36C25818B0332-044.pdf
PDF 2 MB Posted
- Attached to
- 36C25818B0332 / 691-18-2-5155-0005 -RETROFIT SEWER SYSTEM BLDG500 (VA-18-00042765) LOS ANGELES, CA.
- Solicitation number
- 36C25818B0332
About this file
36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 2 Architecture AS100-A101B.pdf
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S02 ATTACHMENT 22--DRAWINGS 2 ARCHITECTURAL AS100-A101B
Drawings
ARCHITECTURAL
PAGES AS100-A101B
691-17-104WL
RETROFIT SEWER SYSTEM B500 1ST 5TH 6TH
FLOOR
S A
W T
E L
L E
B L
V D
D O
W L
E N
D R
E
S E
R V
IC
E
E N
T R
A N
C E
DOWLEN DR EDOWLEN DR
VA GREATER LA:
GEORGE LANCE MD
VA GREATER LOS ANGELES
HEALTHCARE CENTER: B500
D O
W L E N
D R
E
CONNEX CONTAINER, PROPOSED
CONTRACTOR STAGING/STORAGE
AREA, 300 SF
CONTRACTOR SITE
ACCESS ROUTE
PARKING
PARKING
LOADING DOCK
'-0
30'-0"
EXISTING
STAIRWELL
10' MIN.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
AREA D
B500 KEY PLAN
AREA B
AREA A
AREA C
A1A2
C1C2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :3
P
M
AS100
ARCHITECTURAL SITE PLAN
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS L. FALK
1" = 50'-0"
ARCHITECTURAL SITE PLAN
Revisions: Date: Expires 6.30.16Expires: 6/30/18
/20
/17
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
L L
M M
N N
O O
P P
Q Q
R R
S S 19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"
19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"
'-0
'-6
'-0
'-0
'-0
'-0
'-6
'-0
'-0
'-0
'-6
'-0
'-0
'-0
'-0
'-6
'-0
'-0
'-6
'-0
'-0
'-0
'-0
'-6
'-0
'-0
'-0
'-6
'-0
'-0
'-0
'-0
'-6
'-0
MATCHLINE
FOR CONTINUATION SEE: 1/A-101C1
MATCHLINE
FOR CONTINUATION SEE: 1/A-101D
MATCHLINE
FOR CONTINUATION SEE: 1/A-101D
MATCHLINE
FOR CONTINUATION SEE: 1/A-101A1
MATCHLINE
FOR CONTINUATION SEE: 1/A-101C2
MATCHLINE
FOR CONTINUATION SEE: 1/A-101B
MATCHLINE
FOR CONTINUATION SEE: 1/A-101B
MATCHLINE
FOR CONTINUATION SEE: 1/A-101A2
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
E
/A
-1 A
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
-1 A
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
-1 C
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
-1 C
1 1
M A
T C
H L
IN
E F
O R
C O
N T
IN
U
A T
IO
N
S E
-1 D
M A
T C
H L
IN
E F
O R
C O
N T
IN
U
A T
IO
N
S E
-1 B
MEDICAL ADMIN PATIENT EDUCATION PRIMARY CARE ADMIN FISCAL
AMBULATORY CARE SERVICE-SPECIALTY CARE
AMBULATORY CARE SERVICE - ER
AMBULATORY CARE SERVICE-
SPECIALTY CARE
CANTEEN
AMBULATORY CARE SERVICE -
PRIMARY CARE
REHAB MEDICINE
AMBULATORY CARE SERVICE-
SURGICAL CLINIC
AMBULATORY CARE SERVICE-
WOMEN'S HEALTH
CARDIOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION
PATHOLOGY AND LABORATORY
PHARMACY - OUTPATIENT
= MEDICAL ADMIN
DEPARTMENT NAMEPATTERN
LEGEND
= PATIENT EDUCATION
= PRIMARY CARE ADMIN
= AMBULATORY CARE
SERVICE - SPECIALTY CARE
= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL
SPACE BELOW (SEE PLUMBING SHEETS).
= AMBULATORY CARE
SERVICE - PRIMARY CARE
= CANTEEN
= REHAB MEDICINE
= COMMON SPACE, LOBBY, ETC.
= AMBULATORY CARE
SERVICE - SURGICAL CLINIC
= AMBULATORY CARE
SERVICE - WOMEN'S HEALTH
= CARDIOLOGY
= VETERANS ASSISTANCE/
SERVICE ORGANIZATION
= PATHOLOGY AND
LABORATORY
= PHARMACY-OUTPATIENT
= AMBULATORY CARE
SERVICE - ER
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
AREA D
B500 KEY PLAN
AREA B
A1A2
C1C2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :1
P
M
A-101
ARCHITECTURAL PLAN - FIRST FLOOR
COMPOSITE
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
3/64" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS
TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT
ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN
ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO
NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL
PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS
AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING
DISRUPTIONS TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO
PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE
MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC
SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH
FIRE RATING) WITH THE APPROVAL OF THE COR.
I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED
AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS
CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA
SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY
THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN
PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING
PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL
CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT
REQUIREMENT FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05
11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN
MANUAL, 2014 OR MOST CURRENT VERSION.
GENERAL SHEET NOTES
1 REFER TO AREA PLANS FOR EXISTING PLUMBING FIXTURE TYPES
2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.
KEYNOTES
Revisions: Date: Expires 6.30.16Expires: 6/30/18
B
C
D
E
F
23456789
P-2P-2 WCF
P-66DP-66DP-66D
P-66DP-66DP-66D
P-2P-2P-2P-2 WCF
P-91
P-91
P-91
P-2P-66D
P-2 WCF
P-2 WCF
FL -110FL -110FL -110FL -110
P-66DP-66D
P-2
P-2
P-91
P-66D
P-92WCF
P-66D
P-66D
P-7P-69A
P-7
P-7P-7P-7
P-2
P-2
FL -110
P-14C
P-7
P-7
P-7 P-7P-7P-7P-7
P-7
P-7
P-7 P-7
P-7
P-7
P-7
P-66D
P-66D
P-2
P-2
P-7P-7P-7P-7
P-7
P-66D
P-2
T-1G
P-14C
P-7
P-7
P-7
P-7
P-7
P-7
P-7
P-66D P-2
P-2
P-2
P-2 WCF
P-66D
P-66D
P-66D
P-66 WCL
P-92WCF
2.1
B.1
3.13.24.25.17.19.19.29.25
D.1
D.2
E.1
E.2
'-0
9'
-0
2' -6
'-0
'-0
5'
-6
'-6
'-0
5' -0
'-0
4.1X.1X.2X.3X.4X.5X.6
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
-1 A
MATCHLINE
FOR CONTINUATION SEE: 1/A-101B
2'-6" 7'-0" 6'-4" 9'-8" 17'-0" 1'-4"2'-0" 8'-8" 3'-6" 10'-0" 3'-6" 6'-6" 18'-0" 25'-0" 27'-0" 22'-6" 3'-6" 22'-6" 6'-7" 9'-8" 1'-9" 6'-0" 9'-0"
AMBULATORY CARE SERVICE-SPECIALTY CARE
AMBULATORY CARE SERVICE - ER
P-66D
P-2
P-7 P-7
P-7P-7P-7
P-7
P-7
FL -110 FL -110
FL -110
P-7
P-7 P-7
P-7
P-7
FL -110
FL -110
P-7
FL -110 FL -110 FL -110
FL -110
FL -110
P-7
P-7P-7
P-7 P-7 P-7
P-7
P-7
P-7
P-7
P-7
FL -110
FL -110
FL -110
P-7
P-7
P-7
P-2
P-2P-7
P-7 P-7 P-7
E1001E1001
1C0021C002
1C0081C008
1C0091C009
1C0101C010
1C0111C011
1C0121C012 1C0141C014 1C0151C015 1C0161C016 1C0171C017
1C0181C0181C0291C0291C0281C0281C0271C0271C0261C026
1C0251C025
1C0241C024
1C0231C023 1C0221C022 1C0211C021
1C0201C020
1C0191C019
1B0171B017
1C0011C001 1B0181B018
1B0191B019
1B0071B007
1B0081B008
1B0091B009
1B0101B0101B0111B0111B0121B0121B0131B0131B0141B0141B0151B0151B0161B016
1B0201B020 1B0211B021
1B0221B022
1B0231B023
1B0241B024
1B0251B0251B0261B026 1B0271B027
1B0281B028
1B0011B001 1B0021B002 1B0031B003 1B0041B004 1B0051B005 1B0061B006
1A0011A001 1A0021A002 1A0031A003 1A0041A004 1A0051A005 1A0061A006
1A0071A007
1A0081A008
1A0091A009
1A0101A0101A0111A0111A0121A0121A0131A0131A0141A0141A0151A0151A0161A016
1A0181A018 1A0191A019 1A0201A020
1A0211A021
1A0221A022
1A0231A023
1A0241A024
1A0251A0251A0261A0261A0271A027
1C0031C0031C0041C0041C0051C0051C0061C0061C0071C007
A1003A1003
A1004A1004
A1005A1005 A1006A1006
A1009A1009
A1012A1012
A1013A1013A1014A1014A1015A1015
A1023A1023
A1018A1018A1019A1019A1020A1020
A1021A1021
A1022A1022
A1010A1010
A1024A1024
1C031B1C031B1C031C1C031C1C031E1C031E
1C031F1C031F
1C031G1C031G
1C031H1C031H
1C0311C031
1C032A1C032A 1C032B1C032B
1C032C1C032C1C032D1C032D
1C032G1C032G
1C032G11C032G1 1C0341C034
E1000E1000 E1002E1002 E1003E1003 E1004E1004 E1005E1005 E1006E1006
10051005
10061006
10071007
1007A1007A
1007B1007B
A1002A1002
A1003A1003
A1004A1004
1C130A1C130A
A1005A1005
A1007A1007
P-7
16111611A1018A1018
= MEDICAL ADMIN
DEPARTMENT NAMEPATTERN
LEGEND
= PATIENT EDUCATION
= PRIMARY CARE ADMIN
= AMBULATORY CARE
SERVICE - SPECIALTY CARE
= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL
SPACE BELOW (SEE PLUMBING SHEETS).
= AMBULATORY CARE
SERVICE - PRIMARY CARE
= CANTEEN
= REHAB MEDICINE
= COMMON SPACE, LOBBY, ETC.
= AMBULATORY CARE
SERVICE - SURGICAL CLINIC
= AMBULATORY CARE
SERVICE - WOMEN'S HEALTH
= CARDIOLOGY
= VETERANS ASSISTANCE/
SERVICE ORGANIZATION
= PATHOLOGY AND
LABORATORY
= PHARMACY-OUTPATIENT
= AMBULATORY CARE
SERVICE - ER
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
A1
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :1
P
M
A-101A1
ARCHITECTURAL PLAN - FIRST FLOOR - AREA
A1
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS
TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT
ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN
ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO
NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL
PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS
AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING
DISRUPTIONS TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO
PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE
MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC
SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH
FIRE RATING) WITH THE APPROVAL OF THE COR.
I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED
AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS
CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA
SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY
THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN
PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING
PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL
CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT
REQUIREMENT FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05
11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN
MANUAL, 2014 OR MOST CURRENT VERSION.
GENERAL SHEET NOTES
1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR
EXISTING PLUMBING FIXTURE TYPES
2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.
KEYNOTES
1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
Revisions: Date: Expires 6.30.16Expires: 6/30/18
B
C
D
E
F
1112 1013141516
P-7P-7P-7P-7P-7
P-7
P-7P-7
P-7
P-7
P-7
P-7
P-7
P-7
P-66 WCL
P-66D
P-66D
P-66 WCL
P-66D
P-66D
P-66D
P-66 WCL
P-66 WCL
P-2 WCF
P-2
P-2
P-2 WCF
P-2
P-2
P-2
P-2
P-2 WCF
P-2 WCF
P-2 WCF
P-14C
P-14C
P-91
P-91
P-7
P-66D P-66 WCL
B.1
9.39.411.113.314.116.1
D.1
D.2
E.1
E.2
X.7 X.613.113.213.414.2 X.10 X.9 X.8
P-7P-7P-7P-7P-7P-7
2'-6" 18'-0" 10'-2" 19'-4" 22'-6" 9'-9" 17'-3" 4'-0" 11'-0" 10'-0" 18'-0" 6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6"
MEDICAL ADMIN PATIENT EDUCATION PRIMARY CARE ADMIN FISCAL
AMBULATORY CARE SERVICE-
SPECIALTY CARE
AMBULATORY CARE SERVICE-
WOMEN'S HEALTH
CARDIOLOGY
P-7 P-2
FL -110 P-7
FL -110 FL -110 FL -110 FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110 FL -110
FL -110
FL -110
FL -110
P-7
P-7
P-7
P-2
P-2
P-92W
P-92W
P-66 WCL
P-7
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110
FL -110FL -110
16011601
1601E1601E
1601A1601A
1601B1601B 1601C1601C 1601D1601D
1603B1603B
1602A1602A
16021602 16031603
1603A1603A
1605A1605A
16911691
16861686
16881688
16851685
16871687 16791679 16811681 16821682 16831683 16841684
16771677
16751675
16741674
16731673
16761676
16801680
16871687
16681668
1690169016721672
16711671
16701670
16691669 16681668 16671667 16661666 16651665 16641664 16631663
1611D1611D 2VE072VE071612P1612P1612O1612O1612N1612N1612M1612M
1612L1612L
1612K1612K
1612J1612J
1612I1612I 1612F1612F 1612F1612F
1612D1612D 1612C1612C 1612A1612A
1611C1611C
1612S1612S
1612G1612G1612H1612H
1612Q1612Q
1612R1612R
16091609
1609B1609B
16101610
A1009A1009
1609160916081608
1670D1670D1607C1607C1607A1607A
16071607 1607B1607B
1607E1607E
1606160616051605
1605B1605B
16041604
W1010W1010
W1011W1011
W1012W1012
W1013W1013
W1014W1014
W1015W1015 W1017W1017 W1018W1018 W1019W1019
16251625
16241624
16301630
W1005W1005 W1004W1004
W1006W1006W1007W1007
W1008W1008
W1001W1001
W1002W1002
W1003W1003 16931693 16921692 16261626
16271627
16281628
2" FD-C
= MEDICAL ADMIN
DEPARTMENT NAMEPATTERN
LEGEND
= PATIENT EDUCATION
= PRIMARY CARE ADMIN
= AMBULATORY CARE
SERVICE - SPECIALTY CARE
= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL
SPACE BELOW (SEE PLUMBING SHEETS).
= AMBULATORY CARE
SERVICE - PRIMARY CARE
= CANTEEN
= REHAB MEDICINE
= COMMON SPACE, LOBBY, ETC.
= AMBULATORY CARE
SERVICE - SURGICAL CLINIC
= AMBULATORY CARE
SERVICE - WOMEN'S HEALTH
= CARDIOLOGY
= VETERANS ASSISTANCE/
SERVICE ORGANIZATION
= PATHOLOGY AND
LABORATORY
= PHARMACY-OUTPATIENT
= AMBULATORY CARE
SERVICE - ER
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
A2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :1
P
M
A-101A2
ARCHITECTURAL PLAN - FIRST FLOOR - AREA
A2
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS
TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT
ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN
ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO
NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL
PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS
AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING
DISRUPTIONS TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO
PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE
MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC
SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH
FIRE RATING) WITH THE APPROVAL OF THE COR.
I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED
AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS
CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA
SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY
THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN
PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING
PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL
CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT
REQUIREMENT FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05
11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN
MANUAL, 2014 OR MOST CURRENT VERSION.
GENERAL SHEET NOTES
1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR
EXISTING PLUMBING FIXTURE TYPES
2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.
KEYNOTES
1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
Revisions: Date: Expires 6.30.16Expires: 6/30/18
G
23456789
H
J
K
L
M
P-7
P-7
P-2
P-7
P-92WCF
P-14C
P-2
P-66D
P-7D
P-7D
P-7D
P-2
P-66D
P-112
P-7
P-2 P-66D
P-7
P-7D
M20A-48
P-66 WCL
P-2 WCF
P-66 WCL
P-2 WCF
P-2
P-2
P-112
M21-24
M21-24
M21A-24
P-66DP-66DP-66D
P-66DP-66D
P-92WCF
M22-32
P-112
2.13.13.24.25.17.19.19.29.25
G.1
J.1
J.2
J.3
J.4
L.1
6' -6
3'
-6
'-0
3'
-6
8' -8
2'
-0
1' -4
'-0
2' -0
3'
-8
2"
'-2
8' -4
5'
-8
'-0
1'
-4
2' -0
8'
-8
3' -6
'-0
3' -6
6'
-6
4.1X.1X.2X.3X.4X.5
X.A
X.B
X.C
X.D
X.E
X.F
X.G
X.H
X.J
X.K
J.2.1
X.6
MATCHLINE
FOR CONTINUATION SEE: 1/A-101C1
M A
T C
H L
IN
E F
O R
C O
N T
IN
U
A T
IO
N
S E
-1 D
AMBULATORY CARE SERVICE - ER
AMBULATORY CARE SERVICE -
PRIMARY CARE
PHARMACY - OUTPATIENT
PATHOLOGY AND LABORATORY
P-7
P-7
2" FD-C
P-7
P-66D
P-66D
P-7
P-7
P-7
P-7
FL -110
P-2
P-2
FL -110
2" FD-C
2" FD-C
P-2
P-7
P-7
P-7 P-7P-2 P-2
K-144D
11341134 11351135 11371137
11401140
11361136
11281128 11311131
11321132
11381138
11301130 11291129 11271127 11261126 11241124
11231123
11221122
12011201
1200A1200A
1200B1200B
12001200
E1020E1020
12161216
122112211220122012221222
1118111811191119
12191219
1213A1213A
12061206 12171217
12241224
12091209
E1021CE1021C
E1008E1008
E1018E1018E1019E1019
12131213
1213A1213A
12121212
1224A1224A
1213D1213D
12041204
12051205
12081208
1213C1213C
1210A1210A
12031203
1121B1121B
11201120
E1013E1013
E1020E1020
E1016BE1016B
12181218
1214A1214A
12021202
12501250 125112511252125212341234 12721272 1249124912481248124712471231A1231A1274E1274E12791279
E1012E1012
1C031D1C031D 1C032C1C032C1C032D1C032D
E1009E1009E1010E1010
E1011E1011
E1014E1014
E1016CE1016C
E1016AE1016A
E1021CE1021C
E1125E1125
E1125BE1125B
E1024E1024
E1003E1003E1004E1004
E1025E1025
E1009E1009
12141214
E1008E1008
12251225
1136A1136A
1136B1136B
1210B1210B
1214B1214B
E1001E1001
12071207
P-7
P-2
P-14C
P-14C
FL -110
FL -110
P-92WCF
= MEDICAL ADMIN
DEPARTMENT NAMEPATTERN
LEGEND
= PATIENT EDUCATION
= PRIMARY CARE ADMIN
= AMBULATORY CARE
SERVICE - SPECIALTY CARE
= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL
SPACE BELOW (SEE PLUMBING SHEETS).
= AMBULATORY CARE
SERVICE - PRIMARY CARE
= CANTEEN
= REHAB MEDICINE
= COMMON SPACE, LOBBY, ETC.
= AMBULATORY CARE
SERVICE - SURGICAL CLINIC
= AMBULATORY CARE
SERVICE - WOMEN'S HEALTH
= CARDIOLOGY
= VETERANS ASSISTANCE/
SERVICE ORGANIZATION
= PATHOLOGY AND
LABORATORY
= PHARMACY-OUTPATIENT
= AMBULATORY CARE
SERVICE - ER
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
AREA B
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION
11/01/2017
95% CONSTRUCTION DOCUMENTS - OWNER REVIEW
11/20/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B .r v t
/2
/2
:4 :2
P
M
A-101B
ARCHITECTURAL PLAN - FIRST FLOOR - AREA
B
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 20, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS
TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT
ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN
ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO
NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL
PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS
AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING
DISRUPTIONS TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO
PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE
MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC
SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH
FIRE RATING) WITH THE APPROVAL OF THE COR.
I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED
AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS
CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA
SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY
THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN
PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING
PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL
CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT
REQUIREMENT FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05
11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN
MANUAL, 2014 OR MOST CURRENT VERSION.
GENERAL SHEET NOTES
1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR
EXISTING PLUMBING FIXTURE TYPES
2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.
KEYNOTES
Revisions: Date: Expires 6.30.16Expires: 6/30/18
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - AS100 - Architectural Site Plan |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
| P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY |
| 691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| Sheets |
| A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE |
| A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1 |
| A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2 |
| A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B |
| A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1 |
| A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2 |
| A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D |
| A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE |
| A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A |
| A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B |
| A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C |
| A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D |
| A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE |
| A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A |
| A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B |
| A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C |
| A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL SECTIONS - BUILDING |
| AS100 - ARCHITECTURAL SITE PLAN |
| G-000 - GENERAL COVER SHEET AND DRAWING INDEX |
| G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES |
| P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR |
| P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.