Penetrations through existing wall cores
Site Wall This will be poured after tank installation.
Cores will be places in wall (10" PVC pipe) to ensure AEP pipe (previously submitted and approved) can run through wall.
To FOS fill station (submittal pending)
FOS FILL STATION SUBMITTAL PENDING AND WILL INCLUDE LOCATION AND DETAIL.
SUMP (see submittal) Bottom of sump estimated at 97'.
All eight vents line (two per tank) will run through a single sump.
Wate r T an k
N
Fill Lines
Po lis he r L in es
Po lis he r L in es
Po lis he r L in es
Po lis he r L in es
B oi le r F
O S
B oi le r F
O S
B oi le r F
O S
B oi le r F
O S
G en er at or F
O S
G en er at or F
O S
G en er at or F
O S
G en er at or F
O S
B oi le r a nd G en F
O R
L in es
B oi le r a nd G en F
O R
L in es
B oi le r a nd G en F
O R
L in es B oi le r a nd
G en
F O
R L in es
BOP Elevations
Sump to be Western Fiberglass Inc. Vapor Vent Transition Sump reference page 14 of this submittal package
Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.
NOTE: THIS FIELD DRAWING SHOWS
APPROXIMATE LIMITS OF NEW WORK
AREA SITE. ONLY EXISTING CONDITIONS
ARE SHOWN FOR FIELD VERIFICATION BY
THE CONTRACTOR PRIOR TO THE WORK.
NEW WORK AREA
EXISTING CONDITIONS
VHAECHMarshR Line
VHAECHMarshR Line
VHAECHMarshR Line