This is Amendment 0003 to Solicitation 36C25926R0047 for the Miles City VA Campus Demolition project, issued by the Department of Veterans Affairs Network Contracting Office on May 27, 2026. The amendment provides clarification regarding Question 55b concerning the scope of work for footings, foundations, piers, and pilings at the facility.
The key modification clarifies the pile removal requirements in the Statement of Work. The original response indicated that pile removal is excluded unless piles are one foot above existing basement soil elevations. The revised clarification specifies that pile removal is excluded unless piles are above one foot below grade, in which case they shall be demolished to one foot below grade. Contractors are directed to reference as-built drawings for known pile locations and to confirm whether Building 1 contains driven piles and deep foundations. All offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation by completing the required items, acknowledging receipt on each offer copy, or submitting separate written communication that references both the solicitation and amendment numbers.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25926R0047 0003
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-27-2026 436-24-105 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25926R0047 03-31-2026
X X X
Please see Page 2
The purpose of this amendment is to provide a clarification for question 55b regarding footings/foundations/piers/pilings.
Question 55b is changed from:
1. The Statement of Work indicates that foundations are to be demolished to one foot below grade “except for piles.” Please confirm:
0. Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings.
0. Is pile removal explicitly excluded from the scope of work? Yes, unless they are one foot above existing basement soil elevations.
0. If pile removal is excluded, please identify known locations. Refer to the as-built drawings.
To:
55. The Statement of Work indicates that foundations are to be demolished to one foot below grade “except for piles.” Please confirm:
0. Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings.
0. Is pile removal explicitly excluded from the scope of work? Yes, unless they are above one foot below grade. If above one foot below grade piles shall be demolished to be one foot below grade.
0. If pile removal is excluded, please identify known locations. Refer to the as-built drawings.