Attachment 2 - Price Schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
J061--Miles City Generator Maintenance
Solicitation number
36C25925Q0534
Issued by

About this file

The document is a Price Schedule spreadsheet for generator maintenance and load testing services for the Department of Veterans Affairs Veterans Health Administration (VA VHA) in Miles City. The contract covers a five-year period from September 1, 2025, to September 1, 2030, with annual maintenance and testing requirements for an emergency backup generator. The scope includes comprehensive generator maintenance, inspection, testing, and calibration of all generator components, with specific requirements for load bank testing ranging from 2 to 4 hours depending on the contract year.

The contract (Solicitation Number: 36C25925Q0534) mandates use of genuine CAT filters, fluids, and components, and requires adherence to NFPA 99 and NFPA 110 standards. The testing specifications include a Joint Commission requirement for a 4-hour generator test under load at least 30 percent of the generator's nameplate rating every 36 months. The contractor must provide all necessary labor, materials, tools, and specialized equipment to fully perform the contract, with each contract line item (CLIN) representing an annual maintenance period from September 1 of one year to August 31 of the following year.

View the file

Other files

File Type Posted
36C25925Q0534_2.docx DOCX document
Attachment 2 - Price Schedule revision.xlsx XLSX spreadsheet
Attachment 1 - PWS revision.docx DOCX document
Attachment D - Equipment Plate.docx DOCX document
36C25925Q0534_1.docx DOCX document
Attachment C - Quality Assurance Surveillance Plan QASP.docx DOCX document
Attachment 1 - PWS Generator Maintenance and Testing.docx DOCX document
Attachment 3 - LOS 852.219-75 - SERVICES.docx DOCX document
36C25925Q0534.docx DOCX document
Attachment B - DOL 2015-5395 rv25 Custer County MT.pdf PDF
Attachment A - Diagram.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Price Schedule
CONTRACT LINE ITEM NUMBER (CLIN)DESCRIPTIONUnitESTIMATED QTYTOTAL
Miles City CLC Generator Maintenance and Repair
0001Annual Load Test and Maintenance- Contractor shall provide maintenance, inspection, testing, and calibration of Emergency Backup Generator and all its components (e.g., batteries, Automatic Transfer Switches (ATS), fuel supply, radiators, etc.). Contractor shall provide all labor, equipment, generator and resources necessary to complete the services and the 4-HOUR Load Bank Testing per the manufacturers guidelines and as described in the SOW.

NOTE: The Joint Commission requires a 4-hour generator test under load(dynamic or static) that is at least 30 percent of the nameplate ratingof the generator once every 36 months. All material & supplies should be genuine CAT filters, fluids, gaskets,seals, etc.Testing, maintenance, and exercising of the generator, including allrelated components, must be executed to meet the requirements of NFPA 99 and NFPA 110, whichever is more stringent.The contractor shall provide all necessary labor, materials, tools andspecialized equipment

necessary for the full performance of this contract.JB1
BASE Contract Period 9/1/2025-8/31/2026TOTAL
1001Annual Load Test and Maintenance- Contractor shall provide maintenance, inspection, testing, and calibration of Emergency Backup Generator and all its components (e.g., batteries, Automatic Transfer Switches (ATS), fuel supply, radiators, etc.). Contractor shall provide all labor, equipment, generator and resources necessary to complete the services and the 2-HOUR Load Bank Testing per the manufacturers guidelines and as described in the SOW.

All material & supplies should be genuine CAT filters, fluids, gaskets,seals, etc.Testing, maintenance, and exercising of the generator, including allrelated components, must be executed to meet the requirements of NFPA 99 and NFPA 110, whichever is more stringent. The contractor shall provide all necessary labor, materials, tools andspecialized equipment

necessary for the full performance of this contract.JB1
Contract Period 9/1/2026-8/31/2027TOTAL
2001Annual Load Test and Maintenance- Contractor shall provide maintenance, inspection, testing, and calibration of Emergency Backup Generator and all its components (e.g., batteries, Automatic Transfer Switches (ATS), fuel supply, radiators, etc.). Contractor shall provide all labor, equipment, generator and resources necessary to complete the services and the 2-HOUR Load Bank Testing per the manufacturers guidelines and as described in the SOW.

All material & supplies should be genuine CAT filters, fluids, gaskets,seals, etc.Testing, maintenance, and exercising of the generator, including allrelated components, must be executed to meet the requirements of NFPA 99 and NFPA 110, whichever is more stringent. The contractor shall provide all necessary labor, materials, tools andspecialized equipment

necessary for the full performance of this contract.JB1
Contract Period 9/1/2027-8/31/2028TOTAL
3001Annual Load Test and Maintenance- Contractor shall provide maintenance, inspection, testing, and calibration of Emergency Backup Generator and all its components (e.g., batteries, Automatic Transfer Switches (ATS), fuel supply, radiators, etc.). Contractor shall provide all labor, equipment, generator and resources necessary to complete the services and the 4-HOUR Load Bank Testing per the manufacturers guidelines and as described in the SOW.

NOTE: The Joint Commission requires a 4-hour generator test under load(dynamic or static) that is at least 30 percent of the nameplate ratingof the generator once every 36 months. All material & supplies should be genuine CAT filters, fluids, gaskets,seals, etc.Testing, maintenance, and exercising of the generator, including allrelated components, must be executed to meet the requirements of NFPA 99 and NFPA 110, whichever is more stringent.The contractor shall provide all necessary labor, materials, tools andspecialized equipment

necessary for the full performance of this contract.JB1
Contract Period 9/1/2028-8/31/2029TOTAL
4001Annual Load Test and Maintenance- Contractor shall provide maintenance, inspection, testing, and calibration of Emergency Backup Generator and all its components (e.g., batteries, Automatic Transfer Switches (ATS), fuel supply, radiators, etc.). Contractor shall provide all labor, equipment, generator and resources necessary to complete the services and the 2-HOUR Load Bank Testing per the manufacturers guidelines and as described in the SOW.

All material & supplies should be genuine CAT filters, fluids, gaskets,seals, etc.Testing, maintenance, and exercising of the generator, including allrelated components, must be executed to meet the requirements of NFPA 99 and NFPA 110, whichever is more stringent. The contractor shall provide all necessary labor, materials, tools andspecialized equipment

necessary for the full performance of this contract.JB1
Contract Period 9/1/2029-8/31/2030TOTAL
TOTAL CONTRACT