Addendum 1.pdf
PDF 195 KB Posted
- Solicitation number
- 36C25921R0057
About this file
This addendum and related federal contract opportunity document provide details for renovating the inpatient pharmacy at the Oklahoma City VA Medical Center to comply with pharmacy regulations. The renovation project will expand the existing 9,339 square foot inpatient pharmacy area by adding 2,816 square feet from a primary care office space. The combined 12,155 square foot renovated pharmacy aims to improve efficiency and accommodate a growing veteran population.
The federal contract opportunity is a 100% small business set-aside for Service-Disabled Veteran-Owned Small Businesses. The estimated value is between $2-4 million. The solicitation number provided is 36C25921R0057 and it is being issued by the Department of Veterans Affairs Veterans Health Administration VISN 19. The pre-solicitation notice specifies registration requirements, where to find amendments, and the estimated March 8th posting date for the full solicitation. Interested offerors must carefully review all provided documents and amendments.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURE | ENGINEERING | GIS
517 Seventh Street Rapid City, SD 57701 p 605.342.9470 f 605.342-2377 www.4front.biz
OKLAHOMA CITY VAMC RENOVATE PHARMACY
Oklahoma City, OK
Project: 635-18-102
March 31, 2021
ADDENDUM NO. 1
The following becomes a part of the original Plans and Specifications, just as if printed and bound therein, and takes precedence over any items that may conflict. The bidder shall acknowledge receipt of this Addendum on his bid proposal form, incorporating its provisions in his bid.
GENERAL INFORMATION:
Bid date or time change, alternates added, etc.
CHANGES TO DRAWINGS:
DRAWING SHEET : A1.00 New Floor Plans – Ground Level
1. Wall type at North Wall of Sterile Storage GA153 shall be M3A with the Vapor Barrier to accommodate the sink installation.
2. Wall type at North Wall of Ante GA154a shall be M3A with the Vapor Barrier to accommodate the sink installation.
3. Wall type at South Wall of Ante GA149a shall be M3A with the Vapor Barrier to accommodate the sink installation.
4. Drawing 2 – New Floor Dimension Plan – First Level: Add dimension shown on attached drawing sheet R0.01. These dimensions have been added to clarify the approximate area provided for the mobile shelving system.
DRAWING SHEET : A1.01 Reflected Ceiling Plan and Details
1. Keynote 10-11: Add to end of note: “Access Panel, see detail 5/A1.01 and Specification.”
2. Add Sheet Specific Note: “4. General Contractor to coordinate new Pnuematic Tube System Components between this project and the existing installation. Fully coordinate all above ceiling work (i.e. HVAC, Sprinkler, Lighting, Communication Cabling) with the routing of Pnuematic Tube. Tolerances and routing of tube shall be considered prior to the installation of other tradework.”
DRAWING SHEET : A1.10 Equipment Plan and Schedule
1. Item #4 Pass Through Window: Add the following to the equipment schedule;
a. Manufacturer: Terra Universal
b. Model: Smart 316L SS Recerculation Air Shower
c. Dimensions: 31.87” W x 26”D x 44”H
2. Item #12 Vacuum Tube Delivery System: Add the following to the equipment schedule;
a. Model: Wall Recessed Compact Station with Pedestal Base
b. Dimensions: 24”W x 18”D (Station Size)
c. New Item: X
d. Comments: Provide Pedestal Base with storage capacity for 8 Carriers.
Provide complete with all trim.
DRAWING SHEET : A1.20 Roof Plan
1. See attached Drawing Sheet R0.02 which clarifies drawings 1 & 2 on this sheet for additional detail on the curb support and crickets to provide positive roof drainage around the new curb.
DRAWING SHEET : A5.02 Enlarged Plans and Interior Elevations
1. Note details 2 & 3 on this sheet shall include fixed vertical uprights at 48” centers to support the horizontally spanning adjustable shelving. Verticals shall be pre-drilled to provide adjustability.
DRAWING SHEET : A6.00 Door Schedule and Window Elevations
1. See attached Drawing Sheet R0.03 which clarifies drawing 2 on this sheet for additional detail on the pass through window assembly. Note the requirement for Bullet Resistant Glazing at this opening.
CHANGES TO SPECIFICATIONS:
SECTION : 10 51 13 Metal Lockers
1. 2.2, G Base: Change to “Install Locker on manufacturers standard metal base. Color and material to match lockers above.”
PRIOR APPROVALS:
The following manufacturers/products are approved for bidding on this project subject to all requirements of the Plans and Specifications. Final acceptance is contingent upon receipt and approval of final shop drawings from the successful bidder.
10 51 13 Metal Lockers Scranton Duralife Lockers
PLAN HOLDERS:
As provided by Contracting Officer
END OF ADDENDUM NO. 1
S S S S
S
1' - 0 1/2" 2' - 0 1/2"
16' - 5"
/4
16' - 10 7/8"
PROCUREMENT/STORAGE
GA151
OPEN OFFICE 1
GA150
CORRIDOR
CGA6
© 2011 FourFront Design, Inc.
517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 www.4front.biz
FOURFRONT
D E S I G N I N C.
Project Number:15-2226.013 07/10/2020
ADDENDUM
R0.01
RENOVATE PHARMACY FOR
CHAPTER 797-800
1/4" = 1'-0"
NEW FLOOR PLAN DIMENSIONS - MOBILE STORAGE
TAPERED INSULATION
STEEL ANGLE, SEE STRUCTURAL
MEMBRANE FLASHING
ROOF INSULATION. MATCH
EXISTING INSULATION
DEPTHS AND SLOPE
EXISTING CONCRETE
DECK
HEAT WELD
MEMBRANE ROOF
1/4" GLASS MATT GYPSUM
SHEATHING
GALVANIZED METAL FLASHING
M
IN
PREFABRICATED
CURB BY M.C.
A1.20
1/4" / 12"
1/ 4"
© 2011 FourFront Design, Inc.
517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 www.4front.biz
FOURFRONT
D E S I G N I N C.
Project Number:15-2226.013 07/10/2020
ADDENDUM
R0.02
RENOVATE PHARMACY FOR
CHAPTER 797-800
1 1/2" = 1'-0"
ROOF CURB AT MECHANICAL UNITS ADDENDUM
3/16" = 1'-0"
HIGH ROOF - CRICKET
LEVEL 1 - GROUND
100' - 0"
FP01-FIRST FLOOR
0' - 0"
GROUND
0' - 0"
(N) 100-0 TOC (GROUND-174.08)
100' - 0"
1' - 0"1' - 0"
SQUARE HOOD
SOLID SURFACE
COUNTERTOP
STAINLESS STEEL
COUNTER TOP WITH
INTEGRAL DEAL TRAY
A6.00
A6.00
90 MIN. FIRE RATED
COILING COUNTER
CURTAIN
5/8" GYPSUM BOARD
5/8" BULLET RESISTANT PANEL
3 5/8" METAL STUDS AT 16" O.C.
FULL BATT INSULATION
5/8" GYPSUM BOARD
5/8" BULLET RESISTANT PANEL
3 5/8" METAL STUDS AT 16" O.C.
FULL BATT INSULATION
3/4" HEADER
BULLET RESISTANT
GLASS
© 2011 FourFront Design, Inc.
517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 www.4front.biz
FOURFRONT
D E S I G N I N C.
Project Number:15-2226.013 07/10/2020
ADDENDUM
R0.03
RENOVATE PHARMACY FOR
CHAPTER 797-800
3/4" = 1'-0"
COILED DOOR AT CORRIDOR ADDENDUM