Additional Phasing Considerations.pdf

PDF 821 KB Posted

Attached to
Z2DA--(CON) 442-20-004 Update Isolation Rooms (VA-21-00049451)
Solicitation number
36C25921R0070
Issued by

About this file

This document outlines the phasing plan and scope of work for renovating isolation rooms at the Cheyenne VA Medical Center. The project will update two existing isolation rooms, create a third isolation room, and involves demolishing and constructing walls, installing new doors, flooring, fixtures and equipment. Work will be phased to minimize disruption to the medical center's operations, with Phases 1 and 2 potentially concurrent and focusing on PACU-4 and ICU-1 areas, while Phase 3 for ICU-3 will follow completion of earlier phases. The contractor must submit infection control and scheduling plans for approval and coordinate all outages and shutdowns at least 20 days in advance. The opportunity is a SDVOSB set-aside between $500,000 to $1,000,000 requiring beds from Handicare, to be awarded under solicitation 36C25921R0070 by the Department of Veterans Affairs for the Cheyenne VAMC. The contractor will be responsible for assessing drawings and specifications, submitting RFIs, following security and safety requirements, and meeting all specifications, drawings, codes and deadlines.

View the file

Other files

File Type Posted
36C25921R0070 0003.docx DOCX document
Update Isolation Room Bid RFI 1.docx DOCX document
36C25921R0070 0002.docx DOCX document
Site Visit Attendance.pdf PDF
36C25921R0070 Corrected Pg 18.pdf PDF
36C25921R0070 0001.docx DOCX document
36C25921R0070 Full Solicitation.docx DOCX document
S02 Past Performance Questionnaire.docx DOCX document
J and A 36C259-21-AP-2342 Brand Name Lifts 442 Signed.pdf PDF
36C25921R0070_2.docx DOCX document
SELF-PERFORMED CALCULATIONS.docx DOCX document
Update Isolation Rooms 100CD Submittal Package.pdf PDF
Update Isolation Rooms 100CD Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES - PROJECT PHASING

IN ORDER TO LIMIT DISRUPTION OF ICU/ PACU WARD OPERATIONS AND CONTAIN AIR-

BORNE DUST & CONTAMINATION FROM CONSTRUCTION ACTIVITIES, ALL WORK UNDER

THIS CONTRACT SHALL BE DIVIDED INTO AREAS AS IDENTIFIED IN PHASING PLAN

DRAWINGS. AN INFECTION CONTROL RISK ASSESSMENT SHALL BE PERFORMED TO

DETERMINE EXTENTS OF CONSTRUCTION ACTIVITIES CONTAINMENT BARRIERS.

THE CONTRACTOR SHALL PERFORM WORK IN SEQUENCE AS SHOWN. ALL SCOPED WORK

WITHIN PROJECT PHASE MUST BE COMPLETED AND APPROVED BY VHA COR PRIOR TO

START OF WORK IN THE SUBSEQUENT PHASE.

EXACT SEQUENCING OF DEMOLITION AND CONSTRUCTION ACTIVITIES WITHIN PROJECT

PHASES SHALL BE DETERMINED BY THE CONTRACTOR AND AS SUCH ARE TO BE

CONSIDERED MEANS AND METHODS. THE EXTENTS AND SEQUENCING OF CONSTRUCTION

ACTIVITIES SHALL BE CONFIRMED AND COORDINATED WITH THE VHA COR. ALL

ASSOCIATED MEP, FIRE, LOW VOLTAGE/COMMUNICATIONS ITEMS TO BE COORDINATED BY

CONTRACTOR WITH VHA COR.

A GENERAL DESCRIPTION OF EACH PHASE IS AS FOLLOWS. WORK ON REFER TO

DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.

PROJECT PHASING LEGEND

EXISTING TO REMAIN OPERATIONAL

WALL - EXISTING TO REMAIN

WALL - DEMO

WALL - NEW

ROOM TAG - EXISTING ROOM

ROOM TAG - NEW OR RECONFIGURED

XXXX (E)

XXXX (N)

MECH

WORK

O.H.

NURSE SUP. (E)

NURSE CONSULT (E)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

MECH

WORK

O.H.

NURSE SUP. (N)

NURSE CONSULT (N)

ANTE RM (N)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

NURSE SUP. (E)

NURSE CONSULT (E)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

PACU 4 (E) ANTE RM (E) TOILET (E)

PACU 4 (E) ANTE RM (E) TOILET (E)

MECH WORK O.H.

PACU 4 (E) ANTE RM (E) TOILET (E)

MECH WORK O.H.

PACU 4 (E) ANTE RM (E) TOILET (E)

MECH

WORK

O.H.

PACU 4 (E) ANTE RM (E) TOILET (E)

PACU 4 (E) ANTE RM (E) TOILET (E)

MECH

WORK

O.H.

NURSE SUP. (N)

NURSE CONSULT (N)

ANTE RM (N)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

NURSE SUP. (N)

NURSE CONSULT (N)

ANTE RM (N)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

NURSE SUP. (E)

NURSE CONSULT (E)

ICU 1 (E)

ICU 3 (E)

ANTE RM (E)

KEY PLAN

N o rt h

I-CA

I-B

I-A

I-C

BLDG 45

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V A rc h it e c t

\D o c u m e n ts

\4

-2

-0

Is o la ti o n R o o m s

A rc h R tk o v a ts

E N

R S

.r v t

/1

/2

:0

:2

P

M

GI005

PHASING PLAN CHEYENNE VAMC UPDATE

ISOLATION ROOMS

2360 E. PERSHING AVE, CHEYENNE, WY 82001

442-20-004

I-CA

03/18/2021 GD TK

100% CONSTRUCTION

DOCUMENTS

VEG 20.21

NTS

PHASE 2A - DEMOLITION

2A

NTS

PHASE 2B - CONSTRUCTION

2B

NTS

PHASE 1A - DEMOLITION

1ANTS

PHASE 3A - DEMOLITION

3A

NTS

PHASE 3B - CONSTRUCTION

3B

North

NTS

PHASE 1A - CONSTRUCTION

1B

PHASE 1A - PACU-4, ANTE ROOM & TOILET DEMOLITION:

• COVER AND PROTECT ALL WALL MOUNTED FIXTURES TO REMAIN

• DEMOLISH WALL BASE AT PERIMETER OF PACU-4 (B2-49) & ANTE-ROOM (B2-47)

• DEMOLISH ALL FLOOR FINISHES INCLUDING FLOOR TILE, LAMINATE FLOORING AND FLOOR TILE AT

PACU-4 (B2-49) & ANTE-ROOM (B2-47)

• REMOVE AND STORE EXISTING DOOR B2-49A FOR MODIFICATION AT DOOR FRAME HEAD TO

ACCOMMODATE PATIENT TRACK GATE ASSEMBLY

• REMOVE CEILING MOUNTED OVERHEAD PATIENT LIFT

• REMOVE ALL CEILING MOUNTED EQUIPMENT AND PRIVACY CURTAIN TRACKS

• REMOVE ALL SUSPENDED LIGHTING FIXTURES

• REMOVE CEILING MECHANICAL REGISTERS

• DEMOLISH ALL CEILING TILE AND GRID WITHIN SCOPE

• WALL DEMOLITION FOR NEW DOOR LOCATION AT PACU-4

• FIRE SPRINKLER HEADS ALL ROOMS WITHIN SCOPE TO REMAIN; RE: PLUMBING PLAN FOR

SPRINKLER HEAD WORK

PHASE 1B - PACU-4, ANTE ROOM & TOILET CONSTRUCTION:

• INSTALL NEW DOOR AT PACU-4/ CORRIDOR

• NEW FLOORING AT PACU-4 (B2-49) & ANTE-ROOM (B2-47)

• NEW WALL BASE AT PACU-4 (B2-49) & ANTE-ROOM (B2-47)

• DOOR B2-49A - MODIFY EXISTING DOOR FRAME & WALLS PER DETAILS B3/A62 & D3/A620 AND

REINSTALL DOOR TO ACCOMMODATE PATIENT TRACK GATE ASSEMBLY

• PATCH & PAINT ALL WALLS IN ROOMS TO BE RENOVATED, INCLUDING NEW GYP WALLS & EXISTING

PLASTER WALLS

• INSTALL BED PAN WASHER FLUSH-VALVE SYSTEM AT EXISTING TOILET

• INSTALL ALL WALL MOUNTED EQUIPMENT AS INDICATED IN PLAN

• INSTALL NEW SUSPENDED CEILING TILE, LIGHTING, MECHANICAL REGISTERS

• INSTALL/ REINSTALL CEILING MOUNTED EQUIPMENT INCLUDING SMOKE DETECTORS, WIFI ACCESS

POINTS, PRIVACY CURTAINS, ETC.

• INSTALL NEW CEILING MOUNTED OVERHEAD PATIENT LIFT

• VAV INSTALLED ABOVE CEILING AT CORRIDOR

PHASE 2A - ICU-1, NURSE CONSULT & NURSE WARD SUPPLY DEMOLITION:

• REMOVE WALL MOUNTED EQUIPMENT IN ALL ROOMS WITHIN SCOPE

• REMOVE ALL WALL MOUNTED LIGHTING FIXTURES WITHIN SCOPE

• DEMOUNT & REMOVE ALL PLUMBING FIXTURES

• DEMOLISH/ REMOVE SLIDING GLASS DOOR SYSTEM

• REMOVE CEILING MOUNTED OVERHEAD PATIENT LIFT

• REMOVE ALL CEILING MOUNTED EQUIPMENT AND PRIVACY CURTAIN TRACKS

• REMOVE ALL SUSPENDED LIGHTING FIXTURES

• REMOVE CEILING MECHANICAL REGISTERS

• DEMOLISH ALL CEILING TILE AND GRID WITHIN SCOPE

• DEMOLISH WALL BETWEEN NURSE CONSULT ROOM (B2-14) & NURSE SUPPLY (B2-12)

• WALL DEMOLITION AT CORRIDOR FOR NEW DOOR LOCATIONS FOR B2-12, B2-14, B2-16A

• DEMOLISH WALL BASE AT PERIMETER OF ALL ROOMS IN PROJECT SCOPE

• DEMOLISH ALL FLOOR FINISHES INCLUDING FLOOR TILE, LAMINATE FLOORING AND FLOOR TILE

• FIRES SPRINKLER HEADS AT ICU-1 TO REMAIN; RE: PLUMBING PLAN FOR SPRINKLER HEAD WORK

• FIRE SPRINKLER HEAD AT NURSE CONSULT TO BE RELOCATED TO ACCOMMODATE NEW PLAN

PHASE 2B - ICU-1 & ANTE ROOM CONSTRUCTION:

• CONSTRUCT WALLS

• INSTALL DOORS

• NEW SLIDING GLASS DOOR SYSTEM

• NEW FLOORING

• NEW WALL BASE

• PATCH & PAINT ALL WALLS IN ROOMS TO BE RENOVATED, INCLUDING NEW GYP WALLS & EXISTING

PLASTER WALLS

• NEW WALL WAINSCOTING TILE AT TOILET & LAVATORY SURROUND

• INSTALL NEW TOILET

• INSTALL LAVATORY AT NEW ANTE-ROOM

• INSTALL ALL WALL MOUNTED EQUIPMENT

• NURSE CALL CERTIFIED INSTALLER TO PULL NEW HOME RUNS FOR RELOCATED NURSE CALL

DEVICES

• INSTALL NEW SUSPENDED CEILING TILE, LIGHTING, MECHANICAL REGISTERS

• INSTALL/ REINSTALL CEILING MOUNTED EQUIPMENT INCLUDING SMOKE DETECTORS, WIFI ACCESS

POINTS, PRIVACY CURTAINS, ETC.

• INSTALL NEW CEILING MOUNTED OVERHEAD PATIENT LIFT

• VAV INSTALLED ABOVE CEILING AT CORRIDOR

PHASE 3A - ICU-3 & ANTE ROOM DEMOLITION:

• REMOVE WALL MOUNTED EQUIPMENT IN ALL ROOMS WITHIN SCOPE

• REMOVE ALL WALL MOUNTED LIGHTING FIXTURES WITHIN SCOPE

• DEMOUNT & REMOVE ALL PLUMBING FIXTURES

• DEMOUNT & REMOVE BED PAN WASH SINK AT ANTE ROOM

• DEMOLISH/ REMOVE SLIDING GLASS DOOR SYSTEM

• REMOVE CEILING MOUNTED OVERHEAD PATIENT LIFT

• REMOVE ALL CEILING MOUNTED EQUIPMENT AND PRIVACY CURTAIN TRACKS

• REMOVE ALL SUSPENDED LIGHTING FIXTURES

• REMOVE CEILING MECHANICAL REGISTERS

• DEMOLISH ALL CEILING TILE AND GRID WITHIN SCOPE

• DEMOLISH WALL BASE AT PERIMETER OF ALL ROOMS IN PROJECT SCOPE

• DEMOLISH ALL FLOOR FINISHES INCLUDING FLOOR TILE, LAMINATE FLOORING AND FLOOR TILE

• FIRES SPRINKLER HEADS AT ICU-3 TO REMAIN; RE: PLUMBING PLAN FOR SPRINKLER HEAD WORK

PHASE 3B - ICU-3 & ANTE ROOM CONSTRUCTION:

• NEW SLIDING GLASS DOOR SYSTEM

• NEW FLOORING

• NEW WALL BASE

• PATCH & PAINT ALL WALLS IN ROOMS TO BE RENOVATED, INCLUDING NEW GYP WALLS & EXISTING

PLASTER WALLS

• NEW WALL WAINSCOTING TILE AT TOILET & LAVATORY SURROUND

• INSTALL NEW TOILET

• INSTALL NEW LAVATORY AT ANTE-ROOM

• INSTALL ALL WALL MOUNTED EQUIPMENT

• INSTALL NEW SUSPENDED CEILING TILE, LIGHTING, MECHANICAL REGISTERS

• INSTALL/ REINSTALL CEILING MOUNTED EQUIPMENT INCLUDING SMOKE DETECTORS, WIFI ACCESS

POINTS, PRIVACY CURTAINS, ETC.

• INSTALL NEW CEILING MOUNTED OVERHEAD PATIENT LIFT

• VAV INSTALLED ABOVE CEILING AT CORRIDOR

Additional work and/or additional phasing considerations are shown in red.

Phases 1 and 2 (renovating the PACU-4 and ICU-1 areas) may occur at the same time.

Work in corridors will be phased to only impact one section of the hallway at a time and proper access will be maintained to surrounding rooms.

Work down the corridor indicated by dashed line with "MECH WORK O.H." in phase 1A will likely need to occur in a HEPA filtered containment cart to avoid blocking access to the nurse's station or any of the rooms on the east side of the hallway.

Maintain a minimum of 48” or half of the corridor width where ICRAs barriers are constructed in corridors to allow egress and access to adjacent spaces. Where the scope does not allow for half the corridor to remain open, a detour and ILSM will need to be closely coordinated with government. The use of HEPA filtered containment carts will also be permitted as scope allows.

Phase 3 (ICU-3 area) will not occur until work from Phase 1 and 2 and penthouse mechanical work is complete to a point that shutdown of ICU-3 will be limited to two months.

Reference Sheet PP112 for Medical Gas piping modifications.

Medical has piping modifications for ICU-1 may be completed during week days with close coordination with the VA.

Medical gas piping modifications to relocate the med gas zone shutoff valve in Nurse Station B2-55 shall be exclusively night and weekend work.

Domestic water connections can likely be coordinated on a week day before or after normal business hours of 8am-4:30pm.

Reference specification section 01 57 19 1.5, F for additional detail on noise control. Noise-producing work shall occur between 8am and 6pm, unless otherwise directed. Repetitive, high level impact noise, and noise that will transfer through the structure will be restricted to weekends so not to impact surrounding departments such as Surgery and PACU.

Demolish Temporary Ante Room

Temporary walls in area of work for COVID negative pressure wards are shown in blue.

Temporary wall with door for emergency egress will be required in this location during Phase 3. Note: Not all temporary walls for infection control barriers are shown on this plan, contractor shall include all proposed infection control barriers on their final phasing plans.

Temporary wall with door for emergency egress will be required in this location during Phase 3. Note: Not all temporary walls for infection control barriers are shown on this plan, contractor shall include all proposed infection control barriers on their final phasing plans.