This is a Questions and Answers (Q&A) document for a Department of Veterans Affairs contract opportunity (Solicitation Number 36C25926Q0166) to install humidification monitoring and control systems for a pharmacy cache at a VHA facility. The project is managed by the Rocky Mountain Acquisition Center in Greenwood Village, Colorado.
The Q&A document addresses eight key inquiries from potential contractors regarding project specifications and site conditions. The facility uses a JCI Metasys Building Automation System (BAS), with Will Goodwin from JCI Sales identified as the point of contact. The project requires installation of steam piping and duct insulation per specifications, a new 120 VAC equipment circuit from electrical panel EQLP1 in room KP-105, new control wiring (not reuse of existing wiring), and detailed controls design work including sensors and actuators. Division 26 and Division 23 specifications are referenced for mechanical and control wiring requirements respectively. Control wiring diagrams and input/output point details are specified in Drawing 10.MH.104, Detail 3 (Jacketed Steam Humidifier Controls), with detailed design to be provided by the controls subcontractor. Six site photographs are included showing the work area from various angles (northwest, east, north, and northeast facing views) to assist contractors in assessing site conditions.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS VHA Network Contracting Office 19 Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300 Greenwood Village, CO 80111
CONTRACTOR Q&A’s
Project # 554-26-102
Install Humidification Monitoring and Control for Pharmacy Cache
Q&A No. 1: What is the BAS system used at the VA?
Answer No. 1: JCI Metasys
Q&A No. 2: Can the facility provide a point of contact for the current BAS contractor?
Answer No. 2: Will Goodwin, JCI Sales, will.goodwin@jci.com, 303-328-8736
Q&A No. 3: Is there any insulation expected in this project?
Answer No. 3: Yes, insulation is required on the steam piping and the ducting per the specifications.
Q&A No. 4: Are there any pictures of the site to confirm site conditions?
Answer No. 4: See six pictures below.
Q&A No. 5: Will electrical be needed? If so, please provide electrical drawings.
Answer No. 5: Yes, a 120 VAC equipment circuit will need to be provided to a new control panel from electrical panel EQLP1 in room KP-105 which has several installed spare 20A breakers. Control panel will then provide control power to sensors and actuators. See attached as-built electrical drawings.
Q&A No. 6: Please provide Division 26 specifications.
Answer No. 6: See attached specifications.
Q&A No. 7: Will new control wiring be needed or will be reusing exiting control wiring? If so, please provide division 23 specifications that covers control wiring.
Answer No. 7: New control wiring will be required. See attached specifications.
Q&A No. 8: Please provide control wiring diagrams/drawings and number of IO/DO points if needed
Answer No. 8: See detail 3, Jacketed Steam Humidifier Controls, on Drawing 10.MH.104. Detailed design to be provided by controls subcontractor.
Pictures of Work Area:
Figure 1: Facing NW
Figure 2: Facing ENE
Figure 3: Facing East
Figure 4: Facing East
Figure 5: Facing North
Figure 6: Facing NE image3.jpeg image4.jpeg image5.jpeg image6.jpeg image1.jpeg image2.jpeg