5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-31-2018 36C25818B0332
691-17-104WL
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818B0332
X x x x Amendment includes:
1. Amends the price schedule to include base bid plus alternate bid 1 and Alternate bid 2
2. Updates the list of Attachments
3. Attachment 9: Section 02-21-13 is removed NOT APPLICABLE DELETED
4. Attachement 29: DB Wage determination Updated
5. Add attachment 31: Asbestos lead survey report
6. Add attachment 32; RFI log (question and answers)
7. Add attachment 33: Signin sheet of Job walk attendees
ALL OTHER TERMS AND CONDITIOS REMAIN THE SAME
Justin Hicks
CONTINUATION PAGE
SECTION C - CONTRACT CLAUSES
C.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001 Base Bid
| 1.00 |
| JB |
| __________________ |
| __________________ |
691-17-104WL RETROFIT SEWER SYSTEM B500 1ST, 5TH & 6TH FLOORS. This project is to replace the sewer and vent pipe system in Building 500 (the Main Hospital Building) in the interstitial spaces serving. SEE SOW B.5 Specific requirement-- A.-- for full description.
LOCAL STOCK NUMBER: 691-17-104WL.C
| GRAND TOTAL |
| __________________ |
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Alternate Bid No. 1
| 1.00 |
| JB |
| __________________ |
| __________________ |
691-17-104WL RETROFIT SEWER SYSTEM B500 1ST, 5TH & 6TH FLOORS. SEE SOW B.5 Specific requirement-- B. --for full description.
ALTERNATE BID NO.1: PROVIDE BASE BID AND REMOVE WORK FROM FIRST FLOOR SEWER.
| GRAND TOTAL |
| __________________ |
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Alternate Bid No. 2
| 1.00 |
| JB |
| __________________ |
| __________________ |
691-17-104WL RETROFIT SEWER SYSTEM B500 1ST, 5TH & 6TH FLOORS. SEE SOW B.5 Specific requirement-- C.-- for full description.
ALTERNATE BID NO. 2: PROVIDE ALTERNATE BID NO.1 AND REMOVE WORK FROM FIFTH FLOOR SEWER.
| GRAND TOTAL |
| __________________ |
36C25818B0332 0001
Page 1 of
C.2 ADDITIONAL ATTACHMENTS
| Attachment # |
| Title |
| Date |
| # Pages |
| 1 |
| Statement of Work CONSTRUCTION |
691-17-104WL
| 08-09-2018 |
| 6 |
| 2 |
| 22 66 00 Chemical-Waste Systems |
Laboratory and Healthcare Facilities
| 11-20-2017 |
| 10 |
| 3 |
| SECTION 01 00 00 |
GENERAL REQUIREMENTS
| 11-20-2017 |
| 17 |
| 4 |
| SECTION 02 82 13.13 |
GLOVEBAG ASBESTOS ABATEMENT
| 11-20-2017 |
| 60 |
| 5 |
| SECTION 22 13 00 |
FACILITY SANITARY AND VENT PIPING
| 11-20-2017 |
| 7 |
| 6 |
| SECTION 01 91 00 |
GENERAL COMMISSIONING REQUIREMENTS
| 11-20-2017 |
| 57 |
| 7 |
| SECTION 01 35 26 |
SAFETY REQUIREMENTS
| 11-20-2017 |
| 26 |
| 8 |
| SECTION 13 05 41 |
SEISMIC RESTRAINT REQUIREMENTS
| 11-20-2017 |
| 6 |
| 9 |
| SECTION 02 21 13 (NOT APPLICABLE DELETED) |
SITE SURVEYS
| 11-20-2017 |
| 5 |
| 10 |
| SECTION 01 57 19 |
TEMPORARY ENVIRONMENTAL CONTROLS
| 11-20-2017 |
| 7 |
| 11 |
| SECTION 22 08 00 |
COMMISSIONING OF PLUMBING SYSTEMS
| 11-20-2017 |
| 3 |
| 12 |
| SECTION 01 45 29 |
TESTING LABORATORY SERVICES
| 11-20-2017 |
| 5 |
| 13 |
| SECTION 01 33 23 Submittal processes |
SHOP DRAWINGS PRODUCT DATA AND SAMPLES
| 11-20-2017 |
| 6 |
| 14 |
| SECTION 09 91 00 |
PAINTING
| 11-20-2017 |
| 11 |
| 15 |
| SECTION 02 41 00 |
DEMOLITION
| 11-20-2017 |
| 17 |
| 16 |
| SECTION 01 42 19 |
REFERENCE STANDARD
| 11-20-2017 |
| 9 |
| 17 |
| SECTION 07 81 00 |
APPLIED FIREPROOFING
| 11-20-2017 |
| 8 |
| 18 |
| SECTION 02 29 00 |
GYPSUM BOARD
| 11-20-2017 |
| 8 |
| 19 |
| SECTION 02 82 11 |
TRADITIONAL ASBESTOS ABATEMENT
| 11-20-2017 |
| 61 |
| 20 |
| SECTION 22 05 11 |
COMMON WORK RESULTS FOR PLUMBING
| 11-20-2017 |
| 20 |
| 21 |
| SECTION 00 01 07 |
SEALS
| 11-20-2017 |
| 1 |
| 22 |
| DRAWINGS |
| 11-20-2017 |
| 48 |
| 23 |
| SECTION 00 01 15 |
LIST OF DRAWING SHEETS
| 11-20-2017 |
| 1 |
| 24 |
| SECTION 01 58 16 |
TEMPORARY INTERIOR SIGNAGE
| 11-20-2017 |
| 1 |
| 25 |
| SECTION 07 84 00 |
FIRESTOPPING
| 11-20-2017 |
| 5 |
| 26 |
| SECTION 07 92 00 |
JOINT SEALANTS
| 11-20-2017 |
| 8 |
| 27 |
| SECTION 01 74 19 |
CONSTRUCTION WASTE MANAGEMENT
| 11-20-2017 |
| 6 |
| 28 |
| SECTION 02 83 33.13 |
LEAD-BASED PAINT REMOVAL AND DISPOSAL
| 11-20-2017 |
| 10 |
| 29 |
| DAVIS BACON WAGE DETERMINATION (UPDATED) |
| 8-24-2018 |
| 38 |
| 30 |
| MATERIAL APPROVAL SUBMITTAL |
GENERAL COMMISSIONING REQUIREMENTS
| 31 |
| BLD 500 ASBESTOS LEAD SURVEY REPORT |
| 32 |
| RFI LOG (QUESTIONS AND ANSWERS) |
| 33 |
| SIGNIN SHEET OF JOB WALK ATTENDEES |
See attached document: S02 ATTACHMENT 29-- DBA Wage Determinations CA180033 24 August 2018.
See attached document: S02 ATTACHMENT 31--VA West LA Bld. Survey Report -B500 ONLY 8.31.
See attached document: S02 ATTACHMENT 32-- Request for Information RETROFIT SEWER SYSTEM B500 8.30.
See attached document: S02 ATTACHMENT 33--Signin Sheet 691-17-104 Retrofit Sewer B500 Job walk.
Page 1 of