Penetrations through existing wall cores

Site Wall This will be poured after tank installation.

Cores will be places in wall (10" PVC pipe) to ensure AEP pipe (previously submitted and approved) can run through wall.

To FOS fill station (submittal pending)

FOS FILL STATION SUBMITTAL PENDING AND WILL INCLUDE LOCATION AND DETAIL.

SUMP (see submittal) Bottom of sump estimated at 97'.

All eight vents line (two per tank) will run through a single sump.

Wate r T an k

N

Fill Lines

Po lis he r L in es

Po lis he r L in es

Po lis he r L in es

Po lis he r L in es

B oi le r F

O S

B oi le r F

O S

B oi le r F

O S

B oi le r F

O S

G en er at or F

O S

G en er at or F

O S

G en er at or F

O S

G en er at or F

O S

B oi le r a nd G en F

O R

L in es

B oi le r a nd G en F

O R

L in es

B oi le r a nd G en F

O R

L in es B oi le r a nd

G en

F O

R L in es

BOP Elevations

Sump to be Western Fiberglass Inc. Vapor Vent Transition Sump reference page 14 of this submittal package

Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.

NOTE: THIS FIELD DRAWING SHOWS

APPROXIMATE LIMITS OF NEW WORK

AREA SITE. ONLY EXISTING CONDITIONS

ARE SHOWN FOR FIELD VERIFICATION BY

THE CONTRACTOR PRIOR TO THE WORK.

NEW WORK AREA

EXISTING CONDITIONS

VHAECHMarshR Line

VHAECHMarshR Line

VHAECHMarshR Line

VHAECHMarshR Line