About this file

36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 3 Architecture A-101C1 TO A-105D.pdf

View the file

Other files

File Type Posted
36C25818B0332-0001002.pdf PDF
36C25818B0332-0001004.pdf PDF
36C25818B0332-0001000.docx DOCX document
36C25818B0332-0001001.docx DOCX document
36C25818B0332-0001003.pdf PDF
36C25818B0332-026.docx DOCX document
36C25818B0332-052.docx DOCX document
36C25818B0332-043.pdf PDF
36C25818B0332-033.docx DOCX document
36C25818B0332-036.docx DOCX document
36C25818B0332-055.docx DOCX document
36C25818B0332-023.docx DOCX document
36C25818B0332-041.docx DOCX document
36C25818B0332-058.docx DOCX document
36C25818B0332-053.docx DOCX document
36C25818B0332-057.docx DOCX document
36C25818B0332-025.docx DOCX document
36C25818B0332-040.docx DOCX document
36C25818B0332-048.pdf PDF
36C25818B0332-056.docx DOCX document
36C25818B0332-051.pdf PDF
36C25818B0332-054.docx DOCX document
36C25818B0332-044.pdf PDF
36C25818B0332-049.pdf PDF
36C25818B0332-059.pdf PDF
36C25818B0332-047.pdf PDF
36C25818B0332-024.docx DOCX document
36C25818B0332-030.docx DOCX document
36C25818B0332-029.docx DOCX document
36C25818B0332-032.docx DOCX document
36C25818B0332-050.pdf PDF
36C25818B0332-022.docx DOCX document
36C25818B0332-037.docx DOCX document
36C25818B0332-060.xls XLS spreadsheet
36C25818B0332-027.docx DOCX document
36C25818B0332-031.docx DOCX document
36C25818B0332-039.docx DOCX document
36C25818B0332-035.docx DOCX document
36C25818B0332-034.docx DOCX document
36C25818B0332-028.docx DOCX document
36C25818B0332-042.pdf PDF
36C25818B0332-038.docx DOCX document
36C25818B0332-046.pdf PDF
36C25818B0332-000.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 22--DRAWINGS 3 Architecture A-101C1

TO A-105D

Drawings

ARCHITECTRUE

PAGES

A101C1-A105D

2691-17-104WL

RETROFIT SEWER SYSTEM B500 1ST 5TH

6TH FLOOR

23456789

N

O

P

Q

R

S

T-22H

P-66D

P-66 WCL

P-66 WCL

P-66D

P-2 WCF

P-91A

P-2 WCF

P-2

P-2P-2

P-2

P-66D

P-66D

P-66 WCL

P-92WCF

M50-32

M21-18 M20-48

M20-48

M20-48

M20-48

M20-24M20-24

M20-24 M20-24

P-112

M20-24 M20A-24

M20-36

VS-611

P-112

P-7 P-7

M20-36

M20A-24

M21A-18

M21A-24

M20-36

M20-24 M20-48

M20-48

M20-32 M22-32

M20-24

M20A-24

M20A-24

M20-36

M20-36

M20-36

P-14C

P-92WCF

P-2

P-66D P-2 WCF

P-2

P-66D

P-66 WCL

P-2 WCF

P-66D

P-66 WCL

P-2

P-2

P-66D

M20-30

M20-36

2" FD-M

P-92WCF

2.13.13.24.25.17.19.19.29.25

N.2

N.4

N.7

O.1

Q.1

4.1X.1X.2X.3X.4X.5X.6

O.2

N.3

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

E

/A

-1 C

MATCHLINE

FOR CONTINUATION SEE: 1/A-101B

2'-6" 7'-0" 6'-4" 9'-8" 17'-0" 1'-4"2'-0" 8'-8" 3'-6" 10'-0" 3'-6" 6'-6" 18'-0" 25'-0" 27'-0" 22'-6" 3'-6" 22'-6" 6'-7" 9'-8" 1'-9" 6'-0" 9'-0"

'-6

1'

-6

4' -0

'-5

3' -7

'-6

'-9

'-9

'-0

2'

-6

9' -0

'-0

REHAB MEDICINE

PATHOLOGY AND LABORATORY

P-48

P-2

P-7

P-7

P-7

FL -110

FL -110

FL -110

FL -110

M20-36

M20-36

FL -110

P-91

12501250

12511251

12521252

12531253

12541254

12551255

12711271

12341234 12721272 1249124912481248

12461246

12471247

12311231

12751275

1231A1231A1274E1274E

12561256

12571257

12581258

12591259

12611261

12621262

12631263

12641264

12651265126612661267126712681268126912691270127012411241

1243B1243B

12441244

12451245

12421242

12731273

12771277

12781278

12791279

12821282

1281C1281C

1281A1281A

1281F1281F 1281E1281E

1281D1281D

1281C1281C

12981298

12861286

12871287

12881288

12891289

12901290129112911293129312941294

12951295

12961296 12971297

12851285

12991299

13001300

1300A1300A

1300B1300B

1300C1300C

1300D1300D

1289A1289A

1275A1275A

1275A1275A 1275B1275B 1275C1275C

1281B1281B

1274A1274A

12831283

12921292

1287A1287A

1270A1270A

12811281

1299A1299A

1299B1299B

1299C1299C

ELEV.ELEV.

12601260

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

C1

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :2

P

M

A-101C1

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

C1

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1

Revisions: Date: Expires 6.30.16Expires: 6/30/18

/20

/17

1112 10

O

P

Q

13141516

R

S

P-66D

P-66 WCL

P-66D

P-66D

P-66 WCL P-91

P-2

P-2

P-2 WCF P-2 WCF

P-2

P-2

P-14C

P-2 WCF

K-144

K-144D P-66

P-92W

P-2 P-2

P-2

P-91

P-66D

P-66D

P-66D

P-66D

P-91

P-2 WCF

P-2 WCF

P-2

P-66DP-66D

P-66D P-66D P-2

P-14C

P-92WCF

P-58 P-58

P-17

P-7

T-1L

P-92WCF

P-2

P-92WCF

9.39.411.113.314.116.1

N.2

N.4

N.7

O.1

Q.1

X.7 X.6

O.2

13.113.213.4

N.3

14.2 X.10 X.9 X.8

MATCHLINE

FOR CONTINUATION SEE: 1/A-101D

M A

T C

H L

IN

E F

O R

C O

N T

I N U

A T

IO

N

S E

-1 C

2'-6" 18'-0" 10'-2" 19'-4" 22'-6" 9'-9" 17'-3" 4'-0" 11'-0" 10'-0" 18'-0" 6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6"

'-6

1'

-6

4' -0

'-5

3' -7

'-6

'-9

'-9

'-0

2'

-6

9' -0

'-0

CANTEEN

REHAB MEDICINE

REHAB MEDICINE

P-7P-7 P-7

P-7

P-91

P-7 P-7

P-7

P-7

P-7P-7

P-7

P-7

P-7

2" FD-C

P-7

14601460

14181418 14191419

14201420 14211421

14221422

14231423

14251425

14261426 14271427

14321432

14361436

14371437

14381438

1439143914401440

1436A1436A

14411441144214421443144314441444

14461446

14471447

14481448

14491449

14501450

14511451

14531453

1453a1453a1453B1453B

1453A1453A

14541454

1438A1438A

14591459

1459B1459B

1459C1459C

1459A1459A

14151415

1416A1416A

14161416

14551455

14561456

14571457 1455C1455C

14611461

14621462

14631463

14641464

14651465

14661466

14671467

1460B1460B

1460C1460C

1460D1460D

1460E1460E

1554A1554A

1455A1455A

1446A1446A

1455B1455B

14281428

14291429

14341434

14351435

12811281

P-66

2" FD-C 2" FD-C

2" FD-C

2" FD-C

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

C2

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :3

P

M

A-101C2

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

C2

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2

Revisions: Date: Expires 6.30.16Expires: 6/30/18

G

H

J

K

L

M

131415161718

P-66D P-66 WCL

P-2 WCF

P-91

P-2

P-66D

P-2 WCF

P-66D

P-91

P-2

P-66D

P-7P-7P-7

P-7

P-66 WCL

P-66D

P-2 WCF

P-66 WCLP-66D

P-2 WCF

P-91 P-2

P-2 WCF

P-66DP-66 WCL

P-66DP-66DP-66DP-66 WCLP-66 WCLP-97FP-66D

P-2P-2P-2P-2 WCFP-2 WCFP-2P-2

P-91

P-91

P-92WCF

P-14C

9.39.411.113.314.116.1

G.1

J.1

J.2

J.3

J.4

L.1

X.A

X.B

X.C

X.D

X.E

X.F

X.G

X.H

X.J

X.K

J.2.1

X.7 X.613.113.213.414.2 X.10 X.9 X.8

6' -6

3'

-6

'-0

3'

-6

8' -8

2'

-0

1' -4

'-0

2' -0

3'

-8

2"

'-2

8' -4

5'

-8

'-0

1'

-4

2' -0

8'

-8

3' -6

'-0

3' -6

6'

-6

19'-0" 9'-0" 2'-6" 18'-0" 10'-2" 19'-4" 22'-6" 9'-9" 17'-3" 4'-0" 11'-0" 10'-0" 18'-0" 6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6"

MATCHLINE

FOR CONTINUATION SEE: 1/A-101C2

MATCHLINE

FOR CONTINUATION SEE: 1/A-101A2

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 B

AMBULATORY CARE SERVICE-

SPECIALTY CARE

CANTEEN

REHAB MEDICINE

AMBULATORY CARE SERVICE-

SURGICAL CLINIC

VETERANS ASSISTANCE/SERVICE

ORGANIZATION

P-7

P-7 P-7P-7

P-7

P-7

P-7 P-7

P-7

P-7

P-7

P-7

P-7

P-7

P-7P-7

P-7

P-7

P-7 P-2

P-7

P-7P-7

P-7

P-7

P-7

2" FD-C

2" FD-C

161516151616161616171617

16181618

16191619 16201620

16141614

16211621

16231623

16431643

1652B1652B 16531653

165416541655165516561656

1669A1669A 16581658 16591659 16601660 16611661 16621662

16321632

16331633

16341634 16351635

16361636 16371637

16381638

16391639

16401640

16411641

16421642

1643A1643A

1644A1644A1645164516461646

16471647

16481648

1631J1631J

1649164916511651

14601460

14051405

14041404

14021402

14071407

1407A1407A

14091409

14131413

1413B1413B

14121412

1412B1412B

1647A1647A1647B1647B

1643B1643B

16441644

1406A1406A

1614A1614A

16241624

16631663166416641665166516661666166716671668166816691669

16951695W1016W1016

16521652 1653A1653A

16501650

2" FD-C

2" FD-C

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

ELEVATOR ELEVATOR ELEVATOR

ELEVATOR ELEVATOR ELEVATOR

= MEDICAL ADMIN

DEPARTMENT NAMEPATTERN

LEGEND

= PATIENT EDUCATION

= PRIMARY CARE ADMIN

= AMBULATORY CARE

SERVICE - SPECIALTY CARE

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= AMBULATORY CARE

SERVICE - PRIMARY CARE

= CANTEEN

= REHAB MEDICINE

= COMMON SPACE, LOBBY, ETC.

= AMBULATORY CARE

SERVICE - SURGICAL CLINIC

= AMBULATORY CARE

SERVICE - WOMEN'S HEALTH

= CARDIOLOGY

= VETERANS ASSISTANCE/

SERVICE ORGANIZATION

= PATHOLOGY AND

LABORATORY

= PHARMACY-OUTPATIENT

= AMBULATORY CARE

SERVICE - ER

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :3

P

M

A-101D

ARCHITECTURAL PLAN - FIRST FLOOR - AREA

D

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - AREA D

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

A A

B B

C C

D D

E E

F F

G G

H H

J J

K K

L L

M M

N N

O O

P P

Q Q

R R

S S

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-6

'-0

'-0

'-0

'-0

'-6

'-0

19'-0" 11'-6" 18'-0" 52'-0" 52'-0" 18'-0" 23'-6" 12'-0" 80'-0" 12'-0" 23'-6" 18'-0" 52'-0" 48'-6" 18'-0" 15'-0" 19'-0"

MATCHLINE

FOR CONTINUATION SEE: 1/A-105B

MATCHLINE

FOR CONTINUATION SEE: 1/A-105D

MATCHLINE

FOR CONTINUATION SEE: 1/A-105A

MATCHLINE

FOR CONTINUATION SEE: 1/A-105A

MATCHLINE

FOR CONTINUATION SEE: 1/A-105C

MATCHLINE

FOR CONTINUATION SEE: 1/A-105C

MATCHLINE

FOR CONTINUATION SEE: 1/A-105B

MATCHLINE

FOR CONTINUATION SEE: 1/A-105D

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 B

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 D

MEDICAL BEDS - MICU/CCU/SICU

SURGICAL OR

SURGERY-CLINICAL PROCEDURE CENTER

SURGICAL BEDS - PCU

MEDS/SURG SWING SPACE

MEDS/SURG SWING SPACE

= MEDICAL BEDS -

MICU/CCU/SICU

DEPARTMENT NAMEPATTERN

LEGEND

= SURGERY-CLINICAL

PROCEDURE CENTER

= SURGICAL BEDS - PCU

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= MEDS/SURG SWING SPACE

= SURGICAL OR

= RADIOLOGY IMAGING

= COMMON SPACE, LOBBY, ETC.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

AREA B

AREA A

AREA C

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :4

P

M

A-105

ARCHITECTURAL PLAN - FIFTH FLOOR -

COMPOSITE

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

3/64" = 1'-0"

ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO AREA PLANS FOR EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

A

B

C

D

E

F

7891112 10

P-2

P-14C

P-7

P-7

P-7

P-7 P-2

P-14C

P-7

P-2

P-2 T-S4

B.1

7.19.19.29.259.39.411.1

D.1

D.2

E.1

E.2

X.1X.2X.3X.4X.5X.7 X.6X.10 X.9 X.8

P-7

P-7

'-0

9'

-0

2' -6

'-0

'-0

5'

-6

'-6

'-0

5' -0

'-0

6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6" 2'-6" 7'-0" 6'-4" 9'-8" 17'-0" 1'-4"2'-0" 8'-8" 3'-6" 10'-0" 3'-6" 6'-6"

MATCHLINE

FOR CONTINUATION SEE: 1/A-105B

MATCHLINE

FOR CONTINUATION SEE: 1/A-105D

P-7

P-7 P-7

P-7

P-7

P-7

SURGICAL OR

50065006

50035003

CN 5-3CN 5-3

50085008

50135013

50155015 50145014

CN 5-11CN 5-11

50115011

50125012

50105010

CN 5-2CN 5-2

5016A5016A

ELEV.ELEV.

50055005

50045004

50375037

CN 5-13CN 5-13

5036503650165016

50345034

503250325031503150285028

50185018

50205020

50195019

50175017 50355035

50215021

50235023

50245024

50255025

50265026

50275027

50295029

CN 5-10CN 5-10

50335033

CN 5-12CN 5-12

50385038

50395039

504050405040A5040A

5039A5039A

5039B5039B

CN 5-4CN 5-4

CN 5-5CN 5-5

CN 5-6CN 5-6

T-S4

T-S4

T-S4

P-66D

P-66D

P-66D

T-S4

T-S4

T-S4

T-S4

P-91

P-91

P-2B

P-2B

2" FD-C

2" FD-C

2" FD-C

P-92WCF

P-92WCF

P-92WCF

P-92WCF

P-92WCFP-92WCF

P-92WCF

P-92WCF

P-92WCF

P-92WCF

P-92WCF

P-92WCF

T-S4 T-S4

T-S4

T-S4T-S4

T-S4

P-92WCF P-92WCF

T-S4

P-92WCF P-92WCF

13131414

= MEDICAL BEDS -

MICU/CCU/SICU

DEPARTMENT NAMEPATTERN

LEGEND

= SURGERY-CLINICAL

PROCEDURE CENTER

= SURGICAL BEDS - PCU

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= MEDS/SURG SWING SPACE

= SURGICAL OR

= RADIOLOGY IMAGING

= COMMON SPACE, LOBBY, ETC.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

AREA A

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :4

P

M

A-105A

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

KEYNOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

Revisions: Date: Expires 6.30.16Expires: 6/30/18

23456789

H

J

K

L

M

P-14C

P33

P33

P33P-14C

P33

P33

P33

P-7

P-7

P-2P-2P-2

P-7

P-69A

P-2

P-2

P-2P-14C

P-7

P-2 P-2 WCF

P-66 WCLP-66DP-66D

P-91A

P-2 WCF

P-2

P-2

P-66 WCL

P-66D

P-66D

P-14C

2.13.13.24.25.17.19.19.29.25

G.1

J.1

J.2

J.3

J.4

L.1

4.1X.1X.2X.3X.4X.5

X.A

X.B

X.C

X.D

X.E

X.F

X.G

X.H

X.J

X.K

J.2.1

X.6

6' -6

3'

-6

'-0

3'

-6

8' -8

2'

-0

1' -4

'-0

2' -0

3'

-8

2"

'-2

8' -4

5'

-8

'-0

1'

-4

2' -0

8'

-8

3' -6

'-0

3' -6

6'

-6

2" FD-C

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 D

MATCHLINE

FOR CONTINUATION SEE: 1/A-105A

MATCHLINE

FOR CONTINUATION SEE: 1/A-105C

2'-6" 7'-0" 6'-4" 9'-8" 17'-0" 1'-4"2'-0" 8'-8" 3'-6" 10'-0" 3'-6" 6'-6" 18'-0" 25'-0" 27'-0" 22'-6" 3'-6" 22'-6" 6'-7" 9'-8" 1'-9" 6'-0" 9'-0" 19'-0"

SURGERY-CLINICAL PROCEDURE CENTER RADIOLOGY IMAGING

P-2

52485248

522052205218A5218A

52195219

50755075

50765076

50775077

52185218

52215221

52225222

52235223

52245224

52505250

5248A5248A

52475247

5215B5215B

52365236 52405240

52115211

52125212

52145214

52695269

52005200

54015401

540254025403540354045404

52425242

54005400

52435243

5269A5269A

52495249 52485248

5250A5250A

52515251 5251A5251A

CE 5-10CE 5-10

5254525452555255

52565256

52285228

CE 5-15CE 5-15

CE 5-8CE 5-8

CE 5-17CE 5-17

52635263

CE 5-6CE 5-6

5222A5222A CE 5-13CE 5-13

CE 5-18CE 5-18CE 5-9CE 5-9

CE 5-11CE 5-11

52255225

52265226

52275227

5217521752165216

CE 5-5ACE 5-5A

52445244

52455245

52465246

52575257

52295229

52585258

5259525952605260

52615261

52625262

5232523252335233523452345235523552415241

CE 5-21CE 5-2152645264

52665266

52705270

52655265

52675267

52685268

5239A5239A

5237523752385238

52415241

ELEV.ELEV.

52035203

52045204

5215A5215A

CE 5-5CE 5-5

CE 5-14CE 5-14

CE 5-7CE 5-7

CE 5-16CE 5-16

52135213

CE 5-3BCE 5-3B

CE 5-3CE 5-3

5VSH75VSH7

ELEV.ELEV.

5075A5075A

P-7

P-7

P-7

T-S4

P-7P-7

P-2P-2

P-7

P-7

P-7

P-7

P-7

P-7

P-7

P-7

P-7 P-7

P-7

T-S4

T-S4

T-S4

T-S4 T-S4 T-S4

T-S4

T-S4

P-7

P-2

P-2

P-2

P-2

P-2

P-2

P-2

P33P33

P33

P33

P33

P33

P33

P33

P33

P33

P33

P33

P33

P-66 WCL

6VSH136VSH13

= MEDICAL BEDS -

MICU/CCU/SICU

DEPARTMENT NAMEPATTERN

LEGEND

= SURGERY-CLINICAL

PROCEDURE CENTER

= SURGICAL BEDS - PCU

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= MEDS/SURG SWING SPACE

= SURGICAL OR

= RADIOLOGY IMAGING

= COMMON SPACE, LOBBY, ETC.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

AREA B

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :5

P

M

A-105B

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

7891112 10

O

P

Q

R

S

P-7D

P-7D P-7D

P-2

P-7

P-92WCF

P-7

2" FD-C

T-S4

P-2B

P-2B

P-2B

T-S4

P-92WCF

T-S4

T-S4 P-2B

P-14C

P-2B

P-66D

T-S4

P-7

P-7P-69A

T-S4 2" FD-C

2" FD-C

2" FD-C

P-2B

P-7

P-2B

T-S4 2" FD-C

P-7

P-7P-2

P-66D

T-S4

P-2B

P-14C

T-S4

2" FD-C

2" FD-C

P-2B

T-S4

P-2B P-2B

T-S4

2" FD-C

2" FD-C

2" FD-C

P-7 P-2

P-2

P-2

7.19.19.29.259.39.411.1

N.2

N.4

N.7

O.1

Q.1

X.1X.2X.3X.4X.5X.7 X.6

O.2

N.3

X.10 X.9 X.8

'-6

1'

-6

4' -0

'-5

3' -7

'-6

'-9

'-9

'-0

2'

-6

9' -0

'-0

MATCHLINE

FOR CONTINUATION SEE: 1/A-105B

MATCHLINE

FOR CONTINUATION SEE: 1/A-105D

2 2

2 2

P-2B

P-66D

P-7D

P-7

P-7P-69A

P-7

P-7 P-69A

SURGICAL BEDS - PCU

MEDS/SURG SWING SPACE

MEDS/SURG SWING SPACE

54055405

54075407 54085408

54095409

5409A5409A

5409B5409B

5409C5409C

5409D5409D

5409E5409E

5409F5409F5409G5409G

54545454

54115411

54125412

5454A5454A

54145414

54155415

54165416

54175417

54185418

54195419

54205420 54215421

54225422

54235423

54245424

54255425

54265426 54275427

54285428

54295429

54305430

54325432

5433543354345434

5434A5434A5434B5434B

5434C5434C

5434D5434D54355435

54365436

54375437

54385438

54395439

54405440

54415441

54425442

54435443

54445444

54455445 54465446

54475447

54485448

54495449

54505450

54515451

54525452

54555455

54105410

CS 5-2CS 5-2

54655465

54665466

54675467

54685468

54735473 54745474 5409H5409H

54065406

5VE45VE4

5421A5421A

5420A5420A

5422B5422B

5426A5426A

5423A5423A

5430B5430B

CS 5-11CS 5-11

5436B5436B

5446A5446A

5444B5444B

5443A5443A

5440A5440A

CS 5-8CS 5-8

5454B5454B

54535453

54575457 54565456

54585458

5459545954605460546154615462546254635463

54645464

54755475

54765476

54725472

5471547154695469

54705470

CS 5-3CS 5-3 CS 5-9CS 5-9

P-7

T-S4

T-S4

P-66D

T-S4

T-S4

T-S4

P-7

P-2B

P-7

P-7

P-7 T-S4 T-S4

P-7P-2B

2" FD-C

P-14C

P-2BP-2B

P-7DP-7DP-7D P-7D

P-2BP-2B

P-7D

P-2B

P-7D P-2B

P-7D

P-2B

T-18D

T-18D

P-2B

P-2B P-7D

P-2B P-7D

99 1010

= MEDICAL BEDS -

MICU/CCU/SICU

DEPARTMENT NAMEPATTERN

LEGEND

= SURGERY-CLINICAL

PROCEDURE CENTER

= SURGICAL BEDS - PCU

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= MEDS/SURG SWING SPACE

= SURGICAL OR

= RADIOLOGY IMAGING

= COMMON SPACE, LOBBY, ETC.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

B500 KEY PLAN

AREA C

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :5

P

M

A-105C

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA

C

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

H

J

K

L

M

131415161718

P-2P-2B

P-2B

P-7

P-2B

P-2B

P-2BP-2B

P-7

P-69A

P-7

P-69A

P-7 P-7

P-2

P-66D

P-2B P-2B

P-2B

P-2B

P-2B

T-S4

P-2B

P-2B

T-S4

P-2BP-2B

P-7 P-7

P-2B

P-46

P-82

M21-24

P-7

P-7

P-69A

P-7

P-2

P-7

P-7 P-7

P-7

P-2B P-82

P-92WCF

9.39.411.113.314.116.1

G.1

J.1

J.2

J.3

J.4

L.1

X.A

X.B

X.C

X.D

X.E

X.F

X.G

X.H

X.J

X.K

J.2.1

X.7 X.613.113.213.414.2 X.10 X.9 X.8

6' -6

3'

-6

'-0

3'

-6

8' -8

2'

-0

1' -4

'-0

2' -0

3'

-8

2"

'-2

8' -4

5'

-8

'-0

1'

-4

2' -0

8'

-8

3' -6

'-0

3' -6

6'

-6

M A

T C

H L

IN

E F

O R

C O

N T

IN

U

A T

IO

N

S E

-1 B

MATCHLINE

FOR CONTINUATION SEE: 1/A-105A

MATCHLINE

FOR CONTINUATION SEE: 1/A-105C

19'-0" 9'-0" 2'-6" 18'-0" 10'-2" 19'-4" 22'-6" 9'-9" 17'-3" 4'-0" 11'-0" 10'-0" 18'-0" 6'-6" 3'-6" 10'-0" 3'-6" 8'-8" 2'-0"1'-4" 22'-6" 8'-6" 6'-6"

MEDICAL BEDS - MICU/CCU/SICU

50015001

50025002

50095009

56125612

56245624

56285628

56435643

56335633

56345634

56355635

563756375638563856395639

56415641 56425642

56465646

56535653

56515651

5655565556545654

56575657 56585658 56595659 56615661

56635663

56645664

56665666

56265626

56685668

56705670

56815681

56715671

56725672

56745674 56755675 56775677

5679567956805680

56895689

56905690

56935693

50025002

5666A5666A

5613561356145614

56005600

56055605

56085608

56065606

56095609 56105610

56165616

56175617

56185618

56215621

56155615

56075607

56045604

56035603 56025602

56015601

5VE35VE3

562056205622562256235623

56365636

56475647

56485648

56495649

56505650

56325632

56305630

56295629

56255625

56605660

56625662

56695669

56735673

56765676

56845684 56855685

568656865687568756885688

56925692

P-7D

P-2B

P-2B

P-7D

P-7D

P-7D

P-7D

P-7D

P-2B

P-2B

P-7D

P-7D

P-7

P-2B P-7

P-7

P-14C

P-2B

P-7

2" FD-C

T-S4

P-2B

P-66 WCL P-66 WCL

P-82

P-66 WCL

P-2BP-2B

P-66 WCL

P-66 WCL

P-2B

P-66 WCLP-66 WCL

P-2B

P-2B

P-2B

P-66 WCL

P-66 WCL

P-2B

P-2B

P-66 WCL

P-66 WCL

P-2B

P-66 WCL

T-S4

T-S4

P-66 WCL

P-66 WCL

P-66 WCL

P-66 WCL

P-66 WCL

T-S4

T-S4

P-66D

P-2B

P-2B

P-2B

P-2B

P-66D

P-66D

P-66D

P-66D

P-66D

P-66D P-66D

P-2BP-2B

P-2B

P-66D

T-S4

P-66D P-66D P-66D

P-2B

T-S4

P-46P-46

P-82

P-82

P-14C

P-14C

T-S4

T-S4

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

ELEVATOR ELEVATOR ELEVATOR

ELEVATOR ELEVATOR ELEVATOR

= MEDICAL BEDS -

MICU/CCU/SICU

DEPARTMENT NAMEPATTERN

LEGEND

= SURGERY-CLINICAL

PROCEDURE CENTER

= SURGICAL BEDS - PCU

= AREA OF WORK, REPLACE WASTE PIPE IN INTERSTITIAL

SPACE BELOW (SEE PLUMBING SHEETS).

= MEDS/SURG SWING SPACE

= SURGICAL OR

= RADIOLOGY IMAGING

= COMMON SPACE, LOBBY, ETC.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION DOCUMENTS

SUBMISSION - ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical:

AREA D

B500 KEY PLAN

35% SCHEMATIC DESIGN SUBMISSION 09/14/2017

65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017

100% CONSTRUCTION DOCUMENTS SUBMISSION - ISSUED FOR CONSTRUCTION

11/01/2017

95% CONSTRUCTION DOCUMENTS - OWNER REVIEW

11/20/2017

B

IM

/6

-1

-1

W

L R e tr o fi t S e w e r

S y s te m B s t, th th

F L /6

-1

-1

W

L V

A G

L A

H C

S -R e tr o fi tS e w e r-

B .r v t

/2

/2

:4 :5

P

M

A-105D

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA

D

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S Engineering

5000 East Spring Street, 8th Floor

Long Beach, CA 90815

(562) 497-2999

Mikhail Fuks, P.E.

RETROFIT SEWER SYSTEM B500

FIRST, FIFTH & SIXTH FLOORS

11301 Wilshire Blvd., Los Angeles, CA 90073

691-17-104WL

B500

NOVEMBER 20, 2017 M. PERKINS K. LUKE

1/8" = 1'-0"

ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND

ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS

TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT

ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN

ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING

SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO

NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS

REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL

PATCH AND PAINT AND RETURN TO MATCH EXISTING CONDITIONS

AND FINISHES.

F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING

DISRUPTIONS TO EXISTING BUILDING OPERATION.

H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO

PREVENT CONTAMINATION FROM SEWAGE SPILLS AND WASTE

MATTER. STATIC-FREE DUST BARRIERS FORMED WITH PLASTIC

SHEETS SHALL BE PROVIDED (USING FACILE OR GRIFFOLYN WITH

FIRE RATING) WITH THE APPROVAL OF THE COR.

I. UNLESS OTHERWISE NOTED, WASTE AND VENT PIPING IS SLOPED

AT 1/4" PER 100' (2%).

J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS

CONTAINING MATERIAL, ALL WORK WITHIN THE AFFECTED AREA

SHALL IMMEDIATELY STOP AND THE CONTRACTOR SHALL NOTIFY

THE COR. NO WORK MAY RESUME WITHOUT COR'S WRITTEN

PERMISSION.

K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING

PIPING AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.

L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN

ACCORDANCE WITH GUIDLINES FOR SEISMIC RESTRAINTS OF

PLUMBING SYSTEMS PUBLISHED BY SMACNA.

M. SEISMIC DESIGN REQUIREMENTS OF THE PROJECT SHALL

CONFORM TO VA PLUMBING AND SEISMIC DESIGN MANUALS, H-18-8.

N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT

PIPING SHALL BE INSTALLED WITH THE MOST CURRENT

REQUIREMENT FOR SEISMIC RESTRAINTS.

O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT

PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05

11, 22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN

MANUAL, 2014 OR MOST CURRENT VERSION.

GENERAL SHEET NOTES

1 REFER TO PLUMBING FIXTURE SHEDULE ON P - 600 SERIES SHEETS FOR

EXISTING PLUMBING FIXTURE TYPES

2 WASTE AND VENT PIPING TO BE REPLACED, BELOW. SEE PLUMBING PLANS.

KEYNOTES

Revisions: Date: Expires 6.30.16Expires: 6/30/18

691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-000 - GENERAL COVER SHEET AND DRAWING INDEX
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D
A-106 - ARCHITECTURAL PLAN - SIXTH FLOOR - COMPOSITE
A-106A - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA A
A-106B - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA B
A-106C - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA C
A-106D - ARCHITECTURAL PLAN - SIXTH FLOOR - AREA D
A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 - ARCHITECTURAL SECTIONS - BUILDING
AS100 - ARCHITECTURAL SITE PLAN
G-000 - GENERAL COVER SHEET AND DRAWING INDEX
G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
P-600 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-601 - PLUMBING FIXTURE SCHEDULES - FIRST FLOOR
P-602 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-603 - PLUMBING FIXTURE SCHEDULES - FIFTH FLOOR
P-604 - PLUMBING FIXTURE SCHEDULES - SIXTH FLOOR AND SUMMARY
691-17-104WL_VAGLAHCS-RetrofitSewer-B500 - Sheet - G-001 - GENERAL NOTES, SYMBOLS AND SCHEDULES
Sheets
A-101 - ARCHITECTURAL PLAN - FIRST FLOOR COMPOSITE
A-101A1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A1
A-101A2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A2
A-101B - ARCHITECTURAL PLAN - FIRST FLOOR - AREA B
A-101C1 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C1
A-101C2 - ARCHITECTURAL PLAN - FIRST FLOOR - AREA C2
A-101D - ARCHITECTURAL PLAN - FIRST FLOOR - AREA D
A-105 - ARCHITECTURAL PLAN - FIFTH FLOOR - COMPOSITE
A-105A - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA A
A-105B - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA B
A-105C - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA C
A-105D - ARCHITECTURAL PLAN - FIFTH FLOOR - AREA D

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.