36C25921R0070 Full Solicitation.docx
DOCX document 249 KB Posted
- Solicitation number
- 36C25921R0070
About this file
This document is a solicitation for updating isolation rooms at the Cheyenne VA Medical Center located in Cheyenne, Wyoming. The contractor shall provide supervision, manpower, and materials to update two existing isolation rooms to meet current standards and create a third isolation room. The project is set aside for Service Disabled Veteran Owned Small Businesses and has an estimated value between $500,000 to $1,000,000. Offerors must be verified by the VA Center for Verification and Evaluation by the time of proposal submission. Proposals are due by May 14, 2021 with award anticipated within 180 calendar days of notice to proceed. The contractor must complete all work within the performance period, including adhering to safety and infection control requirements. The statement of work provides additional details on contractor responsibilities, site requirements, and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0070 0003.docx | DOCX document | |
| Additional Phasing Considerations.pdf | ||
| Update Isolation Room Bid RFI 1.docx | DOCX document | |
| 36C25921R0070 0002.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| 36C25921R0070 Corrected Pg 18.pdf | ||
| 36C25921R0070 0001.docx | DOCX document | |
| S02 Past Performance Questionnaire.docx | DOCX document | |
| J and A 36C259-21-AP-2342 Brand Name Lifts 442 Signed.pdf | ||
| 36C25921R0070_2.docx | DOCX document | |
| SELF-PERFORMED CALCULATIONS.docx | DOCX document | |
| Update Isolation Rooms 100CD Submittal Package.pdf | ||
| Update Isolation Rooms 100CD Specifications.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
2014 AMBULATORY CARE, DENTAL, STAIRWAY, IT CLOSETS PROJECT
PROJECT NO. 442-14-06S
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25921R0070
X
442-20-004 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 aldo.girany@va.gov
Aldo F Girany 307 433-3761 The contractor shall provide supervision, manpower, and materials to upgrade isolation rooms at the Cheyenne VAMC Located at 2360 East Pershing Blvd Cheyenne WY 82001 Project # 442-20-004
Construction magnitude is 500,000.00 to 1,000,000.00
The NAICS code is 236220 - Small Business size standard is $36.5 Million.
In accordance with P.L. 109-461, this acquisition is 100% set aside for Service Disabled Veteran Owned Small Businesses concerns. See VAAR 852.219-10, Notice of Total Service-Disabled Veteran Owned Small Business Set-Aside of this solicitation for information in regard to requirements in order to be considered. Offerors must be both VISIBLE and VERIFIED by the Department of Veterans Affairs Center for Verification and Evaluation (CVE) at the time of offer submission. Failure to be VERIFIED by CVE and VISIBLE on VetBiz at the time of offer submission will result in the offeror's proposal being deemed non-compliant. All offerors are urgedto contact the CVE and submit the aforementioned required documents to obtain CVE verification of their SDVOSB statusif they have not already done so.
Site Visit see FAR provision 52.236-27 See FAR Provision 52.228-1 for address to mail bid bonds.
Questions and RFIs are due by May 14, 2021 2:00PM MT.
All question are to be in writing and sent via email to aldo.girany@va.gov. No other method will be accepted.
X X
52.211-10 X
14:00
CDT
06-03-2021 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
Financial Service Center PO Box 149971 Austin TX 78714-9971
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 5 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 20 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 20 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 21 |
| 2.4 52.228-1 BID GUARANTEE (SEP 1996) | 22 |
| 2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 23 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 23 |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 24 |
| 2.8 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 24 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 26 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) | 26 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 30 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 32 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021) | 34 |
| GENERAL CONDITIONS | 36 |
| 4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 36 |
| 4.2 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 36 |
| 4.3 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 39 |
| 4.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 40 |
| 4.5 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 40 |
| 4.6 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 40 |
| 4.7 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 42 |
| 4.8 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 43 |
| 4.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 43 |
| 4.10 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018) | 43 |
| 4.11 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 46 |
| 4.12 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 48 |
| 4.13 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 49 |
| 4.14 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 49 |
| 4.15 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 49 |
| 4.16 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019) | 51 |
| 4.17 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 52 |
| 4.18 SUPPLEMENTAL INSURANCE REQUIREMENTS | 52 |
| 4.19 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 52 |
| ATTACHMENTS | 64 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
A.3 Bid Schedule The contractor shall furnish all labor, equipment, materials, and to update two existing isolation rooms to meet current standards and create a third isolation room at the Cheyenne VA Medical Center. This project is located at the Cheyenne VA Medical Center Campus at 2360 East Pershing Blvd., Cheyenne WY, 82001 The contractor shall provide four (4) prices; Line Item 0001 and Line Items 0002 - 0004 (deductive pricing). The contractor shall include prices for all items listed in the pricing schedule and include all costs associated for work in the SOW, if specifically listed in the pricing schedule.
| ITEM |
| DESCRIPTION OF SUPPLIES/SERVICES |
| Qty |
| UNIT |
AMOUNT
| 0001 |
| The contractor shall provide all tools, equipment personnel and material to complete all work associated with the Statement of Work (SOW) to update two existing isolation rooms to meet current standards and create a third isolation room at the Cheyenne VA Medical Center. This project is located at the Cheyenne VA Medical Center Campus at 2360 East Pershing Blvd., Cheyenne WY, 82001 |
| 1 |
| JB |
TOTAL
| ITEM |
| DESCRIPTION OF SUPPLIES/SERVICES |
| Qty |
| UNIT |
AMOUNT
| 0002 |
| Deduct #1 |
Replacement of glass sliding door to TCU-1 and ICU-3. If this alternate is accepted the contractor will instead refurbish the existing doors and track and provide new seals on them.
| 1 |
| EA |
TOTAL
| ITEM |
| DESCRIPTION OF SUPPLIES/SERVICES |
| Qty |
| UNIT |
AMOUNT
| 0003 |
| Deduct #2 |
Replacement of ceiling mounted patient lifts in rooms ICU-1 and ICU-3. If this alternate is accepted the contractor shall instead reinstall the existing patient lift in ICU-1 and ICU-3 and modify the track and associated support system for the ICU-1 lift as needed for the room reconfiguration. Contractor shall load test and certify patient lifts.
| 1 |
| EA |
TOTAL
| ITEM |
| DESCRIPTION OF SUPPLIES/SERVICES |
| Qty |
| UNIT |
AMOUNT
| 0004 |
| Deduct #3 |
Eliminate Installation of a patient lift in PACU-4.
| 1 |
| EA |
TOTAL
Note: Offerors shall provide prices on the base bid and the deductive alternates. The base bid shall be priced exclusive of the deductive Line Items. The deductive alternate shall have its own price exclusive of the base bid price.
The Government intends to award the base bid if the lowest priced acceptable offeror is within funding limitations. If the low offeror for base bid is not within funding limitations, the Government will award to the lowest technically acceptable offeror for the base bid and alternate one if within funding limitations. If not within funding limitations the Government will then award to the lowest technically acceptable offeror for the base bid and alternates one and two. The Government will continue evaluating pricing in this order until within funding limitations.
1. Purpose
The purpose of this Statement of Work (SOW) is to update two existing isolation rooms to meet current standards and create a third isolation room at the Cheyenne VA Medical Center. This project is located at the Cheyenne VA Medical Center Campus at 2360 East Pershing Blvd., Cheyenne WY, 82001. All local and federal standards and requirements shall be met. Project phasing considerations will be in accordance with the drawings and specifications, final phasing determined by the contractor. All outages and shutdowns shall be closely coordinated with the Contracting Officer Representative (COR) with minimum 20 days’ notice, per the specification requirements.
2. Project Scope
This SOW is provided in order to construct the project as outlined herein, in the construction drawings (including any addendums), specifications, and any further detail provided in this SOW. All work shall be planned and scheduled to minimize the construction activity impact on the operation of the medical center. All work shall be conducted with strict adherence to Cheyenne Medical Center and Veteran’s Health Administration regulations and infection control requirements.
3. Contractor Responsibilities
The drawings shown a general arrangement of MEP systems but do not show all required fittings, offsets, elbows, etc. that may be necessary to field coordinate and install the system. It is the contractor’s responsibility to field coordinate with existing infrastructure and supply all labor and materials necessary to provide a complete and working system as outlined in the construction documents at no additional cost or time to the Government.
It is the responsibility of the Contractor to properly assess the contract documents and existing site conditions for the installation of the work prior to providing their bid.
a) Contractor shall assess the contract drawings for the installation of the work as called out in the drawings and specifications. Contractor and/or Sub-contractors shall be responsible for timely and accurate determination of work to be performed.
b) If there is a discrepancy between the specifications and the construction drawings, the specifications or the more stringent condition shall apply.
c) Contractor and/or Sub-contractors shall be responsible for reviewing all drawings and specifications and shall submit Requests for Information (RFI’s) directed to the VAMC’s Contracting Officer for any discrepancies or clarifications needed to provide a complete and working system prior to the bidding of the work.
d) Contractors shall adhere to the VAMC’s facility security requirements, including preparation of a fire safety plan, protection of all existing facility improvements and coordination with the COR.
e) All requests for any clarification shall be forwarded by the VAMC’s Contracting Officer (CO) and copy the Contracting Officer Representative (COR).
f) Contractor and/or Sub-contractors shall be responsible for the accuracy and scope of the specifications, drawings, and cost estimates in relation to areas or items addressed in this SOW. Any deficiencies in the documents shall be brought to the attention of the Contracting Officer prior to bid receipt.
g) Contractor and/or Sub-contractors shall perform all necessary investigations and work to determine and verify work can be performed as specified.
h) Contractor and/or Sub-contractors shall provide all materials and equipment as well as installation as required in the specifications and drawings.
i) Contractor and/or Sub-contractors shall provide material submittals to the Engineer of Record and COR for review and approval prior to purchase or installation.
j) Contractor and/or Sub-contractors are responsible for providing all tools and equipment necessary to perform this work. Facility equipment such as ladders will not be used.
k) The medical center must remain operational throughout the construction period. Any required shutdowns shall be the coordinated through the COR and a minimum of 20 days prior to the proposed date of the shutdown.
l) All work performed and specified shall comply with applicable Local, State, and Federal code requirements, and VA Master Construction Specifications. It is the responsibility of the Contractor to understand and comply with all applicable municipal, county, state, and federal codes, laws, ordinances, standards, rules, and regulations.
m) The Contractor will provide a final phasing plan that is coordinated with phasing information provided in the construction documents for COR approval.
n) The contractor shall meet all specifications and approved drawings.
o) The contractor will be held responsible for any damages to VA property and shall replace any damage in full.
p) The contractor shall meet the safety requirements of OSHA and VA.
q) The contractor shall meet all deadlines for construction.
r) The contractor shall identify to the COR any possible problems and or deficiencies if they foresee a future problem related to the construction of the project.
4. Safety & Training:
a) Comply with the requirements of the Div. 01 Safety Requirement’s specification.
b) A competent person must always be on site who has completed OHSA’s 30-hour construction safety course per VA directive 2011-036. All other employees of general contractor must at a minimum has completed the OSHA 10-hour construction worker course and /or other relevant competency training, as determined by VA CP with input from the ICRA team. Provide a Site Safety and Health Officer (SSHO) in accordance with the specifications.
c) Submit training records of all such employees for approval before the start of work.
d) The contractor shall not mobilize unit these and other requirements outlined in Division 1 specifications are met.
5. Physical Security Requirements:
a) THE CONTRACTOR SHALL COMPLY WITH AGENCY PERSONAL IDENTITY VERIFICATION PROCEDURES IDENTIFIED IN THE CONTRACT THAT IMPLEMENT HOMELAND SECURITY PRESIDENTIAL DIRECTIVE-12 (HSPD-12), OFFICE OF MANAGEMENT AND BUDGET (OMB) GUIDANCE M-05-24, AND FEDERAL INFORMATION PROCESSING STANDARDS PUBLICATION (FIPS PUB) NUMBER 201.
b) THE CONTRACTOR SHALL INSERT THIS CLAUSE IN ALL SUBCONTRACTS WHEN THE SUBCONTRACTOR IS REQUIRED TO HAVE ROUTINE PHYSICAL ACCESS TO A FEDERALLY-CONTROLLED FACILITY AND/OR ROUTINE ACCESS TO A FEDERALLY-CONTROLLED INFORMATION SYSTEM.
c) Every worker must wear a valid VA ID badge at all times to work on this site. The VA Police will issue day badges to workers who produce valid IDs. Right-to-work documentation will be required for workers who are not US citizens.
6. Information Security Requirements
a) Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
b) In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
c) In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
d) VA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA. The agency must report promptly to NARA in accordance with 36 CFR 1230.
e) The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
f) The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
g) The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA policy.
h) The Contractor shall not create or maintain any records containing any non-public VA information that are not specifically tied to or authorized by the contract.
i) The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
j) The VA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
k) Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
l) The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract, and require written subcontractor acknowledgment of same.
m) Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
7. Infection Control Requirements:
a) All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures. The contractor is responsible for ensuring compliance with this training requirement.
b) Waste materials shall be removed in containers with tightly fitting lids or covers that are taped in place and are wet-wiped down before removal.
c) Implement the requirements of VAMC’s Infection Control Risk Assessment (ICRA). Infection Prevention and/or Safety personnel may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.
d) Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the VA requirements.
e) All equipment, tools, material, worker’s clothing, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down prior to entering all existing hospital areas.
f) Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA (High Efficiency Particulate Accumulator) filtration. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g) Medical Center Infection Control personnel may monitor for micro-organisms associated with construction dust (e.g. aspergillillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality.
h) Construction areas shall maintain a sealed barrier between the construction areas and the working areas of the hospital. Above ceiling spaces shall be sealed to the deck above in order to achieve an isolated workspace.
i) The construction areas are “Infection Control-Class III/IV” areas and require negative pressure to be maintained during construction activity. The Contractor shall establish containment to accomplish an area pressure of negative 0.01 in. WC. See additional requirement in the specifications.
j) New construction ductwork shall follow specification requirements for sealing off during construction.
k) There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
l) All work will be performed per the Contractor submitted and approved VA schedule, updated on a weekly basis, and the COR shall be notified at least 20 days in advance the proposed areas that will undergo construction. All scheduling of areas will be coordinated with the relevant hospital personnel by the COR to minimize impact to normal hospital functions.
m) Fire sprinkler lines will be down less than four hours unless otherwise approved by the COR. All sprinkler line shutdowns shall be coordinated with the COR at least 2 weeks in advance.
n) Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
3. All work performed cleaned by the Contractor per Cheyenne VA hospital standards prior to turning the area over for use by the VA.
8. Place of Performance
Cheyenne VA Medical Center 2360 E. Pershing Blvd, Cheyenne, WY 82001
9. Travel
The contractor shall not charge travel costs to the Government.
10. Hours of Work
a) See the Phasing Plan on sheet GI005 for phasing guidance. Contractor to provide final phasing plan for COR approval. Work shall be planned and scheduled to minimize the construction activity impact on the operation of the medical center. Work requiring system shutdowns, utility interruptions, critical infection control work, or potential interruption of power or HVAC to critical areas of the Medical Center will require extensive coordination and planning with the COR and will require at least 20 days’ notice. This work and high noise producing work is to occur outside of normal agency operations hours and on weekends.
b) All other work is expected to occur within agency normal operation hours of Monday through Friday from 7:00am – 4:30pm (MST).
11. Schedule and General Requirements
Construction shall be completed 180 calendar days from Notice to Proceed. This period of performance includes considerations for long lead equipment times and phasing of the project.
Federal Legal Holidays: The following Federal legal holidays are observed by this facility:
| New Year’s Day | January 1 | ||
| Martin Luther King’s Birthday | Third Monday in January | ||
| President’s Day | Third Monday in February | ||
| Memorial Day | Last Monday in May | ||
| Independence Day | July 4 | ||
| Labor Day | First Monday in September | ||
| Columbus Day | Second Monday in November | ||
| Veteran’s Day | November 11 | ||
| Thanksgiving Day | Fourth Thursday in November | ||
| Christmas Day | December 25 |
12. Historic Preservation
Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
- END OF SOW-
PART I - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
PART I/SECTION A – REQUEST FOR PROPOSAL
I.1A JOINT VENTURES
If submitting an offer as a joint venture as defined by P.L. 109-461 AND Department of Veterans Affairs I.L. 049-06-4, http://www.vetbiz.gov/library/jtventure.pdf , an offeror must provide a copy of the joint venture agreement specific to the project that is consistent with the percentage of required work and net proceed. Additionally, the offeror must provide a breakdown or labor of which is to be performed by the SDVOSB firm and that which is performed by the small business joint venture firm and that which is sub-contracted. All Joint Ventures will be required to be registered and verified as an entity in VETBIZ prior to award.
I.2A SELECTION PROCEDURES
This acquisition will be a competitive acquisition utilizing FAR Part 15 source selection employing tradeoff source selection procedures. Competing offerors' past performance history will be evaluated on a basis of significantly more important than, cost or price considerations. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations, and certifications. All such offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined non-compliant. It is the intent of the Government to award without discussions; however, the Government will reserve the right to have discussions if such are needed.
I.3A PRE-PROPOSAL SITE VISIT
See FAR Provision 52.236-27, Site Visit (Construction) of this solicitation. At site specific information related to COVID screenings and parking.
I.4A SELECTION CRITERIA
This acquisition will utilize the tradeoff process in accordance with FAR 15.101-1. This process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria. Inherent in this process is the necessity to make tradeoffs considering the non-cost strengths and weaknesses, risks, and the cost (or price) offered in each proposal.
The source selection process will be conducted utilizing FAR part 15.101-1 Trade-off Process Source Selection Procedures with Special Standards of Responsibility. Offers will be evaluated using the following evaluation factors:
Factor 1 – Past Performance Factor 2 – Price
Initially offers shall be ranked according to price, including any option prices if applicable. The lowest price offer’s past performance shall be evaluated to determine its performance confidence rating. The past performance evaluation results are an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. There are two aspects of the past performance evaluation: (1) the assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirement; and (2) determine how well the contractor performed on the contracts.
If the lowest priced offer is judged to have a Substantial Confidence performance confidence rating and meets the special standards of responsibility, that offer represents the best value for the Government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
If the lowest price offer does not receive a Substantial Confidence performance confidence rating, the past performance evaluation continues until an offeror’s past performance is judged to have a Substantial Confidence performance rating. The Government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. The Government also reserves the right to award to the lower priced offeror with lower past performance rating if the Source Selection Authority (SSA) determines the price difference does not merit awarding to the higher priced offeror. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.
Competing offerors' past performance history will be evaluated on a basis of significantly more important than, cost or price considerations.
Special Standard of Responsibility
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)
(1) OSHA or EPA Violation(s):
Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years
(2) Experience Modification Rate (EMR):
Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.
Offerors who fail to meet any special standard of responsibility will not be eligible to receive contract award.
Past Performance Evaluation For Factor 1, based on the evaluation of all recent and relevant past performance for an offeror, an overall performance confidence rating shall be assigned. The performance confidence ratings are defined below:
| ASSESSMENT |
| DESCRIPTION |
| Substantial Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectations that the offeror will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance.
(a) Aspects of Past Performance Evaluation. The past performance evaluation results are an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. There are two aspects of the past performance evaluation.
(1) The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the effort to be acquired. The criteria to establish what is relevant is unique to each source selection.
| (2) The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance from all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. |
| (b) Source Selection Evaluation Board (SSEB) members will review past performance information to determine the quality and usefulness as it applies to the performance confidence assessment. |
Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.
The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest.
Factor 1-Past Performance The contracting officer shall review relevant performance information on each offeror based on (1) the past efforts provided by the offeror and (2) data independently obtained from other government and commercial sources. Relevant performance includes performance of efforts that includes renovation of space in an active hospital that is similar or greater in scope, magnitude, and complexity than the effort described in this solicitation. A recent project is defined as being completed within five years of the due date of this solicitation. The purpose of the past performance evaluation is to allow the government to assess the offeror’s ability to perform the effort described in this RFP, based on the offeror’s demonstrated past performance. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror. Design Build Projects will be rated more favorability. Offerors with no relevant past performance history or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.
Submit no less than 2 and no more than 5 projects.
If the lowest priced evaluated offer is judged to have a Substantial Confidence performance assessment, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
The government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.
Offerors are cautioned to submit enough information in the format specified in the solicitation. Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
Factor 2 – Price:
(a) Solicitation Submittal Requirements:
· Standard Form 1442, Solicitation Offer and Award
· All pages of the SF1442 Continuation Sheet
(b) Basis of Evaluation: The Government will evaluate price based on the total price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
· Comparison of proposed prices received in response to the RFP
· Comparison of proposed prices with the IGCE.
· Comparison of proposed prices with available historical information.
Special Standard of Responsibility Solicitation Submittal Requirements:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)
(1) OSHA or EPA Violation(s):
Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years
(2) Experience Modification Rate (EMR):
Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.
Offerors who fail to meet any special standard of responsibility will not be eligible to receive contract award.
PART I/SECTION B - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
I.1B COST RANGE: Between $500,000.00 - $1,000,000.00
I.2B GENDER: Wherever the masculine gender is used in this solicitation and contract documents, it shall be considered to include both masculine and feminine.
I.3B METRIC PRODUCTS:
Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch-pound units, providing they fall within the tolerance specified using conversion tables contained in the latest revision of Federal Standard No. 376, and all other requirements of this document are met.
If a product is manufactured to metric dimensions and those dimensions exceed the tolerance specified in the inch-pound units, a request should be made to the Contracting Officer to determine if the product is acceptable. The Contracting Officer, in concert with the Contracting Officer’s Representative (COR), will accept or reject the product.
I.4B REQUESTS FOR INFORMATION:
All requests for information must be submitted in writing to the Contracting Officer for action no later than the date shown in Block 10 of the Standard Form 1442, Solicitation, Offer and Award.
I.5B PROPOSAL REQUIREMENTS
General – Both past performance information and price proposal shall be submitted in response to this solicitation. Submit at least 2 (two) but no more than 5 (five) relevant projects. Proposals shall be submitted via email to aldo.girany@va.gov Emails are limited to 15 MB. The proposal, in its entirety, shall be no more than 2 emails (one attachment for price proposal, and one attachment for past performance information) not to exceed 15MB. Proposal cam be submitted in one email if 15MB or less. Failure to submit in the format required and clearly address those factors may result in rejection of the offer. An original Bid Bond, in the amount of twenty (20%) percent (but not to exceed $3,000,000) of the bid price shall be mailed to the address listed in block 8 of the SF1442 and be received at the address no later than the closing date and time. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation. Electronic copies of the proposals will be time/date stamped by Microsoft Outlook upon receipt of email. Further details on electronic submission are outlined below.
Proposals shall be received by 2:00 P.M. Mountain Time on May 14, 2021. There will be no public opening of the proposals. Submit proposals to: aldo.girany@va.gov.
Submit bid bonds to:
Department of Veterans Affairs Cheyenne VA Medical Center 442-90C ATTN: Aldo Fred Girany 2360 E Pershing Blvd.
Cheyenne WY 82001
Past performance information and price sections of the offeror’s proposal will be evaluated independently. Offerors shall include all required Representations and Certifications and complete their registration in System for Award Management (SAM). See FAR 52.204-7 and 52.204-8, of this solicitation.
Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership, and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the Department of Veteran Affairs CVE at the time of offer submission. Failure to be both VERIFIED by CVE and VISIBLE on VetBiz at the time of offer submission and contract award will result in the offeror’s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so.
I.6B PROPOSAL REVISIONS
If it is determined to be necessary, proposal revisions will be requested from the offers received. The Contracting Officer may identify those offerors, whose proposals are within the competitive range based upon the selection criteria identified in this solicitation. Negotiations may be conducted with those firms falling within the competitive range, after which proposal revisions may be requested. Offerors submitting proposal revisions will not be required to re-submit any documents which are unchanged from their proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with the Table of Contents that clarifies where within the initial proposal the additional information and/or changed document would be placed. A new bid bond shall be submitted only if the final cost proposal revisions are greater than its initial cost proposal.
1.7B REQUIREMENTS FOR ELECTRONIC SUBMISSION OF OFFER
Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to noncompliance with the terms of the solicitation. You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below.
In addition, contractors are notified of the award via an electronic Notice of Award e-mail. The award document will be attached to the Notice of Award e-mail.
Acceptable Electronic Formats (Software) for Submission of Offers
1. Files readable using the current Microsoft© Office version Products: Word, Excel, PowerPoint, or Access. Please see security note below for caution regarding use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (purpose: contracting can open the PDF version and engineering can open AutoCAD files).
2. Files in Adobe© PDF (Portable Document Format) Files: When scanning documents scanner resolution should be set to 200 dots per inch, or greater.
3. Another electronic format. If you wish to submit an offer using another format other than described in these instructions, e-mail the Contracting Officer who issued the solicitation. Please submit your request at least ten (10) calendar days before the scheduled closing date of the solicitation.
This is the start of the file's text. The full file is on GovTribe.