RETURN OF SUBMITTAL

I tie or Description Date: Spec. Section:

- ENC - Underaround Fuel Oil Piina Layout & Product Data 23 1000

Contractors Name and Address Station Location:

Chris Bantner 13611 East Colfax Ave.

Aurora, CO 80045 Kiewit-Turner. a Joint Venture Contract No: Project No:

13611 East Colfax Avenue VA1OIF-15-C-0005 554-501 Aurora, CO 80045 Transmittal Date: VA File No:

7/27/2015 23 1000 - 005

Submittal Scope

Submittal Items Acted Upon

Submittal Item Status

001 - ENC - Underground Fuel Oil Piping Layout & DAP- Disapprovec Product Data

Supplier or Manufacturer Submittal Type

Shop Drawings

Notes/Comments [8/25/2015 Jacobs - Manzar Rizvi]

1. Pipe sizes have been reduced from the construction documents. Pipe sizes are further reduced utilizing HOPE Piping. The smaller pipes are not acceptable.

2. The double wall HOPE piping is shown entering the boiler room without a transition sump. Typically, plastic pipe is not rated for above ground applications. Provide documentation that this transition piping is listed for this location.

3. Contractor to verify NPSHA will work with the installed fuel oil pumps and pipe layout. Consideration should be given to increasing the suction piping to the fuel polishing systems.

Signature of Authorizing Official

Date

L

Received 08/26/2015

Fax: 303.930.9001

303.930.9000Tel:

Kiewit - Turner a Joint Venture

Suite A-300 7200 S. Alton Way

Englewood, CO 80112

Job: 15387 - Replacement Medical Center Facility

Product Data

Sample

Other

Shop Drawing

Resubmittal

First Submittal X

VA Proj #:

To: H+L Architecture 1755 Blake Street

Suite 400

Denver, CO 80202

DESCRIPTIONSpecificationSUBMITTAL

ItemQuantity Section Sub./SupplierNo. Mfgr.

ACTION

DCBA E

Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008

Review Cycle: 001

Attn: Chuck Adkisson

1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a

Joint Venture

01 573

ACTION TAKEN

CONTRACTOR'S SIGNATURE:

CONTRACTOR'S NOTES:

DATE: 7/12/2011

Reviewed Only for Revisions to

Reviewed: Incorporate Changes

Reviewed=

A

B

C

Previous Submittal

Revise and Resubmit=D

Rejected =E

ARCHITECT/ENGINEER RESPONSE:

REMARKS:

BY: DATE:

Expedition f_sb_pks_01a

VA101CFM-C-0100

Cc: Tim Pogany, U.S. Dept. of Veterans Affairs

Received By ___________________

Date _______________

23 10 00

X

ENC Underground Fuel Oil Piping Layout & Product Data

X

The Mechanical Diamond Partners

23 10 0005

07/27/2015

08/10/2015

Kiewit-Turner Submittal No.

VA 1

JVT 2

REQUESTED RETURN DATE:

Kevin Lindsey, U.S. Dept. of Veterans Affairs

VA101F-15-C-0005

13611 E. Colfax Avenue 2nd Floor Aurora, CO 80045

By VACO BoltonT at 11:31 am, Aug 21, 2015

These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.

KIEWIT-TURNER

a Joint Venture

REVIEWED - NO COMMENTS MADE

REVIEWED WITH COMMENTS

RESUBMITTAL REQUIRED

DATE SIGNED

SUBMITTAL #: 23 10 00 05

07/27/15

X

Wes Sramek

7/27/2015

231000.05

Cator, Ruma & Assoc (wow)

8/20/2015

Kiewit-Turner a Joint Venture

7200 S. Alton Way, Suite A-300, Englewood, CO 80112

Phone: 303-930-9000 FAX: 303-930-9001

Project Name:

Subcontractor Name: Submittal Date:

Contact Name: E-mail: Return By Date:

Contact Phone(s): Review Days:

Number: Name:

1.4.A

N/A Y N N Y

1.4.A

2.5 N/A Y N N Y

2.6 N/A Y N N Y

2.7 N/A Y N N Y

3.3 N/A Y N N Y

1.4.L N/A N/A N/A N/A N/A

Electr-O-Fuze

Western Fiberglass

Enviroguard/Pneumercator

A p p ro v e r

In fo rm a ti o n

N e e d e d

I n

T h is P a c k a g e

Submittal Type

Submittal Item Description Manufacturer

Shop Drawings

S p e c

S u b m it ta l

P a ra g ra p h

S p e c

P ro d u c t

P a ra g ra p h

S p e c if ie d o r

L is te d

M a n u fa c tu re r?

All Materials in this submittal (X) do ( ) do not comply with the FAR 52.225-11 Buy American Act

M e e ts

A ll

S p e c

R e q u ir e m e n ts

E x c e p ti o n s o r

V a ri a n c e s f ro m

S p e c kpeter@rkmi.com 07/14/15

720-737-7190

Specification Section: 231000.07 Facility Fuel Systems

Submittal is in Compliance

Submittal is in Compliance with Variances from Specifications

Signature

SUBMITTAL INDEX & COVER SHEET

Department of Veteran's Affairs

Replacement Medical Center

The Mechanical Diamond Partners 06/24/15

Kramer Peter

Reviewed By

Leak Detection Systems

Installation and Testing, Undergound Piping Systems

Sustainable Design

Date

Westatlantic Tech Corp

Underground Fuel Oil Piping Layout

Product Data

Piping, Valves, Fittings

Secondary Containment for Underground Fuel Piping Systems

SubmittalIndexForm_041009 Page 1 of 1 mailto:kpeter@rkmi.com

Date Submitted: June 25, 2015

Date Due Back: July 14 2015

RK Submittal No.: 231000.07 - 00

Specification Section: 231000 – ENC - Fuel Oil Underground Piping and Product Data

Project Name: Veteran Affairs Replacement Medical Facility 13529 East 17th Place

General Contractor: Kiewit -- Turner 7200 South Alton Way Englewood, CO 80112

Mechanical Contractor: Mechanical Diamond Partners 12800 East Colfax Avenue Aurora, CO 80011

Subcontractor/Supplier: Platt Rogers

Submittal Cover Sheet

ITEM COPIES REV SUBMITTAL DESCRIPTION DRAWING MANUFACTURER

1 1.4.A Shop Drawings

2 2.5 Piping, Valves, Fittings

2.6 Secondary Containment for Underground Fuel

Piping Systems

4 2.7 Leak Detection Systems

3.3 Installation and Testing, Underground Piping

Systems

Submittal Cover Page 12211 W. Alameda Parkway, Ste 200, Lakewood, CO 80228

Ph. 303.708.9900

VA Replacement Medical Center, Aurora Project # 8169

Underground Fuel Oil Piping Shop DrawingSubmittal for :

Specification Section : 23 10 00

00103Register Item No :

Sub Section :

Manufacturer :

Revision No : 0

Model / Part No. :

This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.

Any additions to submitted products shall be accompanied by an appropriate contract change request.

Comments :

Please approve the layout and elevation of the underground (UG) fuel oil piping per the attached shop drawing.

Printed on: 6/11/2015 Page 1

Note, underground pipe itself previously approved in submittal 23 10 00 - 001 - R1 (AEP Electr-O-Fuze double wall pipe)

Penetrations through existing wall cores

Site Wall This will be poured after tank installation.

Cores will be places in wall (10" PVC pipe) to ensure AEP pipe (previously submitted and approved) can run through wall.

To FOS fill station (submittal pending)

FOS FILL STATION SUBMITTAL PENDING AND WILL INCLUDE LOCATION AND DETAIL.

SUMP (see submittal) Bottom of sump estimated at 97'.

All eight vents line (two per tank) will run through a single sump.

W ate r T an k

N

Fill Lines

P ol is he r Li ne s

P ol is he r Li ne s

P ol is he r Li ne s

P ol is he r Li ne s

B oi le r

F O

S

B oi le r

F O

S

B oi le r

F O

S

B oi le r

F O

S

G en er at or F

O S

G en er at or F

O S

G en er at or F

O S

G en er at or F

O S

B oi le r an d

G en

F O

R L in es

B oi le r an d

G en

F O

R L in es

B oi le r an d

G en

F O

R L in es

B oi le r an d

G en

F O

R L in es

BOP Elevations

Sump to be Western Fiberglass Inc. Vapor Vent Transition Sump reference page 14 of this submittal package

Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.

Lakewood, CO 80228

Ph. 303.708.9900

VA Replacement Medical Center, Aurora Project # 8169

Transition and Leak Detection for Fuel Oil PipingSubmittal for :

Specification Section : 23 10 00

00105Register Item No :

Sub Section :

Manufacturer :

Revision No : 0

Model / Part No. :

This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.

Any additions to submitted products shall be accompanied by an appropriate contract change request.

Comments :

Subcontractor seeks approval to use transition fittings, interior tray and leak detector in place of transition sumps. This is required because the cores into the ENC for the FOS piping are at an elevation of 5377'. This is almost 12 feet below finished grade between the ENC south wall and site wall in the ENC courtyard. This would require a 12-14' deep sump to access a transition outside of the building. This is neither safe, nor practical.

Printed on: 6/11/2015 Page 1

Note, this submittal replaces any prior submittal addressing the transition from UG to AG pipe and the related sumps / leak detection.

V A

F U

E L O

IL

D

R A

W N

B Y

A U

STIN

H

ILTO

N

06/10/15

06/10/15

18"

ELECTRO-O-FUZE TRANSITION

FITTINGS (THREADED) 11.5" LONG

FOR 2" PIPE 12.75 LONG FOR 3"

THREAED 90

THREADED CARBON STEEL PIPE

THREADED COUPLING (3" LONG)

AEP UG PIPE LENTH INSIDE WALL IS (2" OR LESS)

Overview of Proposed Transition Inside the South Wall of the ENC

Note, this transition will be less than 18" long, which will keep the entire transition positioned over the top of the leak tray

Tray (leak detection)

F U

E L O

IL

D

R A

W N

B Y

A U

STIN

H

ILTO

N

06/10/15

06/10/15

12'

18" Seal does not support pipe through core, it is strictly used to seal core from water and air

10.125" OD

Seal wraps around UG AEP pipe in core

INSIDE

Overview of Proposed Transition Inside the South Wall of the ENC (dimensions)

Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.

F U

E L O

IL

D

R A

W N

B Y

A U

STIN

H

ILTO

N

06/10/15

06/10/15

12' LONG

1.75" TALL

18.0" WIDE

HS100ND LEAK DETECTION SENSOR

TRAY

Overview of Proposed Transition Inside the South Wall of the ENC (dimensions p.2)

F U

E L O

IL

D

R A

W N

B Y

A U

STIN

H

ILTO

N

06/10/15

06/10/15

12'

18"

ENC WALL

INSIDE

TRAY

LEAK DETECTION

N

Overview of Proposed Transition Inside the South Wall of the ENC (top view)

Fitting

Specifications

Electr-O-Fuze™ EF Fittings, UL971 Listed

Product Description

Electr-O-Fuze™ EF fittings are safe and reliable proven electrofusion technology using open wire principles. Electr-O-Fuze™ EF couplers are the only fittings used in petroleum industry to also be tested and approved for use with natural gas and low pressure gas, thus providing unparalleled quality and protection. When used in conjunction with Electr-O-Fuze™ pipe and an Electr-O-Fuze™ EF welding machine, it provides a UL971 compliant fuel installation with a 30 year life span.

Electr-O-Fuze™ EF fittings are available in sizes from ½” to 30” nominal bore. Elbows and Tees in sizes up to and including 6” are available as an electrofusion fitting, while larger sizes are only obtainable in spigot fittings, requiring an electrofusion coupler on either side of the fitting.

Applications o Service Stations o Marinas o Fuel Terminals o Moist & Marshy Areas o Refineries o Harbors o Airports o Non-Contaminated & Contaminated Sites o Fitting Type:

Matched electrofusion fittings are utilized throughout the pipeline system in order to join the various pieces. Deep sockets and ‘safe’ low voltage operation (42V), applied through dedicated ancillary equipment ensures maximum joint integrity. Fusion indicators monitor the joint melt pressure, while absolute security of the weld is ensured using the fittings bar code feature in conjunction with the fully automatic Electr-O-Fuze™ EF welding machine.

o Electrofusion Machine: Electr-O-Fuze™ EF welding machine with memory, bar code reader, printing and error reporting.

o Temperature Range: Fittings can be worked with at ambient temperatures between –24oF and 160oF.

o Pipe Fusion Range: The fittings can be fused to pipe of SDR stages 17.6 to 7.4 in accordance with DIN 8074 (E), ISO 4437, pr EN 1555 and DIN EN 12201 (E).

o Operating Pressures: 150 psi.

o Test Pressure: 232 psi.

o Approved Fuel Types: All Petroleum Products (Motor Vehicle Fuels, High Blend Fuels, Concentrated Fuels, Aviation & Marine Fuels) E85 and Biodiesel.

Installation Installation, use, and maintenance of all Electr-O-Fuze™ products shall be in accordance with the manufacturer’s recommendations, State and County approvals. In event of conflicts, the stricter requirement shall govern. AEP installation manual available directly from AEP, or at info@aep-inc.net. All operators to be AEP certified on both the fittings and electrofusion machine.

Certifications/Approvals o UL 971 Approved File # MH47372 o Institute of Petroleum Cert # BC63/1010/98/001 And cert # BC63/0115/2000/001 o Shell Int. Procurement Cert. Cert # BC63/1010/98/002 o State of Florida EQ 683 and EQ 617 – and Derm Approval o State of Michigan MUSTR – Rule 9, subsections 280.20 (b) o New York City Fire Dept. CoA 5117 o DOT 192 and 195 On waiver letter per project o DVGW Permit VP 607, with decisions DV-8601AU2248, DV-8606AU2249 and DV-8611AU2250 o Factory Permit DIN EN 10 204-3.1 o State of California CARB, State Fire Marshall Cert # GVRC 005:060:001

Transition Fitting (from UG pipe to Carbon Steel)

Per Specification Section 23 10 00 - 2.5.C.1

Fitting

Electr-O-Fuze™ Spigot Transition Fitting, UL971 Listed Product Description

Electr-O-Fuze™ Transition Fittings are safe, reliable and a proven method of connecting Electr-O-Fuze™ pipe to steel threaded parts. The transition fitting come in various different styles and sizes to suite the application. Two main styles are stock items namely the threaded transitions and the E-Z Fit. Both these are electro plated with a 12 inch hose tail as standard;

however the metal transition section can be made of Stainless Steel to order. Also made to order are transitions with longer hose tails, these can be made up to any length. A further advantage is that these fittings are completely fluorinated for maximum protection against hydrocarbons. Electr-O-Fuze™ Transition Fittings are also threaded both on the outside and inside for ease of application offering different options during installation. When used in conjunction with Electr-O-Fuze™ pipe and an Electr-O-Fuze™ EF welding machine, it provides a UL971 compliant fuel installation with a 30 year life span.

Electr-O-Fuze™ Transition Fitting is available in sizes 1¼”, 1½”, 2”, 3” and 4”nominal bore.

Applications o Service Stations o Marinas o Fuel Terminals o Moist & Marshy Areas o Refineries o Harbors o Airports o Non-Contaminated & Contaminated Sites o Fitting Type: Spigot ends to the transition allow easy matching to various electrofusion fittings such as couplers, tee’s and elbows among others throughout the pipeline system in order to join the various pieces. The long spigot allows length adjustment to the fitting for precise fitting, applied with dedicated ancillary equipment ensures maximum joint integrity. Absolute security of the weld is ensured using the system listed electrofusion fittings with the bar code feature in conjunction with the fully automatic Electr-O-Fuze™ welding machine. The transition Spigot is threaded both on the inside and outside with NPT thread for flexibility of use and is factory leak tested.

o Electrofusion Machine: None, Spigot Type.

o Temperature Range: Fittings can be worked with at ambient temperatures between –24oF and 160oF.

o Pipe Fusion Range: The fittings can be fused to pipe of SDR stages 17.6 to 7.4 in accordance with DIN 8074 (E), ISO 4437, pr EN 1555 and DIN EN 12201 (E).

o Operating Pressures: 150 psi maximum.

o Test Pressure: Primary>60psi<150psi o Approved Fuel Types: All Petroleum Products (Motor Vehicle Fuels, High Blend Fuels, Concentrated Fuels, Aviation & Marine Fuels) E85 and Biodiesel.

Installation Installation, use, and maintenance of all Electr-O-Fuze™ products shall be in accordance with the manufacturer’s recommendations, State and County approvals. In event of conflicts, the stricter requirement shall govern. AEP installation manual available directly from AEP, or at info@aep-inc.net. All operators to be AEP certified on both the fittings and electrofusion machine.

Certifications/Approvals o UL 971 Approved File # MH47372 o Institute of Petroleum Cert # BC63/1010/98/001 And cert # BC63/0115/2000/001 o Shell Int. Procurement Cert. Cert # BC63/1010/98/002 o State of Florida EQ 683 and EQ 617 – and Derm Approval o State of Michigan MUSTR – Rule 9, subsections 280.20 (b) o New York City Fire Dept. CoA 5117 o DOT 192 and 195 On waiver letter per project o State of California CARB, State Fire Marshall Cert # GVRC 005:060:001

30 Note : specifications subject to change without notice 01/13

Diam.

NB*

inches

Diam.

OD**

metric

Part # Dim B Dim D Dim L Weight kg/ea

Weight lbs/ea mm in. mm in. mm in.

1¼” 40 TR-SP-1.25M 82 3.23” 32 1¼” 282 11.10” 0.9 1.98

1½” 50 TR-SP-1.5M 86 3.39” 47 1½” 286 11.26” 1.0 2.20

2” 63 TR-SP-2M 92 3.62” 60 2” 292 11.50” 2.0 4.40

3” 90 TR-SP-3M 124 4.88” 87 3” 324 12.76” 2.8 6.16

4” 110 TR-SP-4M 134 5.28” 102 4” 334 13.15” 3.0 6.60

Diam.

NB*

inches

Diam.

OD**

metric

Part # Dim B Dim D Dim L Weight kg/ea

Weight lbs/ea mm in. mm in. mm in.

1¼” 40 TR-SP-1.25M 82 3.23” 25.0 1” 282 11.10” 0.9 1.98

1½” 50 TR-SP-1.5M 86 3.39” 31.8 1¼” 286 11.26” 1.0 2.20

2” 63 TR-SP-2M 92 3.62” 38.1 1½” 292 11.50” 2.0 4.40

3” 90 TR-SP-3M 124 4.88” 63.5 2½” 324 12.76” 2.8 6.16

4” 110 TR-SP-4M 134 5.28” 76.2 3” 334 13.15” 3.0 6.60

(*) Nominal Bore (**) Outside Diameter

Lakewood, CO 80228

Ph. 303.708.9900

VA Replacement Medical Center, Aurora Project # 8169

Sump for Vent LinesSubmittal for :

Specification Section : 23 10 00

00104Register Item No :

Sub Section :

Manufacturer :

Revision No : 0

Model / Part No. :

This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.

Any additions to submitted products shall be accompanied by an appropriate contract change request.

Comments :

Subcontractor seeks approval of a single sump for eight (8) vent lines running from the Fuel Oil Storage Tanks to the south wall of the ENC. The sump will be placed between the south wall of the ENC and the site wall and will be at final grade (estimated to be 5388'). The sump will contain all vent lines which must pass into the sump and then 90-upwards to terminate on the side of the ENC 12-feet above finished grade.

Printed on: 6/11/2015 Page 1

PLEASE NOTE:

CUSTOM ITEMS ARE NOT RETURNABLE

X_____________________________________________

SIGN AND FAX WITH PURCHASE ORDER FOR

PRODUCTION.

Per Specification Section 23 10 00 - 2.6.G

Leak Detector (for use in tray)

Per Specification Section 23 10 00 -2.7.C

PNEUMERCATOR

Liquid Level Control Systems

PHONE: (631) 293-8450

FAX: (631) 293-8533

www.pneumercator.com

PNEUMERCATOR CO., INC. 1785 EXPRESSWAY DRIVE NORTH, HAUPPAUGE, NY 11788

Per Specification Section 23 10 00 - 2.7.C

PNEUMERCATOR

Liquid Level Control Systems

PHONE: (631) 293-8450

FAX: (631) 293-8533

www.pneumercator.com

PNEUMERCATOR CO., INC. 1785 EXPRESSWAY DRIVE NORTH, HAUPPAUGE, NY 11788

Per Specification Section 23 10 00 - 2.7.C

Features

• All stainless steel construction.

• Minimal floor preparation necessary.

• Can be configured to fit most applications.

• Optional floor anchors

• Spill containment for stationary lead-acid battery systems

• Available with a drain plug.

Part Number SPAN-LL-WWW (i.e. SPAN-24-60) WW = Width in inches LLL = Length in Inches

Regulations In Compliance With

• Code of Federal Regulations

• International Fire Code (IFC)

• Uniform Building Code

• OSHA

• ANSI

• Completely customizable length, width, and height

• All stainless steel construction meets a wide range of chemical compatability needs.

• Weight and capacity depend on dimensions

Recommended Products

STAINLESS STEEL PAN

Custom containment system for lead-acid battery systems

5534 Olive Street, Montclair, CA 91763 • 800.206.9884 Fax 909.624.1772 • www.EnviroGuard.com

S-SC-SPAN Rev A 01/12

Protecting Mission-Critical Facilities and Personnel Since 1993. SM

Battery Room Aisle Mat

Compliance Package

QU

AL

ITY MANAGEMENT SYSTEM

ENVIROGUARD

ISO 9001:2008

CERTIFIED

Part Number: SPAN

Leak Tray (inside ENC wall) Per Specification Section 23 10 00 - 2.7.D.2

A A

B B

C C

D D

SHEET 1 OF 1

DRAWN

CHECKED

Outside Dimension:

18.00''x94.00''x1.25''

Inside Dimension:

M. Hermansen

M. Hermansen

5/6/2015

5/6/2015

DWG NO

SPAN 18-094-1.25

TITLE

Stainless Pan Containment

SIZE

C

SCALE

EnviroGuard

5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884

REV

A

18.00

94.00

1.25

Tray 1 (of 3)

A A

B B

C C

D D

SHEET 1 OF 1

DRAWN

CHECKED

Outside Dimension:

18.00''x60.00''x1.25''

M. Hermansen

M. Hermansen

5/6/2015

5/6/2015

DWG NO

SPAN 18-060-1.25

TITLE

Stainless Pan Containment

SIZE

C

SCALE

EnviroGuard

5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884

REV

A

18.00

60.00

1.25

Tray 2 (of 3) Per Specification Section 23 10 00 - 2.7.D.2

A A

B B

C C

D D

SHEET 1 OF 1

DRAWN

CHECKED

Inside Dimension:

Outside Dimension:

18.00''x144.00''x1.25''

17.50''x143.50''x1.00''

M. Hermansen

M. Hermansen

4/20/2015

4/20/2015

DWG NO

TITLE

SIZE

C

SCALE

EnviroGuard

5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884

REV

A

18.00

144.00

1.25

17.50

143.50

.25

.25

Stainless Pan Containment

SPAN 18-144-1.25

Tray 3 (of 3)

For use to seal FOS/R piping entering ENC

Disk Seal For Pipe Penetration into ENC

Per Specification Section 23 10 00 - 3.3.D.4

Split W2 Model DiskSeal Stainless Steel Plates and Bolting EDPM Seal Element

WESTATLANTIC Tech Corp www.westatlantictech.com sales@westatlantictech.com +902 455 4455

Your project orientation W-2 Horizontal (Split)

Disk Seal for Pipe Penetrations (single and dual penetrations)

F U

E L O

IL

D

R A

W N

B Y

A U

STIN

H

ILTO

N

06/10/15

06/10/15

Reference Image of Seal Installation

June 24, 2015

Kiewit-Turner

13611 East Colfax Ave

Aurora, CO 80045

Attention: Mr. Chris Betts

MEP Engineer

Reference: VA Replacement Hospital

Subject: Sustainable Design Documentation – Facility Fuel Systems

Specification Section 23 10 00 – 1.4.L

Dear Chris:

There are no submittal items required for Sustainable Design Documentation relative to specification section 23 10

00, paragraph 1.4.L. Reference is made to the requirements of section 01 81 11 – SUSTAINABLE DESIGN

REQUIREMENTS, which lists the required documentation. Per this section, nothing is required relative to section 23

10 00.

We are available to discuss any comments or questions you may have.

Sincerely, VA Mechanical Diamond Partners

Kramer Peter

Kramer Peter

Field Engineer

Text4:
Text5: SWVV-992424-8
Text6: 8"
Text7: 6"
Text8: 30" (OVH)
Text9: 2.375
Text10: 2.375
Text11: 2.375
Text12: 2.375
Text13: 2.375
Text14: 2.375
Text15: 2.375
Text16: 2.375
Text1:
0: 24"
1: 99"
2: 24"
Text2:
Text3: Ph 707.523.2050

Fx 707.523.2046 Text17: FITTINGS TO BE EVENLY SPACED ALONG TOP OF BOX.