36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 9 Plumming P902-P903.pdf

View the file

Other files

File Type Posted
36C25818B0332-0001002.pdf PDF
36C25818B0332-0001004.pdf PDF
36C25818B0332-0001000.docx DOCX document
36C25818B0332-0001001.docx DOCX document
36C25818B0332-0001003.pdf PDF
36C25818B0332-026.docx DOCX document
36C25818B0332-052.docx DOCX document
36C25818B0332-043.pdf PDF
36C25818B0332-033.docx DOCX document
36C25818B0332-036.docx DOCX document
36C25818B0332-055.docx DOCX document
36C25818B0332-023.docx DOCX document
36C25818B0332-041.docx DOCX document
36C25818B0332-058.docx DOCX document
36C25818B0332-053.docx DOCX document
36C25818B0332-057.docx DOCX document
36C25818B0332-025.docx DOCX document
36C25818B0332-040.docx DOCX document
36C25818B0332-048.pdf PDF
36C25818B0332-056.docx DOCX document
36C25818B0332-045.pdf PDF
36C25818B0332-054.docx DOCX document
36C25818B0332-044.pdf PDF
36C25818B0332-049.pdf PDF
36C25818B0332-059.pdf PDF
36C25818B0332-047.pdf PDF
36C25818B0332-024.docx DOCX document
36C25818B0332-030.docx DOCX document
36C25818B0332-029.docx DOCX document
36C25818B0332-032.docx DOCX document
36C25818B0332-050.pdf PDF
36C25818B0332-022.docx DOCX document
36C25818B0332-037.docx DOCX document
36C25818B0332-060.xls XLS spreadsheet
36C25818B0332-027.docx DOCX document
36C25818B0332-031.docx DOCX document
36C25818B0332-039.docx DOCX document
36C25818B0332-035.docx DOCX document
36C25818B0332-034.docx DOCX document
36C25818B0332-028.docx DOCX document
36C25818B0332-042.pdf PDF
36C25818B0332-038.docx DOCX document
36C25818B0332-046.pdf PDF
36C25818B0332-000.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S02 ATTACHMENT 22--DRAWINGS 8 PLUMMING P901- TO P-903

Drawings

PLUMMING

PAGES P901- TO P-903

691-17-104WL

RETROFIT SEWER SYSTEM B500 1ST 5TH 6TH

FLOOR

NEW SANITARY DRAIN

PIPE,TYP.

EXISTING SANITARY

DRAIN PIPE TO

REMAIN,TYP.

NEW ACID WASTE

DRAIN PIPE,TYP.

GREATER LOS ANGELES VA HEALTH CARE

SYSTEM - BUILDING 500

CONTRACTOR STAGING AREA, SEE AS100.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

AREA B

AREA A

AREA C

A1A2

C1C2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B M

E P

.r v t

/1

/2

:0 :0

P

M

P-902

PLUMBING GRAPHICS

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 17, 2017 M. PERKINS K. LUKE

3D Plumbing - Graphics

Revisions: Date:

EFORP

DE

R E

T

SI

G E

R R E

E

NI

G

NE

LANOISS

C A L I F ORN

I AS

T A

T E O F

EFORP

DE

R E

T

SI

G E

R R E

E

NI

G

NE

LANOISS

C A L I F ORN

I AS

T A

T E O F

No. M35363

M

I K H A I L F U K

S

ME C H A N I C A L

06/30/2019

NOVEMBER 20, 2017

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

AREA B

AREA A

AREA C

A1A2

C1C2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B M

E P

.r v t

/1

/2

:0 :0

P

M

P-903

PLUMBING GRAPHICS

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 17, 2017 M. PERKINS K. LUKE

NTS

LIDAR SCAN - TRUVIEW EXAMPLE

NTS

LIDAR SCAN - RAW POINT CLOUD

EXAMPLE

NTS

PLUMBING MODELING EXAMPLE

Revisions: Date:

EFORP

DE

R E

T

SI

G E

R R E

E

NI

G

NE

LANOISS

C A L I F ORN

I AS

T A

T E O F

EFORP

DE

R E

T

SI

G E

R R E

E

NI

G

NE

LANOISS

C A L I F ORN

I AS

T A

T E O F

No. M35363

M

I K H A I L F U K

S

ME C H A N I C A L

06/30/2019

NOVEMBER 20, 2017

691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-000 - GENERAL COVER SHEET AND DRAWING INDEX
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - AS100 - Architectural Site Plan
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-301 - ARCHITECTURAL SECTIONS - BUILDING
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY