About this file

36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 2 Architecture AS100-A101B.pdf

View the file

Other files

File Type Posted
36C25818B0332-0001002.pdf PDF
36C25818B0332-0001004.pdf PDF
36C25818B0332-0001000.docx DOCX document
36C25818B0332-0001001.docx DOCX document
36C25818B0332-0001003.pdf PDF
36C25818B0332-026.docx DOCX document
36C25818B0332-052.docx DOCX document
36C25818B0332-043.pdf PDF
36C25818B0332-033.docx DOCX document
36C25818B0332-036.docx DOCX document
36C25818B0332-055.docx DOCX document
36C25818B0332-023.docx DOCX document
36C25818B0332-041.docx DOCX document
36C25818B0332-058.docx DOCX document
36C25818B0332-053.docx DOCX document
36C25818B0332-057.docx DOCX document
36C25818B0332-025.docx DOCX document
36C25818B0332-040.docx DOCX document
36C25818B0332-048.pdf PDF
36C25818B0332-056.docx DOCX document
36C25818B0332-045.pdf PDF
36C25818B0332-051.pdf PDF
36C25818B0332-054.docx DOCX document
36C25818B0332-049.pdf PDF
36C25818B0332-059.pdf PDF
36C25818B0332-047.pdf PDF
36C25818B0332-024.docx DOCX document
36C25818B0332-030.docx DOCX document
36C25818B0332-029.docx DOCX document
36C25818B0332-032.docx DOCX document
36C25818B0332-050.pdf PDF
36C25818B0332-022.docx DOCX document
36C25818B0332-037.docx DOCX document
36C25818B0332-060.xls XLS spreadsheet
36C25818B0332-027.docx DOCX document
36C25818B0332-031.docx DOCX document
36C25818B0332-039.docx DOCX document
36C25818B0332-035.docx DOCX document
36C25818B0332-034.docx DOCX document
36C25818B0332-028.docx DOCX document
36C25818B0332-042.pdf PDF
36C25818B0332-038.docx DOCX document
36C25818B0332-046.pdf PDF
36C25818B0332-000.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S02 ATTACHMENT 22--DRAWINGS 2 ARCHITECTURAL AS100-A101B

Drawings

ARCHITECTURAL

PAGES AS100-A101B

691-17-104WL

RETROFIT SEWER SYSTEM B500 1ST 5TH 6TH

FLOOR

S A

W T

E L

L E

B L

V D

D O

W L

E N

D R

E

S E

R V

IC

E

E N

T R

A N

C E

DOWLEN DR EDOWLEN DR

VA GREATER LA:

GEORGE LANCE MD

VA GREATER LOS ANGELES

HEALTHCARE CENTER: B500

D O

W L E N

D R

E

CONNEX CONTAINER, PROPOSED

CONTRACTOR STAGING/STORAGE

AREA, 300 SF

CONTRACTOR SITE

ACCESS ROUTE

PARKING

PARKING

LOADING DOCK

'-0

30'-0"

EXISTING

STAIRWELL

10' MIN.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

AREA B

AREA A

AREA C

A1A2

C1C2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :3

P

M

AS100

ARCHITECTURAL SITE PLAN

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS L. FALK

1" = 50'-0"

ARCHITECTURAL SITE PLAN

Revisions: Date: Expires 6.30.16Expires: 6/30/18

/20

/17

A A

B B

C C

D D

E E

F F

G G

H H

J J

K K

L L

M M

N N

O O

P P

Q Q

R R

S S 19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"

19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

MATCHLINE

FOR CONTINUATION SEE: 1/A-101C1

MATCHLINE

FOR CONTINUATION SEE: 1/A-101D

MATCHLINE

FOR CONTINUATION SEE: 1/A-101D

MATCHLINE

FOR CONTINUATION SEE: 1/A-101A1

MATCHLINE

FOR CONTINUATION SEE: 1/A-101C2

MATCHLINE

FOR CONTINUATION SEE: 1/A-101B

MATCHLINE

FOR CONTINUATION SEE: 1/A-101B

MATCHLINE

FOR CONTINUATION SEE: 1/A-101A2

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

E

/A

-1 A

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

-1 A

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

-1 C

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

-1 C

1 1

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 D

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 B

MEDICAL ADMIN PATIENT EDUCATION PRIMARY CARE ADMIN FISCAL

AMBULATORY CARE SERVICE-SPECIALTY CARE

AMBULATORY CARE SERVICE - ER

AMBULATORY CARE SERVICE-

SPECIALTY CARE

CANTEEN

AMBULATORY CARE SERVICE -

PRIMARY CARE

REHAB MEDICINE

AMBULATORY CARE SERVICE-

SURGICAL CLINIC

AMBULATORY CARE SERVICE-

WOMEN'S HEALTH

CARDIOLOGY

VETERANS ASSISTANCE/SERVICE

ORGANIZATION

PATHOLOGY AND LABORATORY

PHARMACY - OUTPATIENT

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

AREA B

A1A2

C1C2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :1

P

M

A-101

ARCHITECTURAL PLAN - FIRST FLOOR

COMPOSITE

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

3/64" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO AREA PLANS FOR EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

B

C

D

E

F

23456789

P-2P-2 WCF

P-66DP-66DP-66D

P-66DP-66DP-66D

P-2P-2P-2P-2 WCF

P-91

P-91

P-91

P-2P-66D

P-2 WCF

P-2 WCF

FL -110FL -110FL -110FL -110

P-66DP-66D

P-2

P-2

P-91

P-66D

P-92WCF

P-66D

P-66D

P-7P-69A

P-7

P-7P-7P-7

P-2

P-2

FL -110

P-14C

P-7

P-7

P-7 P-7P-7P-7P-7

P-7

P-7

P-7 P-7

P-7

P-7

P-7

P-66D

P-66D

P-2

P-2

P-7P-7P-7P-7

P-7

P-66D

P-2

T-1G

P-14C

P-7

P-7

P-7

P-7

P-7

P-7

P-7

P-66D P-2

P-2

P-2

P-2 WCF

P-66D

P-66D

P-66D

P-66 WCL

P-92WCF

2.1

B.1

3.13.24.25.17.19.19.29.25

D.1

D.2

E.1

E.2

'-0

9'

-0

2' -6

'-0

'-0

5'

-6

'-6

'-0

5' -0

'-0

4.1X.1X.2X.3X.4X.5X.6

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

-1 A

MATCHLINE

FOR CONTINUATION SEE: 1/A-101B

2'-6" 7'-0" 6'-4" 9'-8" 17'-0" 1'-4"2'-0" 8'-8" 3'-6" 10'-0" 3'-6" 6'-6" 18'-0" 25'-0" 27'-0" 22'-6" 3'-6" 22'-6" 6'-7" 9'-8" 1'-9" 6'-0" 9'-0"

AMBULATORY CARE SERVICE-SPECIALTY CARE

AMBULATORY CARE SERVICE - ER

P-66D

P-2

P-7 P-7

P-7P-7P-7

P-7

P-7

FL -110 FL -110

FL -110

P-7

P-7 P-7

P-7

P-7

FL -110

FL -110

P-7

FL -110 FL -110 FL -110

FL -110

FL -110

P-7

P-7P-7

P-7 P-7 P-7

P-7

P-7

P-7

P-7

P-7

FL -110

FL -110

FL -110

P-7

P-7

P-7

P-2

P-2P-7

P-7 P-7 P-7

E1001E1001

1C0021C002

1C0081C008

1C0091C009

1C0101C010

1C0111C011

1C0121C012 1C0141C014 1C0151C015 1C0161C016 1C0171C017

1C0181C0181C0291C0291C0281C0281C0271C0271C0261C026

1C0251C025

1C0241C024

1C0231C023 1C0221C022 1C0211C021

1C0201C020

1C0191C019

1B0171B017

1C0011C001 1B0181B018

1B0191B019

1B0071B007

1B0081B008

1B0091B009

1B0101B0101B0111B0111B0121B0121B0131B0131B0141B0141B0151B0151B0161B016

1B0201B020 1B0211B021

1B0221B022

1B0231B023

1B0241B024

1B0251B0251B0261B026 1B0271B027

1B0281B028

1B0011B001 1B0021B002 1B0031B003 1B0041B004 1B0051B005 1B0061B006

1A0011A001 1A0021A002 1A0031A003 1A0041A004 1A0051A005 1A0061A006

1A0071A007

1A0081A008

1A0091A009

1A0101A0101A0111A0111A0121A0121A0131A0131A0141A0141A0151A0151A0161A016

1A0181A018 1A0191A019 1A0201A020

1A0211A021

1A0221A022

1A0231A023

1A0241A024

1A0251A0251A0261A0261A0271A027

1C0031C0031C0041C0041C0051C0051C0061C0061C0071C007

A1003A1003

A1004A1004

A1005A1005 A1006A1006

A1009A1009

A1012A1012

A1013A1013A1014A1014A1015A1015

A1023A1023

A1018A1018A1019A1019A1020A1020

A1021A1021

A1022A1022

A1010A1010

A1024A1024

1C031B1C031B1C031C1C031C1C031E1C031E

1C031F1C031F

1C031G1C031G

1C031H1C031H

1C0311C031

1C032A1C032A 1C032B1C032B

1C032C1C032C1C032D1C032D

1C032G1C032G

1C032G11C032G1 1C0341C034

E1000E1000 E1002E1002 E1003E1003 E1004E1004 E1005E1005 E1006E1006

10051005

10061006

10071007

1007A1007A

1007B1007B

A1002A1002

A1003A1003

A1004A1004

1C130A1C130A

A1005A1005

A1007A1007

P-7

16111611A1018A1018

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

A1

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :1

P

M

A-101A1

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

A1

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1

Revisions: Date: Expires 6.30.16Expires: 6/30/18

B

C

D

E

F

1112 1013141516

P-7P-7P-7P-7P-7

P-7

P-7P-7

P-7

P-7

P-7

P-7

P-7

P-7

P-66 WCL

P-66D

P-66D

P-66 WCL

P-66D

P-66D

P-66D

P-66 WCL

P-66 WCL

P-2 WCF

P-2

P-2

P-2 WCF

P-2

P-2

P-2

P-2

P-2 WCF

P-2 WCF

P-2 WCF

P-14C

P-14C

P-91

P-91

P-7

P-66D P-66 WCL

B.1

9.39.411.113.314.116.1

D.1

D.2

E.1

E.2

X.7 X.613.113.213.414.2 X.10 X.9 X.8

P-7P-7P-7P-7P-7P-7

2'-6" 18'-0" 10'-2" 19'-4" 22'-6" 9'-9" 17'-3" 4'-0" 11'-0" 10'-0" 18'-0" 6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6"

MEDICAL ADMIN PATIENT EDUCATION PRIMARY CARE ADMIN FISCAL

AMBULATORY CARE SERVICE-

SPECIALTY CARE

AMBULATORY CARE SERVICE-

WOMEN'S HEALTH

CARDIOLOGY

P-7 P-2

FL -110 P-7

FL -110 FL -110 FL -110 FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110 FL -110

FL -110

FL -110

FL -110

P-7

P-7

P-7

P-2

P-2

P-92W

P-92W

P-66 WCL

P-7

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110

FL -110FL -110

16011601

1601E1601E

1601A1601A

1601B1601B 1601C1601C 1601D1601D

1603B1603B

1602A1602A

16021602 16031603

1603A1603A

1605A1605A

16911691

16861686

16881688

16851685

16871687 16791679 16811681 16821682 16831683 16841684

16771677

16751675

16741674

16731673

16761676

16801680

16871687

16681668

1690169016721672

16711671

16701670

16691669 16681668 16671667 16661666 16651665 16641664 16631663

1611D1611D 2VE072VE071612P1612P1612O1612O1612N1612N1612M1612M

1612L1612L

1612K1612K

1612J1612J

1612I1612I 1612F1612F 1612F1612F

1612D1612D 1612C1612C 1612A1612A

1611C1611C

1612S1612S

1612G1612G1612H1612H

1612Q1612Q

1612R1612R

16091609

1609B1609B

16101610

A1009A1009

1609160916081608

1670D1670D1607C1607C1607A1607A

16071607 1607B1607B

1607E1607E

1606160616051605

1605B1605B

16041604

W1010W1010

W1011W1011

W1012W1012

W1013W1013

W1014W1014

W1015W1015 W1017W1017 W1018W1018 W1019W1019

16251625

16241624

16301630

W1005W1005 W1004W1004

W1006W1006W1007W1007

W1008W1008

W1001W1001

W1002W1002

W1003W1003 16931693 16921692 16261626

16271627

16281628

2" FD-C

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

A2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :1

P

M

A-101A2

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

A2

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2

Revisions: Date: Expires 6.30.16Expires: 6/30/18

G

23456789

H

J

K

L

M

P-7

P-7

P-2

P-7

P-92WCF

P-14C

P-2

P-66D

P-7D

P-7D

P-7D

P-2

P-66D

P-112

P-7

P-2 P-66D

P-7

P-7D

M20A-48

P-66 WCL

P-2 WCF

P-66 WCL

P-2 WCF

P-2

P-2

P-112

M21-24

M21-24

M21A-24

P-66DP-66DP-66D

P-66DP-66D

P-92WCF

M22-32

P-112

2.13.13.24.25.17.19.19.29.25

G.1

J.1

J.2

J.3

J.4

L.1

6' -6

3'

-6

'-0

3'

-6

8' -8

2'

-0

1' -4

'-0

2' -0

3'

-8

2"

'-2

8' -4

5'

-8

'-0

1'

-4

2' -0

8'

-8

3' -6

'-0

3' -6

6'

-6

4.1X.1X.2X.3X.4X.5

X.A

X.B

X.C

X.D

X.E

X.F

X.G

X.H

X.J

X.K

J.2.1

X.6

MATCHLINE

FOR CONTINUATION SEE: 1/A-101C1

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 D

AMBULATORY CARE SERVICE - ER

AMBULATORY CARE SERVICE -

PRIMARY CARE

PHARMACY - OUTPATIENT

PATHOLOGY AND LABORATORY

P-7

P-7

2" FD-C

P-7

P-66D

P-66D

P-7

P-7

P-7

P-7

FL -110

P-2

P-2

FL -110

2" FD-C

2" FD-C

P-2

P-7

P-7

P-7 P-7P-2 P-2

K-144D

11341134 11351135 11371137

11401140

11361136

11281128 11311131

11321132

11381138

11301130 11291129 11271127 11261126 11241124

11231123

11221122

12011201

1200A1200A

1200B1200B

12001200

E1020E1020

12161216

122112211220122012221222

1118111811191119

12191219

1213A1213A

12061206 12171217

12241224

12091209

E1021CE1021C

E1008E1008

E1018E1018E1019E1019

12131213

1213A1213A

12121212

1224A1224A

1213D1213D

12041204

12051205

12081208

1213C1213C

1210A1210A

12031203

1121B1121B

11201120

E1013E1013

E1020E1020

E1016BE1016B

12181218

1214A1214A

12021202

12501250 125112511252125212341234 12721272 1249124912481248124712471231A1231A1274E1274E12791279

E1012E1012

1C031D1C031D 1C032C1C032C1C032D1C032D

E1009E1009E1010E1010

E1011E1011

E1014E1014

E1016CE1016C

E1016AE1016A

E1021CE1021C

E1125E1125

E1125BE1125B

E1024E1024

E1003E1003E1004E1004

E1025E1025

E1009E1009

12141214

E1008E1008

12251225

1136A1136A

1136B1136B

1210B1210B

1214B1214B

E1001E1001

12071207

P-7

P-2

P-14C

P-14C

FL -110

FL -110

P-92WCF

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

AREA B

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :2

P

M

A-101B

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

B

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA B

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-000 - GENERAL COVER SHEET AND DRAWING INDEX
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - AS100 - Architectural Site Plan
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.