23 10 00-001R2 - ENC Underground Fuel Oil Stroage Tanks Alternate.pdf
PDF 29 MB Posted
- Attached to
- Z1DA--554 FUEL LINE REPAIR
- Solicitation number
- 36C25921Q0630
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
OMAHA DISTRICT CORPS OF ENGINEERS
DENVER VAMC CONSTRUCTION OFFICE
13611 EAST COLFAX AVENUE, 2ND FLOOR
AURORA, CO 80045
Kiewit-Turner, a Joint Venture 13611 E. Colfax Ave., 2nd Floor Aurora, CO 80045
Transmittal Number: 23 10 00-001 Description: Underground Fuel Oil Storage Tanks FRP & Piping Alternate
Government Review Comments:
Code: “G”-Approved
Authorizing Official:
US Army Corps of Engineers Date
02 Dec 2015
Received 12/02/2015
Received 12/02/2015
Fax: 303.930.9001
303.930.9000Tel:
Kiewit - Turner a Joint Venture
Suite A-300 7200 S. Alton Way
Englewood, CO 80112
Job: 15387 - Replacement Medical Center Facility
Product Data
Sample
Other
Shop Drawing
Resubmittal
First Submittal X
VA Proj #:
To: H+L Architecture 1755 Blake Street
Suite 400
Denver, CO 80202
DESCRIPTIONSpecificationSUBMITTAL
ItemQuantity Section Sub./SupplierNo. Mfgr.
ACTION
DCBA E
Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008
Review Cycle: 001
Attn: Chuck Adkisson
1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a
Joint Venture
01 573
ACTION TAKEN
CONTRACTOR'S SIGNATURE:
CONTRACTOR'S NOTES:
DATE: 7/12/2011
Reviewed Only for Revisions to
Reviewed: Incorporate Changes
Reviewed=
A
B
C
Previous Submittal
Revise and Resubmit=D
Rejected =E
ARCHITECT/ENGINEER RESPONSE:
REMARKS:
BY: DATE:
Expedition f_sb_pks_01a
VA101CFM-C-0100
Cc: Tim Pogany, U.S. Dept. of Veterans Affairs
Received By ___________________
Date _______________
23 10 00
X
ENC Underground Fuel Oil Storage Tanks FRP & Piping ALTERNATE
X
GCH Construction Company
23 10 00001R2
11/24/2015
12/08/2015
Kiewit-Turner Submittal No.
COE 1
REQUESTED RETURN DATE:
Kevin Lindsey, U.S. Dept. of Veterans Affairs
VA101F-15-C-0005
13611 E. Colfax Avenue 2nd Floor Aurora, CO 80045
DEPARTMENT OF THE ARMY
Omaha District Corps of Engineers 13611 East Colfax Avenue 2nd Floor Aurora, CO 80045
W9128F-16-C-0003
Peter Sturdivant
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
KIEWIT-TURNER
a Joint Venture
REVIEWED - NO COMMENTS MADE
REVIEWED WITH COMMENTS
RESUBMITTAL REQUIRED
DATE SIGNED
SUBMITTAL #: 23 10 00 - 001R2
11/24/15
X
O.RUIZ
APPROVAL REQUESTED NO LATER THAN FRIDAY, 12/4/15.
AN ALTERNATE SUBMITTAL FOR THE UNDERGROUND FUEL OIL TANKS
AND PIPING IS BEING SUBMITTED FOR THE FOLLOWING REASONS
FROM OUR SUBCONTRACTORS GCH/RK/PLATT-ROGERS:
1. Due to the lengthy delay in procuring the tanks, there will be a price increase associated with purchasing the tanks from CSI; this price increase looks to be between 6 to 8%. In fairness to CSI, the final quote was from 12/23/13. The drawings were approved in May of 2014, and the pricing was still good then.
Most recently in 2015, we were suppose to set these tanks in June, then July, then August. I finally told CSI that we definitely needed a production spot for an October delivery. Now we are looking at mid January to early February.
2. When we give the green light to CSI to start production, we need to make sure that they can be delivered. CSI has already told us that we need to take possession of the tanks, and that they can’t sit in their yard. That said, we need to make sure that we are truly ready for the tanks.
3. The timing here is critical, but it does allow us the opportunity to consider the Xerxes tanks so that we can eliminate a cost increase.
Xerxes compared to CSI:
A. Xerxes has given us a quote that they will hold a price until February that will have no financial impact to the project.
B. When we give Xerxes the green light to start production, they can deliver in 6 to 8 weeks; almost 3 weeks faster than CSI.
C. Xerxes is a more flexible than CSI, if for some reason the schedule slips again (hopefully not), they are willing to hold the tanks at their facility for a reasonable duration of time (not to exceed 4 months.)
D. The Xerxes and CSI tanks are the same from a product standpoint. The VA will not be getting a better product, but it is not any less of a product.
E. Xerxes is an approved vendor for both the VA and USACE.
Kiewit-Turner a Joint Venture
7200 S. Alton Way, Suite A-300, Englewood, CO 80112 Phone: 303-930-9000 FAX: 303-930-9001
Project Name:
Subcontractor Name: Submittal Date:
Contact Name: E-mail: Return By Date:
Contact Phone(s): Review Days:
Number: Name:
1.4.A
2.2 N/A Y N N Y
2.5.C N/A Y N N Y
2.2.D N/A Y N N Y
2.2.G N/A Y N N Y
1.1.E N/A N/A N/A N/A N/A
Product Data
Underground Storage FRP Tanks FRP Pipe and Fittings Fiberglass Manhole Covers Internal Ladders
Reviewed By
Sustainable Design Letter
Date Submittal is in Compliance
Submittal is in Compliance with Variances from Specifications
Signature
SUBMITTAL INDEX & COVER SHEET
Department of Veteran's Affairs Replacement Medical Center
The Mechanical Diamond Partners 11/19/15 Kramer Peter kpeter@rkmi.com 12/10/15 720-737-7190
Specification Section: 231000.02 Facility Fuel Systems
S p e c
S u b m it ta l
P a ra g ra p h
S p e c
P ro d u c t
P a ra g ra p h
S p e c if ie d o r
L is te d
M a n u fa c tu re r?
All Materials in this submittal (X) do ( ) do not comply with the FAR 52.225-11 Buy American Act
M e e ts
A ll
S p e c
R e q u ir e m e n ts
E x c e p ti o n s o r
V a ri a n c e s f ro m
S p e c
A p p ro v e r
In fo rm a ti o n
N e e d e d
I n
T h is P a c k a g e
Submittal Type
Submittal Item Description Manufacturer
23 11 00 - Facility Fuel Systems
Containment Solutions
Western Fiberglass Ultra Fiberglass Systems
AEP Pipe Systems
SubmittalIndexForm_041009 Page 1 of 1
231000.02-1 23 10 00 - 01R2 mailto:kpeter@rkmi.com
Date Submitted: November 19, 2015
Date Due Back: December 10, 2015
RK Submittal No.: 231000.02 - 1
Specification Section: 231000 - Facility Fuel Systems - Underground Tank Alternative Manufacturer.
Project Name: Veteran Affairs Replacement Medical Facility 13529 East 17th Place
General Contractor: Kiewit -- Turner 7200 South Alton Way Englewood, CO 80112
Mechanical Contractor: The Mechanical Diamond Partners 12800 E Colfax Ave Aurora, CO 80011
Subcontractor/Supplier: Platt Rogers
Submittal Cover Sheet
ITEM COPIES REV SUBMITTAL DESCRIPTION DRAWING MANUFACTURER
1 1 2.2 Underground Storage FRP Tanks
2 1 2.5.C FRP Pipe and Fittings
3 1 2.2.D Fiberglass Manhole Enclosures
4 1 2.2.G Internal Ladders
Transmittal of Submittal
November 19, 2015
Kiewit -- Turner 7200 South Alton Way Englewood, CO 80112
Attention: Chris Betts
Reference: Veteran Affairs Replacement Medical Facility 13529 East 17th Place
Subject: Submittals for Specification Section 231000
Dear Chris:
The Mechanical Diamond Partners is providing Kiewit -- Turner the enclosed submittals for Specification Section 231000 - Facility Fuel Systems - Underground Tank Alt., as listed below:
ITEM COPIES REV SUBMITTAL DESCRIPTION STATUS DUE BACK
1 1 2.2 Underground Storage FRP Tanks For Approval 12/10/2015
2 1 2.5.C FRP Pipe and Fittings For Approval 12/10/2015
3 1 2.2.D Fiberglass Manhole Enclosures For Approval 12/10/2015
4 1 2.2.G Internal Ladders For Approval 12/10/2015
Your immediate review and processing is requested to ensure these submittals are returned back to The Mechanical Diamond Partners. on or before the DUE BACK date(s) listed above.
We are available to discuss any comments or questions you may have concerning these submittals.
Sincerely, The Mechanical Diamond Partners
Kramer Peter Project Engineer
Submittal Transmittal 12211 W. Alameda Parkway, Ste 200, Lakewood, CO 80228
Ph. 303.708.9900
Project # 8169VA Replacement Medical Center, Aurora
Date: 2/9/2015 Reference Number: 0011
Transmitted To: Transmitted By: Robb MoodySean Warren
RK Mechanical Platt Rogers Construction 3800 Xanthia Street Denver, CO 80238
12211 W. Alameda Parkway Suite 200 Lakewood, CO 80228 Tel: 303-708-9900
Submittal Package No Description
0003 - 23 10 00 - 1 Facility Fuel Systems
Transmitted For : Delivered Via : Tracking Number :
NotesItems Description
1 2.2 Underground Storage FRP Tanks - Shop Drawing and Product Data
2 2.5C Fiberglass Reinforced Plastic (FRP) Pipe and Fitings - Product Data
AEP Electr-O-Fuze Double-Wall pipe is now being proposed in place of the Red Thread.
3 Fiberglass Manhole Enclosures Same material and thickness, provided by Western Fiberglass
4 Sump Ladders
Contact NameCompany NameCc:
Remarks
Package includes underground piping, underground tanks, fiberglass tank sumps, and fiberglass sump ladders.
Printed on: 2/9/2015 Page 1
9.4.15
Aron Kendrick
Platt Rogers would like to substitute the AAN Containment Solutions fuel tanks with a different manufacture. Included in the package is a similar tank by Xeres for approval.
11.12.15
2.2 Underground Storage FRP Tanks
Replacement Medical Center Facility VA No. 554-501 Eastern Colorado Health Care System
Facility Fuel Systems CDI No. 12 23 10 00 - 12 31 AUG 2012
2. Pipe sizes 100 mm (4 inches) and smaller, threaded. Pipe sizes 150 mm (6 inches) and larger, raised faced slip-on flanges, 1025 kPa (150 pound) ASME rating.
3. Welded joints required on steel piping located inside tanks.
4. Provide and coordinate tank connection quantities, sizes and types with requirements of fluid level gage unit; leak detector sensor; sounding rod;
vent, fill, supply and return pipes; and other pipes as shown.
5. Dielectric insulation on all connections to steel piping.
6. All tank piping connections, except vent, shall be within the tank manhole enclosure.
J. Tank Manholes: Provide quantity shown. Bolted cover type, gasketed. Zinc plated bolts, nuts, washers.
K. Internal Ladder: Provide as shown and shall have 50 mm x 6 mm (2 inch x 0.25 inch) sides, 20 mm (0.75 inch) diameter rungs on 300 mm (12 inch) centers.
Provide slide supports to allow for tank movement.
L. Wear (Striker) Plates: Provide 300 mm (12 inch) square, 6 mm (0.25 inch) thick steel plates rolled and seal-welded to bottom of tank directly under all openings.
M. Lifting Lugs: Provide for rigging tanks.
N. Hold Down Straps: Provide quantity and design of EPDM-type rubber encased steel straps as recommended by tank manufacturer to anchor tank to concrete ballast slab. Hold down strap electrical isolation shall conform to STI R891.
Straps shall have tension load capability equal to hold-down capability of ballast slab, with a minimum safety factor of two. Provide complete anchorage devices, including turnbuckles, for adjusting tension.
2.2 UNDERGROUND FIBERGLASS REINFORCED PLASTIC TANKS:
A. Type: Factory-fabricated, double-wall, fiberglass reinforced polyester (FRP), horizontal cylindrical configuration, atmospheric pressure, for underground installation as shown.
B. Construction:
1. UL 1316. Provide label of conformance.
2. Conform to NFPA 30 or 31 as applicable.
3. Design for surcharge loads due to backfill and paving as shown. In addition, in paved areas, design for H-20 (14 500 kg) (32,000 pound) axle loading.
4. Leaks and abrasions are not permitted. Maximum out-of-roundness is one percent of the diameter.
5. Outer wall shall provide leak-tight secondary containment that covers entire tank. Provide annular space between the walls arranged with flow
CDI No. 12 23 10 00 - 13 31 AUG 2012 channels to allow tank leakage at any point to flow to a leak detector at the bottom of the annular space. Provide connection point to outer wall and plastic pipe from tank connection to grade designed to accommodate leak detection device.
C. Factory Cleaning: Clean interior and exterior. Remove all dirt, debris, and coatings and material incompatible with fuel being stored.
D. Fiberglass Manhole Enclosures:
1. Cylindrical enclosures sized as shown, designed to contain fuel spills from tank piping. Locate all tank manholes and all tank piping connections within the enclosures.
2. Same material type and thickness as tank. Reinforce to prevent deflection.
Provide leak-tight connection to tank designed to allow removal of tank manway cover without disturbing connection between enclosure and tank.
Coat all exposed steel surfaces, such as bolting, with two coats of urethane.
3. In traffic areas, enclosures and tank must have flexible isolation system to prevent wheel loads from being transmitted to the tank.
4. For burner fuel tanks, design enclosure to permit installation and removal from above grade of present or future heating coil as an assembled unit.
5. Access to Manhole Enclosure: Fed. Spec. A-A-60005 cast iron manhole frames and covers rated for H-20 (14 500 kg) (32,000 pound) axle loading minimum with opening size as shown. Sidewalk type metal doors as shown and as specified under Section 05 50 00, METAL
FABRICATIONS.
E. Pipe Connections to Tanks:
1. Conform to UL 1316.
2. Pipe sizes 100 mm (4 inches) and smaller, threaded. Pipe sizes 125 mm (5 inches) and larger, 1025 kPa (150 pound) ASME flanged.
3. Welded joints required on steel piping located inside tanks.
4. Provide and coordinate tank connection quantities, sizes and types with requirements of level gage unit; tank leak detector; sounding rod; vent, fill, supply and return pipes; and other pipes as shown.
5. All tank piping connections shall be within the tank manhole enclosures and sump/risers.
F. Tank Manholes: Provide quantity shown. Bolted cover type, gasketed, zinc-plated bolts, nuts and washers.
G. Internal Ladder: Provide with 50 mm x 6 mm (2 inch x 0.25 inch) sides and 20 mm (0.75 inch) diameter rungs at 300 mm (12 inches) on center. Provide slide support to allow tank movement.
CDI No. 12 23 10 00 - 14 31 AUG 2012
H. Wear (Striker) Plates: Provide 300 mm (12 inch) square, 6 mm (0.25 inch) thick steel plates attached to bottom of tank directly under the sounding opening, the fuel return discharge, and the fill discharge.
I. Lifting Lugs: Provide for rigging tanks.
J. Hold-Down Straps: Provide quantity and design of FRP straps as recommended by tank manufacturer to anchor tank to concrete ballast slab. Straps shall have tension load capability equal to hold-down capability of ballast slab, with a minimum safety factor of two. Provide complete anchorage devices, including turnbuckles, for adjusting tension.
2.3 SOIL SEPARATOR MAT:
A. Material: Porous, non-woven polypropylene geotextile, 135 g per sq. meter (4 ounces per square yard), resistant to all alkalies and weak acids.
B. Material and Manufacturer: Typar 3401 from LINQ Industrial Fabrics, or equal.
2.4 TANK AND PIPING ACCESSORIES:
A. Vent Caps: Galvanized cast iron or cast aluminum with brass or bronze screens, arranged to permit full venting and to prevent entry of foreign material into the vent line. Same pipe size as vent pipe.
B. Fill Boxes:
1. Spill-container type enclosing a fill cap assembly with camlock hose connector with closure coordinated with fittings used by fuel supplier.
2. Watertight assembly, cylindrical body, quick-opening corrosion-resistant watertight sealable cover, polyethylene spill containment compartment with minimum // 5 // 10// 15 //25// gallon capacity. Integral drain valve with discharge to fill pipe.
3. Fill cap shall be lockable, tight-fill design with provision for padlock on the top of the cap. Fill cap shall screw onto threaded adapter that can be removed without removing fill box. Entire assembly shall seal tight with no leakage during filling and when cap is in place.
4. Provide special tools necessary for opening fill boxes and fill caps.
5. Protect spill container from traffic by ramped, drain-slotted cast iron body ring and cover. Design shall prevent transmission of traffic loads to the underground tank. Spill-container type not required at locations designated only for sounding tanks.
C. Fill caps located above grade without fill boxes shall be lockable, tight-fill design, operated by special wrench that shall be furnished. Entire assembly shall seal tight with no leakage during fill and when cap is in place.
D. Refer to Section 05 50 00, METAL FABRICATIONS, for access platforms shown for aboveground tanks.
09/12 Xerxes Petroleum Guide Specifications — p. 1
Guide Specifications – Xerxes® Fiberglass Underground Storage Tanks
Short form The contractor shall provide a double-wall or triple-wall fiberglass reinforced plastic (FRP) UL-listed underground storage tank as shown on the drawings. The tank size, fittings and accessories shall be as shown on the drawings. The fiberglass tank shall be manufactured by Xerxes® Corporation.
The tank shall be tested and installed according to the Xerxes Installation Manual and Operating Guidelines for Fiberglass Underground Storage Tanks in effect at time of installation.
Long form Part I: General
1.01 Quality Assurance
A. Acceptable Manufacturer: Xerxes Corporation B. Governing Standards, as applicable:
1. Underwriters Laboratories (UL) Standard for Safety 1316 Glass-Fiber-Reinforced Plastic Underground Storage Tanks for Petroleum Products, Alcohols, and Alcohol-Gasoline Mixtures. A UL Label shall be attached to each tank.
2. National Fire Protection Association (NFPA) Standards: NFPA 30: Flammable and Combustible Liquids Code, NFPA 30A: Code for Motor Fuel Dispensing Facilities and Repair Garages, NFPA 31: Standard for the Installation of Oil- Burning Equipment.
3. City of New York Department of Buildings M.E.A.
4. American Concrete Institute (ACI) standard ACI 318-11, Building Code Requirements for Structural Concrete.
C. Submittals
1. Contractor shall submit ___ copies of shop drawings, manufacturer’s product brochures, Installation Instructions and calibration charts.
Part II: Products
2.01 Double-Wall and Triple-Wall Fiberglass Reinforced Plastic (FRP) Underground Storage Tanks A. Loading Conditions – Tank shall meet these design criteria:
1. Interstitial Pressure - The interstitial space of the tank shall withstand a minimum 20-psig pressure test.
2. Internal Load – Tank shall withstand a 5-psig air-pressure test with a 5:1 safety factor.
3. Surface Loads – Tank shall withstand surface H-20 and HS-20 axle loads when properly installed according to Xerxes' current Installation Manual and Operating Guidelines.
4. External Hydrostatic Pressure – Tank shall be designed for 7' of overburden over the top of the tank, the hole fully flooded and a safety factor of 5:1 against general buckling.
B. Product Storage:
1. The primary containment of double and triple-wall tanks shall be vented and operated at atmospheric pressure only.
2. Tank shall be capable of storing liquids with a specific gravity up to 1.1.
3. Tank shall be capable of storing products identified in the manufacturer’s standard limited warranty in effect at the time of purchase.
C. Materials:
1. The primary and secondary walls of the tank shall be manufactured with 100% premium resin and glass-fiber reinforcement. No sand or silica fillers shall be added to the resin.
1. The interstitial space between the primary and secondary walls shall be constructed with a glass reinforcement material such as Parabeam®, which provides a structural bond between the two tank walls, while creating a defined interstice that allows for free flow of liquid.
D. Tank Dimensions:
1. Tank shall have nominal capacity of _____ gallons.
2. Tank shall have nominal outside diameter of _____ feet.
3. Tank shall have a nominal overall length of _____ feet/inches .
2.02 Tank Monitoring System
A. General http://www.xerxes.com/
07/12 Xerxes tank Guide Specifications — p. 2
1. Tank shall be continuously monitored with TRUCHEK hydrostatic leak monitoring system.
2. The continuous monitoring system shall include monitoring fluid factory-installed in the interstitial space and within a fiberglass tank-top mounted reservoir.
3. The monitoring system shall be recognized by the National Work Group on Leak Detection Evaluations (NWGLDE) as continuous leak detection and as a precision tank test.
4. The monitoring system shall be independently tested by a qualified third-party and verified to be capable of detecting leaks as small as .05 per hour when proper tank tightness test procedures are followed.
B. Design
1. The continuous monitoring system shall be designed to detect a leak in either the primary or secondary wall at all times, regardless of the water table conditions at the installation site.
2. The interstice of the tank shall be designed for a 5:1 safety factor beyond normal hydrostatic operating pressure to ensure structural integrity and to prevent false leak alarms.
2.03 Accessories
A. Tank Anchoring
1. Anchor straps shall be as supplied by tank manufacturer and designed for a maximum load of 25,000 lbs.
2. Galvanized turnbuckles (two per anchor strap) shall be supplied by the tank manufacturer.
3. Prefabricated concrete anchors shall be supplied by the tank manufacturer, designed to the ACI 318-11 standard, manufactured with 4,000 psi concrete and shall have adjustable anchor points.
B. Manways
1. The standard manway shall be flanged, 22" I.D. and complete with UL-listed gaskets, bolts and covers as shown on tank drawings.
C. Threaded Fittings
1. All threaded fittings shall be NPT half or full couplings, in 2”, 4” or 6” diameters.
2. Fittings shall be installed on the tank-top centerline or in the cover of the manway as shown on the tank drawings.
D. Containment Collars & Sumps
1. The tank shall have factory installed 42”-or 48”-diameter containment collars as shown on the tank drawings.
2. Containment sumps in 42” or 48” diameter, provided by the tank manufacturer and designed for mounting on the containment collars, shall be supplied as shown on the tank drawings.
3. UL-listed adhesive shall be provided by the tank manufacturer with each containment collar and sump.
4. Containment collars and sumps shall be UL-listed for use with the manufacturer’s tank.
5. Containment collars and sumps shall be designed and supplied as a containment system. Only sumps provided by the manufacturer shall be allowed.
Part III: Testing and Installation
3.01 Testing
A. Testing – Tank shall be tested according to the Xerxes Installation Manual and Operating Guidelines in effect at time of installation.
3.02 Installation
A. Installation – Tank shall be installed according to the Xerxes Installation Manual and Operating Guidelines in effect at time of installation.
Part IV: Limited Warranty
4.01 Limited Warranty
A. Limited Warranty – Warranty shall be manufacturer's standard limited warranty in effect at the time of purchase.
Installation Manual and Operating Guidelines www.xerxes.com
INSTALLATION MANUAL AND OPERATING GUIDELINES
TABLE OF CONTENTS
SECTIONS
1. Introduction
1.1 Safety
1.2 General
1.3 Equipment
2. Handling and Storing Tanks
2.1 General
2.2 Unloading, Hoisting and Guiding Tanks
2.3 Storing Tanks
3. Preinstallation Inspection and Testing
3.1 General
3.2 Inspecting the Tank
3.3 Pretesting Procedures
3.4 Preparing the Tank for Air Testing
3.5 Pressurizing the Primary Tank
3.6 Pressurizing the Interstitial Space in a Dry Tank
3.7 Soaping the Tank
3.8 Performing Visual Checks on a
Tank with a Wet Interstitial Space
3.9 Releasing Pressure from the Tank
4. Preinstallation Testing for Specific Types of Air-Testable Tanks
4.1 Air Testing a Single-Wall Tank
4.2 Testing a Wet Double-Wall Tank
4.3 Testing a Dry-Monitor, Double-Wall
Multicompartment Tank under Vacuum
4.4 Air Testing a Dry-Monitor, Double-Wall Tank
4.5 Air Testing a Dry-Monitor, Double-Wall
Multicompartment Tank not under Vacuum
5. Installing Tanks
5.1 General
5.2 Dry-Hole Installation
5.3 Wet-Hole Installation
6. Backfill Material
6.1 General
6.2 Primary Backfill
6.3 Secondary Backfill
7. Excavation Requirements
7.1 General
7.2 Excavation and Tank Location
7.3 Depth of Excavation
7.4 Depth of Cover
7.5 Tank Spacing
7.5.1 General
7.5.2 Spacing in Stable In Situ (Native)
Soil Conditions
7.5.3 Spacing in Unstable In Situ (Native)
Soil Conditions
8. Anchoring
8.1 General
8.2 Anchor Straps
8.2.1 General
8.2.2 Standard Anchor Straps
8.2.3 Man-out-of-Hole (MOH) Straps
8.3 Hardware and Anchor Points
8.4 Deadmen
8.5 Prefabricated Deadmen
8.6 Anchor Slabs
8.7 Alternate Wet-Hole Anchoring Method
9. Geotextile Fabric
9.1 General
10. Bottom Sumps and Fittings
10.1 General
11. Taking Diameter Measurements
11.1 General
11.2 Diameter Measurement without a
Standpipe
11.3 Diameter Measurement with a
Standpipe
11.4 Calculation and Comparison
12. Ballasting Tanks (adding Liquid)
12.1 General
13. Postinstallation Testing
13.1 General
13.2 Air Testing Tanks
13.3 Optional Hydrostatic Testing
14. Piping and Venting
14.1 Internal Piping
14.2 External Piping
14.3 Venting Tanks
14.4 Venting Interstitial Spaces
15. Monitoring Tanks
15.1 General
15.2 Single-Wall Tank
15.3 Double-Wall Tank
15.3.1 General
15.3.2 Double-Wall Tank with a Dry Interstitial
Space
15.3.3 Double-Wall Tank with a Wet Interstitial
Space
15.3.4 Setting the Level of the Monitoring Fluid
16. Installing Containment Sumps
16.1 General
16.2 Final Containment Sump Installation
17. Adding Tanks at Existing Locations ``17.1 General
17.2 Preferred Method
17.3 Alternate Method
18. Operating Guidelines
18.1 General
18.2 Temperature Limits for Stored Products
and Materials
18.3 Entering Tanks
18.4 Filling Tanks (In General)
18.5 Filling UL-Labeled Tanks
19. Limited Warranties
19.1 General
20. Supplemental Materials
20.1 General
21. Retention of Installation Manual
21.1 General
22. Use of Tank Data Charts (Appendix A & B)
22.1 General
22.2 Standard Tank Data Charts (Appendix A)
22.3 Standard and Multi-Compartment
Tank Data Charts (Appendix B)
APPENDICES
A. Standard Tank Data Charts B. Standard Multi-Compartment Tank Data Charts C. Primary Backfill Requirements D. Xerxes Split Backfill Instructions
Installation Checklist
XERXES INSTALLATION MANUAL AND OPERATING GUIDELINES
Read all instructions, supplemental materials and operating guidelines before installation.
Compliance with the installation instructions and operating guidelines contained in this Installation Manual and Operating Guidelines are necessary for the proper installation, maintenance and use of our tanks and accessories.
Supplemental materials referenced in SECTION 20 may also be necessary to consult for proper installation of some tanks. Failure to comply will void our obligations under the applicable limited warranty for the tank(s) and could result in death, serious injury, property damage or tank failure.
To Installer: Before installation, read and understand the Installation Manual and Operating Guidelines (subsequently referred to as Installation Manual) and any applicable supplemental materials. After installation, deliver the Installation Manual with the completed Tank Installation Checklist (back of manual) to the tank owner.
To Owner: After installation, retain the limited warranty, Installation Manual and checklist for future reference and follow all operating guidelines in the Installation Manual.
1. INTRODUCTION
1.1. SAFETY
1.1.1. Before beginning the tank installation, read through
the entire Installation Manual and Operating Guidelines (subsequently referred to as Installation Manual) and any applicable supplemental materials. It is the responsibility of the owner, installer and operator to understand and follow all requirements contained in this Installation Manual.
1.1.2. Work must be performed according to standard
industry practices applicable to tank installations and operations.
1.1.3. Work must comply with all codes, regulations and
standards of appropriate governmental agencies, such as:
• construction, health, safety and environmental codes
• National Fire Protection Association standards (for example, NFPA 30, 30A and 31)
• industry standard practices (for example, PEI RP100, API RP1615).
1.1.4. For additional information, contact appropriate govern-mental agency storage tank authorities, including health, fire or building departments, and environmental agencies.
1.1.5. The following definitions will apply when reading
the Installation Manual:
Indicates a potentially hazardous situation, which, if not avoided, could result in death or serious injury.
Indicates a potentially hazardous situation, which, if not avoided, could result in minor or moderate injury.
Notice indicates information considered important but not hazard related. Failure to heed this notice could result in property damage.
1.1.6. Keep this Installation Manual available at the installation site to refer to safety procedures as needed.
Follow OSHA regulations for tank excavations. Collapse of excavation walls could result in death or serious injury.
1.1.7. Working in and around excavations is dangerous.
Prior to beginning work at the site, the installer must follow any governmental or other codes and/or regulations applicable to excavation.
1.1.8. Careless activity or reckless operation of equipment
can cause death, serious injury or property damage.
1.1.9. Governmental agency codes, regulations and standards
always take precedence over our requirement.
1.1.10. No instructions or procedures presented in this
Installation Manual should be interpreted so as to put at risk any person’s health or safety, or to harm any property or the environment.
1.2. GENERAL
1.2.1. It is important to follow the procedures and instruc-
tions in this manual in order to safely and properly install our underground storage tank and accessories. Failure to follow these instructions will void our obligations under the limited warranty, could result in death, serious personal injury, property damage or tank failure.
1.2.1.1. The presence of our representative does not
relieve the installer of having sole responsibility for proper tank installation.
1.2.2. Our limited warranty applies only to a tank installed
according to these instructions. Since we do not control the parameters of any installation, our sole responsibility in any installation is that presented in the limited warranty.
1.2.3. It is the responsibility of the owner and operator
to always follow the operating guidelines set forth in our applicable limited warranty.
NOTICE
1.2.4. It is the responsibility of the owner and operator to
always follow the operating guidelines set forth in SECTION 18 of this Installation Manual.
1.2.5. It is the responsibility of the owner to retain the
limited warranty and Installation Manual provided with the tank for future reference.
1.2.5.1. A copy of the current limited warranty is available
on our website. The address can be found on the back cover of this manual.
1.2.6. Use the Tank Installation Checklist (back of Installation Manual) for all underground storage tanks throughout installation process.
1.2.7. Record the relevant information for each tank installed on the Tank Installation Checklist found at the back of the Installation Manual. Additional copies are available on our website.
1.2.8. Tank installer must retain a copy of the completed
Tank Installation Checklist and provide tank owner with a copy in order to facilitate any warranty claim.
1.2.9. Any variation to, or deviation from, the instructions
in the Installation Manual must be approved in writing from us prior to the tank installation.
1.2.9.1. All correspondence regarding any variances must
be retained in the event of a future warranty claim.
1.2.10. For any questions regarding the interpretation
of these instructions or for any other technical inquiries, contact technical support.
1.2.11. All contact information applicable to installation is found on the back cover of this Installation Manual.
1.3. EQUIPMENT
1.3.1. The following list is to be used as a guide for the
equipment recommended for installing tanks:
1.3.1.1. excavation equipment capable of producing a level-bottom hole and placing backfill material at any point in the excavation
1.3.1.2. suitable lifting equipment capable of lifting and placing the tanks and associated tank anchors
1.3.1.3. spirit level or transit
1.3.1.4. 50-foot [15-metre] tape measure
1.3.1.5. tamping rod(s)
1.3.1.6. pipe wrenches and appropriate pipe joint compound
1.3.1.7. a test manifold for each air-testable tank or compartment—see FIGURE 3-2
1.3.1.8. source of pressurized air capable of 6 psig [40 kPa]
1.3.1.9. soap and water solution (during freezing conditions, a suitable solution such as windshield wiper fluid may be added to the soap and water mixture)
1.3.1.10. soft cloth, brush or hand-held pneumatic sprayer
1.3.1.11. hand shovel
1.3.1.12. lifting sling(s)
1.3.1.13. soil compacting equipment (if necessary).
2. HANDLING AND STORING TANKS
2.1. GENERAL
2.1.1. Although our tanks are rugged, the tank owner and/
or tank owner’s representative must take care of the tank so that it is not dropped or damaged during loading, unloading, handling and storage at the jobsite.
2.1.2. Move tanks by lifting and setting only. Do not move
tanks by rolling or dragging.
2.1.3. Always lift tanks by using the lifting lugs provided
with the tank. Distribute the lifting load evenly between the lifting lugs. Use spreader bars and equal length slings as required.
NOTE: Larger tanks may be provided with guide lugs for attachment of guide ropes during lifting and positioning operations. Do not use guide lugs for lifting.
Never roll, drag or drop the tank. This could result in damage to the tank.
2.2. UNLOADING,HOISTING AND GUIDING TANKS
2.2.1. Before the tank is unloaded or relocated on the job-
site (and before preinstallation testing at the jobsite), tank owner and/or tank owner’s representative must complete the following steps:
2.2.1.1. Visually inspect the entire exterior surface of the
tank to make sure that no shipping or handling damage has occurred. Look particularly for visible damage, cracks or deep scrapes.
2.2.1.2. Sign the shipping papers accepting the tank as
delivered. Any damage observed must be noted in these papers.
2.2.1.3. Be sure that all equipment used to lift the tank is
rated to handle the load. Refer to Appendix A and/or B for weights.
2.2.1.4. Select a smooth, solid, level area on which to
place the tank, and clear that area of all large rocks, trash and debris.
2.2.1.5. Make sure that all tools and other items that may
damage the tank during unloading are removed from the trailer bed.
2.2.2. When unloading the tank from the truck, tank
owner and/or tank owner’s representative must make sure that the tank is secured in such a way that it does not roll off the truck.
Do not release straps securing the tank to the truck until lifting equipment (such as a crane) is secured to the tank’s lifting lug(s) and until anyone in a position to be injured by the tank’s movement is in a safe location.
Failure to do so could result in death, serious injury or property damage.
2.2.3. When hoisting and guiding the tank, follow these
instructions—see FIGURE 2-1, FIGURE 2-2 and FIGURE 2-3:
2.2.3.1. Choose suitable lifting sling(s) for the tank being
installed.
2.2.3.2. When using multiple lifting lugs, the angle of the
lifting sling should never exceed 30 degrees—see FIGURE 2-1.
FIGURE 2-1
2.2.3.3. When the tank is not rotated (the tank is upright), use all lifting lugs to unload and install the tank. See FIGURE 2-2.
2.2.3.4. Some tanks are rotated on the truck for shipping
purposes. These tanks have extra lifting lug(s) to aid in the loading/unloading process. See FIGURE 2-2.
2.2.3.4.1. Use the lifting lugs that are situated on top of
the tank in its rotated position to offload the tank from the truck and place it on the ground.
2.2.3.4.2. To install the tank, carefully rotate the tank to
its upright position and then use all lifting lugs situated on top of the tank in its upright position. See FIGURE 2-2.
FIGURE 2-2
2.2.4. Do not wrap chain or cable around the tank at any
time, including when securing the tank on the ground.
2.2.5. Use guide ropes to guide the tank when needed.
Do not use guide lugs for lifting. Failure to follow this warning could result in death, serious injury or property damage.
2.2.6. When handling a tank with a bottom sump or
fitting, always take extra care so that the bottom sump or fitting is not damaged by contact with any other object, such as the truck bed or the ground.
2.3. STORING TANKS
2.3.1. Whenever a tank is temporarily placed above the
ground at the site, place it on a smooth, solid, level area that is clear of large rocks, trash and debris, and then chock it in place to prevent rolling. See FIGURE 2-3.
Always chock the tank. The tank is heavy and has a large surface area. The tank will roll on sloped surfaces and could be blown about by the wind. Movement of the tank could result in death or serious injury.
2.3.2. Tie the tank down if high winds are expected. Do
not use wire rope or chains. Doing so could damage the tank. See FIGURE 2-3.
2.3.2.1. Never place tie-down straps over collars or reservoirs.
FIGURE 2-3
2.3.3. Whenever a tank is temporarily placed above the
ground at the site, always take extra care so water does not enter the collar. It is recommended that the tank be rotated and/or the collar covered.
If water enters the collar, it could freeze and could result in damage to the tank and/or collar.
30-degree maximum
Top of tank in rotated position Lifting lugs to be used when tank is in upright position
Lifting lugs to be used when tank is in rotated position
Top of tank in rotated position
Lifting lugs to be used when tank is in upright position
Tank
Sandbags Tires
Tie Downs
3. PREINSTALLATION INSPECTION AND TESTING
3.1. GENERAL
Do not conduct preinstallation testing while the tank is on a trailer. Failure to follow this warning could result in death or serious injury.
Do not put product in the tank until all necessary preinstallation inspection and testing is completed.
Failure to follow this notice could result in property damage.
3.1.1. The applicable inspection and testing procedures set
forth in SECTIONS 3 and 4 must be performed to validate the applicable limited warranty.
3.1.2. All tanks are tested and inspected at the factory prior to shipment. However, in order to verify the absence of any damage resulting from shipping or handling, prior to installation all tanks must also be inspected at the site. Some tanks must also be tested at the site prior to installation according to the applicable procedures.
Always secure the tank before moving, rotating or lifting it. This is commonly done by connecting a crane or backhoe to the lifting lugs. Failure to follow this warning could result in death or serious injury.
While moving or lifting the tank, do not position any part of your body underneath the tank. Failure to follow this warning could result in death or serious injury.
Do not lift or hoist a tank under pressure. Failure to follow this warning could result in death or serious injury.
3.1.3. Not all tanks are air-testable in the field. If a tank needs to be hydrostatically tested, see SECTION 13.3.
3.1.4. If the tank is a water/wastewater tank equipped for
optional preinstallation testing, after inspecting the tank (see SECTION 3.2.), follow procedures in the Preinstallation Testing Instructions for Water/Wastewater Tanks Factory- Equipped for Pressure Testing supplement. See SECTION 20 for information on how to obtain this supplement.
3.1.5. If damage of any kind is detected, contact customer
service before installing the tank.
NOTE: Do not attempt unauthorized repairs.
3.2. INSPECTING THE TANK
3.2.1. Thoroughly inspect the entire outside surface of the
tank for signs of shipping or handling damage. Rotate or lift the tank to inspect the bottom of the tank.
3.2.2. If damage of any kind is detected, contact customer
service before installing the tank.
NOTE: Do not attempt unauthorized repairs.
3.3. PRETESTING PROCEDURES
Do not install any piping or fittings other than test fittings until all preinstallation testing has been completed. Fail-ure to follow this notice could result in property damage.
Never pressurize a wet interstitial space. Doing so could result in damage to the primary tank and/or tank failure.
3.3.1. All UL-labeled, ULC-labeled and potable water tanks
must be air tested after backfill is brought close to the top of the tank.
3.3.2. If the tank being installed is not an air-testable tank, proceed to SECTION 5.
3.3.3. See SECTIONS 3.4. through 3.9. for specific instructions for preinstallation testing procedures.
3.3.4. See SECTION 4 for preinstallation testing instructions for specific types of air-testable tanks.
3.3.5. Someone must be with the tank at all times during
air testing.
3.3.6. Prior to the pressure test, remove all plugs, apply
sealant, and replace and tighten plugs.
Before beginning the air test, notify all people on the test site to remain in a safe location. NEVER LEAVE A TANK UNDER PRESSURE UNATTENDED. Stand clear of manways, fittings and tank ends during the test. When the tank is under pressure, the manways, access open-ings and/or fittings may dislodge, or the tank could rupture, and this could result in death or serious injury.
3.4. PREPARING THE TANK FOR AIR TESTING
3.4.1. The air-test pressure is 5 psig [35 kPa] (3 psig [21 kPa] for 12-foot-diameter tanks). See FIGURE 3-1.
Do not overpressurize the tank. Position the pressure gauges so that the pressure readings can be clearly read at all times. The pressure gauge must have a pressure-relief valve that is used and set at 6 psig [40 kPa] (4 psig [28 kPa] for 12-foot-diameter tanks).
Failure to follow this warning could result in death or serious injury.
NOTICE
FIGURE 3-1
3.4.2. The tester is responsible for verifying that all of the test equipment is in good working condition, and is properly configured and calibrated.
3.4.3. Construct a test manifold with two pressure gauges as
shown in FIGURE 3-2. Each pressure gauge must have a max-imum full-scale reading of 15 psig [100 kPa] with graduations in 1/2 psig [2.5 kPa] increments, and a pressure-relief valve set at 6 psig [40 kPa] (4 psig for 12-foot-diameter tanks).
3.4.3.1. When air testing multicompartment tanks, a test
manifold is needed for each compartment. See FIGURE 3-2.
FIGURE 3-2
NOTE: All compartments on a double-wall tank may be manifolded together and tested simultaneously, or each compartment may be tested separately.
3.4.3.2. A test manifold is needed for testing the dry
interstitial space of an air-testable, double-wall tank. See
FIGURE 3-2.
NOTE: A test manifold is not required for a tank with an interstice filled with monitoring fluid.
3.4.4. During air tests, ambient air temperature can affect
pressure-gauge readings.
Allow for pressure variations when tanks are subject to abrupt temperature changes. Failure to follow this caution could result in minor or moderate injury.
3.4.5. When testing tanks with wet monitoring, remove
the reservoir-fitting plug.
3.4.6. If the tank has threaded fittings, it is the installer’s responsibility to select a thread sealant that is compatible with the product being stored. Some sealants cannot be used with some stored products.
3.4.7. Remove factory-supplied plastic temporary plugs
and install permanent plugs in all openings where piping will not be installed.
3.4.8. Make sure all manway bolts or flange bolts are tight-
ened to 25 ft.-lb. [34 N-m], and fitting plugs are properly doped and sealed.
3.4.8.1. The tank may be air tested with the factory-supplied temporary plugs. Redope and tighten temporary plugs if needed.
3.4.9. Keep one service fitting open in each compartment
for the test manifold.
3.4.10. Tanks equipped with flanged nozzles may require
contractor-supplied blind flanges for preinstallation air testing.
3.5. PRESSURIZING THE PRIMARY TANK
3.5.1. Install the test manifold in the open service fitting
and connect the pressure source to the test manifold. See
FIGURE 3-2.
3.5.2. If the interstitial space is dry, install the test manifold and close the valve before pressurizing the primary tank.
3.5.3. Open the air-supply valve and pressurize the primary
tank to 5 psig [35 kPa] (3 psig [21 kPa] for 12-foot-diameter tanks). Allow a few minutes for the air temperature in the tank to stabilize, then allow the pressure to stabilize by adding or removing air as necessary.
3.5.4. Hold and monitor the pressure for a minimum of 1 hour.
3.5.4.1. If the test manifold shows a pressure build-up in the interstitial space of a dry-monitor, double-wall tank, contact customer service.
NOTE: Do not attempt unauthorized repairs.
Maximum 5 psig
[35 kPa]
Note: Maximum is 3 psig [21 kPa] for 12-foot-diameter tanks.
air-pressure gauge air-supply valve air-pressure gauge pressure-relief device air-supply
3.6. PRESSURIZING THE INTERSTITIAL SPACE IN A
DRY TANK
Never lift or hoist a tank under pressure. Failure to follow this warning could result in death or serious injury.
NOTE: Do not attempt unauthorized repairs.
3.6.1. Tanks with a dry interstitial space not shipped under vac-uum come with a quick-disconnect assembly. See FIGURE 3-3.
FIGURE 3-3
3.6.2. If the tank is not configured as shown in FIGURE 3-3
prior to installation, contact customer service.
3.6.3. The quick-disconnect assembly must not be connected
to the service fitting when air testing the primary tank. Keep the nylon tie in place.
3.6.4. Maintain the pressure in the primary tank.
Do not connect the air supply directly to the inter-stitial-space monitoring access fitting. Pressurizing the secondary tank (interstitial space) by itself could damage the primary tank or cause tank failure.
3.6.5. Free the hose from the service fitting by cutting the
nylon tie.
3.6.6. Insert the hose into the quick-disconnect fitting.
This will allow air to transfer from the primary tank to the interstitial space.
3.6.7. Reconnect the air-supply line. Allow the pressure
to stabilize at 5 psig [35 kPa] (3 psig [21 kPa] for 12-foot-diameter tanks) by adding or removing air as necessary.
3.6.8. Close the air-supply valve on the test manifold and
disconnect the air-supply line.
3.7. SOAPING THE TANK
3.7.1. After pressurizing the tank, soap the tank to check
the tank’s integrity.
3.7.1.1. Soap either the fittings, manways and covers or
the entire exterior of the tank, depending on what part of the testing process the tester is at and what kind of tank is being air tested. See SECTION 4 instructions for specific types of tanks.
3.7.1.2. Watch for active air bubbles. There should not be any.
NOTE: During freezing conditions, a suitable solution such as windshield washer fluid may be added to the soap and water mixture.
3.7.2. When doing a soap test, rotate the tank to check
the bottom. Do not rotate a tank filled with monitoring fluid.
3.7.2.1. Before rotating the tank, place protective material
on the area on which the tank will be rotated. Make sure the area is flat and free of large or sharp objects, such as rocks, which may damage the tank.
3.7.2.2. Rotate the tank slowly and carefully to avoid
developing too much momentum. Momentum can grow because manways and fittings on top of the tank make it top heavy. Make sure the tank’s fittings and manways never touch the ground. Do not rotate the tank more than 120 degrees from the initial starting point.
3.7.3. If damage is detected, contact customer service.
NOTE: Do not attempt unauthorized repairs.
3.8. PERFORMING VISUAL CHECKS ON A TANK
WITH A WET INTERSTITIAL SPACE
Never pressurize a wet interstitial space. Doing so could result in damage to the tank and/or tank failure.
Never rotate a tank filled with monitoring fluid. Doing so could result in damage to the tank and/or tank failure.
3.8.1. Check that the tank has monitoring fluid in the reservoir.
Measure the level of the monitoring fluid in the reservoir.
NOTE: If the reservoir is less than a third full, contact customer service. See the back cover of the Installation Manual for contact numbers.
3.8.2. Visually check the interior of the tank for monitoring fluid. There should not be any.
3.8.2.1. When checking a multicompartment tank, inspect
the interior of each compartment for monitoring fluid.
3.8.3. Visually check the exterior of the tank for monitoring fluid. (The monitoring fluid is dyed blue to distinguish between moisture and monitoring fluid.) If monitoring fluid is found, wipe the tank dry and verify that the monitoring fluid does not reappear. Lift the tank to check the bottom. Do not roll the tank.
Nylon tie
Quick-disconnect assembly
Monitoring access fitting
NOTICE
3.8.3.1. When checking a multicompartment tank, inspect
the exterior of each compartment for monitoring fluid.
NOTE: Tanks are shipped with a pop-off valve to ensure that excess pressure does not build in the interstitial space during shipping and/or storage. Conditions such as excess heat can cause this valve to release. If the tank is rotated and the ambient temperature is much higher than when it was shipped, the pop-off value will relieve the pressure, which may result in monitoring fluid on the tank surface. If this occurs, wipe the tank dry and verify that the monitoring fluid does not reappear.
3.9. RELEASING PRESSURE FROM THE TANK
3.9.1. If there is an interstitial space to pressurize, open
the valve of the test manifold and carefully release the air pressure in the interstitial space first.
3.9.2. If the tank is a multicompartment tank, carefully
release the air pressure in the end compartments first.
3.9.3. Then carefully release the air pressure from the base tank.
Never allow the pressure in the interstitial space to be greater than the pressure in a primary tank. Fail-ure to follow this notice could result in damage to a primary tank and/or tank failure.
Never remove the service-fitting plugs when there is pressure in the tank. Failure to follow this warning could result in death or serious injury.
3.9.4. Remove the test manifolds and replace the protective
covers in the service fittings.
4. PREINSTALLATION TESTING FOR SPECIFIC
TYPES OF AIR-TESTABLE TANKS
NOTE: When air testing a tank, follow the procedures out-lined here for the specific type of tank being installed. For more specific details on these procedures, see SECTION 3
SUBSECTIONS.
4.1. AIR TESTING A SINGLE-WALL TANK
4.1.1. Prepare the tank for air testing. See SECTION 3.4.
4.1.2. Pressurize the tank. See SECTION 3.5.
4.1.3. Soap the entire exterior of the tank. See SECTION 3.7.
4.1.4. Hold and monitor the pressure for a minimum of 1 hour.
4.1.5. Carefully release the air pressure from the tank. See
SECTION 3.9.
4.1.6. Remove the test manifold and replace the protective
covers in the service fittings.
4.2. TESTING A WET DOUBLE-WALL TANK
Never pressurize a wet interstitial space. Doing so could result in damage to the primary tank and/or tank failure.
4.2.1. Check the level of the monitoring fluid in the reservoir.
See SECTION 3.8. for instructions.
4.2.2. Visually check the interior and the exterior of each
compartment for the presence of monitoring fluid. See SECTION 3.8. for instructions.