S06 - Drawing - 05-ES-404.pdf
PDF 461 KB Posted
- Solicitation number
- 36C25926Q0166
About this file
This is a Penthouse Level Power Plan (Drawing 05.ES.404) for the Replacement Medical Center Facility at the Eastern Colorado Health Care System in Aurora, Colorado. The drawing is dated August 31, 2012, and prepared by the Office of Construction and Facilities Management with architectural and engineering support from H+L Architecture, Skidmore, Owings & Merrill LLP, Cator, Ruma & Associates, and S.A. Miro, Inc.
The plan specifies electrical installation requirements for the penthouse level of the Inpatient Building (North), including detailed flag notes for various systems. Key requirements include: installation of a 120V circuit for lighting and receptacle within an air handling unit with coordinated rough-in location; location of elevator equipment disconnect within 18 inches of the elevator machine room door latch; provision of 2#10 wire in 3/4-inch conduit from elevator controller to associated automatic transfer switch for pre-transfer signal relay; installation of a 120V, 20-amp, single-pole enclosed circuit breaker for elevator cab lights, receptacle, and ventilation system; VFD and disconnect installation using Unistrut rack with floor-to-ceiling supports maintaining three-foot working clearance per NEC requirements; 120V connections for low-voltage power actuated dampers and VAV transformers with field coordination; NEMA L15-30P installation at the parapet; 277V connection to snow melt control panel with specified conduit requirements; and 120V connections to electric actuators controlling smoke damper operation. The plan includes detailed equipment layouts with numerous mechanical and electrical systems identified by reference designations and coordinates requiring field coordination among multiple contractors.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLAG NOTES:
120V CIRCUIT FOR LIGHTING/RECEPTACLE WITHIN AIR
HANDLING UNIT. COORDINATE EXACT ROUGH-IN LOCATION
WITH EQUIPMENT FURNISHED.
LOCATE ELEVATOR EQUIPMENT DISCONNECT WITHIN 18” OF
LATCH SIDE OF ELEVATOR MACHINE ROOM
DOOR. PROVIDE 2#10 IN 3/4” CONDUIT FROM ELEVATOR
CONTROLLER TO ASSOCIATED ATS SERVING THE
ELEVATOR FOR THE PRE-TRANSFER SIGNAL RELAY.
PROVIDE A 120V, 20A1P ENCLOSED CIRCUIT BREAKER
CAPABLE OF BEING LOCKED IN THE OPEN POSITION FOR
THE BRANCH CIRCUIT SUPPLYING THE ELEVATOR CAB
LIGHTS, RECEPTACLE, AND VENTILATION SYSTEM.
INSTALL VFD/DISCONNECT USING UNISTRUT RACK WITH
SUPPORTS FROM FLOOR TO STRUCTURAL CEILING.
INSTALL MAINTAINING 3 FOOT WORKING CLEARANCE AS
REQUIRED BY THE NEC.
120V CONNECTION FOR LOW VOLTAGE POWER ACTUATED
DAMPER.
VFD PROVIDED BY MANUFACTURER.
120V CONNECTION FOR VAV LOW VOLTAGE TRANSFORMER.
FIELD COORDINATED EXACT LOCATION WITH MECHANICAL
CONTROLS CONTRACTOR PRIOR TO ROUGH-IN.
NEMA L15-30P INSTALLED AT PARAPET. REFER TO
MOUNTING DETAIL ON TRACTEL SHOP DRAWINGS FOR
INSTALLATION REQUIREMENTS.
277V CONNECTION TO SNOW MELT CONTROL PANEL.
PROVIDE (2-#10;1-#10 GND) IN 3/4" CONDUIT TO CIRCUIT
NOTED. COORDINATE EXACT LOCATION OF CONTROLLER
WITH MECHANICAL CONTRACTOR. PROVIDE CONDUIT
FROM CONTROLLER TO SNOW MELT MAT AS REQUIRED BY
THE MANUFACTURER.
PROVIDE 120V CONNECTION TO ELECTRIC ACTUATOR(S)
CONTROLLING OPERATION OF SMOKE DAMPER.
DN
UP
UP
DN
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
J
J
R1
R1
R2
R2
RE
RE
RF
RF
RG
RG
RH
RH
RJ
RJ
RC
RC
RB
RB
RA
RA
RD
RD
K
K
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
J
J
K
K
R1
R1
R2
R2
RJ
RJ
RH
RH
RG
RG
RF
RF
RE
RE
RD
RD
RC
RC
RB
RB
RA
RA
T30
T225
T225
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
JJ
JJ
J J
J
J
J
JJ
J
J
J
J
J
J
J
J
JJ
J
J
REFER TO "PENTHOUSE LEVEL
ENLARGED POWER PLAN", DRAWING
05.ES.414, FOR EQUIPMENT LAYOUT
THIS AREA
SUPPLY RETURN
SUPPLY RETURN
RETURNSUPPLY
TO
ELEVATOR
CONTROLLER
ELEVATOR
CAB
FAN/LIGHTING/
CONTROLS
ELEVATOR
CONTROLLER
ELEVATOR
CAB
FAN/LIGHTING/
CONTROLS
+54"
+54"
+54"
+54"
+54"
+54"+54"
+54"
+54"
+54"
+54"
+54"
+54"
+54"
+54"
05 - HWP 1
05 - HWP 2
05 - GWP 1
05 - GWP 2
05 - GPP 1
05 - GPP 2
05 - GCFP- 1
05 - AHU 3
05 - AHU 5
05 - AHU 6
05 - AHU 1
05 - AHU 2
WP
+48"
WP
+48"
WP
+48"
WP
+48"
WP
+48"
WP
+48"
05 - AHU 4
6 6
WP
+48"
+54"
+54"
WP
+48"
SUPPLYRETURN
WP
+48"
+54"
WP
+48"
WP
+48"
(TYP)
05-EQLP1-1
05-EQLP1-1
05-EQLP1-1
TRAP
PRIMER
TRAP
PRIMER
TRAP
PRIMER
(PART)
(PART)
(PART)
05 - EF- 01
05 - EF- 02
05 - EF- 03
05 - EF- 04
05 - EF- 06
05 - EF- 07
05 - EF- 05
05 - EF- 08
05 - FCU- 06
05 - FCU- 02
05 - FCU- 03
05 - FCU- 04
05 - FCU- 05
TEMP.
CONTROL
PANEL
05-EQHP1-10 05-EQHP1-11
05-EQHP1-8 05-EQHP1-9
05-EQHP1-6
05-EQHP1-5
05-EQHP2-405-EQHP2-3
05-EQHP2-5
05-EQHP2-6
05 - SE1
05 - SE2
05-EQHP2-7
05-EQHP2-8
05 - PE1 05 - PE2
05-EQHP1-12
05-EQHP1-13
05-EQHP1A-1,3,5
05-EQHP2A-1,3,5
05-EQHP1A-2,4,6
05-EQHP2A-2,4,6
05-EQHP1A-7,9,11
05-EQHP2A-7,9,11
05-EQHP2A-13,15,17
05-EQHP1A-13,15,17
05-EQHP1A-8,10,12
05-EQHP2A-8,10,12
05-EQHP1A-19,21,23
05-EQHP2A-19,21,23
05-EQHP2A-25,27,29
05 - ERU 1
05-EQHP1-14
05-EQHP2A-14,16,18
05-EQHP1A-25,27,29
05-EQHP2A-31,33,35
05-EQHP1A-26,28,30
05-EQHP2A-20,22,24 05-EQHP1A-31,33,35
05 - FCU- 07
05-NLP2-5
05-NLP2-6
05-NLP2-6
(PART)
(PART)
05-NLP1-5
05-NLP2-7
05-NLP2-5
(PART)
(PART)
+54"
05-EQLP1-3
05-EQLP1-4
05-EQLP1-5
05-EQLP1-6
05-EQLP1-7
TO
TO
TO
TO
TO
TO
TO
TO
05-EQLP1-9
05-EQLP1-10
05-EQLP1-11
05-EQLP1-12
05-EQLP1-13
05-EQLP1-14
05-EQLP1-15
05 - FCU-01
05-EQHP1A-20,22,24
05 - HWCP- 1
05 - HWCP- 2
05 - HWCP- 3
05-EQHP1-15
05-EQHP2-11
05-EQHP1-16
05-EQLP1-2
05-EQLP1-25
TO
05-EQLP1-27
05 - GCFP- 2
05-EQLP1-26
05 - EC1
05-EQLP1-28
05-NL31-83,85,87
05-NL31-90,92,94
05-NL32-94,96,98
05-NHP1-7
05-NLP2-8
05-NLP2-9
05-NLP2-10
05-NLP1-9
05-LSL31-19
05-LSL31-21
05-LSL31-25
05-LSL31-23
05-EQLP1-8
05-EQLP1-8
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501
REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C
O N
R
E S
D
A T
I B
S
I B
N
E
N C
C
L C
C
B N
C
B C
C
B S
P
S N
P
V N
P
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e i g h t h i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
H+L Architecture
1755 Blake Street, Suite 400
Denver, CO
80202
Skidmore, Owings & Merrill LLP
224 South Michigan Avenue
Suite 1000
Chicago, IL 60604
Cator, Ruma & Associates
896 Tabor Street
Lakewood, CO 80401
S. A. Miro, Inc.
4582 South Ulster Street
Pkwy.
Suite 300
Denver, CO 80237
Professional Seal
P
M C
U s e r s k a t h l D o c u m e n t s E
S I B
N k m a d s e n F
F R
G r v t
05.ES.404
PENTHOUSE LEVEL POWER PLAN
INPATIENT BUILDING (NORTH)
08/31/2012
1/8" = 1'-0"
PENTHOUSE LEVEL POWER
PLAN
0' 4' 8' 16' 32'
NORTH
CDI No.12 08/31/2012
JSI No. 038 10/26/2012
RFI 2503 09/19/2013
RFI 2504 10/10/2013
RFI 2970 02/12/2014
RFI 3229a 02/24/2014
RFI 4015a 07/29/2014
JSI No. 118 - POSTED SET 03/16/2015
RFI No. 6267 01/28/2015
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .