S06 - Drawing - 05.ES.414.pdf

PDF 1 MB Posted

Attached to
Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache
Solicitation number
36C25926Q0166
Issued by

About this file

This is an architectural drawing depicting an enlarged penthouse-level power plan for what appears to be a healthcare facility in Aurora, Colorado. The drawing, dated September 29, 2025, shows the electrical infrastructure and equipment layout at a 1¼-inch-to-1-foot scale and includes as-built conditions for the Eastern Colorado Health Care System project.

The power plan illustrates critical electrical distribution equipment including two 2,500 kVA and 2,000 kVA dry-type transformers (13.2 kV/480/277V, 3-phase, 5.75% impedance), multiple automatic transfer switches (ATS) rated at 800A with bypass/isolation capabilities for standard, life safety, and critical loads, medium-voltage switching equipment, circuit breakers rated at 15 kV, and associated distribution panels. The plan designates nine sections across the penthouse level and shows the arrangement of equipment including meter connections, future equipment locations, fire alarm control panel (FACP), and network access control (NAC) panels. The drawing references consultants and architect/engineers with professional seals and includes detailed flag notes regarding operational specifications and conditions. The document serves as a technical reference for the facility's electrical infrastructure configuration and equipment placement.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T30

T225

T225

T75T150

J

JJ

CBMETER

FUTURE

05-EMDCP

15KV15KV

EQUIPMENT

ATS #1 800A

BIPASS/

ISOLATION

EQUIPMENT

ATS #2 800A

BIPASS/

ISOLATION

LIFE SAFETY

ATS 800A

BIPASS/

ISOLATION

CRITICAL ATS

#1 800A

BIPASS/

ISOLATION

FUTURE ATS

CRITICAL ATS

#1 800A

BIPASS/

ISOLATION

05-EQLP1

Distribution

Panel

05-EQHP1

Distribution Panel

05-EQHP2

FUTURE

05-NDCP

METERCB

15KV15KV

05-LCPP

PV

PV

SEC 1SEC 2SEC 3SEC 4SEC 5SEC 6SEC 7SEC 8SEC 9 SEC 1 SEC 2 SEC 3 SEC 4 SEC 5 SEC 6 SEC 7 SEC 8 SEC 9 SEC 10

2,500KVA

DRY TYPE XFMR

13.2KV/480/277V

3 PHASE

5.75%Z

2,000KVA

DRY TYPE XFMR

13.2KV/480/277V

3 PHASE

5.75%Z

05-CLP105-CLP2

05-EQHP1A05-EQHP2A1

05-LSL31-1105-LSL31-13

05-FACP

NAC PANEL

TEQLP1

TCLP2 TCLP1

TNLP1

TNLP2

05-LSL31-12

(PART)

(PART)

(PART)

(PART)

+54" +54"

+54"+54" +54"

+54"

05-CHP1

05-NHP1

05-NLP2

05-NLP1

05EQLP1-18,20

05-LSL31-27

05-NLP2-13

05-NLP2-13

05-NLP2-13

MV

TRANSFORMERS

KP-105

ELEC

05-PH-C1-E1

MV SWITCHING

KP-107

ELEC

05-PH-D1-E2

PV INVERTER

FLAG NOTES:

PROVIDE A 120V CONNECTION TO THE ATS HMI CABINET. PROVIDE

CONNECTION OF AUTOMATIC TRANSFER SWITCHES TO REMOTE

MONITORING PANEL AND FIBER CONNECTION TO CAMPUS ATS

CONTROL LOOP. REFER TO CAMPUS FIBER LOOP FOR GENERATOR

REMOTE MONITORING PANELS DETAIL FOR ADDITIONAL

REQUIREMENTS. ROUTE FIBER IN 4" CONDUIT FROM CONCOURSE

DUCTBANK TO HMI CABINET SHARING CONCRETE ENCASMENT.WITH

MEDIUM VOLTAGE FEEDER.

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e q u a rt e r in c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

C

C O

N

B

R E

S

D

T

D A

T

H

IB

S

K

IB

N

L

E N

C

G

C B

N

E

C B

C

A

C B

S

P E

P

S N

P N

P

V N

P S

P

V S

Q

A S

D

R

F S

H

/2

/2

:1

:2

A M

C U s e rs

\h a u n g \D o c u m e n ts

\E S

-I B

N h a u n g

G

H V

P .r v t

9/29/2025 12:14:27 AM

05.ES.414

ENLARGED PENTHOUSE POWER

PLANS

08/31/2012

1/4" = 1'-0"1

PENTHOUSE LEVEL ENLARGED

POWER PLAN

0' 2' 4' 8' 16'

NORTH

Sheets
05.ES.400 - SERVICE LEVEL POWER PLAN
05.ES.401-A - ENLARGED LEVEL 1 POWER PLAN - AREA A
05.ES.401-B - ENLARGED LEVEL 1 POWER PLAN - AREA B
05.ES.401-C - ENLARGED LEVEL 1 POWER PLAN - AREA C
05.ES.401.1 - LEVEL 1 INTERSTITIAL POWER PLAN
05.ES.402-A - ENLARGED LEVEL 2 POWER PLAN - AREA A
05.ES.402-B - ENLARGED LEVEL 2 POWER PLAN - AREA B
05.ES.402.1 - LEVEL 2 INTERSTITIAL POWER PLAN
05.ES.403-A - ENLARGED LEVEL 3 POWER PLAN - AREA A
05.ES.403-B - ENLARGED LEVEL 3 POWER PLAN - AREA B
05.ES.403.1 - LEVEL 3 INTERSTITIAL POWER PLAN
05.ES.404 - PENTHOUSE LEVEL POWER PLAN
05.ES.405 - ROOF LEVEL ELECTRICAL/LIGHTNING PROTECTION PLAN
05.ES.410 - ENLARGED SERVICE LEVEL POWER PLAN
05.ES.414 - ENLARGED PENTHOUSE POWER PLANS
05.ES.420 - SERVICE LEVEL FEEDER ROUTING PLAN
05.ES.421 - LEVEL 1 FEEDER ROUTING PLAN
05.ES.421.1 - LEVEL 1 INTERSTITIAL FEEDER ROUTING PLAN
05.ES.422 - LEVEL 2 FEEDER ROUTING PLAN
05.ES.422.1 - LEVEL 2 INTERSTITIAL FEEDER ROUTING PLAN
05.ES.423 - LEVEL 3 FEEDER ROUTING PLAN
05.ES.423.1 - LEVEL 3 INTERSTITIAL FEEDER ROUTING PLAN
05.ES.424 - PENTHOUSE LEVEL FEEDER ROUTING PLAN

File details come from the government source that posted it. Updated .