00.MS.201.pdf

PDF 574 KB Posted

Attached to
Z1DA--554 FUEL LINE REPAIR
Solicitation number
36C25921Q0630
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14

GAS SERVICE FROM

XCEL ENERGY.

E

UP

INTERRUPTIBLE GAS METER & SERVICE BY

XCEL ENERGY. TOTAL GAS LOAD = 93,728,000

BTU/H AT SEA LEVEL. FUTURE GAS LOAD =

23,432,000 BTU/H AT SEA LEVEL. GAS METER

DISCHARGE PRESSURE 20 PSI.

FIRM RATE GAS METER & SERVICE BY XCEL

ENERGY. TOTAL GAS LOAD = 14,500,000 BTU/H

AT SEA LEVEL. FUTURE GAS LOAD = 5,500,0000

BTU/H AT SEA LEVEL. GAS METER DISCHARGE

PRESSURE 2 PSI.

RECESSED MOUNTED

EMERGENCY OXYGEN

SUPPLY CONNECTION (INLET)

UP

UP

DN

UP

D

UP

DN

12" HIGH CONCRETE

HOUSEKEEPING

PAD. REFER TO

STRUCTURAL DWGS

FOR PAD SUPPORT

FOR FROST

PROTECTION.

RESERVE OXYGEN

VAPORIZER

RESERVE LIQUID OXYGEN

CRYOGENIC STORAGE

TANK (3,000 GAL.)

PRIMARY LIQUID OXYGEN

CRYOGENIC STORAGE

TANK (11,000 GAL.)

OXYGEN FILL

CONNECTION

4"O2

PRIMARY OXYGEN

VAPORIZER

ENC

2" FOS/R PIPING TO

BOILERS AND

GENERATORS (TYP.)

DN

OXYGEN REGULATOR

MODULE CABINET

FUEL CLEANING

SYSTEM (TYP.)

C TRANSITION

SUMPS, IF

NEEDED.

(TYP.)

DOUBLE WALL,

DIRECT BURIED

PIPING (TYP.)

(2) 3" VENTS, 12'-0"

ABOVE GRADE (TYP.)

UP

TANK MAN

WAY (TYP.)

REMOTE FILL

STATION

TRANSITION

SUMP

06-FOT-01 06-FOT-02 06-FOT-03 06-FOT-04

DOUBLE WALL,

DIRECT BURIED

PIPING (TYP.)

FUEL OIL TANKS

(TYP.), 50000 GAL

EACH

B

A

CONSULTANTS: Professional Seal ARCHITECT/ENGINEERS:

CDI NO. 12

Revisions

1 2

08/31/2012 Date

3 4 5 6

H+L Architecture 1755 Blake Street, Suite 400 Denver, CO 80202

Skidmore, Owings & Merrill LLP 224 South Michigan Avenue Suite 1000 Chicago, IL 60604

Cator, Ruma & Associates 896 Tabor Street Lakewood, CO 80401

S. A. Miro, Inc.

4582 South Ulster Street Pkwy.

Suite 300 Denver, CO 80237

Key Plan

0 056 04 03

7 8 9

11 12 08 09 13

10 11

ENLARGED SITE PLAN- ENERGY

CENTER

NORTH

3/32" = 1'-0"

Drawing Title

SITE PLAN

ENLARGED SITE PLAN- ENERGY

CENTER

Approved: Project Director

Project Title

REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

Location

Date

AURORA, COLORADO

Checked Drawn

08/31/2012

12 13 14

00.MS.201

Drawing Number

Building Number

Project Number

554-501 OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

8/

/2

8:

:1

AM

D :\R ev it

Lo ca l P ro je ct s\

\M

H -S

IT

_w w om ac k.

rv t

N

PV

S

PV

N

PS

N

C

BS

C

BC

C

BN

C

LC

EN

C

IB

N

IB

S

D

AT

R

ES

C O

N

Sheets and Views
00.MS.201-Layout1

File details come from the government source that posted it. Updated .