FinalHazMatReportOKCityVAPharmacy.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25921R0057
About this file
This hazardous building materials inspection report details the findings of an asbestos, lead-based paint, and mold inspection conducted at the Oklahoma City VA Medical Center pharmacy in preparation for renovations to meet USP 797 and 800 requirements. The inspection identified no asbestos-containing materials or lead-based paint in the sampled areas. Recommendations include addressing any mold or water intrusion issues, as well as point count analysis or TEM testing if suspect materials are disturbed during renovations.
The related federal contract opportunity is a 100% SDVOSB set-aside between $2,000,000 to $4,000,000 by the Department of Veterans Affairs to renovate approximately 12,155 square feet of inpatient pharmacy and primary care office space at the Oklahoma City VA Medical Center to comply with pharmacy standards and improve efficiency. The solicitation is expected to post on or shortly after March 8, 2021. Offerors must register in SAM and complete online representations and certifications at SAM.gov, and SDVOSBs must also register in VetBiz. Amendments will be posted to the website provided.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS BUILDING MATERIALS
INSPECTION REPORT
Renovate Pharmacy for
USP 797 and 800 Requirements
Oklahoma City VA Medical Center
Oklahoma City, OK
VA Project No: 635-16-104
August 27, 2019
Prepared for:
Veterans Affairs Medical Center c/o FourFront Design, Inc.
517 7th Street
Rapid City, SD 57701
Prepared by:
AMI Environmental
8802 South 135th Street, Suite 100 Omaha, Nebraska 68138
TABLE OF CONTENTS
1. SURVEY OVERVIEW
1.1. Purpose and Scope
1.1.1. Inspection Area
1.1.2. Limitations
1.2. Regulatory Reference
2. BUILDING INFORMATION
2.1. General Construction
2.2. Pre-Existing Information
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
3.1.1. Key Definitions
3.1.2. Homogenous Material Numbering Convention
3.1.3. Bulk Sampling
3.2. Lead-Based Paint Inspection
3.2.1. Key Definitions
3.2.2. Homogenous Paint Applications Numbering Convention
3.2.3. Paint Chip Sampling
3.3. Mold Inspection
4. SUMMARY OF INSPECTION FINDINGS
4.1. Asbestos Inspection Findings
4.2. Lead Paint Inspection Findings
4.3. Mold & Water Intrusion Inspection Findings
5. RISKS AND HAZARDS
5.1. Asbestos
5.2. Lead-Based Paint
5.3. Mold
6. RECOMMENDATIONS
6.1. General Recommendations
6.1.1. Asbestos
6.1.2. Lead-Based Paint
6.1.3. Mold
6.2. Hazardous Conditions Recommendations
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
7.1.1. Notification Requirements
7.1.2. Asbestos Removal Requirements
7.1.3. OSHA Regulation of <1 Percent Asbestos
7.1.4. Asbestos Removal Regulations
7.2. Lead-Based Paint
7.2.1. Disposal Requirements
7.2.2. Construction Requirements
APPENDIX A: Tables
APPENDIX B: Photo Logs
APPENDIX C: Schematics
APPENDIX D: Analytical Results
APPENDIX E: Inspectors Credentials
HAZARDOUS MATERIALS INSPECTION REPORT
Renovate Pharmacy for USP
Requirements
Veterans Affairs Medical Center
Oklahoma City, OK
1. SURVEY OVERVIEW
On August 6, 2019, the Pharmacy area at the Veterans Affairs Medical Center, Oklahoma City, OK, was inspected for asbestos-containing material (ACM) and lead-based paint (LBP) by a representative of AMI
Environmental (AMIE). The hazardous building materials inspection was conducted in preparation for renovation of the space. The renovation project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr. Joel Simonyak of FourFront Design Inc. on behalf of the VA Medical
Center.
The inspection was performed by Grayson Cook in accordance with regulatory requirements and generally accepted industry methods. Copies of applicable requisite training certificates for Mr. Cook are provided in Appendix E.
1.1. Purpose and Scope
The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.
1.1.1. Inspection Area
The hazardous building materials inspection of the limited project area included all accessible interior areas of the Project area within Building 1, as identified in the project schematics. The project is expected to impact a part of the first floor Pharmacy area, and a mechanical room directly below the first floor Pharmacy. The above described areas are hereinafter referred to collectively as the Inspection Area.
1.1.2. Limitations
Nondestructive sampling protocols prevented inspection and sampling of materials inside walls and other inaccessible areas of the building. Examples of suspect materials not sampled, include those which may exist inside finished interior walls, pipe chases and rigid ceilings.
The Pharmacy was operational and occupied at the time of the inspection. The sampling was conducted in a manner to minimize disturbance to operations, and to minimize potential dust created by opening ceilings throughout the inspection area. The materials identified as ACM may be found throughout the inspection area, and new materials may be discovered during construction.
It is recommended that prior to or during construction that any new materials discovered in the demolition process be tested or abated.
Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled.
Hazardous Building Materials Inspection Report AMI Project No. 18-00337
Renovate Pharmacy for USP Requirements August 27, 2019
VA Medical Center
Oklahoma City, OK Page of 10
1.2. Regulatory Reference
The asbestos inspection was conducted in accordance with USEPA National Emission Standard for
Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act
(AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non-
HUD facilities.
The State of Oklahoma licenses asbestos inspectors to perform asbestos inspections in the State of
Oklahoma.
2. BUILDING INFORMATION
2.1. General Construction
This project involves renovation of approximately 2,500 sq. ft. of existing Pharmacy area.
2.2. Pre-Existing Information
Information on previous surveys or sampling for lead-based paint or asbestos, was not provided.
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
The inspection and sampling were conducted in accordance with the USEPA National Emission
Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned renovation. Additional aspects of the inspection methodology are discussed below.
3.1.1. Key Definitions
3.1.1.1. Homogenous Material
Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.
3.1.1.2. Asbestos-Containing Material (ACM)
The Environmental Protection Agency (EPA) and the Occupational Safety and Health
Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The
State of Oklahoma follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs, by definition, they are still regulated by OSHA, for worker exposure.
3.1.1.3. Friable/Non-Friable ACM
Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category
II.
3.1.1.4. Regulated Asbestos-Containing Materials (RACM)
Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.
3.1.2. Homogenous Material Numbering Convention
All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation
(TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous
Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.
3.1.3. Bulk Sampling
Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40
CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.
3.1.3.1. Bulk Sample Numbering Convention
Bulk samples are given a sequence number when collected.
3.1.3.2. Polarized Light Microscopy Analysis (PLM)
Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 200 Route 130 North, Cinnaminson, New Jersey. EMSL was instructed to perform Polarized Light
Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA
Method 600/M4-82-020). PLM analysis is the most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.
A total of 43 asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the 43 samples collected, including 12 additional distinct layers (i.e. mastic). Heterogeneous applications are individual layers of different materials contained within a single bulk sampled, each of which must be analyzed individually to determine its asbestos content (e.g. vinyl floor tiles and mastic; cove base and mastic; etc.). Table 1 lists all samples collected and analyzed in the current survey.
Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.
Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.
3.1.3.3. Quantification Method Analysis
EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.
Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.
The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.
Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.
Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.
3.2. Lead-Based Paint Inspection
The LBP inspection included visual identification of homogenous paint applications and bulk sampling of the paint(s) for laboratory analysis. While the U. S. Department of Housing and Urban Development
(HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.
3.2.1. Key Definitions
3.2.1.1. Homogenous Paint Applications
Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc. While visual inspection alone cannot generally identify sub-layers of paint, these applications are often identified in the XRF analysis.
3.2.1.2. Lead-Based Paint (LBP)
Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.
3.2.2. Homogenous Paint Applications Numbering Convention
Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).
The HM# is referenced throughout the report to uniquely identify each paint application.
3.2.3. Lead-based Paint and Lead Containing Materials Sampling Sampling of suspected lead-based paint or other suspected lead containing materials was conducted using bulk sampling of the paint applications and materials identified. A total of 12 lead-based paint samples were analyzed by Atomic Absorption to determine the lead content of materials or painted surfaces.
3.3. Mold Inspection
The Project area was inspected for evidence of moisture intrusion or visible suspected mold.
4. SUMMARY OF INSPECTION FINDINGS
Key findings of the hazardous building materials inspection are summarized below. Please refer to the
Appendices for complete details of the inspection findings and supporting documentation.
4.1. Asbestos Inspection Findings
Below is a summary of the findings of the asbestos inspection:
• Black Duct Mastic – 6% Chrysotile Approximately 200 SF on ducts and concrete above ceiling.
• 8-inch TSI pipe (labeled “asbestos containing”) Approximately 60 Linear Feet
• 8-inch TSI fittings (labeled “asbestos containing”) Approximately 10 Each
Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.
4.2. Lead Paint Inspection Findings
Below is a summary of the findings of the lead-based paint inspection:
• LBP, white (red undercoat), is present on entry door and frame to mechanical room. (1 Each)
Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint sampling.
4.3. Mold & Water Intrusion Inspection Findings
No suspected mold was observed in the Inspection Area. Several areas of ceiling tile moisture damage were observed.
5. RISKS AND HAZARDS
5.1. Asbestos
To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.
5.2. Lead-Based Paint
Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.
Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.
5.3 . Mold
Molds have the potential to cause health problems in some individuals. Molds produce allergens
(substances that can cause allergic reactions), irritants, and in some cases, potentially toxic substances
(mycotoxins). Inhaling or touching mold or mold spores may cause allergic reactions in sensitive individuals. Allergic responses include hay fever-type symptoms, such as sneezing, runny nose, red eyes, and skin rash (dermatitis). Allergic reactions to mold are common and can be immediate or delayed. Molds can also cause asthma attacks in people with asthma who are allergic to mold.
6. RECOMMENDATIONS
The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.
6.1. General Recommendations
6.1.1. Asbestos
State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.
ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.
6.1.2. Lead-Based Paint and Lead Containing Materials
Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching
Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.
Based on the initial lead paint testing results, AMIE recommends TCLP testing be conducted on the existing building materials, painted and unpainted, prior to the start of renovation or demolition activity. In addition, trade contractors who work in the facility should also be notified of the presence of lead so that they can appropriately monitor and protect their workers against lead exposure.
Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below
OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.
6.1.3. Mold
No suspected mold was observed in the Inspection Area. Materials impacted by moisture intrusion should be replaced. The source of moisture intrusion should be investigated and abated.
6.2. Hazardous Conditions Recommendations
No hazardous conditions, from hazardous materials, were observed in the building dur ing the inspection.
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.
7.1.1. Notification Requirements
EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and
Renovation, stipulates that an owner of a facility submit proper notification with either the
EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.
7.1.2. Asbestos Removal Requirements
Asbestos removal must be performed by a licensed abatement contractor. The contractor should follow all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR
1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.
7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos
While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction
Industry Standard, 29 CFR 1926.1101(a)(3))
7.1.4. State of Oklahoma Asbestos Removal Regulations
The State of Oklahoma Asbestos Control Act regulates Asbestos Removal, and licenses workers and professionals working in the Asbestos Industry. Asbestos Containing Building
Material (ACBM) shall only be removed by licensed and accredited contractors in the State of Oklahoma.
7.2. Lead Waste
7.2.1. Disposal Requirements
The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.
7.2.2. Construction Requirements
OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.
APPENDIX A
Tables
Table 1 – Asbestos Materials Sampling Table
Table 2 – Lead Paint Sampling Table www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax http://www.amienvironmental.com/
Table 1 – Asbestos Material Sampling Table
Homogeneous
Area
Sample
No.
Photo
No.
Description Color Material Location Asbestos Content
Estimated
Quantity Comments
1 1 1 12”x12” Vinyl Floor
Tile (VFT)
White/
Beige
GA 143D None Detected
2 1A 1 Mastic Yellow/
Clear
1 2 2 12”x12” Vinyl Floor
Tile (VFT)
White/
2 2A 2 Mastic Black/
1 3 2 12”x12” Vinyl Floor
Tile (VFT)
White/
2 3A 2 Mastic Yellow/Blk
3 4 3 12”x12” VFT
Dark Brown
Gray/
White
4 4A 3 Mastic Black/
Yellow
5 5 4 24”x 24” Ceiling
Tile - Pin
Gray/
5 6 5
Tile - Pin
Gray/
5 7 5
Tile - Pin
Gray/
6 8 6 Duct Mastic Gray GA 143D None Detected
7 9 7 Drywall Brown/
8 9A 7 Joint Compound White GA 143D None Detected
9 10 8 Plaster Tan/Red GA 143D None Detected
9 11 8 Plaster Tan/Red GA 143D None Detected
10 11A 8 Skim Coat White GA 143D None Detected
11 12 9 Base Cove Mastic Yellow GA 143D None Detected
12 13 10 2’x 2’ Carpet
Squares
Brown/
Yellow
GA 143B None Detected
13 14 10 Mastic Yellow GA 143B None Detected
Table 1. Asbestos Material Sampling Results Asbestos Containing Materials (ACM) = >1% Asbestos
Sample
No.
Photo
No.
Description Color
GA 143B
Asbestos Content
Estimated
Quantity Comments
14 14A 10 Leveler Gray GA 143B None Detected
15 15 11 2’x 2’ Ceiling Tile
Hole/Fissure
16 16 12 Duct Mastic White GA 143B None Detected
16 17 12 Duct Mastic White GA 143B None Detected
17 18 13 Plaster-Skim Coat White GA 143B None Detected
18 18A 13 Plaster-Base Coat Tan GA 143B None Detected
19 19 14 2’x 2’ Carpet Mastic Brown/
Blk/Yellow
Room Transition
Opening
None Detected
19 20 14 2’x 2’ Carpet Mastic
Gray/Tan Room Transition
Opening
18 21 15 2’x 2’ Ceiling Tile
Worm & Hole
Gray/
15 22 16 2’x 2’ Ceiling Tile
Hole/Fissure
Gray/
20 23 17 Mudded Fitting White GA 143B None Detected
20 24 18 Mudded Fitting White GA 143B None Detected
21 25 19 Base Cove Brown N Side Hall by GA 152 None Detected
22 25A 19 Mastic Yellow N Side Hall by GA 152 None Detected
23 26 20 Base Cove Brown S Side Hall by GA 148B None Detected
24 26A 20 Mastic Yellow S Side Hall by GA 148B None Detected
25 27 21 Sheet Flooring White GA 143A None Detected
26 27A 21 Mastic Yellow GA 143A None Detected
27 27B 21 Leveler Gray GA 143A None Detected
28 28 22 Spray on
Fireproofing Gray GA 148B
28 29 23 Spray on
Fireproofing
30 23
Spray on
Fireproofing
31 24
Spray on
Fireproofing
32 24
Spray on
Fireproofing
29 33 25 Drywall Brown/
White
GA 148B
30 33A 25 Joint Compound White GA 148B <1% Chrysotile
Sample
No.
Photo
No.
Description Color Material Location Asbestos Content Estimated
Quantity
Comments
31 34
Duct Mastic Black GA 143G 6% Chrysotile 200 Square
Feet
Present on ducts and concrete
32 35 30 Duct Mastic White Mechanical Room None Detected
32 36 31 Duct Mastic White Mechanical Room None Detected
33 37 32 Firestop Blue Mechanical Room None Detected
33 38 33 Firestop Blue Mechanical Room None Detected
34 39 34 Firestop Red Mechanical Room None Detected
34 40 34 Firestop Red Mechanical Room None Detected
35 41 35 Mudded Fitting Beige/
White Mechanical Room
36 41A 35 Insulation Yellow Mechanical Room None Detected
35 42 35 Mudded Fitting White Mechanical Room None Detected
36 42A 35 Insulation Yellow Mechanical Room None Detected
37 43 36 Duct Mastic Tan Mechanical Room None Detected
ASSUMED NONE
LABELED TSI AS
ACM ABOVE
CEILING
White GA 148 B LABELED ACM 60 LF Above ceiling
GA 148B
Table 2 – Lead Sampling Table
Sample
No.
Photo
No.
Substrate Description Location Color Lead Content Condition
Estimated
Quantity
L1 Drywall Wall Paint GA 143D Tan <0.024%
L2 Drywall Wall Paint GA 143D Tan 0.027%
L3 Drywall Wall Paint GA 143D Green 0.026%
L4 Drywall Wall Paint GA 143D Tan/Green 0.11%
L5 Drywall Wall Paint Entry Pink <0.015%
L6 Drywall Wall Paint Entry Green <0.020%
L8 Concrete Wall Paint Mech Rm White 0.16%
L9 Concrete Wall Paint Mech Rm Green 0.16%
L10 Concrete Floor Paint Mech Rm Red/Gray 0.35%
L11 Concrete Ceiling Mech Rm White 0.0091%
L12 Metal Entry Door Mech Rm Red/White 3.4% 1 Each
L14 Concrete Floor Paint Mech Rm Red/Gray 0.32%
Table 2. Lead-Based Paint Lead-Based Paint = ≥ 0.5% by Weight
APPENDIX B
Photo Logs
Asbestos Photo Log
Lead-Based Paint Photo Log www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax) http://www.amienvironmental.com/
Asbestos Photo Log
PHOTO 1
White/Beige 12”x12” Vinyl Floor Tile
(VFT) Non-ACM
PHOTO 2
White/Beige 12”x12” Vinyl Floor Tile
PHOTO 3
Dark Brown 12”x12” Vinyl Floor Tile
PHOTO 4
White 24”x 24” Ceiling Tile – Pin
Non-ACM
PHOTO 5
White 24”x 24” Ceiling Tile – Pin
PHOTO 6
Gray Duct Mastic – Non-ACM
PHOTO 7
Drywall – Non-ACM
Joint Compound – Non-ACM
PHOTO 8
Plaster Non-ACM
Skim Coat Non-ACM
PHOTO 9
Yellow Base Cove Mastic Non-ACM PHOTO 10
2’x 2’ Carpet Squares, Mastic, Leveler
PHOTO 11
White 2’x 2’ Ceiling Tile-Hole/Fissure
PHOTO 12
White Duct Mastic
PHOTO 13
Plaster Skim Coat Non-ACM
Plaster Base Coat Non-ACM
PHOTO 14
2’x 2’ Carpet Square Mastic
PHOTO 15
White 2’x 2’ Ceiling Tile-Worm & Hole
PHOTO 16
White 2’x 2’ Ceiling Tile-Hole/Fissure
PHOTO 17
Mudded Fitting Non-ACM PHOTO 18
Mudded Fitting Non-ACM
PHOTO 19
N Side Hall by GA 152 Non-ACM PHOTO 20
S Side Hall by GA 148B Non-ACM
PHOTO 21
Sheet Flooring, Mastic, Leveler
PHOTO 22
Gray Spray-on Fireproofing Non-ACM
PHOTO 23
Gray Spray-on Fireproofing Non-ACM PHOTO 24
Gray Spray-on Fireproofing Non-ACM
PHOTO 25
Drywall Non-ACM
Joint Compound Non-ACM
PHOTO 26
Black Duct Mastic 6% Chrysotile ACM
PHOTO 27
Black Duct Mastic 6% Chrysotile ACM PHOTO 28
Black Mastic 6% Chrysotile ACM on concrete above ceiling tile
PHOTO 29
Black Duct Mastic 6% Chrysotile ACM PHOTO 30
White Duct Mastic Non-ACM
PHOTO 31
White Duct Mastic Non-ACM PHOTO 32
Blue Firestop Non-ACM
PHOTO 33
Blue Firestop Non-ACM PHOTO 34
Red Firestop Non-ACM
PHOTO 35
Mudded Fitting Non-ACM PHOTO 36
Tan Mastic Non-ACM
Lead-Based Paint Photo Log
Tan Wall Paint – Paint Containing Lead (<0.5%)
Non-Lead-based Paint
PHOTO 2
Tan Wall Paint (Peeling) Paint Containing
Lead(<0.5%) Non-Lead-based Paint
Green Wall Paint – Paint Containing Lead (<0.5%)
PHOTO 4
Tan/Green Wall Paint – Paint Containing Lead
(<0.5%) Non-Lead-based Paint
PHOTO 5
Pink Wall Paint - Paint Containing Lead (<0.5%)
PHOTO 6
Tan Wall Paint Containing Lead (<0.5%) Non-
Lead-based Paint
PHOTO 7
White Paint on Block - Paint Containing Lead
PHOTO 8
Green Paint on Block - Paint Containing Lead
PHOTO 9
Red & Gray Floor Paint - Paint Containing Lead
PHOTO 10
White Paint on Ceiling Concrete - Paint
Containing Lead (<0.5%) Non-Lead-based Paint
PHOTO 11
White Paint on Room Entry Door/Frame (3.4%)
Lead-based Paint
PHOTO 12
Red & Gray Floor Paint - Paint Containing Lead
Mold/Moisture Intrusion Photo Log
Moisture Damaged Ceiling Tile PHOTO 2
Moisture Damaged Ceiling Tile
Moisture Damaged Ceiling Tile PHOTO 4
Apparent Moisture Damage on Plaster (note rust on metal)
APPENDIX C
Schematics
Asbestos Material Locations
Mold Removal Locations
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-16-104
PROJECT AREA
KEY PLAN
NOT TO SCALE
09/03/2019
DEHIIWHC
XXX
GENERAL NOTES
OKLAHOMA
CITY VAMC
15-2226.013
95% CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA100
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF
ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINT (LBP) SUBJECT
TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED.
LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE
REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY
INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING
SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE
PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH
APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED
ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE
ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT
IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND
CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE
APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN
REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT
SHALL APPLY. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE OWNER, THE
OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS
REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED
FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND
PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL
FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE
RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS
REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF
DEMOLITION AND ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF
NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED
IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE PROJECT. NO
ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES
AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION DRAWINGS
AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE
REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
2. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES
(NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE
SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT;
SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82 13-19, ASBESTOS
FLOOR TILE AND MASTIC ABATEMENT; 02 82 13-31 ASBESTOS TRANSITE AND
CLASS II ABATEMENT. FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF
NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF),
AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS,
BEST PRACTICES AND PHASING REQUIREMENTS.
3. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR
ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN
-0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE
AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR
DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S
REPRESENTATIVE, AND VPIH, IF NEEDED.
4. TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED MAY
BE PERFORMED USING GLOVEBAGS TO ACCOMPLISH WRAP AND CUT METHODS IF
APPROVED BY THE GENERAL CONTRACTOR. COORDINATE WITH MECHANICAL
DEMOLITION DRAWINGS AND THE MECHANICAL CONTRACTOR.
5. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR INFORMATION CONCERNING THE
PRESENCE OF ASBESTOS CONTAINING MATERIALS IN THE PROJECT AREAS.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL
CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE,
AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH
PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME
AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO
CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY OPERATIONS.
LEAD-BASED PAINT AND PAINT CONTAINING LEAD:
1. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥1.0 MG/M² OR ≥0.5
PERCENT BY WEIGHT.
2. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL OF LEAD.
3. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS, AND
SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR
DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS WITH LBP
AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS, SECTION 02 83
33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
AND THE APPROVED WORK PLAN.
4. FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE
REMOVED AND STABILIZED USING METHODS IN ACCORDANCE WITH SECTION 02 83
33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
5. IF WALLS WITH LBP ARE TO BE DEMOLISHED, WALL MAY BE REMOVED AND
DISPOSED OF IN ACCORDANCE WITH APPROVAL FROM GENERAL CONTRACTOR.
PERFORM REMOVAL AND DISPOSAL IN ACCORDANCE WITH SECTION 02 83 33.13,
OR 29 CFR 1926.62 LEAD IN CONSTRUCTION FOR MINIMAL NON-ABATEMENT
LEAD-BASED PAINT DISTURBANCE.
6. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR INFORMATION CONCERNING THE
PRESENCE OF LBP, LEAD CONTAINING MATERIALS AND PCL IN THE PROJECT
AREAS.
Summary of Asbestos Materials to be Potentially Impacted
DESCRIPTION LEGEND FRIABLE EST. QTY.
Black Mastic on Ducts & Concrete above Ceiling Tiles No
200 Square Feet
(SF)
8" Diameter Pipe Insulation (labeled ACM) Yes
60 Linear Feet (LF)
8" Diameter Fittings (labeled ACM) Yes
10 Each (EA)
Summary of Lead-Based Painted Materials to be Potentially Impacted
DESCRIPTION LEGEND
PEELING OR
DELAMINATING
EST. QTY.
Entry Door & Frame to Mechanical Room on Floor
Below Project Area
No 1 ea.
* Note - Lead-Based Paint is 1 level down from marked area on main level.
AutoCAD SHX Text
FOURFRONT DESIGN, INC.
AutoCAD SHX Text
517 7TH STREET
AutoCAD SHX Text
RAPID CITY, SOUTH DAKOTA 57701
AutoCAD SHX Text
PH: (605) 342-9470
AutoCAD SHX Text
FAX: (605) 342-2377
AutoCAD SHX Text
WWW.FOURFRONTDESIGN.COM
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 S. 135TH STREET SUITE 100
AutoCAD SHX Text
OMAHA, NE 68138
AutoCAD SHX Text
PH: (402) 861-4445
AutoCAD SHX Text
FARRIS ENGINEERING
AutoCAD SHX Text
12700 WEST DODGE ROAD
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
AutoCAD SHX Text
PH: (402) 330-5900
AutoCAD SHX Text
SCHEMMER
AutoCAD SHX Text
1044 NORTH 115TH ST, SUITE 3300
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
AutoCAD SHX Text
PH: (402) 493-4800
UP
MEN
GA149
WOMEN
GA150
PRIMARY CARE
GA151
PRIMARY CARE
GA153
PRIMARY CARE
GA154
PRIMARY CARE
GA148E
PRIMARY CARE
GA148D
PHARMACY SUPPLY
CHECK IN
GA148C
PRIMARY CARE
GA148B
CONFERENCE ROOM
GA148A
BREAK ROOM
GA148
IV SOLUTION
STORAGE
GA143A
INPATIENT
PHARMACY
GA143F
OFFICE
GA143B
OFFICE
GA141B
MOBILE FILE ROOM
GA143D
NEGATIVE CHEMO
CLEAN ROOM
GA142B1
ANTE ROOM
GA142B
POSITIVE IV CLEAN
ROOM
GA142A1
ANTE ROOM
GA142A
STORAGE / SUPPLY
ROOM
GA142
STAIR 2
02-06
02-0502-05
02-0502-05
02-01
02-0102-01
02-0202-02
02-0502-05
02-06
02-0102-0102-01
02-02
02-01
02-02
02-0702-07
02-01
02-0702-07
02-01
02-0202-02
02-01
02-02
02-01
02-11
02-07
02-50
02-13
02-02
02-09
02-05
02-09
02-09
02-10 02-10
02-15
02-08
02-12 02-14
02-12
02-04
02-0402-04
02-04
02-0402-04
02-05
02-0402-0402-04
02-01
02-01
02-01
02-01
02-02
02-02
02-02
02-02
02-02
02-0102-01
02-01
02-02
02-01
02-01
02-01
02-02
02-0102-01
02-01
02-02
02-0202-02
02-01
02-01
02-01
02-01
02-02
02-10
02-03
02-0302-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-02
02-03
02-03
02-03
02-03
02-01
02-03
02-01
02-04
02-04
02-04
02-07
02-07
26-0126-0126-01
26-01
A5.01
A5.01
A5.01
A5.01 30
A5.02
A5.01
A5.01
A5.01
A5.02
A5.02
A5.02
A5.02
4 2
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-16-104
PROJECT AREA
KEY PLAN
NOT TO SCALE
09/03/2019
DEHIIWHC
XXX
ASBESTOS CONTAINING
MATERIAL
OKLAHOMA
CITY VAMC
15-2226.013
95% CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA101
ASBESTOS KEYED NOTES
1. ESTABLISH REGULATED AREA (MINOR
DECONTAMINATION AREA) AND REMOVE BLACK
MASTIC ON DUCTS AND FLOOR DECK ABOVE
CEILING.
2. ESTABLISH REGULATED AREA AND REMOVE ACM
LABELED THERMAL SYSTEM INSULATION (TSI)
COVERED PIPE AND FITTINGS USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02
82 13.13. FOR SECTIONS OF PIPE TO BE
DEMOLISHED, WRAP AND CUT METHODS MAY BE
USED ONLY IF APPROVED BY THE GENERAL
CONTRACTOR. WHEN GLOVEBAG METHODS ARE
NOT FEASIBLE, USE FULL CONTAINMENT AND
ISOLATION PROCEDURES (MAJOR
DECONTAMINATION AREAS) IN ACCORDANCE WITH
SECTION 02 82 11, TRADITIONAL ASBESTOS
ABATEMENT.
3. CONCEALED TSI CONTAINING ACM MAY EXIST IN
WALLS, ABOVE CEILINGS, IN PIPE CHASES, AND
WITHIN WALL PENETRATIONS. IF SUSPECT ACMS ARE
ENCOUNTERED DURING CONSTRUCTION AND
DEMOLITION THAT ARE NOT IDENTIFIED ON THE
ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
4. THE PROJECT AREA WAS RECENTLY SURVEYED FOR
ACM. REFER TO THE HAZARDOUS BUILDING
MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR
MORE INFORMATION ABOUT ACMS IDENTIFIED IN
THE PROJECT AREA.
Summary of Asbestos Materials to be Potentially Impacted
DESCRIPTION LEGEND FRIABLE EST. QTY.
Black Mastic on Ducts & Concrete above Ceiling Tiles No
200 Square Feet
(SF)
8" Diameter Pipe Insulation (labeled ACM) Yes
60 Linear Feet (LF)
8" Diameter Fittings (labeled ACM) Yes
10 Each (EA)
AutoCAD SHX Text
FOURFRONT DESIGN, INC.
AutoCAD SHX Text
517 7TH STREET
AutoCAD SHX Text
RAPID CITY, SOUTH DAKOTA 57701
AutoCAD SHX Text
PH: (605) 342-9470
AutoCAD SHX Text
FAX: (605) 342-2377
AutoCAD SHX Text
WWW.FOURFRONTDESIGN.COM
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 S. 135TH STREET SUITE 100
AutoCAD SHX Text
OMAHA, NE 68138
AutoCAD SHX Text
PH: (402) 861-4445
AutoCAD SHX Text
FARRIS ENGINEERING
AutoCAD SHX Text
12700 WEST DODGE ROAD
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
AutoCAD SHX Text
PH: (402) 330-5900
AutoCAD SHX Text
SCHEMMER
AutoCAD SHX Text
1044 NORTH 115TH ST, SUITE 3300
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
UP
MEN
GA149
WOMEN
GA150
PRIMARY CARE
GA151
PRIMARY CARE
GA153
PRIMARY CARE
GA154
PRIMARY CARE
GA148E
PRIMARY CARE
GA148D
PHARMACY SUPPLY
CHECK IN
GA148C
PRIMARY CARE
GA148B
CONFERENCE ROOM
GA148A
BREAK ROOM
GA148
IV SOLUTION
STORAGE
GA143A
INPATIENT
PHARMACY
GA143F
OFFICE
GA143B
OFFICE
GA141B
MOBILE FILE ROOM
GA143D
NEGATIVE CHEMO
CLEAN ROOM
GA142B1
ANTE ROOM
GA142B
POSITIVE IV CLEAN
ROOM
GA142A1
ANTE ROOM
GA142A
STORAGE / SUPPLY
ROOM
GA142
STAIR 2
02-06
02-0502-05
02-0502-05
02-01
02-0102-01
02-0202-02
02-0502-05
02-06
02-0102-0102-01
02-02
02-01
02-02
02-0702-07
02-01
02-0702-07
02-01
02-0202-02
02-01
02-02
02-01
02-11
02-07
02-50
02-13
02-02
02-09
02-05
02-09
02-09
02-10 02-10
02-15
02-08
02-12 02-14
02-12
02-04
02-0402-04
02-04
02-0402-04
02-05
02-0402-0402-04
02-01
02-01
02-01
02-01
02-02
02-02
02-02
02-02
02-02
02-0102-01
02-01
02-02
02-01
02-01
02-01
02-02
02-0102-01
02-01
02-02
02-0202-02
02-01
02-01
02-01
02-01
02-02
02-10
02-03
02-0302-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-03
02-02
02-03
02-03
02-03
02-03
02-01
02-03
02-01
02-04
02-04
02-04
02-07
02-07
26-0126-0126-01
26-01
A5.01
A5.01
A5.01
A5.01 30
A5.02
A5.01
A5.01
A5.01
A5.02
A5.02
A5.02
A5.02
4 2
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-16-104
PROJECT AREA
KEY PLAN
NOT TO SCALE
09/03/2019
DEHIIWHC
XXX
LEAD-BASED PAINT
OKLAHOMA
CITY VAMC
15-2226.013
95% CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA102
LEAD NOTES
1. LBP IS KNOWN TO EXIST ON MATERIALS,
COMPONENTS, AND SURFACES THAT MAY BE
DISTURBED, PENETRATED, REFINISHED, OR
DEMOLISHED. PERFORM DEMOLITION OF
MATERIALS AND COMPONENTS WITH LBP AND/OR
PCL IN ACCORDANCE WITH APPLICABLE
REGULATIONS, SECTION 02 83 33.13, LEAD-BASED
PAINT REMOVAL AND DISPOSAL AND THE
APPROVED WORK PLAN.
2. CONCEALED LBP MAY BE PRESENT ON SURFACES
BEHIND WALLS AND MAY BE IMPACTED FOR
PENETRATIONS, OR WALL DEMOLITION. LBP DUST
MUST BE CONTROLLED ACCORDING TO 29 CFR
1926.62. PERFORM CLEANUP AND DISPOSAL OF LBP
DUST AND DEBRIS IN ACCORDANCE WITH SECTION
02 83 33.13, LEAD-BASED PAINT REMOVAL AND
DISPOSAL.
Summary of Lead-Based Painted Materials to be Potentially Impacted
DESCRIPTION LEGEND
PEELING OR
DELAMINATING
EST. QTY.
Entry Door & Frame to Mechanical Room on Floor
Below Project Area
No 1 ea.
* Note - Lead-Based Paint is 1 level down from marked area on main level.
AutoCAD SHX Text
FOURFRONT DESIGN, INC.
AutoCAD SHX Text
517 7TH STREET
AutoCAD SHX Text
RAPID CITY, SOUTH DAKOTA 57701
AutoCAD SHX Text
PH: (605) 342-9470
AutoCAD SHX Text
FAX: (605) 342-2377
AutoCAD SHX Text
WWW.FOURFRONTDESIGN.COM
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 S. 135TH STREET SUITE 100
AutoCAD SHX Text
OMAHA, NE 68138
AutoCAD SHX Text
PH: (402) 861-4445
AutoCAD SHX Text
FARRIS ENGINEERING
AutoCAD SHX Text
12700 WEST DODGE ROAD
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
AutoCAD SHX Text
PH: (402) 330-5900
AutoCAD SHX Text
SCHEMMER
AutoCAD SHX Text
1044 NORTH 115TH ST, SUITE 3300
AutoCAD SHX Text
OMAHA, NEBRASKA 68154
APPENDIX D
Analytical Results
Asbestos Lab Report
Lead Results
XRF Lead Analysis Report
Asbestos Lab Report
EMSL Analytical, Inc.
200 Route 130 North Cinnaminson, NJ 08077
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
041923390EMSL Order:
Customer ID: AMI50
Customer PO: 18-00337
Project ID:
Attention: Phone:William Crowe (402) 397-5001
Fax:AMI Group, Inc. (402) 397-3313
Received Date:8802 South 135th Street 08/09/2019 9:15 AM
Analysis Date:Suite 100 08/12/2019 - 08/13/2019
Collected Date:Omaha, NE 68138-6511 08/06/2019
Project: 18-00337 / Okla Cita, VA Pharmacy / OKC
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
1-Vinyl Floor Tile
041923390-0001
None DetectedNon-fibrous (Other)100%White/Beige
Non-Fibrous
Homogeneous
12x12 VFT - Tan
1-Mastic
041923390-0001A
None DetectedNon-fibrous (Other)100%Yellow/Clear
Non-Fibrous
Homogeneous
Mastic
2-Vinyl Floor Tile
041923390-0002
None DetectedNon-fibrous (Other)100%White/Beige
Non-Fibrous
Homogeneous
12x12 VFT - Tan
2-Mastic
041923390-0002A
None DetectedNon-fibrous (Other)100%Black/Clear
Non-Fibrous
Homogeneous
Mastic
3-Vinyl Floor Tile
041923390-0003
None DetectedNon-fibrous (Other)100%White/Beige
Non-Fibrous
Homogeneous
12x12 VFT - Tan
3-Mastic
041923390-0003A
None DetectedNon-fibrous (Other)100%Black/Yellow/Clear
Non-Fibrous
Heterogeneous
Mastic
4-Vinyl Floor Tile
041923390-0004
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Dark 12x12 VFT -
Brown
4-Mastic
041923390-0004A
None DetectedNon-fibrous (Other)100%Black/Yellow
Non-Fibrous
Heterogeneous
Mastic
041923390-0005
None DetectedNon-fibrous (Other)35%Cellulose
Min. Wool
30%
35%
Gray/White
Fibrous
Homogeneous
Pin 24x24 Ceiling Tile
- White
041923390-0006
None DetectedNon-fibrous (Other)35%Cellulose
Min. Wool
30%
35%
Gray/White
Fibrous
Homogeneous
Pin 24x24 Ceiling Tile
- White
041923390-0007
None DetectedNon-fibrous (Other)10%Cellulose
Min. Wool
60%
30%
Gray/White
Fibrous
Homogeneous
Pin 24x24 Ceiling Tile
- White
041923390-0008
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Gray Duct Mastic
9-Drywall
041923390-0009
None DetectedNon-fibrous (Other)100%Brown/White
Fibrous
Homogeneous
Drywall
9-Joint Compound
041923390-0009A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Joint Compound
041923390-0010
None DetectedNon-fibrous (Other)95%Synthetic5%Tan/Red
Fibrous
Homogeneous
Plaster
11-Skim Coat
041923390-0011
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Plaster
Initial report from: 08/12/2019 09:00:44
Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/14/2019 12:24 AM
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
041923390EMSL Order:
Customer ID: AMI50
Customer PO: 18-00337
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
11-Base Coat
041923390-0011A
None DetectedNon-fibrous (Other)95%Synthetic5%Tan/Red
Fibrous
Homogeneous
Plaster
041923390-0012
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Cove Mastic
041923390-0013
None DetectedNon-fibrous (Other)100%Brown/Yellow
Non-Fibrous
Homogeneous
Offices - 24x24
Carpet Square
14-Mastic
041923390-0014
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Offices - 24x24
Carpet Square
14-Leveler
041923390-0014A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Offices - Leveler
041923390-0015
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
50%
30%
White
Fibrous
Homogeneous
24x24 Ceiling Tile
041923390-0016
None DetectedNon-fibrous (Other)45%Cellulose
Glass
35%
20%
White/Silver/Yellow
Fibrous
Homogeneous
White Mastic Duct
041923390-0017
None DetectedNon-fibrous (Other)55%Cellulose
Glass
30%
15%
White/Silver
Fibrous
Homogeneous
White Mastic Duct
18-Skim Coat
041923390-0018
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Plaster
18-Base Coat
041923390-0018A
None DetectedNon-fibrous (Other)95%Synthetic5%Tan
Fibrous
Homogeneous
Plaster
041923390-0019
None DetectedNon-fibrous (Other)100%Brown/Black/Yellow
Non-Fibrous
Homogeneous
24x24 Carpet Square
Mastic
041923390-0020
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
24x24 Carpet Square
Mastic
041923390-0021
None DetectedNon-fibrous (Other)30%Cellulose
Min. Wool
30%
40%
Gray/White
Fibrous
Homogeneous
Worm and Hole
Ceiling Tile
041923390-0022
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
24x24 Ceiling Tile
Hole and Fissure
041923390-0023
None DetectedNon-fibrous (Other)70%Cellulose30%White
Fibrous
Homogeneous
2" Mudded Fitting
041923390-0024
None DetectedNon-fibrous (Other)70%Cellulose30%White
Fibrous
Homogeneous
2"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .