF
Veterans Hospital_Part12.pdf PDF
Veterans Hospital_Part14.pdf PDF
Well Information.pdf PDF
12_436GJ_1_TT112_NURSING HOME FLOOR PLANS.pdf PDF
11_436GJ_OPC_TT111_FLOOR PLAN BUILDING OPC - 1ST FLOOR.pdf PDF
7_436GJ_8_TT107_FLOOR PLANS BUILDING 8.pdf PDF
4_436GJ_1_TT104_FLOOR PLAN BUILDING 1 3RD FLOOR.pdf PDF
3_436GJ_1_TT103_SECOND FLOOR PLAN.pdf PDF
2_436GJ_1_TT102_BUILDING 1 CABLE PLANT INFRASTRUCTURE.pdf PDF
Veterans Hospital_Part5.pdf PDF
Veterans Hospital_Part15.pdf PDF
Veterans Hospital_Part16.pdf PDF
Veterans Hospital_Part17.pdf PDF
S04 - 436-24-105 Miles City VA Campus Demolition Site Visit Meeting Doc.pdf PDF
S22- 852.219-75 LOS Certification.pdf PDF
13_436GJ_TT113_SITE PLAN.pdf PDF
9_436GJ_10_TT109_BOILER PLANT FLOOR PLANS.pdf PDF
6_436GJ_3_TT106_FLOOR PLAN BUILDING 3 - 1ST FLOOR.pdf PDF
5_436GJ_1_TT105_FLOOR PLAN BUILDING 1 - 4TH FLOOR.pdf PDF
1_436GJ_1_TT101_MILES CITY MONTANA SYMBOLS LEGEND AND GENERAL NOTES.pdf PDF
36C25926R0047 0001.pdf PDF
436-1948 MILES CITY MISC HVAC AND UTLITIES.pdf PDF
Veterans Hospital_Part7.pdf PDF
Veterans Hospital_Part8.pdf PDF
Veterans Hospital_Part9.pdf PDF
Veterans Hospital_Part11.pdf PDF
14190 Final Report - Reduced.pdf PDF
436-24-105 Miles City Campus Demolition -SPECS.pdf PDF
436-24-105 Miles City Campus Demolition - APPENDIX A.pdf PDF
S22- 852.219-75 LOS Certification.docx DOCX document
36C25926R0047.docx DOCX document
Miles City VA Phase 2 ESA Report -Final 122719.pdf PDF
SCA Wage Determination 15-5395 12-03-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25926R0047 0003

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-27-2026 436-24-105 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25926R0047 03-31-2026

X X X

Please see Page 2

The purpose of this amendment is to provide a clarification for question 55b regarding footings/foundations/piers/pilings.

Question 55b is changed from:

1. The Statement of Work indicates that foundations are to be demolished to one foot below grade “except for piles.” Please confirm:

0. Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings.

0. Is pile removal explicitly excluded from the scope of work? Yes, unless they are one foot above existing basement soil elevations.

0. If pile removal is excluded, please identify known locations. Refer to the as-built drawings.

To:

55. The Statement of Work indicates that foundations are to be demolished to one foot below grade “except for piles.” Please confirm:

0. Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings.

0. Is pile removal explicitly excluded from the scope of work? Yes, unless they are above one foot below grade. If above one foot below grade piles shall be demolished to be one foot below grade.

0. If pile removal is excluded, please identify known locations. Refer to the as-built drawings.