RETURN OF SUBMITTAL
I tie or Description Date: Spec. Section:
- ENC - Underaround Fuel Oil Piina Layout & Product Data 23 1000
Contractors Name and Address Station Location:
Chris Bantner 13611 East Colfax Ave.
Aurora, CO 80045 Kiewit-Turner. a Joint Venture Contract No: Project No:
13611 East Colfax Avenue VA1OIF-15-C-0005 554-501 Aurora, CO 80045 Transmittal Date: VA File No:
7/27/2015 23 1000 - 005
Submittal Scope
Submittal Items Acted Upon
Submittal Item Status
001 - ENC - Underground Fuel Oil Piping Layout & DAP- Disapprovec Product Data
Supplier or Manufacturer Submittal Type
Shop Drawings
Notes/Comments [8/25/2015 Jacobs - Manzar Rizvi]
1. Pipe sizes have been reduced from the construction documents. Pipe sizes are further reduced utilizing HOPE Piping. The smaller pipes are not acceptable.
2. The double wall HOPE piping is shown entering the boiler room without a transition sump. Typically, plastic pipe is not rated for above ground applications. Provide documentation that this transition piping is listed for this location.
3. Contractor to verify NPSHA will work with the installed fuel oil pumps and pipe layout. Consideration should be given to increasing the suction piping to the fuel polishing systems.
Signature of Authorizing Official
Date
L
Received 08/26/2015
Fax: 303.930.9001
303.930.9000Tel:
Kiewit - Turner a Joint Venture
Suite A-300 7200 S. Alton Way
Englewood, CO 80112
Job: 15387 - Replacement Medical Center Facility
Product Data
Sample
Other
Shop Drawing
Resubmittal
First Submittal X
VA Proj #:
To: H+L Architecture 1755 Blake Street
Suite 400
Denver, CO 80202
DESCRIPTIONSpecificationSUBMITTAL
ItemQuantity Section Sub./SupplierNo. Mfgr.
ACTION
DCBA E
Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008
Review Cycle: 001
Attn: Chuck Adkisson
1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a
Joint Venture
01 573
ACTION TAKEN
CONTRACTOR'S SIGNATURE:
CONTRACTOR'S NOTES:
DATE: 7/12/2011
Reviewed Only for Revisions to
Reviewed: Incorporate Changes
Reviewed=
A
B
C
Previous Submittal
Revise and Resubmit=D
Rejected =E
ARCHITECT/ENGINEER RESPONSE:
REMARKS:
BY: DATE:
Expedition f_sb_pks_01a
VA101CFM-C-0100
Cc: Tim Pogany, U.S. Dept. of Veterans Affairs
Received By ___________________
Date _______________
23 10 00
X
ENC Underground Fuel Oil Piping Layout & Product Data
X
The Mechanical Diamond Partners
23 10 0005
07/27/2015
08/10/2015
Kiewit-Turner Submittal No.
VA 1
JVT 2
REQUESTED RETURN DATE:
Kevin Lindsey, U.S. Dept. of Veterans Affairs
VA101F-15-C-0005
13611 E. Colfax Avenue 2nd Floor Aurora, CO 80045
By VACO BoltonT at 11:31 am, Aug 21, 2015
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
KIEWIT-TURNER
a Joint Venture
REVIEWED - NO COMMENTS MADE
REVIEWED WITH COMMENTS
RESUBMITTAL REQUIRED
DATE SIGNED
SUBMITTAL #: 23 10 00 05
07/27/15
X
Wes Sramek
7/27/2015
231000.05
Cator, Ruma & Assoc (wow)
8/20/2015
Kiewit-Turner a Joint Venture
7200 S. Alton Way, Suite A-300, Englewood, CO 80112
Phone: 303-930-9000 FAX: 303-930-9001
Project Name:
Subcontractor Name: Submittal Date:
Contact Name: E-mail: Return By Date:
Contact Phone(s): Review Days:
Number: Name:
1.4.A
N/A Y N N Y
1.4.A
2.5 N/A Y N N Y
2.6 N/A Y N N Y
2.7 N/A Y N N Y
3.3 N/A Y N N Y
1.4.L N/A N/A N/A N/A N/A
Electr-O-Fuze
Western Fiberglass
Enviroguard/Pneumercator
A p p ro v e r
In fo rm a ti o n
N e e d e d
I n
T h is P a c k a g e
Submittal Type
Submittal Item Description Manufacturer
Shop Drawings
S p e c
S u b m it ta l
P a ra g ra p h
S p e c
P ro d u c t
P a ra g ra p h
S p e c if ie d o r
L is te d
M a n u fa c tu re r?
All Materials in this submittal (X) do ( ) do not comply with the FAR 52.225-11 Buy American Act
M e e ts
A ll
S p e c
R e q u ir e m e n ts
E x c e p ti o n s o r
V a ri a n c e s f ro m
S p e c kpeter@rkmi.com 07/14/15
720-737-7190
Specification Section: 231000.07 Facility Fuel Systems
Submittal is in Compliance
Submittal is in Compliance with Variances from Specifications
Signature
SUBMITTAL INDEX & COVER SHEET
Department of Veteran's Affairs
Replacement Medical Center
The Mechanical Diamond Partners 06/24/15
Kramer Peter
Reviewed By
Leak Detection Systems
Installation and Testing, Undergound Piping Systems
Sustainable Design
Date
Westatlantic Tech Corp
Underground Fuel Oil Piping Layout
Product Data
Piping, Valves, Fittings
Secondary Containment for Underground Fuel Piping Systems
SubmittalIndexForm_041009 Page 1 of 1 mailto:kpeter@rkmi.com
Date Submitted: June 25, 2015
Date Due Back: July 14 2015
RK Submittal No.: 231000.07 - 00
Specification Section: 231000 – ENC - Fuel Oil Underground Piping and Product Data
Project Name: Veteran Affairs Replacement Medical Facility 13529 East 17th Place
General Contractor: Kiewit -- Turner 7200 South Alton Way Englewood, CO 80112
Mechanical Contractor: Mechanical Diamond Partners 12800 East Colfax Avenue Aurora, CO 80011
Subcontractor/Supplier: Platt Rogers
Submittal Cover Sheet
ITEM COPIES REV SUBMITTAL DESCRIPTION DRAWING MANUFACTURER
1 1.4.A Shop Drawings
2 2.5 Piping, Valves, Fittings
2.6 Secondary Containment for Underground Fuel
Piping Systems
4 2.7 Leak Detection Systems
3.3 Installation and Testing, Underground Piping
Systems
Submittal Cover Page 12211 W. Alameda Parkway, Ste 200, Lakewood, CO 80228
Ph. 303.708.9900
VA Replacement Medical Center, Aurora Project # 8169
Underground Fuel Oil Piping Shop DrawingSubmittal for :
Specification Section : 23 10 00
00103Register Item No :
Sub Section :
Manufacturer :
Revision No : 0
Model / Part No. :
This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.
Any additions to submitted products shall be accompanied by an appropriate contract change request.
Comments :
Please approve the layout and elevation of the underground (UG) fuel oil piping per the attached shop drawing.
Printed on: 6/11/2015 Page 1
Note, underground pipe itself previously approved in submittal 23 10 00 - 001 - R1 (AEP Electr-O-Fuze double wall pipe)
Penetrations through existing wall cores
Site Wall This will be poured after tank installation.
Cores will be places in wall (10" PVC pipe) to ensure AEP pipe (previously submitted and approved) can run through wall.
To FOS fill station (submittal pending)
FOS FILL STATION SUBMITTAL PENDING AND WILL INCLUDE LOCATION AND DETAIL.
SUMP (see submittal) Bottom of sump estimated at 97'.
All eight vents line (two per tank) will run through a single sump.
W ate r T an k
N
Fill Lines
P ol is he r Li ne s
P ol is he r Li ne s
P ol is he r Li ne s
P ol is he r Li ne s
B oi le r
F O
S
B oi le r
F O
S
B oi le r
F O
S
B oi le r
F O
S
G en er at or F
O S
G en er at or F
O S
G en er at or F
O S
G en er at or F
O S
B oi le r an d
G en
F O
R L in es
B oi le r an d
G en
F O
R L in es
B oi le r an d
G en
F O
R L in es
B oi le r an d
G en
F O
R L in es
BOP Elevations
Sump to be Western Fiberglass Inc. Vapor Vent Transition Sump reference page 14 of this submittal package
Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.
Lakewood, CO 80228
Ph. 303.708.9900
VA Replacement Medical Center, Aurora Project # 8169
Transition and Leak Detection for Fuel Oil PipingSubmittal for :
Specification Section : 23 10 00
00105Register Item No :
Sub Section :
Manufacturer :
Revision No : 0
Model / Part No. :
This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.
Any additions to submitted products shall be accompanied by an appropriate contract change request.
Comments :
Subcontractor seeks approval to use transition fittings, interior tray and leak detector in place of transition sumps. This is required because the cores into the ENC for the FOS piping are at an elevation of 5377'. This is almost 12 feet below finished grade between the ENC south wall and site wall in the ENC courtyard. This would require a 12-14' deep sump to access a transition outside of the building. This is neither safe, nor practical.
Printed on: 6/11/2015 Page 1
Note, this submittal replaces any prior submittal addressing the transition from UG to AG pipe and the related sumps / leak detection.
V A
F U
E L O
IL
D
R A
W N
B Y
A U
STIN
H
ILTO
N
06/10/15
06/10/15
18"
ELECTRO-O-FUZE TRANSITION
FITTINGS (THREADED) 11.5" LONG
FOR 2" PIPE 12.75 LONG FOR 3"
THREAED 90
THREADED CARBON STEEL PIPE
THREADED COUPLING (3" LONG)
AEP UG PIPE LENTH INSIDE WALL IS (2" OR LESS)
Overview of Proposed Transition Inside the South Wall of the ENC
Note, this transition will be less than 18" long, which will keep the entire transition positioned over the top of the leak tray
Tray (leak detection)
F U
E L O
IL
D
R A
W N
B Y
A U
STIN
H
ILTO
N
06/10/15
06/10/15
12'
18" Seal does not support pipe through core, it is strictly used to seal core from water and air
10.125" OD
Seal wraps around UG AEP pipe in core
INSIDE
Overview of Proposed Transition Inside the South Wall of the ENC (dimensions)
Enviroguard stainless leak tray inside of south ENC foundation wall. Reference pages 18-21 of this submittal package.
F U
E L O
IL
D
R A
W N
B Y
A U
STIN
H
ILTO
N
06/10/15
06/10/15
12' LONG
1.75" TALL
18.0" WIDE
HS100ND LEAK DETECTION SENSOR
TRAY
Overview of Proposed Transition Inside the South Wall of the ENC (dimensions p.2)
F U
E L O
IL
D
R A
W N
B Y
A U
STIN
H
ILTO
N
06/10/15
06/10/15
12'
18"
ENC WALL
INSIDE
TRAY
LEAK DETECTION
N
Overview of Proposed Transition Inside the South Wall of the ENC (top view)
Fitting
Specifications
Electr-O-Fuze™ EF Fittings, UL971 Listed
Product Description
Electr-O-Fuze™ EF fittings are safe and reliable proven electrofusion technology using open wire principles. Electr-O-Fuze™ EF couplers are the only fittings used in petroleum industry to also be tested and approved for use with natural gas and low pressure gas, thus providing unparalleled quality and protection. When used in conjunction with Electr-O-Fuze™ pipe and an Electr-O-Fuze™ EF welding machine, it provides a UL971 compliant fuel installation with a 30 year life span.
Electr-O-Fuze™ EF fittings are available in sizes from ½” to 30” nominal bore. Elbows and Tees in sizes up to and including 6” are available as an electrofusion fitting, while larger sizes are only obtainable in spigot fittings, requiring an electrofusion coupler on either side of the fitting.
Applications o Service Stations o Marinas o Fuel Terminals o Moist & Marshy Areas o Refineries o Harbors o Airports o Non-Contaminated & Contaminated Sites o Fitting Type:
Matched electrofusion fittings are utilized throughout the pipeline system in order to join the various pieces. Deep sockets and ‘safe’ low voltage operation (42V), applied through dedicated ancillary equipment ensures maximum joint integrity. Fusion indicators monitor the joint melt pressure, while absolute security of the weld is ensured using the fittings bar code feature in conjunction with the fully automatic Electr-O-Fuze™ EF welding machine.
o Electrofusion Machine: Electr-O-Fuze™ EF welding machine with memory, bar code reader, printing and error reporting.
o Temperature Range: Fittings can be worked with at ambient temperatures between –24oF and 160oF.
o Pipe Fusion Range: The fittings can be fused to pipe of SDR stages 17.6 to 7.4 in accordance with DIN 8074 (E), ISO 4437, pr EN 1555 and DIN EN 12201 (E).
o Operating Pressures: 150 psi.
o Test Pressure: 232 psi.
o Approved Fuel Types: All Petroleum Products (Motor Vehicle Fuels, High Blend Fuels, Concentrated Fuels, Aviation & Marine Fuels) E85 and Biodiesel.
Installation Installation, use, and maintenance of all Electr-O-Fuze™ products shall be in accordance with the manufacturer’s recommendations, State and County approvals. In event of conflicts, the stricter requirement shall govern. AEP installation manual available directly from AEP, or at info@aep-inc.net. All operators to be AEP certified on both the fittings and electrofusion machine.
Certifications/Approvals o UL 971 Approved File # MH47372 o Institute of Petroleum Cert # BC63/1010/98/001 And cert # BC63/0115/2000/001 o Shell Int. Procurement Cert. Cert # BC63/1010/98/002 o State of Florida EQ 683 and EQ 617 – and Derm Approval o State of Michigan MUSTR – Rule 9, subsections 280.20 (b) o New York City Fire Dept. CoA 5117 o DOT 192 and 195 On waiver letter per project o DVGW Permit VP 607, with decisions DV-8601AU2248, DV-8606AU2249 and DV-8611AU2250 o Factory Permit DIN EN 10 204-3.1 o State of California CARB, State Fire Marshall Cert # GVRC 005:060:001
Transition Fitting (from UG pipe to Carbon Steel)
Per Specification Section 23 10 00 - 2.5.C.1
Fitting
Electr-O-Fuze™ Spigot Transition Fitting, UL971 Listed Product Description
Electr-O-Fuze™ Transition Fittings are safe, reliable and a proven method of connecting Electr-O-Fuze™ pipe to steel threaded parts. The transition fitting come in various different styles and sizes to suite the application. Two main styles are stock items namely the threaded transitions and the E-Z Fit. Both these are electro plated with a 12 inch hose tail as standard;
however the metal transition section can be made of Stainless Steel to order. Also made to order are transitions with longer hose tails, these can be made up to any length. A further advantage is that these fittings are completely fluorinated for maximum protection against hydrocarbons. Electr-O-Fuze™ Transition Fittings are also threaded both on the outside and inside for ease of application offering different options during installation. When used in conjunction with Electr-O-Fuze™ pipe and an Electr-O-Fuze™ EF welding machine, it provides a UL971 compliant fuel installation with a 30 year life span.
Electr-O-Fuze™ Transition Fitting is available in sizes 1¼”, 1½”, 2”, 3” and 4”nominal bore.
Applications o Service Stations o Marinas o Fuel Terminals o Moist & Marshy Areas o Refineries o Harbors o Airports o Non-Contaminated & Contaminated Sites o Fitting Type: Spigot ends to the transition allow easy matching to various electrofusion fittings such as couplers, tee’s and elbows among others throughout the pipeline system in order to join the various pieces. The long spigot allows length adjustment to the fitting for precise fitting, applied with dedicated ancillary equipment ensures maximum joint integrity. Absolute security of the weld is ensured using the system listed electrofusion fittings with the bar code feature in conjunction with the fully automatic Electr-O-Fuze™ welding machine. The transition Spigot is threaded both on the inside and outside with NPT thread for flexibility of use and is factory leak tested.
o Electrofusion Machine: None, Spigot Type.
o Temperature Range: Fittings can be worked with at ambient temperatures between –24oF and 160oF.
o Pipe Fusion Range: The fittings can be fused to pipe of SDR stages 17.6 to 7.4 in accordance with DIN 8074 (E), ISO 4437, pr EN 1555 and DIN EN 12201 (E).
o Operating Pressures: 150 psi maximum.
o Test Pressure: Primary>60psi<150psi o Approved Fuel Types: All Petroleum Products (Motor Vehicle Fuels, High Blend Fuels, Concentrated Fuels, Aviation & Marine Fuels) E85 and Biodiesel.
Installation Installation, use, and maintenance of all Electr-O-Fuze™ products shall be in accordance with the manufacturer’s recommendations, State and County approvals. In event of conflicts, the stricter requirement shall govern. AEP installation manual available directly from AEP, or at info@aep-inc.net. All operators to be AEP certified on both the fittings and electrofusion machine.
Certifications/Approvals o UL 971 Approved File # MH47372 o Institute of Petroleum Cert # BC63/1010/98/001 And cert # BC63/0115/2000/001 o Shell Int. Procurement Cert. Cert # BC63/1010/98/002 o State of Florida EQ 683 and EQ 617 – and Derm Approval o State of Michigan MUSTR – Rule 9, subsections 280.20 (b) o New York City Fire Dept. CoA 5117 o DOT 192 and 195 On waiver letter per project o State of California CARB, State Fire Marshall Cert # GVRC 005:060:001
30 Note : specifications subject to change without notice 01/13
Diam.
NB*
inches
Diam.
OD**
metric
Part # Dim B Dim D Dim L Weight kg/ea
Weight lbs/ea mm in. mm in. mm in.
1¼” 40 TR-SP-1.25M 82 3.23” 32 1¼” 282 11.10” 0.9 1.98
1½” 50 TR-SP-1.5M 86 3.39” 47 1½” 286 11.26” 1.0 2.20
2” 63 TR-SP-2M 92 3.62” 60 2” 292 11.50” 2.0 4.40
3” 90 TR-SP-3M 124 4.88” 87 3” 324 12.76” 2.8 6.16
4” 110 TR-SP-4M 134 5.28” 102 4” 334 13.15” 3.0 6.60
Diam.
NB*
inches
Diam.
OD**
metric
Part # Dim B Dim D Dim L Weight kg/ea
Weight lbs/ea mm in. mm in. mm in.
1¼” 40 TR-SP-1.25M 82 3.23” 25.0 1” 282 11.10” 0.9 1.98
1½” 50 TR-SP-1.5M 86 3.39” 31.8 1¼” 286 11.26” 1.0 2.20
2” 63 TR-SP-2M 92 3.62” 38.1 1½” 292 11.50” 2.0 4.40
3” 90 TR-SP-3M 124 4.88” 63.5 2½” 324 12.76” 2.8 6.16
4” 110 TR-SP-4M 134 5.28” 76.2 3” 334 13.15” 3.0 6.60
(*) Nominal Bore (**) Outside Diameter
Lakewood, CO 80228
Ph. 303.708.9900
VA Replacement Medical Center, Aurora Project # 8169
Sump for Vent LinesSubmittal for :
Specification Section : 23 10 00
00104Register Item No :
Sub Section :
Manufacturer :
Revision No : 0
Model / Part No. :
This submittal has been reviewed; products have been verified as being specified and field measurements and construction criteria have been coordinated. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.
Any additions to submitted products shall be accompanied by an appropriate contract change request.
Comments :
Subcontractor seeks approval of a single sump for eight (8) vent lines running from the Fuel Oil Storage Tanks to the south wall of the ENC. The sump will be placed between the south wall of the ENC and the site wall and will be at final grade (estimated to be 5388'). The sump will contain all vent lines which must pass into the sump and then 90-upwards to terminate on the side of the ENC 12-feet above finished grade.
Printed on: 6/11/2015 Page 1
PLEASE NOTE:
CUSTOM ITEMS ARE NOT RETURNABLE
X_____________________________________________
SIGN AND FAX WITH PURCHASE ORDER FOR
PRODUCTION.
Per Specification Section 23 10 00 - 2.6.G
Leak Detector (for use in tray)
Per Specification Section 23 10 00 -2.7.C
PNEUMERCATOR
Liquid Level Control Systems
PHONE: (631) 293-8450
FAX: (631) 293-8533
www.pneumercator.com
PNEUMERCATOR CO., INC. 1785 EXPRESSWAY DRIVE NORTH, HAUPPAUGE, NY 11788
Per Specification Section 23 10 00 - 2.7.C
PNEUMERCATOR
Liquid Level Control Systems
PHONE: (631) 293-8450
FAX: (631) 293-8533
www.pneumercator.com
PNEUMERCATOR CO., INC. 1785 EXPRESSWAY DRIVE NORTH, HAUPPAUGE, NY 11788
Per Specification Section 23 10 00 - 2.7.C
Features
• All stainless steel construction.
• Minimal floor preparation necessary.
• Can be configured to fit most applications.
• Optional floor anchors
• Spill containment for stationary lead-acid battery systems
• Available with a drain plug.
Part Number SPAN-LL-WWW (i.e. SPAN-24-60) WW = Width in inches LLL = Length in Inches
Regulations In Compliance With
• Code of Federal Regulations
• International Fire Code (IFC)
• Uniform Building Code
• OSHA
• ANSI
• Completely customizable length, width, and height
• All stainless steel construction meets a wide range of chemical compatability needs.
• Weight and capacity depend on dimensions
Recommended Products
STAINLESS STEEL PAN
Custom containment system for lead-acid battery systems
5534 Olive Street, Montclair, CA 91763 • 800.206.9884 Fax 909.624.1772 • www.EnviroGuard.com
S-SC-SPAN Rev A 01/12
Protecting Mission-Critical Facilities and Personnel Since 1993. SM
Battery Room Aisle Mat
Compliance Package
QU
AL
ITY MANAGEMENT SYSTEM
ENVIROGUARD
ISO 9001:2008
CERTIFIED
Part Number: SPAN
Leak Tray (inside ENC wall) Per Specification Section 23 10 00 - 2.7.D.2
A A
B B
C C
D D
SHEET 1 OF 1
DRAWN
CHECKED
Outside Dimension:
18.00''x94.00''x1.25''
Inside Dimension:
M. Hermansen
M. Hermansen
5/6/2015
5/6/2015
DWG NO
SPAN 18-094-1.25
TITLE
Stainless Pan Containment
SIZE
C
SCALE
EnviroGuard
5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884
REV
A
18.00
94.00
1.25
Tray 1 (of 3)
A A
B B
C C
D D
SHEET 1 OF 1
DRAWN
CHECKED
Outside Dimension:
18.00''x60.00''x1.25''
M. Hermansen
M. Hermansen
5/6/2015
5/6/2015
DWG NO
SPAN 18-060-1.25
TITLE
Stainless Pan Containment
SIZE
C
SCALE
EnviroGuard
5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884
REV
A
18.00
60.00
1.25
Tray 2 (of 3) Per Specification Section 23 10 00 - 2.7.D.2
A A
B B
C C
D D
SHEET 1 OF 1
DRAWN
CHECKED
Inside Dimension:
Outside Dimension:
18.00''x144.00''x1.25''
17.50''x143.50''x1.00''
M. Hermansen
M. Hermansen
4/20/2015
4/20/2015
DWG NO
TITLE
SIZE
C
SCALE
EnviroGuard
5534 Olive St. Montclair, CA • www.enviroguard.com • 1.800.206.9884
REV
A
18.00
144.00
1.25
17.50
143.50
.25
.25
Stainless Pan Containment
SPAN 18-144-1.25
Tray 3 (of 3)
For use to seal FOS/R piping entering ENC
Disk Seal For Pipe Penetration into ENC
Per Specification Section 23 10 00 - 3.3.D.4
Split W2 Model DiskSeal Stainless Steel Plates and Bolting EDPM Seal Element
WESTATLANTIC Tech Corp www.westatlantictech.com sales@westatlantictech.com +902 455 4455
Your project orientation W-2 Horizontal (Split)
Disk Seal for Pipe Penetrations (single and dual penetrations)
F U
E L O
IL
D
R A
W N
B Y
A U
STIN
H
ILTO
N
06/10/15
06/10/15
Reference Image of Seal Installation
June 24, 2015
Kiewit-Turner
13611 East Colfax Ave
Aurora, CO 80045
Attention: Mr. Chris Betts
MEP Engineer
Reference: VA Replacement Hospital
Subject: Sustainable Design Documentation – Facility Fuel Systems
Specification Section 23 10 00 – 1.4.L
Dear Chris:
There are no submittal items required for Sustainable Design Documentation relative to specification section 23 10
00, paragraph 1.4.L. Reference is made to the requirements of section 01 81 11 – SUSTAINABLE DESIGN
REQUIREMENTS, which lists the required documentation. Per this section, nothing is required relative to section 23
10 00.
We are available to discuss any comments or questions you may have.
Sincerely, VA Mechanical Diamond Partners
Kramer Peter
Kramer Peter
Field Engineer
| Text4: |
| Text5: SWVV-992424-8 |
| Text6: 8" |
| Text7: 6" |
| Text8: 30" (OVH) |
| Text9: 2.375 |
| Text10: 2.375 |
| Text11: 2.375 |
| Text12: 2.375 |
| Text13: 2.375 |
| Text14: 2.375 |
| Text15: 2.375 |
| Text16: 2.375 |
| Text1: |
| 0: 24" |
| 1: 99" |
| 2: 24" |
| Text2: |
| Text3: Ph 707.523.2050 |
Fx 707.523.2046 Text17: FITTINGS TO BE EVENLY SPACED ALONG TOP OF BOX.