This document outlines a federal contract opportunity for pharmacy renovation services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is soliciting proposals to renovate approximately 12,155 square feet of inpatient pharmacy and primary care office space at the Veteran Affairs Healthcare Systems facility in Oklahoma City, Oklahoma. The purpose of the renovation is to bring the inpatient pharmacy into compliance with Pharmacy Chapters 797 and 800, and to improve pharmacy efficiency for the growing veteran population. This is a 100% set-aside for Service Disabled Veteran Owned Small Businesses. The North American Industry Classification System code is 236220. The estimated contract value is between $2,000,000 and $4,000,000. The solicitation number is 36C25921R0057. Interested parties must register in the System for Award Management and complete representations and certifications at www.sam.gov. Responses are due by the date specified in the full solicitation, which is expected to be posted on or shortly after March 8, 2021.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHARMACY RENOVATION
PROJECT LOCATION
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
635-18-102
ALBERTSON ENGINEERING, INC.
3202 WEST MAIN STREET, SUITE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
PH: (402) 493-4800
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PH: (402) 397-5001
/1
/2
:1
:3
P
M
CONSTRUCTION DOCUMENTS
07/10/2020
COVER SHEET
G0.00
RENOVATE PHARMACY FOR
CHAPTER 797-800
KZJS
OKLAHOMA CITY, OKLAHOMA
OKLAHOMA CITY VAMC
15-2226.013
FDA.01 FIRE ALARM DEMOLITION PLAN - GROUND LEVEL
FA.00 FIRE ALARM RISER DIAGRAM AND DETAILS
FA.01 FIRE ALARM PLAN - GROUND LEVEL
FDX.01 FIRE SUPPRESSION DEMOLITION PLAN - GROUND
LEVEL
FX.00 FIRE SUPPRESSION GENERAL NOTES AND DETAILS
FX.01 FIRE SUPPRESSION PLAN - GROUND LEVEL
E 00 ELECTRICAL INFO SHEET
E001 FLOOR PLAN - DEMOLITION
E101 FLOOR PLAN - LIGHTING
E201 FLOOR PLAN - POWER AND AUXILIARY SYSTEMS
E501 ELECTRICAL DETAILS
P 00 PLUMBING INFO SHEET
P001 GROUND FLOOR DEMOLITION PLAN - PLUMBING
P101 GROUND FLOOR PLAN - PLUMBING
P201 SANITARY RISER DIAGRAM - PLUMBING
P301 DETAILS AND SCHEDULES - PLUMBING
M 00 MECHANICAL INFO SHEET
M 01 GROUND FLOOR PHASING PLAN - MECHANICAL
M001 GROUND FLOOR DEMOLITION PLAN - MECHANICAL
M101 GROUND FLOOR PLAN - MECHANICAL
M201 GROUND FLOOR PIPING PLAN - MECHANICAL PIPING
M401 DETAILS - MECHANICAL
N402 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
M600 GROUND FLOOR ZONING PLAN - MECHANICAL
AD1.00 DEMO FLOOR AND REFLECTED CEILING PLANS -
GROUND LEVEL
A1.00 NEW FLOOR AND REFLECTED CEILING PLANS -
GROUND LEVEL
A1.01 REFLECTED CEILING PLAN AND DETAILS
A1.10 EQUIPMENT PLAN AND SCHEDULE
A1.20 ROOF PLAN
A5.00 ROOM FINISH SCHEDULE
A5.01 ENLARGED PLANS, INTERIOR ELEVATIONS AND PLAN
DETAILS
A5.02 ENLARGED PLANS AND INTERIOR ELEVATIONS
A6.00 DOOR SCHEDULE AND WINDOW ELEVATIONS
S-001 STRUCTURAL GENERAL NOTES
S-101 FLOOR FRAMING PLAN - GROUND LEVEL AND
SUPPORTING DETAILS
HA100 GENERAL NOTES
HA-101 HAZARDOUS MATERIALS ASSESSMENT
HA-102 HAZARDOUS MATERIALS ASSESSMENT
G0.00 COVER SHEET
G0.01 ABBREVIATION, SYMBOLS, LEGENDS AND GENERAL
NOTES
G0.02 CONTRACTOR STAGING PLAN
G1.01 LIFE SAFETY PLAN - GROUND LEVEL
G1.02 PHASING/ INFECTION CONTROL PLAN
ARCHITECT
STRUCTURAL ENGINEER
FOURFRONT DESIGN INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
SHEET INDEX
GENERAL PLUMBING
MECHANICAL
ELECTRICAL
STRUCTURAL
ALBERTSON ENGINEERING INC.
3202 WEST MAIN STREET, SUITE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
MECHANICAL ENGINEER,
ELECTRICAL ENGINEER
SCHEMMER
1044 NORTH 115TH ST, SUITE 3300
OMAHA, NEBRASKA 68154
PH: (402) 493-4800
FIRE PROTECTION ENGINEER
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
OKLAHOMA CITY
VA MEDICAL CENTER
RENOVATE PHARMACY
FOR CHAPTER 797-800
921 NORTHEAST 13TH STREET
OKLAHOMA CITY, OKLAHOMA 73104
PROJECT #: 635-18-102
FIRE PROTECTION
LOCATION MAP
N
HAZARDOUS MATERIALS SURVEYOR
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PH: (402) 397-5001
HAZARDOUS MATERIALS SURVEY
ARCHITECTURAL
DRAWING ABBREVIATIONS DRAWINGS SYMBOLS
MATERIAL LEGEND
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNITAIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUF.
ASSOC.
BLDG BUILDING
BLKG BLOCKING
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
C. PLAS CEMENT PLASTER
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INS. FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED-
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED-
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PL GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CON PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
REVISION
TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
ROOM NAME
N
A101
SIM
A101
1 Ref
R e f
1Ref
R e f
STEEL/METAL
WOOD (ROUGH) BLOCKING OR
SHIM
BRICK/MASONRY
EXISTING TO REMAIN
CONCRETE MASONRY
PLAN AND SECTION
WOOD (ROUGH)
GYPSUM BOARD
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
RIGID INSULATION
EXISTING TO REMAIN
DEMOLISH
GENERAL NOTES
1. SHEET SIZE FOR PROPER SCALE IS 30"X42". CONTRACTOR
SHALL NOT SCALE DRAWINGS BUT SHALL REQUEST THE
DESIRED DIMENSIONS FROM THE COR.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD
VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED CONDITIONS.
COORDINATE DEMOLITION BETWEEN ALL TRADES. NOTIFY
COR IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.
3. WALL PARTITIONS EXTEND TO THE UNDERSIDE OF DECK
UNLESS NOTED WITH WALL HEIGHT NEXT TO WALL TYPE TAG.
4. SEE ENLARGED AREA PLANS FOR WALL TYPE INDICATIONS
AND DIMENSIONS.
5. SEE LIFE SAFETY PLAN FOR CODE INFORMATION.
6. EXISTING DOORS SHOW AT 45 DEGREE ANGLE FOR CLARITY.
7. EXISTING WALLS SHADED FOR CLARITY.
8. SYSTEMS FURNISHINGS AND OWNER PROVIDED CONTRACTOR
INSTALLED ITEMS NOT SHOWN FOR CLARITY.
A101
SIM
A101 05-01
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASHSHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
U --------------------
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
V --------------------
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W --------------------
W/ WITH
WD WOOD
WDW WINDOW
WP WORKING POINT
WRB WEATHER RESISTANT BARRIER
WWF WELDED WIRE FABRIC
1 DOOR TAG
DOOR NUMBER
PARTITION TAG
WALL HEIGHT (AFF)
9'-6"
WALL TYPE
E1
EQUIPMENT TAG15
GOV'T PROVIDED EQUIPMENT
SHEET INDEX
XX WINDOW TAG
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
635-18-102
ALBERTSON ENGINEERING, INC.
3202 WEST MAIN STREET, SUITE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
PH: (402) 493-4800
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PH: (402) 397-5001
/1
/2
:1
:4
P
M
CONSTRUCTION DOCUMENTS
07/10/2020
ABBREVIATION, SYMBOLS, LEGENDS
AND GENERAL NOTES
G0.01
RENOVATE PHARMACY FOR
CHAPTER 797-800
JEJS
OKLAHOMA CITY, OKLAHOMA
OKLAHOMA CITY VAMC
15-2226.013
FDA.01 FIRE ALARM DEMOLITION PLAN - GROUND LEVEL
FA.00 FIRE ALARM RISER DIAGRAM AND DETAILS
FA.01 FIRE ALARM PLAN - GROUND LEVEL
FDX.01 FIRE SUPPRESSION DEMOLITION PLAN - GROUND
LEVEL
FX.00 FIRE SUPPRESSION GENERAL NOTES AND DETAILS
FX.01 FIRE SUPPRESSION PLAN - GROUND LEVEL
E 00 ELECTRICAL INFO SHEET
E001 FLOOR PLAN - DEMOLITION
E101 FLOOR PLAN - LIGHTING
E201 FLOOR PLAN - POWER AND AUXILIARY SYSTEMS
E501 ELECTRICAL DETAILS
P 00 PLUMBING INFO SHEET
P001 GROUND FLOOR DEMOLITION PLAN - PLUMBING
P101 GROUND FLOOR PLAN - PLUMBING
P201 SANITARY RISER DIAGRAM - PLUMBING
P301 DETAILS AND SCHEDULES - PLUMBING
M 00 MECHANICAL INFO SHEET
M 01 GROUND FLOOR PHASING PLAN - MECHANICAL
M001 GROUND FLOOR DEMOLITION PLAN - MECHANICAL
M101 GROUND FLOOR PLAN - MECHANICAL
M201 GROUND FLOOR PIPING PLAN - MECHANICAL PIPING
M401 DETAILS - MECHANICAL
N402 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
M600 GROUND FLOOR ZONING PLAN - MECHANICAL
AD1.00 DEMO FLOOR AND REFLECTED CEILING PLANS -
GROUND LEVEL
A1.00 NEW FLOOR AND REFLECTED CEILING PLANS -
GROUND LEVEL
A1.01 REFLECTED CEILING PLAN AND DETAILS
A1.10 EQUIPMENT PLAN AND SCHEDULE
A1.20 ROOF PLAN
A5.00 ROOM FINISH SCHEDULE
A5.01 ENLARGED PLANS, INTERIOR ELEVATIONS AND PLAN
DETAILS
A5.02 ENLARGED PLANS AND INTERIOR ELEVATIONS
A6.00 DOOR SCHEDULE AND WINDOW ELEVATIONS
S-001 STRUCTURAL GENERAL NOTES
S-101 FLOOR FRAMING PLAN - GROUND LEVEL AND
SUPPORTING DETAILS
HA100 GENERAL NOTES
HA-101 HAZARDOUS MATERIALS ASSESSMENT
HA-102 HAZARDOUS MATERIALS ASSESSMENT
G0.00 COVER SHEET
G0.01 ABBREVIATION, SYMBOLS, LEGENDS AND GENERAL
NOTES
G0.02 CONTRACTOR STAGING PLAN
G1.01 LIFE SAFETY PLAN - GROUND LEVEL
G1.02 PHASING/ INFECTION CONTROL PLAN
GENERAL SHEETS
HAZARDOUS MATERIALS SURVEY
MECHANICAL
PLUMBING
ELECTRICAL
FIRE PROTECTION
STRUCTURAL
ARCHITECTURAL
OXYGEN
TANK
CHAIN LINK
X X X X X X X X
R A
M P
D O
W N
R A
M P
U P
PARKING
RAMP UP
HC
H C
HC
HC
H C
HC
H C
H C
PARKING
NO
VEH
POLICE
TRUCK
LAUNDRY
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
H C
N. McMECHAN STREET
N. KELLY STREET
N E th
S T
R E
E T
N E th
S T
R E
E T
N E th
S T
R E
E T
31-01
31-01
1. SHEET SIZE FOR PROPER SCALE IS 30"X42".
CONTRACTOR SHALL NOT SCALE DRAWINGS BUT
SHALL REQUEST THE DESIRED DIMENSIONS FROM
THE COR.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED
CONDITIONS. COORDINATE DEMOLITION BETWEEN
ALL TRADES. NOTIFY COR IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
3. WALL PARTITIONS EXTEND TO THE UNDERSIDE OF
DECK UNLESS NOTED WITH WALL HEIGHT NEXT TO
WALL TYPE TAG.
4. SEE ENLARGED AREA PLANS FOR WALL TYPE
INDICATIONS AND DIMENSIONS.
5. SEE CODE PLAN FOR CODE INFORMATION.
6. EXISTING DOORS SHOW AT 45 DEGREE ANGLE FOR
CLARITY.
7. EXISTING WALL SHADED FOR CLARITY.
WORK TO EXTERIOR OF BUILDING
CONTRACTOR POINT OF ACCESS FOR
INTERIOR REMODEL WORK. COORDINATE
WITH PHASING PLANS IN THIS DRAWING
SET.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
635-18-102
ALBERTSON ENGINEERING, INC.
3202 WEST MAIN STREET, SUITE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
PH: (402) 493-4800
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PH: (402) 397-5001
/1
/2
:1
:4
P
M
CONSTRUCTION DOCUMENTS
07/10/2020
CONTRACTOR STAGING PLAN
G0.02
RENOVATE PHARMACY FOR
CHAPTER 797-800
JEJS
OKLAHOMA CITY, OKLAHOMA
OKLAHOMA CITY VAMC
15-2226.013
1" = 40'-0"
CONTRACTOR STAGING PLAN
N
GENERAL NOTES:
KEYNOTES:
31-01 HATCHED AREA INDICATES WORK EXTERIOR TO THE BUILDING.
THE PROJECT INCLUDES THE REPLACEMENT OF A ROOF
MOUNTED AIR HANDLING UNIT ABOVE THE LOADING DOCK. ALSO
INCLUDED IS THE INSTALLATION OF EXHAUST FANS UP TO THE
9TH FLOOR ROOF AREA. CONTRACTOR ACCESS THE LOADING
DOCK AREA SHALL BE SCHEDULED IN ADVANCE WITH THE COR
AND FOR A LIMITED TIME TO FACILITATE HOISTING THE
EQUIPMENT TO THE IDENTIFIED LOCATIONS.
SHEET SPECIFIC NOTES:
1. CONTRACTOR OVERFLOW PARKING SHALL BE PROVIDED
IN COORDINATION WITH THE COR. THE LOCATION OF
THIS PARKING IS 3 BLOCKS EAST OF THE HOSPITAL
ALONG LOTTIE AVENUE. CONTRACTOR SHALL
CORDINATE WITH THE COR FOR SHUTTLE SERVICES TO
THE HOSPITAL OR PROVIDE THEIR OWN SHUTTLE
SERVICES.
STAGING LEGEND
635-18-102
R E
F
R E
F
UP
UP UP
UP UP
GA153 GA154a GA154G154c
GA154d
GA143d
CGA6
GA151 GA150 GA149a
GA149c
GA149b
G149d
GA149e
GA149 ? GA143a CGA7 GA143b
GA143eGA143f
CGA8
GA142
GA143
PHASE 1 CONTRACTOR
ACCESS AT STAIR 2
DUST MAT
(BOTH SIDES)
DUST MAT (BOTH SIDES)
MEN
GA149
WOMEN
GA150
PRIMARY CARE
GA151
PRIMARY CARE
GA153
PRIMARY CARE
GA154
PRIMARY CARE
GA148E
PRIMARY CARE
GA148D
PHARMACY SUPPLY CHECK
IN
GA148C
PRIMARY CARE
GA148B
CONFERENCE ROOM
GA148A
BREAK ROOM
GA148
IV SOLUTION STORAGE
GA143A
INPATIENT PHARMACY
GA143F
OFFICE
GA143B
OFFICE
GA141B
MOBILE FILE ROOM
GA143D
NEGATIVE CHEMO CLEAN
ROOM
GA142B1 ANTE ROOM
GA142B
POSITIVE IV CLEAN ROOM
GA142A1
ANTE ROOM
GA142A
STORAGE / SUPPLY ROOM
GA142
STAIR 2
PHASE 1 CONTRACTOR
ACCESS AT STAIR 2
DUST MAT
(BOTH SIDES)
DUST MAT (BOTH SIDES)
EXISTING FULL-HEIGHT WALL,
FIELD VERIFY
AFTER REMOVAL OF TEMPORARY
DUST WALL - PATCH AND PAINT
EXISTING WALL FROM CORNER TO
CORNER. REINSTALL HANDRAIL,
SIGNAGE, WAINSCOT, RUB RAILS,
ETC.
MAINTAIN NEGATIVE AIR PRESSURE
WITHIN WORK SITE UTILIZING HEPA
EQUIPPED FILTRATION UNITS.
INSTALL A FUSEABLE LINK FIRE
DAMPER AS REQUIRED TO MAINTAIN
1-HR FIRE RATING AT TEMPORARY
WALL. CLEAN OR REPLACE FILTER
DAILY (MIN.). EXHAUST TO EXTERIOR.
PROVIDE 1-HR (45 MIN.) FIRE RATED
TEMPORARY DOOR AND FRAME.
PLACE SCRAP SHEET VINYL BELOW
TEMPORARY WALL, COVERING THE
ENTIRETY OF THE TEMPORARY
ENCLOSURE AND EXTENDING 1/4" INTO
THE CORRIDOR.
EXISTING STRUCTURE ABOVE
IF EXISTING WALL IS NOT FULL-HEIGHT AND 1-HR
FIRE RATED, THEN TEMPORARY WALL MUST GO TO
STRUCTURE. IF EXISTING WALL MEETS ABOVE
REQUIREMENTS, THEN A TEMPORARY CEILING CAN
BE PROVIDED IN LIEU OF A FULL-HEIGHT WALL.
TEMPORARY CEILING CAN BE USED FOR DUST
CONTROL ONLY WHEN THE EXISTING WALL IS FULL-
HEIGHT AND IS CONSTRUCTED AS A1-HOUR WALL (ALL
PENETRATIONS FIRESTOPPED).
3-5/8" METAL STUDS AT 24" O.C. WITH 5/8" TYPE 'X'
GYPSUM BOARD (WITH FIRE TAPE AT ALL JOINTS) ON
EACH SIDE. FIRE CAULK ALL PENETRATIONS.
ASSEMBLY TO PROVIDE 1-HR FIRE RATED
PROTECTION.
ATTACH 1" FIRE SAFING TO BOTTOM OF METAL
STUD TO PROTECT EXISTING FLOOR FROM
DAMAGE.
EXISTING FLOOR - CONTRACTOR RESPONSIBLE FOR TAKING
PRECAUTIONS TO PROTECT EXISTING FLOOR AND REPAIR
TO ORIGINAL CONDITION AS NECESSARY.
PHASING PLAN LEGEND:
LIMITS OF INTERIOR REMODEL, SEE SHEET A1.20 AND
MECHANICAL DRAWINGS FOR ROOF MOUNTED MECHANICAL
WORK, OUTSIDE OF PROJECT BOUNDRY SHOWN ON PLANS.
AREA OF WORK NOT IN SCOPE - EXISTING TO REMAIN
PHASE 1
PHASE 2
AREAS TO REMAIN ACCESSIBLE DURING PROJECT CONSTRUCTION
WORK IN AREA TO BE COMPLETED AFTER REGULAR VA WORKING
HOURS
CONTRACTOR ACCESS ROUTE
TEMPORARY CONSTRUCTION PARTITION
SEQUENCE OF WORK
PRECONSTRUCTION ACTIVITIES
• ESTABLISH CONTRACTOR STAGING AREA IN COORDINATION WITH
THE COR ON STATION.
• SUBMIT PROJECT SCHEDULE TO COR. IDENTIFY ALL TRADES THAT
WILL BE NECESSARY TO COMPLETE DEMOLITION EFFICIENTLY AND
CONCURENTLY.
• INSTALL TEMPORARY ONE-HOUR FIRE RATED CONSTRUCTION
BARRIERS WHRE SHOWN TO SEPARATE AREAS OF CONSTRUCTION
ACTIVITY FROM ADJACENT AREAS OF THE HOSPITAL THAT WILL
REMAIN OCCUPIED AND OPERATIONAL.
• INSTALL HEPA FILTERS AND SEAL PROJECT BOUNDARY TO ENSURE
NEGATIVE AIR PRESSURE AS PER INFECTION CONTROL
REQUIREMENTS.
• PREFORM AND SUBMIT A PRE-CONSTRUCTION RISK ASSESSMENT AS
PER VA REQUIREMENTS.
• PROTECT ALL ITEMS AND EQUIPMENT NOTED TO REMAIN AS
NECESSARY. THE GENERAL CONTRACTOR SHALL BE RESPONISBLE
TO MAINTAIN THE EXISTING CONDITION AND REPAIR ANY DAMAGE TO
PRE-CONSTRUCTION CONDITION PRIOR TO PROJECT COMPLETION.
PHASE 1
• SECURE AND INSTALL A TEMPORARY AIR HANDLING UNIT AS DEFINED
IN THE MECHANICAL DRAWINGS. CONNECT, TEST AND BALANCE THE
TEMPORARY UNIT PRIOR TO THE REMOVAL AND REPLACEMENT OF
THE EXISTING AIR HANDLING UNIT.
• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 1 ON BOTH
GROUND FLOOR AND ABOVE CEILING WORK ON THE BASEMENT
FLOOR.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A
LOCATION DESIGNATED BY THE COR (ON-SITE). IT WILL BE THE
RESPONSIBILTY OF THE GENERAL CONTRACTOR TO RELOCATE
SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-
CONSTRUCTION CONDITION.
• REMOVE ALL MECAHNICAL AND ELECTRICAL SYSTEMS NOTED FOR
DEMOLITION.
• CLEAN AND REPAIR EXISITNG CONCRETE SLAB FOR FUTURE
INTSTALLATION OF FINISH FLOORING MATERIAL.
• CONSTRUCT NEW PARTITION WALLS INCLUDING ROUGH-IN FOR
MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION.
• REPAIR BASEMENT LEVEL CEILING AS SOON AS UNDERFLOOR
ROUGH-IN HAS BEEN COMPLETED. DO NOT LEAVE EXISTING
UNREPAIRED FOR MORE THAT 24 HOURS AFTER COMPLETION OF
ABOVE CEILING ROUGH-IN.
• INSTALL ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE
PROTECTION SYSTSEMS.
• INSTALL ALL CASEWORK, EQUIPMENT DOORS AND HARDWARE
IDENTIFIED IN THE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED
CONTRACTOR INSTALLED AND OWNER PROVIDED, OWNER INSTALLED
EQUIPMENT WITH THE OWNER AND THEIR VENDORS.
• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR
EXISTING AS NECESSARY.
• TURN THE NEWLY REMODELED SPACE OVER TO THE OWNER. THE
INTENT OF PHASE 1 IS TO PROVIDE A FULLY OPERATIONAL INPATIENT
COMPOUNDING SUITE THAT WILL REPLACE THE EXISTING SUITE THAT
WILL BE DEMOLISHED AND REMODELED AS PART OF PHASE 2.
PHASE 2
• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 2 ON BOTH
GROUND FLOOR AND ABOVE CEILING WORK ON THE BASEMENT
FLOOR.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A
LOCATION DESIGNATED BY THE COR (ON-SITE). IT WILL BE THE
RESPONSIBILTY OF THE GENERAL CONTRACTOR TO RELOCATE
SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-
CONSTRUCTION CONDITION.
• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR
DEMOLITION.
• CLEAN AND REPAIR EXISITNG CONCRETE SLAB FOR FUTURE
INTSTALLATION OF FINISH FLOORING MATERIAL.
• CONSTRUCT NEW PARTITION WALLS INCLUDING ROUGH-IN FOR
MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION.
• REPAIR BASEMENT LEVEL CEILING AS SOON AS UNDERFLOOR
ROUGH-IN HAS BEEN COMPLETED. DO NOT LEAVE EXISTING
UNREPAIRED FOR MORE THAT 24 HOURS AFTER COMPLETION OF
ABOVE CEILING ROUGH-IN.
• INSTALL ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE
PROTECTION SYSTSEMS.
• INSTALL ALL CASEWORK, EQUIPMENT DOORS AND HARDWARE
IDENTIFIED IN THE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED
CONTRACTOR INSTALLED AND OWNER PROVIDED, OWNER INSTALLED
EQUIPMENT WITH THE OWNER AND THEIR VENDORS.
• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR
EXISTING AS NECESSARY.
NOTE:
DEMOLITION WORK OF EXISTING CONCRETE FLOORS (ANY JACK HAMMERING
OR CORE DRILLING) SHALL BE CONDUCTED IN THE EVENINGS AFTER VA
NORMAL BUSINESS HOURS (8AM-5PM).
THE FIRE SUPRESSION SYSTEM MUST REMAIN ACTIVE THROUGHOUT THE
DURATION OF CONSTRUCTION. SHOULD AT ANYTIME THE SYSTEM BE SHUT
DOWN THE GENERAL CONTRACTOR SHALL PROVIDE 24 HOUR FIRE WATCH TO
SUPERVISE THE CONSTRUCTION AREA.
PROJECT BOUNDRY ABOVE
BA123
BA124
BA125
BA126
BA130 BA131
BB105a
BB105
BA122 BA121 BA119c
BA119
BA118
BA117
BA115BA116
CBA4
CBA2
BA119b
CBA1
PROJECT BOUNDRY ABOVE
BA130a
BB104
BA123
BA124
BA125
BA126
BA130 BA131
BB105a
BB105
BA122 BA121 BA119c
BA119
BA118
BA117
BA115BA116
CBA4
CBA2
BA119b
CBA1
BA130a
BB104
PROJECT BOUNDRY ABOVE
ABOVE CEILING ROUGH IN
AND DEMOLITION WORK -
PHASE 1, TYP.
ABOVE CEILING ROUGH IN
AND DEMOLITION WORK -
PHASE 2, TYP.
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
635-18-102
PROJECT AREA
KEY PLAN
NOT TO SCALE
ALBERTSON ENGINEERING, INC.
3202 WEST MAIN STREET, SUITE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
PH: (402) 493-4800
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PH: (402) 397-5001
/1
/2
:1
:5
P
M
CONSTRUCTION DOCUMENTS
07/10/2020
PHASING/ INFECTION CONTROL PLAN
G1.02
RENOVATE PHARMACY FOR
CHAPTER 797-800
JEJS
OKLAHOMA CITY, OKLAHOMA
OKLAHOMA CITY VAMC
15-2226.013
1/16" = 1'-0"
NEW FLOOR PLAN - GROUND LEVEL - PHASING
1/16" = 1'-0"
DEMOLITION PLAN - GROUND LEVEL - PHASING
1/2" = 1'-0"
TEMPORARY WALL DETAIL
1/16" = 1'-0"
PHASING PLAN LEGEND
INFECTION CONTROL NOTES - CLASS IV CONSTRUCITON:
A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.
C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.
D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS ARE OFFLINE MORE THAN 4HOURS IN A 24
HOUR PERIOD.
E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT DURATION OF PROJECT USING HEPA
EQUIPPED AIR FILTRATION UNITS.
F. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE
THE CONSTRUCTION AREA.
H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO
THE CONSTRUCTION AREA THAT RED: "CONSTRUCTION AREA - DO NOT ENTER".
I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.
J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE THEY REMAIN EFFECTIVE.
K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.
L. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.
N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT0 BEFORE CONSTRUCTION BEGINS.
O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE
CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM.
UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUCT PROTECTION AND NEGATIVE
AIR PRESSURE.
Q. CONSTRUCT ANTEROOM ART ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BE VACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK
SITE.
Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.
Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM(EXIT/ENTRANCE)
R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING.
S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY PERSONNEL, INFECTION CONTROL GROUP, AND
COR.
T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
1/16" = 1'-0"
FLOOR PLAN - BASEMENT LEVEL - PHASING
1/16" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - BASEMENT LEVEL - PHASING
THE FIRE ALARM SHALL BE FUNCTIONAL AT ALL TIMES DURING CONSTRUCTION.
COORDINATE WITH COR TO SHUT OFF FIRE ALARM FOR CONSTRUCTION
ACTIVITIES, FIRE ALARM MUST BE ACTIVATED PRIOR TO LEAVING THE SITE.
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-16-104
PROJECT AREA
KEY PLAN
NOT TO SCALE
JULY 10, 2020
DEHIIWHC
GENERAL NOTES
OKLAHOMA CITY VAMC
15-2226.013
CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA100
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF
ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINT (LBP)
SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT
GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE
REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE
SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE
FOR FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL QUANTITIES, AND
EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE
PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH
APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED
ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE
ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT
IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND
CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE
APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN
REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT
SHALL APPLY. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE OWNER, THE
OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS
REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED
FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND
PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL
FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE
RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS
REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS
OF DEMOLITION AND ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF
NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED
IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE PROJECT. NO
ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES
AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION DRAWINGS
AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE
REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
2. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES
(NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE
SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT;
SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82 13-19, ASBESTOS
FLOOR TILE AND MASTIC ABATEMENT; 02 82 13-31 ASBESTOS TRANSITE AND
CLASS II ABATEMENT. FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF
NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF),
AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS,
BEST PRACTICES AND PHASING REQUIREMENTS.
3. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR
ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN
-0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE
AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR
DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S
REPRESENTATIVE, AND VPIH, IF NEEDED.
4. TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED MAY
BE PERFORMED USING GLOVEBAGS TO ACCOMPLISH WRAP AND CUT METHODS IF
APPROVED BY THE GENERAL CONTRACTOR. COORDINATE WITH MECHANICAL
DEMOLITION DRAWINGS AND THE MECHANICAL CONTRACTOR.
5. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR INFORMATION CONCERNING THE
PRESENCE OF ASBESTOS CONTAINING MATERIALS IN THE PROJECT AREAS.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL
CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE,
AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH
PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME
AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT
TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY OPERATIONS.
LEAD-BASED PAINT AND PAINT CONTAINING LEAD:
1. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥1.0 MG/M² OR ≥0.5
PERCENT BY WEIGHT.
2. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL OF LEAD.
3. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS, AND
SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR
DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS WITH
LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS, SECTION 02
83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
AND THE APPROVED WORK PLAN.
4. FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE
REMOVED AND STABILIZED USING METHODS IN ACCORDANCE WITH SECTION 02
83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
5. IF WALLS WITH LBP ARE TO BE DEMOLISHED, WALL MAY BE REMOVED AND
DISPOSED OF IN ACCORDANCE WITH APPROVAL FROM GENERAL CONTRACTOR.
PERFORM REMOVAL AND DISPOSAL IN ACCORDANCE WITH SECTION 02 83 33.13,
OR 29 CFR 1926.62 LEAD IN CONSTRUCTION FOR MINIMAL NON-ABATEMENT
LEAD-BASED PAINT DISTURBANCE.
6. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR INFORMATION CONCERNING THE
PRESENCE OF LBP, LEAD CONTAINING MATERIALS AND PCL IN THE PROJECT
AREAS.
Summary of Asbestos Materials to be Potentially Impacted
DESCRIPTION LEGEND FRIABLE EST. QTY.
Black Mastic on Ducts & Concrete above Ceiling Tiles No
200 Square Feet
(SF)
8" Diameter Pipe Insulation (labeled ACM) Yes
60 Linear Feet (LF)
8" Diameter Fittings (labeled ACM) Yes
10 Each (EA)
Summary of Lead-Based Painted Materials to be Potentially Impacted
DESCRIPTION LEGEND
PEELING OR
DELAMINATIN
G
EST. QTY.
Entry Door & Frame to Mechanical Room on Floor
Below Project Area
No 1 ea.
* Note - Lead-Based Paint is 1 level down from marked area on main level.
UP
MEN
GA149
WOMEN
GA150
PRIMARY CARE
GA151
PRIMARY CARE
GA153
PRIMARY CARE
GA154
PRIMARY CARE
GA148E
PRIMARY CARE
GA148D
PHARMACY SUPPLY
CHECK IN
GA148C
PRIMARY CARE
GA148B
CONFERENCE ROOM
GA148A
BREAK ROOM
GA148
IV SOLUTION
STORAGE
GA143A
INPATIENT
PHARMACY
GA143F
OFFICE
GA143B
OFFICE
GA141B
MOBILE FILE ROOM
GA143D
NEGATIVE CHEMO
CLEAN ROOM
GA142B1
ANTE ROOM
GA142B
POSITIVE IV CLEAN
ROOM
GA142A1
ANTE ROOM
GA142A
STORAGE / SUPPLY
ROOM
GA142
STAIR 2
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-18-102
PROJECT AREA
KEY PLAN
NOT TO SCALE
JULY 10, 2020
DEHIIWHC
ASBESTOS CONTAINING
MATERIAL
OKLAHOMA CITY VAMC
15-2226.013
CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA101
ASBESTOS KEYED NOTES
1. ESTABLISH REGULATED AREA (MINOR
DECONTAMINATION AREA) AND REMOVE BLACK
MASTIC ON DUCTS AND FLOOR DECK ABOVE
CEILING.
2. ESTABLISH REGULATED AREA AND REMOVE ACM
LABELED THERMAL SYSTEM INSULATION (TSI)
COVERED PIPE AND FITTINGS USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02
82 13.13. FOR SECTIONS OF PIPE TO BE
DEMOLISHED, WRAP AND CUT METHODS MAY BE
USED ONLY IF APPROVED BY THE GENERAL
CONTRACTOR. WHEN GLOVEBAG METHODS ARE
NOT FEASIBLE, USE FULL CONTAINMENT AND
ISOLATION PROCEDURES (MAJOR
DECONTAMINATION AREAS) IN ACCORDANCE WITH
SECTION 02 82 11, TRADITIONAL ASBESTOS
ABATEMENT.
3. CONCEALED TSI CONTAINING ACM MAY EXIST IN
WALLS, ABOVE CEILINGS, IN PIPE CHASES, AND
WITHIN WALL PENETRATIONS. IF SUSPECT ACMS
ARE ENCOUNTERED DURING CONSTRUCTION AND
DEMOLITION THAT ARE NOT IDENTIFIED ON THE
ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
4. THE PROJECT AREA WAS RECENTLY SURVEYED FOR
ACM. REFER TO THE HAZARDOUS BUILDING
MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, DATED AUGUST 27, 2019, FOR
MORE INFORMATION ABOUT ACMS IDENTIFIED IN
THE PROJECT AREA.
Summary of Asbestos Materials to be Potentially Impacted
DESCRIPTION LEGEND FRIABLE EST. QTY.
Black Mastic on Ducts & Concrete above Ceiling Tiles No
200 Square Feet
(SF)
8" Diameter Pipe Insulation (labeled ACM) Yes
60 Linear Feet (LF)
8" Diameter Fittings (labeled ACM) Yes
10 Each (EA)
MEN
GA149
WOMEN
GA150
PRIMARY CARE
GA151
PRIMARY CARE
GA153
PRIMARY CARE
GA154
PRIMARY CARE
GA148E
PRIMARY CARE
GA148D
PHARMACY SUPPLY
CHECK IN
GA148C
PRIMARY CARE
GA148B
CONFERENCE ROOM
GA148A
BREAK ROOM
GA148
IV SOLUTION
STORAGE
GA143A
INPATIENT
PHARMACY
GA143F
OFFICE
GA143B
OFFICE
GA141B
MOBILE FILE ROOM
GA143D
NEGATIVE CHEMO
CLEAN ROOM
GA142B1
ANTE ROOM
GA142B
POSITIVE IV CLEAN
ROOM
GA142A1
ANTE ROOM
GA142A
STORAGE / SUPPLY
ROOM
GA142
STAIR 2
N
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairs of
635-18-102
PROJECT AREA
KEY PLAN
NOT TO SCALE
JULY 10, 2020
DEHIIWHC
XXX
LEAD-BASED PAINT
OKLAHOMA CITY VAMC
15-2226.013
CONSTRUCTION DOCUMENTS
RENOVATE PHARMACY FOR
CHAPTER 797_800
OKLAHOMA CITY, OKLAHOMA
HA102
LEAD NOTES
1. LBP IS KNOWN TO EXIST ON MATERIALS,
COMPONENTS, AND SURFACES THAT MAY BE
DISTURBED, PENETRATED, REFINISHED, OR
DEMOLISHED. PERFORM DEMOLITION OF
MATERIALS AND COMPONENTS WITH LBP AND/OR
PCL IN ACCORDANCE WITH APPLICABLE
REGULATIONS, SECTION 02 83 33.13, LEAD-BASED
PAINT REMOVAL AND DISPOSAL AND THE
APPROVED WORK PLAN.
2. CONCEALED LBP MAY BE PRESENT ON SURFACES
BEHIND WALLS AND MAY BE IMPACTED FOR
PENETRATIONS, OR WALL DEMOLITION. LBP DUST
MUST BE CONTROLLED ACCORDING TO 29 CFR
1926.62. PERFORM CLEANUP AND DISPOSAL OF LBP
DUST AND DEBRIS IN ACCORDANCE WITH SECTION
02 83 33.13, LEAD-BASED PAINT REMOVAL AND
DISPOSAL.
Summary of Lead-Based Painted Materials to be Potentially Impacted
DESCRIPTION LEGEND
PEELING OR
DELAMINATIN
G
EST. QTY.
Entry Door & Frame to Mechanical Room on Floor
Below Project Area
No 1 ea.
* Note - Lead-Based Paint is 1 level down from marked area on main level.
1/2" 1"0" 2"SCALE: FULL
MATCH LINE
SEE XN/XXNNN
XC1 P1 R1
XX" X
XX'-X" XX'-X"
X
XN
XXNNN
XN
XXNNN
XN
XXNNN
F1 A
HSS _x_x_
B1
20GA TYPE 'W3' MTL DECK
PC S
PAN
Hx R15:12
B
B
GENERAL STRUCTURAL NOTES & IBC TABLES INDEX TO STRUCTURAL SHEETSSYMBOLS LEGEND
COORDINATE SYSTEM
S J
W--x--
(XXX'-XX")
ELEVATION
INDICATOR
CUT
SECTION
INDICATOR
WALL
REINFORCING
INDICATOR
PC SPAN
IDENTIFIER
STEP TOP OF
WALL INDICATOR
PIER TAG CALLOUT INDICATOR
ROOF SLOPE
INDICATOR
STEP TOP OF
FOOTING
IDENTIFIER
MASONRY
PIER
INDICATOR
CORNER
REINF
INDICATOR
CONTINUOUS
BEAM
INDICATOR
MATCH LINE INDICATOR
PLAN NORTH ORIENTED 90°
TO THE SHEET W/ MAGNETIC
NORTH (OPTIONAL)
SHEET TYPE DESIGNATORS
SHEET IDENTIFICATION
SHEET TYPE
DESIGNATOR
SHEET
SEQUENCE
NUMBER 01-99
MODIFIER
CHARACTER
DISCIPLINE
CHARACTER
-S
AA
DETAIL BUBBLE
INDICATOR
DETAIL/SECTION/PLAN
BLOCK TITLE INDICATOR
EXT ELEVATION
INDICATOR
COLUMN
INDICATOR(S)
KEYNOTE
IDENTIFIER
REVISION
SYMBOL
NNN
0 GENERAL (SYMBOLS LEGEND, NOTES, ETC)
1 PLANS (HORIZONTAL VIEWS)
2 ELEVATIONS (VERTICAL VIEWS)
3 SECTIONS (SECTIONAL VIEWS)
4 LARGE SCALE VIEWS (PLANS, ELEV, OR SECTIONS, NOT DETAILS)
5 DETAILS
6 SCHEDULES AND DIAGRAMS
7 USER DEFINED
8 USER DEFINED
9 3D REPRESENTATIONS (ISOMETRICS, PERSPECTIVES, PHOTOGRAPHS)
A1
54321
FOOTING/PIER
IDENTIFIER
STEP
INDICATOR
HOLDOWN
INDICATOR
BEAM
INDICATOR(S)
MOMENT
INDICATOR
DECK INDICATOR
SHEAR WALL
INDICATOR
LINTEL
INDICATOR
RAFTER
INDICATOR
ASTERISK
INDICATOR
SLOPE
INDICATOR
WORK
POINT
INDICATOR
54321
D
B
A
C
D
B
A
C
A3
C5C4
D4
C3
D3
XN
ELEVATION INDICATOR
SECTION
INDICATOR
COLUMN/FND
GRID INDICATOR
SLAB JOINT
INDICATOR
STRUCTURAL HATCH PATTERNS
BRICK
CONCRETE
NATIVE
UNDISTURBED
SOIL
BACKFILL/FILL
ENGINEERED FILL
DRAINAGE
COURSE
GYPSUM
BOARD
WOOD-
BLKG OR SHIM
PLYWOOD/OSB
/PARTICLE BD
WD- GLUED
/LAMINATED
WOOD-
CONTINUOUS
FRAMING
INSUL/FIRE
SAFING
METAL FLOOR
GRATING
GROUT
RIGID
INSUL/ICF/SIP
/EIFS SYSTEMS
METALS
MORTAR
CMU
ROUGH LOG
WALL
WOOD STUD
BRG WALL
CONC WALL
HOLDOWN
(BLOCKOUT)
STONE/
ROCK WALL
C1
Hx
S W x
XXX' - XX"
TOx
N
CONT
TABLE N5.4-1
INSPECTION TASKS PRIOR TO WELDING
TABLE N5.4-2
INSPECTION TASKS DURING WELDING
AISC 360-16 TABLE N5.4-3
INSPECTION TASKS AFTER WELDING
AISC 360-16 TABLE N5.6-1
INSPECTION TASKS PRIOR TO BOLTING
AISC 360-16 TABLE N5.6-2
INSPECTION TASKS DURING BOLTING
AISC 360-16 TABLE N5.6-3
INSPECTION TASKS AFTER BOLTING
INSPECTION TASKS PRIOR TO WELDING
WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE/GRADE)
WELDER IDENTIFICATION SYSTEM(a)
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
• JOINT PREPARATION
• DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
CONFIGURATION AND FINISH OF ACCESS HOLES
FIT-UP OF FILLET WELDS
• DIMENSIONS (ALIGNMENT, GAPS AT ROOT)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
CHECK WELDING EQUIPMENT
INSPECTION INTERVAL
USE OF QUALIFIED WELDERS
CONTROL AND HANDLING OF WELDING CONSUMABLES
• PACKAGING
• EXPOSURE CONTROL
NO WELDING OVER CRACKED TACK WELDS
ENVIRONMENTAL CONDITIONS
• WIND SPEED WITHIN LIMITS
• PRECIPITATION AND TEMPERATURE
WPS FOLLOWED
• SETTINGS ON WELDING EQUIPMENT
• TRAVEL SPEED
• SELECTED WELDING MATERIALS
• SHIELDING GAS TYPE/FLOW RATE
• PREHEAT APPLIED
• INTERPASS TEMPERATURE MAINTAINED (MIN/MAX)
• PROPER POSITION (F, V, H, OH)
WELDING TECHNIQUES
• INTERPASS AND FINAL CLEANING
• EACH PASS WITHIN PROFILE LIMITATIONS
• EACH PASS MEETS QUALITY REQUIREMENTS
(a) THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW-STRESS TYPE.
P
P
O
O
O
O
O
O
O
O
O
O
O
O
WELDS CLEANED
SIZE, LENGTH AND LOCATION OF WELDS
WELDS MEET VISUAL ACCEPTANCE CRITERIA:
• CRACK PROHIBITION
• WELD/BASE-METAL FUSION
• CRATER CROSS SECTION
• WELD PROFILES
• WELD SIZE
• UNDERCUT
• POROSITY
ARC STRIKES
k-AREA(a)
BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
REPAIR ACTIVITIES
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER
O
P
P
P
P
P
P
O
(a)WHEN WELDING OF DOUBLE PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT THE WEB k-AREA FOR CRACKS WITHIN 3" (75 mm) OF THE WELD.
(b) AFTER ROLLED HEAVY SHAPES (SEE SECTION A3.1c) AND BUILT-UP HEAVY SHAPES (SEE SECTION A3.1d) ARE WELDED, VISUALLY
INSPECT THE WELD ACCESS HOLE FOR CRACKS.
INSPECTION TASKS PRIOR TO BOLTING
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS
FASTENER ASSEMBLIES PLACED IN ALL HOLES AND
WASHERS AND NUTS ARE POSITIONED AS REQUIRED
O
O
O
O
O
P
O
O
O
O
O
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT
LENGTH IF THREADS ARE TO EXCLUDED FROM SHEAR PLANE)
CORRECT BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION
AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL
OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED
PROTECTED STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER
FASTENER COMPONENTS
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING
OPERATION
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM
ROTATING
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC
SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT
TOWARD THE FREE EDGES
• O-OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS.
P-PERFORM THESE TASKS FOR EACH WELDED JOINT OR MEMBER.
• OBSERVATION OF WELDING OPERATIONS AND VISUAL INSPECTION OF IN-PROCESS AND COMPLETED WELDS SHALL BE THE PRIMARY METHOD TO CONFIRM THAT THE MATERIALS, PROCEDURES AND WORKMANSHIP ARE IN CONFORMANCE WITH THE CONSTRUCTION
DOCUMENTS.
• FOR STRUCTURES IN RISK CATEGORY III/IV (ASCE/SEI 7, TABLE 1.5-1), ULTRASONIC TESTING SHALL BE PERFORMED ON ALL COMPLETE-JOINT-PENETRATION GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN BUTT, T- AND CORNER
JOINTS, IN MATERIALS 5/16" (8 MM) THICK OR GREATER.
• FOR STRUCTURES IN RISK CATEGORY II (ASCE/SEI 7, TABLE 1.5-1), ULTRASONIC TESTING SHALL BE PERFORMED ON 10% OF COMPLETE-JOINT-PENETRATION GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN BUTT, T- AND CORNER
JOINTS, IN MATERIALS 5/16" (8 MM) THICK OR GREATER.
• ALL NONDESTRUCTIVE TESTING OF WELDED JOINTS SHALL BE DOCUMENTED.
• SEE AISC360-16 CHAPTER N FOR ADDITIONAL WELD INSPECTION REQUIREMENTS.
• SEE AISC360-16 CHAPTER N FOR ADDITIONAL BOLT INSPECTION REQUIREMENTS.
• EXPOSED CUT SURFACES OF GALVANIZED STRUCTURAL STEEL MAIN MEMBERS AND EXPOSED CORNERS OF RECTANGULAR HSS
SHALL BE VISUALLY INSPECTED FOR CRACKS SUBSEQUENT TO GALVANIZING.
• INSPECTION SHALL OCCUR DURING THE PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING DIAMETER, GRADE, TYPE AND LENGTH OF THE ANCHOR ROD
OR EMBEDDED ITEM, AND THE EXTENT OR DEPTH OF EMBEDMENT INTO THE CONCRETE.
• FABRICATED STEEL AND ERECTED STEEL FRAMES, AS APPROPRIATE, SHALL BE INSPECTED FOR COMPLIANCE WITH THE DETAILS SHOWN ON THE CONSTRUCTION DOCUMENTS, INCLUDING BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPER JOINT DETAIL
APPLICATION.
INSPECTION TASKS DURING BOLTING
INSPECTION TASKS AFTER BOLTING
INSPECTION TASKS DURING WELDING
INSPECTION TASKS AFTER WELDING
.WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AND BUILT-UP HEAVY SHAPES(b)
NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE APPROVAL OF THE EOR
YES
PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS P
WELDER QUALIFICATION RECORDS AND CONTINUITY RECORDS P YES
FIT-UP OF CJP GROOVE WELDS OF HSS T-, Y- AND K-JOINTS WITHOUT BACKING
• JOINT PREPARATIONS
• DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
P
REQUIRED ON PROJECT
YES
YES
YES
YES
NO
NO
NO
YES
REQUIRED ON PROJECTINSPECTION INTERVAL
REQUIRED ON PROJECTINSPECTION INTERVAL
YES
YES
YES
YES
YES
NO
O
O
YES
YES
YES
YES
NO
NO
YES
YES
YES
YES
INSPECTION INTERVAL REQUIRED ON PROJECT
INSPECTION INTERVAL REQUIRED ON PROJECT
INSPECTION INTERVAL REQUIRED ON PROJECT
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .