This is an architectural drawing depicting an enlarged penthouse-level power plan for what appears to be a healthcare facility in Aurora, Colorado. The drawing, dated September 29, 2025, shows the electrical infrastructure and equipment layout at a 1¼-inch-to-1-foot scale and includes as-built conditions for the Eastern Colorado Health Care System project.
The power plan illustrates critical electrical distribution equipment including two 2,500 kVA and 2,000 kVA dry-type transformers (13.2 kV/480/277V, 3-phase, 5.75% impedance), multiple automatic transfer switches (ATS) rated at 800A with bypass/isolation capabilities for standard, life safety, and critical loads, medium-voltage switching equipment, circuit breakers rated at 15 kV, and associated distribution panels. The plan designates nine sections across the penthouse level and shows the arrangement of equipment including meter connections, future equipment locations, fire alarm control panel (FACP), and network access control (NAC) panels. The drawing references consultants and architect/engineers with professional seals and includes detailed flag notes regarding operational specifications and conditions. The document serves as a technical reference for the facility's electrical infrastructure configuration and equipment placement.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T30
T225
T225
T75T150
J
JJ
CBMETER
FUTURE
05-EMDCP
15KV15KV
EQUIPMENT
ATS #1 800A
BIPASS/
ISOLATION
EQUIPMENT
ATS #2 800A
BIPASS/
ISOLATION
LIFE SAFETY
ATS 800A
BIPASS/
ISOLATION
CRITICAL ATS
#1 800A
BIPASS/
ISOLATION
FUTURE ATS
CRITICAL ATS
#1 800A
BIPASS/
ISOLATION
05-EQLP1
Distribution
Panel
05-EQHP1
Distribution Panel
05-EQHP2
FUTURE
05-NDCP
METERCB
15KV15KV
05-LCPP
PV
PV
SEC 1SEC 2SEC 3SEC 4SEC 5SEC 6SEC 7SEC 8SEC 9 SEC 1 SEC 2 SEC 3 SEC 4 SEC 5 SEC 6 SEC 7 SEC 8 SEC 9 SEC 10
2,500KVA
DRY TYPE XFMR
13.2KV/480/277V
3 PHASE
5.75%Z
2,000KVA
DRY TYPE XFMR
13.2KV/480/277V
3 PHASE
5.75%Z
05-CLP105-CLP2
05-EQHP1A05-EQHP2A1
05-LSL31-1105-LSL31-13
05-FACP
NAC PANEL
TEQLP1
TCLP2 TCLP1
TNLP1
TNLP2
05-LSL31-12
(PART)
(PART)
(PART)
(PART)
+54" +54"
+54"+54" +54"
+54"
05-CHP1
05-NHP1
05-NLP2
05-NLP1
05EQLP1-18,20
05-LSL31-27
05-NLP2-13
05-NLP2-13
05-NLP2-13
MV
TRANSFORMERS
KP-105
ELEC
05-PH-C1-E1
MV SWITCHING
KP-107
ELEC
05-PH-D1-E2
PV INVERTER
FLAG NOTES:
PROVIDE A 120V CONNECTION TO THE ATS HMI CABINET. PROVIDE
CONNECTION OF AUTOMATIC TRANSFER SWITCHES TO REMOTE
MONITORING PANEL AND FIBER CONNECTION TO CAMPUS ATS
CONTROL LOOP. REFER TO CAMPUS FIBER LOOP FOR GENERATOR
REMOTE MONITORING PANELS DETAIL FOR ADDITIONAL
REQUIREMENTS. ROUTE FIBER IN 4" CONDUIT FROM CONCOURSE
DUCTBANK TO HMI CABINET SHARING CONCRETE ENCASMENT.WITH
MEDIUM VOLTAGE FEEDER.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e q u a rt e r in c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C O
N
B
R E
S
D
T
D A
T
H
IB
S
K
IB
N
L
E N
C
G
C B
N
E
C B
C
A
C B
S
P E
P
S N
P N
P
V N
P S
P
V S
Q
A S
D
R
F S
H
/2
/2
:1
:2
A M
C U s e rs
\h a u n g \D o c u m e n ts
\E S
-I B
N h a u n g
G
H V
P .r v t
9/29/2025 12:14:27 AM
05.ES.414
ENLARGED PENTHOUSE POWER
PLANS
08/31/2012
1/4" = 1'-0"1
PENTHOUSE LEVEL ENLARGED
POWER PLAN
0' 2' 4' 8' 16'
NORTH
| Sheets |
| 05.ES.400 - SERVICE LEVEL POWER PLAN |
| 05.ES.401-A - ENLARGED LEVEL 1 POWER PLAN - AREA A |
| 05.ES.401-B - ENLARGED LEVEL 1 POWER PLAN - AREA B |
| 05.ES.401-C - ENLARGED LEVEL 1 POWER PLAN - AREA C |
| 05.ES.401.1 - LEVEL 1 INTERSTITIAL POWER PLAN |
| 05.ES.402-A - ENLARGED LEVEL 2 POWER PLAN - AREA A |
| 05.ES.402-B - ENLARGED LEVEL 2 POWER PLAN - AREA B |
| 05.ES.402.1 - LEVEL 2 INTERSTITIAL POWER PLAN |
| 05.ES.403-A - ENLARGED LEVEL 3 POWER PLAN - AREA A |
| 05.ES.403-B - ENLARGED LEVEL 3 POWER PLAN - AREA B |
| 05.ES.403.1 - LEVEL 3 INTERSTITIAL POWER PLAN |
| 05.ES.404 - PENTHOUSE LEVEL POWER PLAN |
| 05.ES.405 - ROOF LEVEL ELECTRICAL/LIGHTNING PROTECTION PLAN |
| 05.ES.410 - ENLARGED SERVICE LEVEL POWER PLAN |
| 05.ES.414 - ENLARGED PENTHOUSE POWER PLANS |
| 05.ES.420 - SERVICE LEVEL FEEDER ROUTING PLAN |
| 05.ES.421 - LEVEL 1 FEEDER ROUTING PLAN |
| 05.ES.421.1 - LEVEL 1 INTERSTITIAL FEEDER ROUTING PLAN |
| 05.ES.422 - LEVEL 2 FEEDER ROUTING PLAN |
| 05.ES.422.1 - LEVEL 2 INTERSTITIAL FEEDER ROUTING PLAN |
| 05.ES.423 - LEVEL 3 FEEDER ROUTING PLAN |
| 05.ES.423.1 - LEVEL 3 INTERSTITIAL FEEDER ROUTING PLAN |
| 05.ES.424 - PENTHOUSE LEVEL FEEDER ROUTING PLAN |