RETURN OF SUBMITTAL

iA ;i-.

i we ur i.Jescription

Facility Fuel Systems Product Data Contractors Name and Address

Chris Bantner

Kiewit-Turner. a Joint Venture

13611 East Colfax Avenue Aurora, CO 80045 uate:

Station Location:

13611 East Colfax Ave.

Aurora, CO 80045 Contract No:

VA1 01 F-i 5-C-0005

Transmittal Date:

3/2/2015 pec. ection:

231000

Project No:

554-501

VA File No:

23 10 00 - 001 - Ri

Submittal Scope

Submittal Items Acted Upon

Submittal Item Status

001 - Facility Fuel Systems Product Data AN

Supplier or Manufacturer Submittal Type

Data Sheets

Approved as Noted

Notes/Comments

Flourinated HOPE piping is not listed in the specifications and a Variance Request should have been submitted prior to the submission of this submittal.

Signature ofAuthorizing Official

I 'Date

Received 03/17/2015

Fax: 303.930.9001

303.930.9000Tel:

Kiewit - Turner a Joint Venture

Suite A-300 7200 S. Alton Way

Englewood, CO 80112

Job: 15387 - Replacement Medical Center Facility

Product Data

Sample

Other

Shop Drawing

Resubmittal

First Submittal X

VA Proj #:

To: H+L Architecture 1755 Blake Street

Suite 400

Denver, CO 80202

DESCRIPTIONSpecificationSUBMITTAL

ItemQuantity Section Sub./SupplierNo. Mfgr.

ACTION

DCBA E

Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008

Review Cycle: 001

Attn: Chuck Adkisson

1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a

Joint Venture

01 573

ACTION TAKEN

CONTRACTOR'S SIGNATURE:

CONTRACTOR'S NOTES:

DATE: 7/12/2011

Reviewed Only for Revisions to

Reviewed: Incorporate Changes

Reviewed=

A

B

C

Previous Submittal

Revise and Resubmit=D

Rejected =E

ARCHITECT/ENGINEER RESPONSE:

REMARKS:

BY: DATE:

Expedition f_sb_pks_01a

VA101CFM-C-0100

Cc: Tim Pogany, U.S. Dept. of Veterans Affairs

Received By ___________________

Date _______________

23 10 00

X

Facility_Fuel_Systems_Product_Data _Resubmittal

X

GCH

23 10 0001R1

03/02/2015

03/11/2015

Kiewit-Turner Submittal No.

VA 1

JVT 1

REQUESTED RETURN DATE:

Kevin Lindsey, U.S. Dept. of Veterans Affairs

VA101F-15-C-0005

By VACO BoltonT at 2:01 pm, Mar 11, 2015

3/2/15

23 10 00 - 01R1 x

3/3/2015

231000.01R1

Cator, Ruma & Assoc (MRD)

3/9/2015

Kiewit-Turner a Joint Venture

7200 S. Alton Way, Suite A-300, Englewood, CO 80112

Phone: 303-930-9000 FAX: 303-930-9001

Project Name:

Subcontractor Name: Submittal Date:

Contact Name: E-mail: Return By Date:

Contact Phone(s): Review Days:

Number: Name:

1.4.A

2.2 N/A Y N N Y

2.5.C N/A Y N N Y

2.2.D N/A Y N N Y

2.2.G N/A Y N N Y

1.1.E N/A N/A N/A N/A N/A

Product Data

Underground Storage FRP Tanks

FRP Pipe and Fittings

Fiberglass Manhole Covers

Internal Ladders

Reviewed By

Sustainable Design Letter

Date

Submittal is in Compliance

Submittal is in Compliance with Variances from Specifications

Signature

SUBMITTAL INDEX & COVER SHEET

Department of Veteran's Affairs

Replacement Medical Center

The Mechanical Diamond Partners 02/11/15

Kramer Peter kpeter@rkmi.com 03/03/15

720-737-7190

Specification Section: 231000.02 Facility Fuel Systems

S p e c

S u b m it ta l

P a ra g ra p h

S p e c

P ro d u c t

P a ra g ra p h

S p e c if ie d o r

L is te d

M a n u fa c tu re r?

All Materials in this submittal (X) do ( ) do not comply with the FAR 52.225-11 Buy American Act

M e e ts

A ll

S p e c

R e q u ir e m e n ts

E x c e p ti o n s o r

V a ri a n c e s f ro m

S p e c

A p p ro v e r

In fo rm a ti o n

N e e d e d

I n

T h is P a c k a g e

Submittal Type

Submittal Item Description Manufacturer

23 11 00 - Facility Fuel Systems

Containment Solutions

Western Fiberglass

Ultra Fiberglass Systems

AEP Pipe Systems

SubmittalIndexForm_041009 Page 1 of 1 mailto:kpeter@rkmi.com

Submittal Transmittal 12211 W. Alameda Parkway, Ste 200, Lakewood, CO 80228

Ph. 303.708.9900

Project # 8169VA Replacement Medical Center, Aurora

Date: 2/9/2015 Reference Number: 0011

Transmitted To: Transmitted By: Robb MoodySean Warren

RK Mechanical Platt Rogers Construction 3800 Xanthia Street Denver, CO 80238

12211 W. Alameda Parkway Suite 200 Lakewood, CO 80228 Tel: 303-708-9900

Submittal Package No Description

0003 - 23 10 00 - 1 Facility Fuel Systems

Transmitted For : Delivered Via : Tracking Number :

NotesItems Description

1 2.2 Underground Storage FRP Tanks - Shop Drawing and Product Data

2 2.5C Fiberglass Reinforced Plastic (FRP) Pipe and Fitings - Product Data

AEP Electr-O-Fuze Double-Wall pipe is now being proposed in place of the Red Thread.

3 Fiberglass Manhole Enclosures Same material and thickness, provided by Western Fiberglass

4 Sump Ladders

Contact NameCompany NameCc:

Remarks

Package includes underground piping, underground tanks, fiberglass tank sumps, and fiberglass sump ladders.

Printed on: 2/9/2015 Page 1

2.2 Underground Storage FRP Tanks

Replacement Medical Center Facility VA No. 554-501 Eastern Colorado Health Care System

Facility Fuel Systems CDI No. 12 23 10 00 - 12 31 AUG 2012

2. Pipe sizes 100 mm (4 inches) and smaller, threaded. Pipe sizes 150 mm (6 inches) and larger, raised faced slip-on flanges, 1025 kPa (150 pound) ASME rating.

3. Welded joints required on steel piping located inside tanks.

4. Provide and coordinate tank connection quantities, sizes and types with requirements of fluid level gage unit; leak detector sensor; sounding rod;

vent, fill, supply and return pipes; and other pipes as shown.

5. Dielectric insulation on all connections to steel piping.

6. All tank piping connections, except vent, shall be within the tank manhole enclosure.

J. Tank Manholes: Provide quantity shown. Bolted cover type, gasketed. Zinc plated bolts, nuts, washers.

K. Internal Ladder: Provide as shown and shall have 50 mm x 6 mm (2 inch x 0.25 inch) sides, 20 mm (0.75 inch) diameter rungs on 300 mm (12 inch) centers.

Provide slide supports to allow for tank movement.

L. Wear (Striker) Plates: Provide 300 mm (12 inch) square, 6 mm (0.25 inch) thick steel plates rolled and seal-welded to bottom of tank directly under all openings.

M. Lifting Lugs: Provide for rigging tanks.

N. Hold Down Straps: Provide quantity and design of EPDM-type rubber encased steel straps as recommended by tank manufacturer to anchor tank to concrete ballast slab. Hold down strap electrical isolation shall conform to STI R891.

Straps shall have tension load capability equal to hold-down capability of ballast slab, with a minimum safety factor of two. Provide complete anchorage devices, including turnbuckles, for adjusting tension.

2.2 UNDERGROUND FIBERGLASS REINFORCED PLASTIC TANKS:

A. Type: Factory-fabricated, double-wall, fiberglass reinforced polyester (FRP), horizontal cylindrical configuration, atmospheric pressure, for underground installation as shown.

B. Construction:

1. UL 1316. Provide label of conformance.

2. Conform to NFPA 30 or 31 as applicable.

3. Design for surcharge loads due to backfill and paving as shown. In addition, in paved areas, design for H-20 (14 500 kg) (32,000 pound) axle loading.

4. Leaks and abrasions are not permitted. Maximum out-of-roundness is one percent of the diameter.

5. Outer wall shall provide leak-tight secondary containment that covers entire tank. Provide annular space between the walls arranged with flow

CDI No. 12 23 10 00 - 13 31 AUG 2012 channels to allow tank leakage at any point to flow to a leak detector at the bottom of the annular space. Provide connection point to outer wall and plastic pipe from tank connection to grade designed to accommodate leak detection device.

C. Factory Cleaning: Clean interior and exterior. Remove all dirt, debris, and coatings and material incompatible with fuel being stored.

D. Fiberglass Manhole Enclosures:

1. Cylindrical enclosures sized as shown, designed to contain fuel spills from tank piping. Locate all tank manholes and all tank piping connections within the enclosures.

2. Same material type and thickness as tank. Reinforce to prevent deflection.

Provide leak-tight connection to tank designed to allow removal of tank manway cover without disturbing connection between enclosure and tank.

Coat all exposed steel surfaces, such as bolting, with two coats of urethane.

3. In traffic areas, enclosures and tank must have flexible isolation system to prevent wheel loads from being transmitted to the tank.

4. For burner fuel tanks, design enclosure to permit installation and removal from above grade of present or future heating coil as an assembled unit.

5. Access to Manhole Enclosure: Fed. Spec. A-A-60005 cast iron manhole frames and covers rated for H-20 (14 500 kg) (32,000 pound) axle loading minimum with opening size as shown. Sidewalk type metal doors as shown and as specified under Section 05 50 00, METAL

FABRICATIONS.

E. Pipe Connections to Tanks:

1. Conform to UL 1316.

2. Pipe sizes 100 mm (4 inches) and smaller, threaded. Pipe sizes 125 mm (5 inches) and larger, 1025 kPa (150 pound) ASME flanged.

3. Welded joints required on steel piping located inside tanks.

4. Provide and coordinate tank connection quantities, sizes and types with requirements of level gage unit; tank leak detector; sounding rod; vent, fill, supply and return pipes; and other pipes as shown.

5. All tank piping connections shall be within the tank manhole enclosures and sump/risers.

F. Tank Manholes: Provide quantity shown. Bolted cover type, gasketed, zinc-plated bolts, nuts and washers.

G. Internal Ladder: Provide with 50 mm x 6 mm (2 inch x 0.25 inch) sides and 20 mm (0.75 inch) diameter rungs at 300 mm (12 inches) on center. Provide slide support to allow tank movement.

CDI No. 12 23 10 00 - 14 31 AUG 2012

H. Wear (Striker) Plates: Provide 300 mm (12 inch) square, 6 mm (0.25 inch) thick steel plates attached to bottom of tank directly under the sounding opening, the fuel return discharge, and the fill discharge.

I. Lifting Lugs: Provide for rigging tanks.

J. Hold-Down Straps: Provide quantity and design of FRP straps as recommended by tank manufacturer to anchor tank to concrete ballast slab. Straps shall have tension load capability equal to hold-down capability of ballast slab, with a minimum safety factor of two. Provide complete anchorage devices, including turnbuckles, for adjusting tension.

2.3 SOIL SEPARATOR MAT:

A. Material: Porous, non-woven polypropylene geotextile, 135 g per sq. meter (4 ounces per square yard), resistant to all alkalies and weak acids.

B. Material and Manufacturer: Typar 3401 from LINQ Industrial Fabrics, or equal.

2.4 TANK AND PIPING ACCESSORIES:

A. Vent Caps: Galvanized cast iron or cast aluminum with brass or bronze screens, arranged to permit full venting and to prevent entry of foreign material into the vent line. Same pipe size as vent pipe.

B. Fill Boxes:

1. Spill-container type enclosing a fill cap assembly with camlock hose connector with closure coordinated with fittings used by fuel supplier.

2. Watertight assembly, cylindrical body, quick-opening corrosion-resistant watertight sealable cover, polyethylene spill containment compartment with minimum // 5 // 10// 15 //25// gallon capacity. Integral drain valve with discharge to fill pipe.

3. Fill cap shall be lockable, tight-fill design with provision for padlock on the top of the cap. Fill cap shall screw onto threaded adapter that can be removed without removing fill box. Entire assembly shall seal tight with no leakage during filling and when cap is in place.

4. Provide special tools necessary for opening fill boxes and fill caps.

5. Protect spill container from traffic by ramped, drain-slotted cast iron body ring and cover. Design shall prevent transmission of traffic loads to the underground tank. Spill-container type not required at locations designated only for sounding tanks.

C. Fill caps located above grade without fill boxes shall be lockable, tight-fill design, operated by special wrench that shall be furnished. Entire assembly shall seal tight with no leakage during fill and when cap is in place.

D. Refer to Section 05 50 00, METAL FABRICATIONS, for access platforms shown for aboveground tanks.

Installation Instructions Petroleum Tanks Flowtite® Water Tanks Oil/Water Separators

F I B E R G L A S S S T O R A G E T A N K S

VERSION

H9/12

2.01 B Underground Storage Tank

Fiberglass Tank Installation Instructions

A. Handling/Preparation B. Bed and Backfi ll C. Pre-installation Testing D. Testing Single and Double-Wall Tanks D1. Testing Single-Wall Tanks

D2. Testing a Single-Wall Compartment Tank with a Double-Wall Bulkhead

D3. Testing a Single-Wall Compartment Tank with a Single-Wall Bulkhead

D4. Testing Double-Wall Tanks with Dry Annular Space

D5. Testing a Double-Wall Compartment Tank with a Dry Annular Space and Double-Wall Bulkhead(s)

D6. Testing a Double-Wall Compartment Tank with a Dry Annular Space and Single-Wall Bulkhead(s)

D7. Testing Double-Wall Tanks with Liquid Filled Annular Space (Hydrostatically Monitored)

D8. Testing a Double-Wall Hydrostatically Monitored Compartment Tank with Double-Wall Bulkheads

D9. Testing a Double-Wall Hydrostatically Monitored Compartment Tank with Single-Wall Bulkheads

D10. Alternative Water Test for a Non Air-Testable Tank

E. Excavation and Tank Clearance Stable Excavations Unstable Excavations

F. Geotextile Fabric

Tank Technical Support Conroe, Texas

(800) 537-4730 • (936) 756-7731

G. Burial Depth & Cover No Traffi c Load Traffi c Loads

H. Anchoring General Anchoring Requirements Anchor Point Loads Fiberglass Anchor Strap Drop-Forged Turnbuckles Wire Rope Deadmen Anchors Concrete Anchor Pad Split Strap Anchoring System

I. Tank Installation Tank Vertical Diameter Measurements Installation Procedure Backfi ll to Subgrade

J. Adding Tanks at Existing Locations K. Piping & Bottom Sump Clearances L. Venting M. Filling Tanks N. Manways O. Annular Space Monitoring Hydrostatic Monitoring Dry Annular Space Monitoring Systems Dry Annular Space Vacuum or Air Pressure Monitoring Systems

P. Containment Collars and Tank Sumps Q. Conversion Formulas R. Supplemental Documents Appendix App. A. Anchor Chart ........................................ 26-27

App. B. Standard Tank Sizes

Tank Installation Checklist (INST 6002)........29-30

Table of Contents

Field Service Department Mt. Union, Pennsylvania

(800) 822-1997 • (814) 542-8520

INTRODUCTION

The purpose of this manual is to provide detailed instructions for installing Containment Solutions, Inc.

(CSI) single and double-wall fiberglass underground storage tanks and oil/water separators.

If you do not have the proper experience and you have not completed CSI training for tank installation in the last 24 months, please contact a licensed contractor, or call CSI for a list of trained contractors.

These instructions have been developed and refined from the experience of over 300,000 tank installations.

Proper installation is required to assure the long-term performance of CSI Storage Tanks. These instructions must be followed

SAFETY

These instructions should not be interpreted in any way to put one’s health at risk, or to harm property and/or the environment.

The following definitions will serve as a guide when reading this manual:

IMPORTANT INFORMATION

Proper installation of each tank is essential:

• To ensure the safety of all the individuals involved in the tank installation.

• To prevent tank damage and/or failure, which could lead to product loss and environmental contamination.

• To validate the tank structural warranty.

IMPORTANT REMINDERS

• In addition to these instructions, the installation must comply with NFPA (30, 30A, and 31), OSHA and all applicable Federal, State, Local, or Provincial, construction, safety and environmental codes and regulations.

• Any variances or deviations which are in direct conflict with these published installation instructions must be approved in writing prior to the installation by Containment Solutions Tank Technical Support.

Introduction / Important Information Intro

Indicates a potentially hazardous situation, which if not avoided could result in death or serious injury.

Indicates a potentially hazardous situation, which if not avoided may result in minor or moderate injury.

Indicates a potentially hazardous situation, which if not avoided may result in property damage.

• These instructions provide the minimum requirements for the successful installation of a fiberglass underground storage tank under normal conditions.

Containment Solutions does not design or engineer the actual installation. The owner’s Engineer of Record for the installation can exceed these minimum requirements and is responsible for the final design.

• The presence of any Containment Solutions representative at the job site does not relieve the contractor of responsibility to follow these installation instructions.

TANK WARRANTY ACTIVATION

• These instructions must be followed.

• The Tank Installation Checklist (Pub. No. INST 6002) must be properly completed and signed by the tank owner’s representative and the installing contractor.

• The Tank Installation Checklist, these instructions and any correspondence related to the tank installation must be retained by the tank owner and provided to CSI to validate any future warranty claim.

• The warranty in effect at the time of tank delivery will apply and is available from Containment Solutions.

BEFORE YOU BEGIN

• Read, understand and follow these instructions.

• Barricade the tank area until the job is completed.

• Review and prepare to complete the installation checklist.

• Check with local authorities for building codes, underground utilities and testing requirements.

• If you have installation questions or need alternate installation methods, contact CSI Tank Technical Support.

• If you have other questions regarding tank modifications, such as adding fittings or manways or tank repair, contact Containment Solutions Field Service.

• A list of supplemental documents is found in Section R.

ASPHYXIATION FIRE EXPLOSION

Do not enter tank or sumps unless following OSHA guidelines for confined space entry. Failure to follow OSHA guidelines could result in death or serious injury.

Do not stand on or under tank while tank is being lifted. This could result in personal injury or death.

- Chock with sandbags.

- If high winds are anticipated, tie the tanks down to prevent damage.

- When the tank must be rolled for air/soap test, roll only on shipping pads or smooth surface free of protruding rocks or hard objects. Ensure fittings and/ or collars do not come in contact with the ground.

- Protect collars from water accumulation in freezing conditions or tank damage may occur.

To avoid tank damage:

• Do not allow tank to rotate or swing during off loading.

• Do not use chains or cables around tanks.

• Do not allow metal hardware to contact the tank.

• Do not allow fittings, collars, manways, reservoirs, or any accessory to contact ground during rotation.

• Do not drop tank.

LIFTING TANKS

To lift the tank, always use the number of lift lugs indicated on the label adjacent to the lift lugs. Slings may also be used to lift the tank. Refer to Supplemental Documents (Section R) for additional information. Apply equal tension to all lift lugs simultaneously.

Identify the tank lift lug orientation and use the appropriate method to lift the tank. The tank orientations are shown below.

Handling & Preparation

• The contractor is responsible for rigging, unloading and securing the tank.

• Tanks must be mechanically unloaded under the direction of a qualified rigger.

• Upon tank delivery and when lifting tank, visually inspect entire exterior surface of the tank for shipping or handling damage. If the tank has a wet annular space, inspect for monitoring fluid on the exterior surface.

• Before unloading a tank from the truck, the contractor must make sure all tools, hardware, supplies and anything else capable of damaging the tank are removed from the trailer bed.

• The contractor is responsible for making sure the tank is secure before removing shipping straps so the tank does not roll off the truck or trailer.

• For tanks with a bottom sump or bottom fittings, be sure the bottom sump or fittings are not damaged by contact with any object. Refer to Supplemental Documents (Section R) for additional information.

• For temporary storage of tanks at job site:

- Set on smooth ground (no protruding rocks or hard objects) or on the shipping pads oriented to allow for tank rotation as needed.

A

A. HANDLING AND PREPARATION

Straps securing the tank to the truck should never be released before the appropriate lifting equipment is properly secured to the tank’s lift lugs. This could result in personal injury or death.

3.

ED

Lifting from Truck or Ground with Tank Upright

Use the number of lugs identified on the label to lift tank.

C max. 60°

Use the number of lugs identified on the label to lift tank.

Lifting from Truck or Ground with Tank Upright2.

A B

Figure A-3

Use all lugs on top center line to lift tank from truck.

Rotate tank after unloading to upright position for lifting into excavation.

Lifting from Truck with Tank Rotated1.

Figure A-1

Figure A-2

Lift Lug Annular Space Fitting

Anchor Strap Location Arrows

Rib

Monitoring Fluid Reservoir

Bulkhead

Containment Collar

Endcap

Manway and Cover with fittings

Primary Tank Fitting

Rib Section Joint

Lift Lug Flanged Nozzle Manway and CoverBaffle Access Collar

Inlet / Outlet

Bottom Sump Tangentially Flanged Nozzle

Endcap Rib Section Joint

Common Terms for:

• Petroleum Tanks (see Figure A-1).

• Non Petroleum Tanks (see Figure A-2).

The use of approved backfill material is critical to long term tank performance.

Do not mix approved backfill with sand or native soil.

Do not backfill tank with sand or native soil.

• Replace all excavated native soil with approved backfill of proper size and gradation. Use backfill which meets ASTM C-33 for quality and soundness.

• Require your backfill supplier to certify, with a sieve analysis, that the backfill meets this specification.

• Sieve analysis must be attached to the Tank Installation Checklist.

• Keep backfill dry and free of ice in freezing conditions.

• Use only approved pea gravel or crushed stone (see Figure B-1):

Note: If material which meets these specifications is not available, contact Tank Technical Support for information on approved alternate materials and installation instructions. Using other backfill without Containment Solutions' prior written approval will void the tank warranty and may result in tank failure.

LIFTING CSI DEADMEN

• Insure lifting equipment is rated to handle the load before lifting. For deadmen sizes and weights use Table A-5.

• Lift deadman using a minimum of two equally spaced anchor points.

• The angle from the deadmen to the lifting equipment should always be between 60º and 90º (see Figure A-4).

• The deadmen type, lengths, and the number of anchor points are dependent upon the tank diameter, model and capacity.

• Refer to Supplemental Documents (Section R) for additional information on deadmen anchors.

LIFTING TANK SUMPS OR RISERS

• Visually inspect the sump components for shipping damage. If damage is found, contact CSI Field Service.

• Wear gloves.

• Do not roll, drop or bounce.

• Set on smooth surface.

• The sump must be secured to prevent damage from high winds.

• Refer to Supplemental Documents (Section R) for additional information on tank sumps.

Handling & Preparation - Bed and Backfi ll A, B

Use only the anchor points when lifting and positioning CSI deadmen. Failure to do so could result in death or serious injury.

Lifting Chain or SlingAnchor Point

60°-90°

Figure A-4

Deadmen Anchors Length (ft) Weight

12" x 12" 18" x 8" Pounds Kilograms 12 1,655 750 16 2,250 1,020 18 2,550 1,156 20 2,850 1,293

14 1,686 765 18 2,100 952 22 2,500 1,134

TABLE A-5

B. BED AND BACKFILL

Not using approved backfill material may result in tank failure and environmental contamination.

3/4" (19 mm)

Maximum Size

1/2" (12 mm)

Maximum Size

1″

½″ ¼″

¾″

Figure B-1

Pea Gravel: Crushed Stone or Gravel:

Clean naturally-rounded aggregate with particle sizes no larger than ¾" with no more than 5% passing a #8 sieve.

Washed, with angular particle sizes no larger than ½" with no more than 5% passing a #8 sieve.

Dry density must be a minimum of 95 pounds per cubic foot.

Dry density must be a minimum of 95 pounds per cubic foot.

PEA GRAVEL CRUSHED STONE

C. PRE-INSTALLATION TESTING

The following instructions apply to all air tests described in Sections D1 to D9. Some Non Petroleum tanks are not field air-testable and require a post installation water test (Section D10).

VISUAL AIR/SOAP TEST

To be performed on all tanks after unloading from the truck.

• Single-Wall and Dry Annular Space Tanks: air/soap tests must be performed at the job site prior to installation to verify the absence of damage.

(Sections D1 to D6)

- For tanks shipped with annular space under vacuum, refer to Supplemental Documents - Section R.

• Liquid Filled Annular Space Tanks: air/soap tests on accessories and fittings can be performed after the tank is in the excavation. (Sections D7 to D9)

• All tanks must be vented at all times except as defined during testing.

FOR ALL AIR TESTS:

• All petroleum tanks with a UL label and all potable water tanks must be air tested prior to installation.

• Use a contractor supplied “Tank Test Manifold” connected to a tank primary fitting (see Figure C-1).

For tanks with any dry annular space configurations, including double-wall bulkheads:

• Use a contractor supplied “Annular Space Gauge and Valve” connected to the annular space fitting (see Figure C-2).

Do not pressurize 4', 6', 8' and 10' diameter tanks over 5 psig (35 kPa). Do not pressurize 12' diameter tanks over 3 psig (21 kPa). Tank damage or physical injury may result.

Pre-Installation Testing C

• Prepare for testing.

- Replace all fitting plugs with plugs suitable for the product to be stored in the tank.

- Clean factory pipe dope from plugs and fittings.

- Apply pipe dope suitable for the material being stored in the tank.

- Reinstall and tighten fitting plugs.

- Assemble the required number of “Tank Test

Manifolds” (Figure C-1) and “Annular Space Gauge and Valves” (Figure C-2).

- Gauges must have a maximum full-scale reading of 15 psig (40 kPa) with ¼ psig (1 kPa) or smaller increments.

- Pressure-relief device must be sized and set to prevent the tank from being pressurized in excess of the maximum allowed test pressure (5 psig / 35 kPa maximum or 3 psig / 21 kPa for 12' tanks).

• Do not pressurize 4', 6', 8' and 10' diameter tanks over 5 psig (35 kPa). Do not pressurize 12' diameter tanks over 3 psig (21 kPa).

• Pressure gauge readings can be affected by changes in ambient air temperature. Allow for pressure fluctuations when tanks are subject to temperature changes.

• Prepare Soap Solution.

- Warm weather soap solution

• 5 gallons of water

• 8 ounces of household dishwashing detergent

- Freezing conditions soap solution

• 4 gallons of water

• 8 ounces household dishwashing detergent

• 1 gallon windshield washer solution

• The entire tank surface must be covered with the soap solution and visually inspected for leaks, as indicated by the presence of active air bubbles.

• Anytime bubbles are observed around fittings, plugs, and gaskets; tighten and retest.

• In the unlikely event a tank leak is discovered, discontinue the installation and immediately call CSI Field Service to schedule a repair.

• If the tank is a Non Petroleum tank and requires post installation water testing, follow the procedures in Section D10.

Do not connect the air supply directly to the annular space monitoring fitting or tank damage will result.

Do not stand on or approach endcaps, manways, or fittings while pressurizing tanks. Do not lift or hoist tank under pressure. These actions could result in death or serious injury.

Air Supply Valve ClosedAir Supply Valve Open

Backup Air Supply Gauge

Air Supply Gauge

Pressure-Relief Device

Primary Tank Fitting

Figure C-1

Tank Test Manifold

Pressure Gauge

Valve ClosedValve Open

Annular Space or Double-Wall Bulkhead Fitting

Figure C-2

Annular Space Gauge and Valve

3. Manufacturer's Testing Procedure

6. Close valve on each compartment “Tank Test Manifold.” Disconnect the air supply line.

7. Close valve to double-wall bulkheads.

(see Figure D2-2).

8. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading on the “Tank Test Manifolds” which may indicate a leak.

9. Also monitor the “Annular Space Gauge and Valve” for any increases in pressure which may also indicate a leak.

10. With all compartments under pressure, cover tank outer surface, including fittings and manway(s), with soap solution and inspect.

11. After completing air test, release pressure.

12. Remove all gauges, valves, and hose assemblies.

13. Replace and tighten fitting plug(s).

14. Replace the plastic vent plug in the open fittings.

D1. TESTING SINGLE-WALL TANKS

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifold” to a tank fitting.

3. Connect the pressure source to the

“Tank Test Manifold.”

4. Pressurize tank to 5 psig maximum

(3 psig for 12' tanks).

(see Figure D1-1)

5. Monitor the pressure readings for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

6. While under pressure, cover tank outer surface, including fittings and manway(s), with soap solution and inspect.

7. After completing air test, release pressure.

8. Remove all gauges, valves, and hose assemblies.

9. Replace and tighten fitting plug(s).

10. Replace the plastic vent plugs in the open fittings.

D2. TESTING A SINGLE-WALL

COMPARTMENT TANK

WITH A DOUBLE-WALL BULKHEAD

Do not connect air supply directly to the bulkhead monitor fitting or tank damage will result.

5psig 5psig End End

Air Supply Air SupplyValve OpenValve Open

Main

Air Supply

5psig

Figure D2-1

Single-Wall Tank Testing D1, D2

5psig

Air Supply

Figure D1-1

Figure D2-2

5psig 5psig End End

Valve Closed Valve Closed Valve Closed Valve ClosedValve Closed

5psig Main

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifolds” to each compartment.

3. Connect “Annular Space Guage and Valve” to double-wall bulkhead fittings with valve open.

4. Connect the pressure source to the

“Tank Test Manifolds.”

5. Pressurize all compartments to 5 psig

(3 psig for 12' tanks).

(see Figure D2-1)

D3. TESTING A SINGLE-WALL

COMPARTMENT TANK

WITH A SINGLE-WALL BULKHEAD

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifolds” to each compartment.

3. Connect the pressure source to the

“Tank Test Manifold” on the main tank.

4. Pressurize the main tank to 5 psig maximum

(3 psig for 12' tanks).

(see Figure D3-1)

5. Close the air supply valve on the main “Tank Test Manifold.” Disconnect the air supply line.

6. Monitor the main tank air pressure for 30 minutes before proceeding.

7. Observe and monitor the air gauge for any loss in pressure from the initial reading, which may indicate a leak.

8. Do not release air pressure in main tank.

9. Connect the pressure source to the “Tank Test

Manifold(s)” on the end tank(s).

10. Pressurize the end tank(s) to 5 psig maximum

(3 psig for 12' tanks).

(See Figure D3-2)

11. Close the valve(s) on the “Tank Test Manifold(s).”

Disconnect the air supply line.

12. Do not release air pressure on main and end tanks.

13. Monitor the pressure readings for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

14. While under pressure, cover tank outer surface, including fittings and manway(s), with soap solution and inspect.

15. After completing air test, release pressure.

16. Remove all gauges, valves, and hose assemblies.

17. Replace and tighten fitting plug(s).

18. Replace the plastic vent plugs in the open fittings.

Figure D3-1

5psig

End EndMain

Air Supply Valve OpenValve Open

Figure D3-2

5psig 5psig5psig

Air Supply Valve Closed

Air Supply

End EndMain

Single-Wall Tank Testing - Double-Wall Tank Testing D3, D4

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifold” to a tank primary fitting.

3. Connect hose between a primary tank fitting and

“Annular Space Gauge and Valve.”

4. Close valve between primary tank and annular space.

5. Connect the pressure source to the “Tank Test

Manifold” on the main tank.

6. Pressurize primary tank to 5 psig maximum

(3 psig for 12' tanks).

(see Figure D4-1)

7. Close the air supply valve to the primary tank.

8. Disconnect the air supply.

9. Open valve between primary tank and annular space in order to pressurize the annular space using the existing pressure in the primary tank (pressure in the primary tank may drop slightly) (see Figure D4-2).

10. While under pressure, cover fittings and manway(s), with soap solution and inspect.

11. Close valve to annular space.

D4. TESTING DOUBLE-WALL TANKS

WITH DRY ANNULAR SPACE

Figure D4-1

Air Supply Valve Closed

Hose

Annular Space Fitting

5 psig Primary Tank

Annular Space

Primary Tank Fitting

Do not connect the air supply directly to the annular space monitoring fitting or tank damage will result.

Figure D4-2

Valve Closed Valve Open

Hose

Annular Space Fitting

5 psig Primary Tank

Annular Space 5 psig

Primary Tank Fitting

7. Close valve on each compartment “Tank Test Manifold.” Disconnect the air supply line.

8. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

9. With all compartments under pressure, cover fittings and manway(s) with soap solution and inspect.

10. Open valve between primary tank and annular space in order to pressurize the annular space using the existing pressure in the primary tank (pressure in the primary tank may drop slightly).

11. Close valve to annular space.

12. Open valves to vent all compartments

(maintain 5 psig on annular space) (see Figure D5-2).

13. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

14. While under pressure, cover tank outer surface, including fittings and manway(s), with soap solution and inspect.

15. After completing air test, release pressure.

16. Remove all gauges, valves, and hose assemblies.

17. Replace and tighten fitting plug(s).

18. Replace the plastic vent plug in the open fittings.

12. Open valve to vent primary tank.

13. Maintain pressure on the annular space

(see Figure D4-3).

14. Observe and monitor the gauge on the annular space for 30 minutes for any loss of pressure which may indicate a leak.

15. While under pressure, cover tank outer surface, including fittings and manway(s) with soap solution and inspect.

16. After completing air test, release pressure.

17. Remove all gauges, valves, and hose assemblies.

18. Replace and tighten fitting plug(s).

19. Replace the plastic vent plugs in the open fittings.

Figure D4-3

Valve Open

Valve Closed

Hose

Annular Space Fitting

5 psig Annular Space

Primary Tank Fitting

Double-Wall Tank Testing - Double-Wall Compartment Testing D4, D5

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifolds” to each compartment.

3. Connect hose between a primary tank fitting and

“Annular Space Gauge and Valve” (refer to Figure D4-1).

4. Close valve between primary tank and annular space.

5. Connect the pressure source to the “Tank Test Manifold” on each compartment.

6. Pressurize all compartments to 5 psig (3 psig for 12' tanks).

(see Figure D5-1)

D5. TESTING A DOUBLE-WALL

COMPARTMENT TANK WITH A DRY

ANNULAR SPACE AND DOUBLE WALL

BULKHEAD(S)

Do not connect the air supply directly to the annular space monitoring fitting or tank damage will result.

5psig

Air Supply Air SupplyAir Supply

5psig 5psig

Valve Closed

Figure D5-1

Figure D5-2

Valve Open Valve OpenValve Open

5 psig

Valve Closed

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Connect “Tank Test Manifolds” to each compartment.

3. Connect hose between a primary tank fitting and

“Annular Space Gauge and Valve” (refer to Figure D4-1).

4. Close valve between primary tank and annular space.

5. Connect the pressure source to the “Tank Test Manifold” on one compartment.

6. Pressurize the compartment to 5 psig (3 psig for 12' tanks).

(see Figure D6-1)

7. Close the valve on the “Tank Test Manifold.”

Disconnect the air supply line.

8. Monitor the pressure readings for 30 minutes for any loss in pressure from the initial readings which may indicate a leak.

9. Do not release air pressure.

10. Repeat steps 5 through 9 for each remaining compartment (see Figure D6-2).

D6. TESTING A DOUBLE-WALL

COMPARTMENT TANK WITH A DRY

ANNULAR SPACE AND SINGLE-WALL

BULKHEAD(S)

Do not connect the air supply directly to the annular space monitoring fitting or tank damage will result.

Double-Wall Tank Testing - Double-Wall Compartment Testing D5, D6

11. With all compartments under pressure, cover fittings and manway(s) with soap solution and inspect.

12. Open valve between primary tank and annular space in order to pressurize the annular space using the existing pressure in the primary tank (pressure in the primary tank may drop slightly).

13. Close valve to annular space.

14. Open valves to vent all compartments

(maintain 5 psig on annular space) (see Figure D6-3).

15. Monitor annular space pressure for 30 minutes for any loss in pressure from the initial readings which may indicate a leak.

16. While under pressure, cover tank outer surface, including fittings and manway(s), with soap solution and inspect.

17. After completing air test, release pressure.

18. Remove all gauges, valves, and hose assemblies.

19. Replace and tighten fitting plug(s).

20. Replace the plastic vent plug in the open fittings.

5psig5psig 5psig

Air Supply Valve Closed

Air Supply Valve Closed

Figure D6-2

5psig

Valve Open Air Supply Valve Open

Valve Closed

Figure D6-1

D7. TESTING DOUBLE-WALL TANKS WITH

LIQUID FILLED ANNULAR SPACE

(HYDROSTATICALLY MONITORED)

This tank has a hydrostatic monitoring system that includes a nontoxic (30% calcium chloride) green monitoring fluid pre-installed between the tank walls.

In the unlikely event of a tank leak, this monitoring fluid will leave a green trace on the tank.

If monitoring fluid is found on the tank inner or outer surface during any test, discontinue the installation and immediately contact Containment Solutions Field Service.

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Closely inspect outer wall for any trace of green monitoring fluid.

Figure D6-3

Valve Open Valve Open Valve Open

5 psig

Valve Closed

Never pressurize a wet annular space. Doing so may damage the primary tank or cause tank failure.

3. With tank in upright position, remove the 4" vented plug from the reservoir fitting.

4. Add only enough monitoring fluid to cover the rib inside the reservoir. Do not overfill past the rib at this time (see Figure D7-1). Final monitoring fluid levels will be set later in the installation process.

5. Reinstall vented reservoir plug to ensure annular space is vented at all times.

6. Remove enough tank fitting plugs to see inside the primary tank.

7. With a light, look inside for any monitoring fluid.

8. Replace and tighten fitting plug(s).

9. Connect “Tank Test Manifold” to a primary tank fitting.

10. Connect the pressure source to the “Tank Test

Manifold.”

11. Pressurize primary tank to 5 psig maximum

(3 psig for 12' tanks) (see Figure D7-2).

12. Close valve on “Tank Test Manifold.” Disconnect the air supply line.

13. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

14. While under pressure, cover fittings and manway(s) with soap solution and inspect.

15. After completing air test, release pressure.

16. Remove all gauges, valves, and hose assemblies.

17. Replace and tighten fitting plug(s).

18. Replace the plastic vent plugs in the open fittings.

Double-Wall Compartment Testing - Hydrostatically Monitored Testing D6, D7

Tank Rib Monitoring

Fluid

Reservoir Vented Reservoir Plug

Figure D7-1

Air Supply

Monitoring Fluid

Vented ReservoirPrimary Tank Fitting

5 psig Primary Tank

Figure D7-2

D8. TESTING A DOUBLE-WALL

HYDROSTATICALLY MONITORED

COMPARTMENT TANK WITH

DOUBLE-WALL BULKHEADS

This tank has a hydrostatic monitoring system that includes a nontoxic (30% calcium chloride) green monitoring fluid pre-installed between the tank walls.

In the unlikely event of a tank leak, this monitoring fluid will leave a green trace on the tank.

If monitoring fluid is found on the tank inner or outer surface during any test, discontinue the installation and immediately contact Containment Solutions Field Service.

Perform in the following the order listed.

1. Comply with the requirements of Section C.

2. Closely inspect outer wall for any trace of green monitoring fluid.

3. With tank in upright position, remove the 4" vented plug from the reservoir fitting.

4. Add only enough monitoring fluid to cover the rib inside the reservoir. Do not overfill past the rib at this time (see Figure D8-1). Final monitoring fluid levels will be set later in the installation process.

5. Reinstall vented reservoir plug to ensure annular space is vented at all times.

6. Remove enough tank fitting plugs to see inside each compartment.

7. With a light, look inside for monitoring fluid.

8. Replace and tighten fitting plug(s).

9. Connect “Tank Test Manifold(s)” to each compartment.

10. Connect the pressure source to the “Tank Test

Manifold” on each compartment.

Never pressurize a wet annular space. Doing so may damage the primary tank or cause tank failure.

Tank Rib Monitoring

Fluid

Reservoir Vented Reservoir Plug

Figure D8-1

11. Pressurize all compartments to 5 psig (3 psig for 12' tanks).

(see Figure D8-2)

12. Close valve on each “Tank Test Manifold.”

Disconnect the air supply line.

13. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

14. With all compartments under pressure, cover fittings and manway(s) with soap solution and inspect.

15. After completing air test, release pressure.

16. Remove all gauges, valves, and hose assemblies.

17. Replace and tighten fitting plug(s).

18. Replace the plastic vent plug in the open fittings.

Air Supply Air SupplyAir Supply

Vented Reservoir

5psig 5psig 5psig

Figure D8-2

Hydrostatically Monitored Testing D8, D9

D9. TESTING A DOUBLE-WALL

HYDROSTATICALLY MONITORED

COMPARTMENT TANK WITH

SINGLE-WALL BULKHEADS

This tank has a hydrostatic monitoring system that includes a nontoxic (30% calcium chloride) green monitoring fluid pre-installed between the tank walls.

In the unlikely event of a tank leak, this monitoring fluid will leave a green trace on the tank.

If monitoring fluid is found on the tank inner or outer surface during any test, discontinue the installation and immediately contact Containment Solutions Field Service.

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Closely inspect outer wall for any trace of green monitoring fluid.

3. With tank in upright position, remove the 4" vented plug from the reservoir fitting.

Never pressurize a wet annular space. Doing so may damage the tank or cause tank failure.

4. Add only enough monitoring fluid to cover the rib inside the reservoir. Do not overfill past the rib at this time (see Figure D9-1). Final monitoring fluid levels will be set later in the installation process.

5. Reinstall vented reservoir plug to ensure annular space is vented at all times.

6. Remove enough tank fitting plugs to see inside each compartment.

7. With a light, look inside for monitoring fluid.

8. Replace and tighten fitting plug(s).

9. Connect “Tank Test Manifold” to each compartment.

10. Connect the pressure source to the “Tank Test Manifold” on a compartment.

11. Pressurize the compartment to 5 psig (3 psig for 12' tanks).

(see Figure D9-2)

12. Close the valve on the “Tank Test Manifold.”

Disconnect the air supply line.

13. Monitor the pressure for 30 minutes for any loss in pressure from the initial reading which may indicate a leak.

14. Do not release air pressure.

15. Repeat steps 10 through 14 for each remaining compartment (see Figure D9-3).

Air Supply Valve OpenValve Open

Vented Reservoir

5psig

Figure D9-2

Tank Rib Monitoring

Fluid

Reservoir Vented Reservoir Plug

Figure D9-1

6. Wait at least 30 minutes, if the water level in the collar does not drop more than ¼", the tank is considered acceptable and leak free.

7. If the level drops more than the ¼", ensure that inlet and outlet pipe caps or plugs and collars are not leaking, then refill the tank and retest.

8. After the tank is proven to be watertight, remove the water in the tank to below the pipe invert.

9. For additional testing instructions for a Non Petroleum tank, refer to Supplemental Documents (Section R).

D10. WATER TEST FOR

A NON AIR-TESTABLE TANK

(NON PETROLEUM TANKS)

These instructions are for tanks that require a post installation water test.

Perform the following in the order listed.

1. Comply with the requirements of Section C.

2. Tanks may only be water tested if the backfill is at tank top (see Figure D10-1).

3. Expose tank penetrations on tank top by temporarily removing backfill.

4. So water does not exit the inlet/outlet pipe, install a turned up elbow or plug.

5. Completely fill the tank with water to a level 2" into the access collar(s).

If the tank is to be water tested, it must be supported by backfill on all sides to the top of the tank. Failure to do so may result in tank damage.

E. EXCAVATION AND TANK CLEARANCE

STABLE EXCAVATIONS

• When your excavation is in stable, undisturbed soil;

use the minimum spacings (per Figure E-1 and Table E-2).

16. With all compartments under pressure, cover fittings and manway(s) with soap solution and inspect.

17. After completing air test, release pressure.

18. Remove all gauges, valves, and hose assemblies.

19. Replace and tighten fitting plug(s).

20. Replace the plastic vent plug in the open fittings.

Valve Closed Air SupplyAir Supply

Vented Reservoir

5psig5psig 5psig

Figure D9-3

Water

Fill 2" into Access Collar

Backfill

Figure D10-1

Do not enter the tank excavation unless in compliance with OSHA regulations. Follow OSHA guidelines for tank excavation.

Collapsing excavation walls can cause injury or death.

Figure E-1

B A A

BB

Stable Soil

Double-Wall Compartment Testing - Excavation and Tank Clearance D9, D10, E

4', 6', 8' Diameter Tanks Minimum w/ 12" x 12" CSI Deadmen

A 18" (457mm) 24" (610mm)

B 18" (457mm) 24" (610mm)

10' Diameter Tanks Minimum w/ 18" x 8" CSI Deadmen

A 18" (457mm) 36" (914mm)

B 24" (610mm) 24" (610mm)

12' Diameter Tanks Minimum w/ 18" x 8" CSI Deadmen

A 24" (610mm) 36" (914mm)

B 24" (610mm) 24" (610mm)

TABLE E-2

SHORING REMOVAL

• After the backfill is properly placed completely around the tank(s):

- Vibrate shoring and pull slowly to top of backfill.

- Fill any voids created by the pulled shoring with approved backfill.

• All shoring should be removed and all voids must filled using a long handled probe before continuing installation.

• If shoring is left in place, the shoring must not degrade over the life of the installation.

TANK LOCATION - NEARBY STRUCTURES

• The tank owner or the tank owner’s representative is responsible for determining the proper location of a tank excavation.

• The location of a tank can be affected by the location of nearby structures. When selecting a tank site, care must be taken to avoid undermining the foundations of new or existing structures.

• Ensure that downward forces from loads carried by the foundations and supports of nearby structures (constructed before or after tank installation) are not transmitted to the tanks. (Refer to NFPA 30 for additional details).

UNSTABLE EXCAVATIONS

• An unstable excavation is any of the following:

- Muck, bog, peat, swamp, quick sand, flowing water, landfill type areas or any other situations where the soil is inherently unstable.

- Soil less than 750 lbs./sq. ft. cohesion per ASTM D2166 (Test Method for Unconfined Compressive Strength of Cohesive Soil), or have an ultimate bearing capacity less than 3,500 lbs./sq. ft.

• A soils consultant can provide additional recommendations, including when a reinforced pad is needed under the tank.

• When a bottom pad is used, it should extend to the excavation walls.

• Unstable excavations may also require geotextile fabric (see Section F).

• When the soil is unstable, with or without shoring, use the minimum spacings (per Figure E-3 and Table E-4).

F. GEOTEXTILE FABRIC

Geotextile fabric (filter fabric) allows the passage of water but prevents the migration of approved backfill into the native soil and native soil into the approved backfill.

Migration may compromise the backfill support of the tank.

GEOTEXTILE FABRICS ARE REQUIRED FOR ANY

OF THE FOLLOWING INSTALLATIONS

• Areas subject to tidal conditions.

• Areas subject to frequently changing ground water levels.

• Water conditions with silty soil.

• Muck, bog, peat, swamp, landfill type areas or any other situations where the soil is inherently unstable.

• Soils with less than 250 lbs./sq. ft cohesion or with ultimate bearing capacity of less than 500 lbs./sq. ft.

• Geotextile fabrics may also be used in alternate installation methods (see Supplemental Documents, Section R).

The tank owner or tank owner’s representative may also specify the use of geotextile fabrics.

Non-degradable geotextile fabric can be either woven or non-woven and should have a minimum grab tensile strength of 120lbs/inch (ASTM D4595) and a maximum apparent opening size of #50 US sieve (0.300mm)

(ASTM D4751).

Do not use plastic, or any other material that may tear or degrade over time, as a replacement for geotextile fabric.

Figure E-3

B A A

BB

Unstable Soil

4', 6', 8' Diameter Tanks Minimum w/ 12" x 12" CSI Deadmen

A 18" (457mm) 24" (610mm)

B ½ Tank Dia. ½ Tank Dia.

10' Diameter Tanks Minimum w/ 18" x 8" CSI Deadmen

A 18" (457mm) 36" (914mm)

B ½ Tank Dia. ½ Tank Dia.

12' Diameter Tanks Minimum w/ 18" x 8" CSI Deadmen

A 24" (610mm) 36" (914mm)

B ½ Tank Dia. ½ Tank Dia.

TABLE E-4

If the soil is unstable, the tank owner should consult a professional engineer to ensure a proper installation and avoid the potential for tank or property damage.

Excavation and Tank Clearance - Geotextile Fabric E, F

Adhere to the minimum and maximum dimensions in this section.

In wet conditions, sufficient overburden and /or an appropriate anchoring system must be used to offset buoyancy of the tank. Refer to the “Anchor Chart” (Appendix A) for minimum burial depth in buoyant conditions.

• Traffic pad must extend at least 12" beyond tank perimeter in all directions.

• The maximum burial depth is 7' from the tank top to grade elevation. Tanks can be designed for burial depths greater than 7', contact your local CSI representative prior to tank purchase.

• Dry…