36C25818B0332-043.pdf
PDF 3 MB Posted
- Attached to
- 36C25818B0332 / 691-18-2-5155-0005 -RETROFIT SEWER SYSTEM BLDG500 (VA-18-00042765) LOS ANGELES, CA.
- Solicitation number
- 36C25818B0332
About this file
36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 1 General.pdf
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S02 ATTACHMENT 22--DRAWINGS 1 General
Drawings
GENERAL
PAGES 1-2
691-17-104WL
RETROFIT SEWER SYSTEM B500 1ST 5TH 6TH
FLOOR
PROJECT REVIEW
DATE: APPROVED: VA PROJECT ENGINEER
DATE: APPROVED: CHIEF, PROJECT SECTION
DATE: APPROVED: CHIEF, MAINTENANCE AND OPERATIONS OFFICE
DATE: APPROVED: CHIEF, ENGINEERING DEPARTMENT
DATE: APPROVED: CHIEF, ENV. OF CARE DEPARTMENT
DATE: APPROVED: CHIEF, ENV. MANAGEMENT DEPARTMENT
DATE: APPROVED: DIRECTOR, FACILITIES MANAGEMENT
DATE: APPROVED: CHIEF, MEDICAL OFFICER
DATE: APPROVED: VP, ADMINISTRATION SUPPORT DATE: APPROVED: C.E.O.
S A
W T
E L L E
B L V
D
D O
W
LE
N D
R
B O
N S
A L L A
V E
S A
N D
IE
G
O F
W Y
N
WILSHIRE BLVD
VA: B500
OHIO AVE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
AREA D
B500 KEY PLAN
AREA B
AREA A
AREA C
A1A2
C1C2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :4
P
M
G-000
GENERAL COVER SHEET AND DRAWING INDEX
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
VA GREATER LOS ANGELES HEALTH CARE SYSTEM
(VAGLAHCS)
CLIENT:
Department of Veterans Affairs, West Los Angeles
Francisco Silva VISN 22 Contracting Officer's Representative
11301 Wilshire Blvd.
Los Angeles, CA 90073
ISSUED FOR CONSTRUCTION
100% CONSTRUCTION DOCUMENTS SUBMISSION
NOVEMBER 20, 2017
TASK ORDER NO.:
VA262-17-J-3853
VISN 22 PROJECT NO.: 691-17-104WL
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________SIGNATURE ________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THE SEWER SYSTEM RETROFIT IS TO BE BID AS A STAND-ALONE PROJECT, COMPLETE,
FULLY COMMISSIONED AND OPERATIONAL.
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND
WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR).
CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION CONSULTANTS TO PERFORM ALL
INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.
ANY REFERENCE TO VA INSPECTIONS SHALL BE A THIRD-PARTY INSPECTOR QUALIFIED TO
PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY
THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE
PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY
REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED,
AND DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.
VICINITY MAP
SCOPE OF WORK:
THIS PROJECT WILL REPLACE AGED AND DAMAGED SANITARY SEWER AND CHEMICAL WASTE
PIPING IN THE INTERSTITIAL SPACES BELOW THE FIRST, FIFTH AND SIXTH FLOORS OF
BUILDING 500. ALL WASTE PIPE BELOW THE FIRST, FIFTH AND SIXTH FLOORS WAS SURVEYED
AND EVALUATED BY THE A/E FOR REPLACEMENT. PIPING TO BE REPLACED WITH NEW IS
INDICATED ON THE PLUMBING DRAWINGS AND INCLUDES EXPOSED HORIZONTAL DRAIN LINES,
RISERS OF BOTH SANITARY AND CHEMICAL WASTE SYSTEMS. THIS PROJECT WILL REPLACE
PIPE UP TO THE FIXTURE CONNECTIONS. EXISTING PLUMBING FIXTURES AND DRAIN PIPE
THROUGH THE FLOORS ARE TO REMAIN IN PLACE. NO VENT PIPING HAS BEEN IDENTIFIED AS
DEFECTIVE REQUIRING REPLACEMENT, MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACEMENT. EXISTING SEISMIC PIPE BRACING IS THE BE RETAINED AND REUSED WHERE
POSSIBLE.
- DRAWING INDEX -
PAGE NUMBER SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
100% CD
GENERAL
1 G-000 GENERAL COVER SHEET AND DRAWING INDEX Yes Yes Yes
2 G-001 GENERAL NOTES, SYMBOLS AND SCHEDULES Yes Yes Yes
ARCHITECTURE
3 AS100 ARCHITECTURAL SITE PLAN No Yes Yes
4 A-101 ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE Yes Yes Yes
5 A-101A1 ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 Yes Yes Yes
6 A-101A2 ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 Yes Yes Yes
7 A-101B ARCHITECTURAL PLAN - FIRST FLOOR - AREA B Yes Yes Yes
8 A-101C1 ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 Yes Yes Yes
9 A-101C2 ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 Yes Yes Yes
10 A-101D ARCHITECTURAL PLAN - FIRST FLOOR - AREA D Yes Yes Yes
11 A-105 ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE Yes Yes Yes
12 A-105A ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A Yes Yes Yes
13 A-105B ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B Yes Yes Yes
14 A-105C ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C Yes Yes Yes
15 A-105D ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D Yes Yes Yes
16 A-106 ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE Yes Yes Yes
17 A-106A ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A Yes Yes Yes
18 A-106B ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B Yes Yes Yes
19 A-106C ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C Yes Yes Yes
20 A-106D ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D Yes Yes Yes
21 A-201 ARCHITECTURAL EXTERIOR ELEVATIONS No Yes Yes
22 A-301 ARCHITECTURAL SECTIONS - BUILDING Yes Yes Yes
PLUMBING
23 P-001 PLUMBING LEGEND No No Yes
24 P-100A1 PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA A1 Yes Yes Yes
25 P-100A2 PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA A2 Yes Yes Yes
26 P-100B PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA B Yes Yes Yes
27 P-100C1 PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA C1 Yes Yes Yes
28 P-100C2 PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA C2 Yes Yes Yes
29 P-100D PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA D Yes Yes Yes
30 P-104A PLUMBING SANITARY SEWER PLAN - FOURTH FLOOR INTERSTITIAL - AREA A Yes Yes Yes
31 P-104B PLUMBING SANITARY SEWER PLAN - FOURTH FLOOR INTERSTITIAL - AREA B Yes Yes Yes
32 P-104C PLUMBING SANITARY SEWER PLAN - FOURTH FLOOR INTERSTITIAL - AREA C Yes Yes Yes
33 P-104D PLUMBING SANITARY SEWER PLAN - FOURTH FLOOR INTERSTITIAL - AREA D Yes Yes Yes
34 P-105A PLUMBING SANITARY SEWER PLAN - FIFTH FLOOR INTERSTITIAL - AREA A Yes Yes Yes
35 P-105B PLUMBING SANITARY SEWER PLAN - FIFTH FLOOR INTERSTITIAL - AREA B Yes Yes Yes
36 P-105C PLUMBING SANITARY SEWER PLAN - FIFTH FLOOR INTERSTITIAL - AREA C Yes Yes Yes
37 P-105D PLUMBING SANITARY SEWER PLAN - FIFTH FLOOR INTERSTITIAL - AREA D Yes Yes Yes
38 P-501 PLUMBING DETAILS No No Yes
38 P-600 PLUMBING FIXTURE SCHEDULES - FIRST FLOOR No Yes Yes
39 P-601 PLUMBING FIXTURE SCHEDULES - FIRST FLOOR No Yes Yes
40 P-602 PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR No Yes Yes
41 P-603 PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR No Yes Yes
42 P-604 PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY No Yes Yes
44 P-605 PIPE SCHEDULES No Yes Yes
45 P-700 PLUMBING CUTSHEETS No No Yes
46 P-901 PLUMBING PHOTOGRAPHS No Yes Yes
47 P-902 PLUMBING GRAPHICS Yes Yes Yes
48 P-903 PLUMBING GRAPHICS Yes Yes Yes
Revisions: Date:
11/20/2017
Expires 6.30.16Expires: 6/30/18
/20
/17
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS.
WHEN REQUIRED BY 2016 CALIFORNIA BUILDING CODE STANDARDS ,
ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES .
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY
THE CONTRACTOR(S) PRIOR TO FABRICATION AND CONSTRUCTION.
ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THESE
DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK
DESCRIBED IN CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO
THE ATTENTION OF THE ARCHITECT AND COR IMMEDIATELY.
4. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL
SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL
WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.
5. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD
VERIFIED. ALL DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT AND COR.
6. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION,
CONTRACTOR SHALL VERIFY THAT ACTUAL CONDITIONS ARE THOSE
REFLECTED BY THE CONTRACT DOCUMENTS. REPORT DISCREPANCIES
TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK
RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
7. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS,
SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE
ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE
CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY
TIME, METHOD, SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
CONTRACTOR WORK EFFORT SHALL NOT DISRUPT OR OTHERWISE
IMPACT NORMAL VA OPERATIONS WITHOUT THE EXPRESS WRITTEN
CONSENT OF THE VA. THIS MAY REQUIRE THAT THE WORK EFFORT BE
PERFORMED DURING NON-WORKING HOURS.
8. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS
NOT IN THE CONTRACT. HOWEVER, THE CONTRACTOR SHALL
COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.
9. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH
OWNER, INCLUDING STAGING AREAS, MATERIAL STORAGE, ACCESS TO
WORK, TIMING OF WORK, NOISY OPERATIONS, INTERRUPTION OF
UTILITIES, ETC. SEE SPECIFICATIONS.
10. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE
PLACEMENT OF EACH TRADE'S WORK SO THAT THERE ARE NO
CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION IMPAIRED. IT
IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS
THROUGH FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
11. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO
ARCHITECT AND COR, BETWEEN DISSIMILAR METALS. SEE
SPECIFICATIONS.
12. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS
TO BE COORDINATED WITH COR. SUBMIT CERTIFICATIONS AS
REQUIRED BY THE SPECIFICATIONS.
13. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED.
CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE
LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA. SEE
SPECIFICATIONS 01 33 23 AND 22 05 11 FOR MORE DETAILS.
FIRE LIFE SAFETY NOTES
1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING,
DAMAGED DURING CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL
CONDITION.
2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE
MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT
POSSIBLE TO MAINTAIN FIRE-RESISTIVE ASSEMBLIES, FIRE-RESISTIVE
CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY CONSTRUCTION
BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND
MAINTAINED AT ALL TIMES PER LOCAL FIRE DEPARTMENT.
2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE
OPERATIONAL AT ALL TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL
FIRE DEPARTMENT.
3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER
CONSTRUCTION. THE NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS
REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT.
4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH
LOCAL FIRE CODES.
6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL
TIMES PER LOCAL FIRE CODES.
7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL
TIMES. TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE
MARSHAL OR BY THE LOCAL FIRE DEPARTMENT.
8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE
FLAME-RETARDANT.
10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING
ALTERATIONS. WHEN REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL
FIRE DEPARTMENT, HEAT DETECTORS MAY BE SUBSTITUTED FOR SMOKE
DETECTORS DURING ALTERATIONS.
11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE
DEPARTMENT VEHICLE ACCESS ROADWAYS SHALL BE INSTALLED, TESTED
AND PLACED IN SERVICE PRIOR TO AND DURING THE TIME OF
CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL FIRE
DEPARTMENT IN THE FIELD.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS,
THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE
BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE,
CONTACT ARCHITECT AND COR PRIOR TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER
THE BID, CONTRACTOR SHALL CONFIRM DIMENSIONS WITH ARCHITECT AND COR PRIOR TO
CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT
BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP
DRAWINGS CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS,
REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS
AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS. MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO
CONTAIN DIMENSIONAL INFORMATION RELATED TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE
SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED,
BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION
TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE
16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/-
1/4").
FLOOR PLAN DIMENSIONS
1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF
THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR,
FROM OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.
2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH
FACES OF MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED
OTHERWISE.
3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
4. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS BETWEEN CANOPY COLUMNS, ARE
NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF FINISHES.
5. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR
SEPARATION REQUIRED.
VERTICAL DIMENSIONS
1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL
OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS
SIGN).
2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO
TOP OF DECKING OR SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY
ARE IN LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH
OPENINGS). HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR
ELEVATION
4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE
WALL PENETRATIONS, UNO.
5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES,
CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A
STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE
FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.
1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED
BOLD LINES INDICATE EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF
CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT
TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS
LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL AND/OR ROOF.
5. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED
DEMOLITION WORK.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY
PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE
COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS
SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRINKLER SYSTEMS ARE TO BE MAINTAINED.
EXIT AND EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR
WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND
AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY
LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.
EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF
EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND
CURRENT NEC GUIDELINES.
RATED DOOR AND WINDOW ASSEMBLIES
1. BUILDING 500 IS EQUIPPED WITH RATED DOOR ASSEMBLIES AND THEY ARE
NOT AFFECTED WITH THIS PROJECT. EXISTING RATINGS ARE TO BE
MAINTAINED.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-
PROOFED IN AN APPROVED MANNER.
2. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS,
CONDUIT, ETC. SHALL BE SEALED WITH A UL APPROVED METHOD AND
MATERIAL APPROVED BY BUILDING, MEETING THE EXISTING FLOOR/ WALL
RATING.
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CUBIC FEET PER HOUR
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CFH
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
X X X X X
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
PLAN REGIONS
= AREA OF WORK, REGION WITH PIPE
DEFECTS
= INTERSTITIAL LEVEL CATWALK
= CONTRACTOR STAGING/LAY-DOWN AREA
= CONTRACTOR SITE ACCESS PATH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :4
P
M
G-001
GENERAL NOTES, SYMBOLS AND SCHEDULES
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES PLUMBING SYMBOL LEGEND
GENERAL DEMOLITION AND PHASING NOTES
SANITARY SEWER IMPAIRMENT
1. IMPAIRMENT OF EXISTING SANITARY SEWER AND VENT SYSTEM IN ORDER
TO INSTALL NEW PIPING SHALL BE LIMITED TO A MINIMUM AND SHALL BE
AUTHORIZED BY THE VA CHIEF ENGINEER AND PROJECT COR. BEFORE
AUTHORIZATION IS GIVEN, CONTRACTOR SHALL VERIFY THAT THE
FOLLOWING ITEMS ARE ACCOMPLISHED:
A. DETERMINE THE EXACT AREA OR LOCATION OF THE INTENDED
IMPAIRMENT AND DURATION.
B. NOTIFY THE CHIEF ENGINEER AND COR OF THE AFFECTED AREA OF THE
IMPAIRMENT.
2. WHEN THE IMPAIRED SANITARY SEWER AND VENT SYSTEM IS RESTORED
TO NORMAL WORKING ORDER, PROVIDE VERIFICATION OF THE FOLLOWING:
A. VERIFY ALL NEW CONNECTIONS TO THE SANITARY SEWER AND VENT
SYSTEM ARE TESTED AND PROVEN TO HAVE NO LEAKAGE. PER THE
CONSTRUCTION DOCUMENTS AND SPECIFICATIONS
B. ADVISE CHIEF ENGINEER AND COR THAT THE PIPING SERVICE HAS
BEEN FULLY RESTORED.
3. INTERRUPTION OF EXISTING CHEMICAL-WASTE SERVICE: DO NOT
INTERRUPT CHEMICAL-WASTE SERVICE TO FACILITIES OCCUPIED UNLESS
PERMITTED UNDER THE FOLLOWING CONDITIONS AND THEN ONLY AFTER
ARRANGING TO PROVIDE TEMPORARY CHEMICAL-WASTE SERVICE
ACCORDING TO REQUIREMENTS INDICATED:
A. PROVIDE WRITTEN NOTICE TO COR NO FWER THAN 21 DAYS IN
ADVANCE OF PROPOSED INTERRUPTION OF CHEMICAL WASTE SERVICE.
B. DO NOT PROCEED WITH INTERRUPTION OF CHEMICAL-WASTE SERVICE
WITHOUT COR'S WRITTEN PERMISSION.
INFECTION CONTROL PLAN
1. CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN FOR
INFECTION CONTROL TO CHIEF ENGINEER AND COR PRIOR TO STARTING
THE PROJECT, PROVIDE THE FOLLOWING ITEMS AS A MINIMUM
REQUIREMENT:
A. TEMPORARY SEWER BYPASS AND PUMP STATION.
B. REMOVAL OF OLD SEWER LINES, WASTE WATER AND SPILL.
C. NEW AND EXISTING SEWER LINES MUST BE SEALED LIQUID TIGHT.
D. EXISTING SEWER PIPES SHALL BE DISPOSED AS HAZARDOUS WASTE.
E. PROTECTION SURROUNDING AREA AND FLOOR FROM SPILLS.
F. PROVIDE INFECTION CONTROL BARRIERS FOR THE WORKING AREA. NOTE:
THE A/E USED DESIGN DRAWINGS PROVIDED BY THE VA FOR FLOOR PLANS AND PLUMBING FIXTURE LOCATIONS. IT IS BEYOND THE SCOPE OF THIS PROJECT TO VERIFY ALL FIXTURE LOCATIONS. ALL SANITARY SEWER AND CHEMICAL-WASTE PIPE WAS LOCATED USING SITE SURVEYS AND LIDAR SURVEYS WHICH GENERATED POINT CLOUD MODELS. ALL PIPE GRADING WAS DEVELOPED USING SITE SURVEYS BY A QUALIFIED PLUMBING ENGINEER. WHERE POSSIBLE, THE AGE, TYPE AND EXPECTED LONGEVITY OF IN-PLACE PIPING HAS BEEN RECORDED AND USED AS THE BASIS FOR RETROFIT
RECOMMENDATIONS.
OWNER SUBMITTAL COMMENTS AND A/E RESPONSES
Revisions: Date:
SEISMIC PIPE BRACING NOTES
1. SANITARY SEWER AND CHEMICAL-WASTE PIPING TO BE REPLACED UNDER THIS
PROJECT HAS EXISTING/CERTIFIED SEISMIC BRACING. EXISTING SEISMIC BRACING
SHALL BE RETAINED AND REUSED TO BRACE NEW PIPING.
2. NEW PIPING SHALL BE SISTERED UP TO EXISTING PIPING UNTIL EXISTING SEISMIC
SUPPORTS ARE CONNECTED TO NEW SANITARY AND CHEMICAL-WASTE PIPING.
3. WHERE EXISTING SEISMIC BRACING IS NOT PROVIDED OR IS UNABLE TO BE REUSED,
PROVIDE EQUIPMENT SUPPORTS AND ANCHORING DEVICES TO WITHSTAND THE
SEISMIC DESIGN FORCES, SO THAT WHEN SEISMIC DESIGN FORCES ARE APPLIED, THE
EQUIPMENT CANNOT DISPLACE, OVERTURN OR BECOME INOPERABLE.
4. PROVIDE ANCHORAGES IN CONFORMANCE WITH RECOMMENDATIONS OF THE PIPING
MANUFACTURER AND AS SHOWN ON APPROVED SHOP DRAWINGS AND CALCULATIONS.
5. SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN ACCORDANCE WITH
GUIDLINES FOR SEISMIC RESTRAINTS OF PLUMBING SYSTEMS PUBLISHED BY SMACNA;
VA PLUMBING AND SEISMIC DESIGN MANUALS (H-18-8); AND SPECIFICATION SECTION 13
05 41.
Expires 6.30.16Expires: 6/30/18
/20
/17
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - AS100 - Architectural Site Plan |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.