36C25818B0332-047.pdf
PDF 3 MB Posted
- Attached to
- 36C25818B0332 / 691-18-2-5155-0005 -RETROFIT SEWER SYSTEM BLDG500 (VA-18-00042765) LOS ANGELES, CA.
- Solicitation number
- 36C25818B0332
About this file
36C25818B0332 S02 ATTACHMENT 22--DRAWINGS 5 Plumbing P-001 TO P-105D.pdf
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S02 ATTACHMENT 22--DRAWINGS 5 PLUMMING
Drawings
PLUMMING
PAGES P-001 TO P-105D
691-17-104WL
RETROFIT SEWER SYSTEM B500 1ST 5TH 6TH
FLOOR
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CUBIC FEET PER HOUR
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CFH
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW
MBh
MV
NA
NIC
No. #
N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
255' OF 6" @ 0.15%SLOPE
SLOPE AND LINEAL FOOTAGE
F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.
SAS SASSANITARY MANHOLE
M.H. M.H.(E)
GM
WM
REDUCED PRESSURE BACKFLOW PREVENTER
STORM DRAIN
IRRIGATION
F.H.(E)F.H.
LP
PP
C.O.(E)C.O.
LIGHT POLE
FENCING
POWER POLE
CLEANOUT
THRUST BLOCK
CONSTRUCTION
FIRE HYDRANT
VALVE WITH VALVE BOX
NATURAL GAS
FIRE PROTECTION
COLD WATER SUPPLY
SANITARY SEWER
SASSAS
WATER METER
NATURAL GAS METER
GATE VALVE
VALVE IN RISER
WM
GM
LP
PP
POST INDICATOR VALVE
PIV
PIV
W
F
SD
G
IRR
S EX. S
EX. W
EX. F
EX. G
EX. SD
EX. IRR
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :0
P
M
P-001
PLUMBING LEGEND
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS G.
MCKINLEY
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
NOVEMBER 20, 2017
A
B
C
D
E
F
9 8 7 6 5 4 3
4" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
2" SAN 2" SAN
4" SAN
4" SAN
2" SAN
3" SAN4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
8" SAN
4" SAN
8" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN UP
4" SAN DN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN3" SAN4" SAN
2" SAN
4" SAN
3" SAN
3" SAN
3" SAN
2" SAN
2" SAN
S T
A
IR
CHASE #15
CHASE #16
E -9
.2
D -9
.2
E.1 -9
.2
F-9 .2
B .1
-9 .2
B.1 -9
.1
C -9 C
-8
B.1 -7
.1
B .1
-6
B.1 -5
.1
B .1
-5
B.1 -4
.2
B.1 -2
.1
D -2
.1
D -4
D -4
.2
D -6D
-7 D -8
D -9
D .1
-9 .2
D .1
-9
D .1
-8
D .1
-7 D .1
-6
D .1
-5 .1
D .1
-5 D .1
-4 .2
D .1
-4
D .2
-2 .1
B .1
-4
E -4
.2 E -2
.1 E -5
E -6
E -7
E -9
E -8
E .1
-9
E .1
-8 E .1
-7
E .1
-6
E.1 -5
.1
E .1
-5
E.1 -4
.2
E .1
-4
E.2 -2
.1
F-2 .1
F-4 F-4
.2
F-5
F-5 .1
F-6F-7 F-8
F-9
E -5
.1
D -5
.1
D -5
MATCHLINE
FOR CONTINUATION SEE: 1/P-100B
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
E
/P
-1 A
2" SAN
4" SAN
4" SAN
3" SAN
2" SAN
2" SAN
2" SAN
2" SAN
9.1 7.1
B.1
D.2
E.1
E.2
2.13.13.24.25.19.29.25
D.1
4.1X.1X.2X.3X.4X.5X.6
2" SAN
4" SAN
3" SAN
3" SAN
4" SAN
3" SAN
3" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN 2" SAN
4" SAN
3" SAN
2" SAN
2" SAN
3" SAN
3" SAN
2" SAN
2" SAN
3" SAN
3" SAN
3" SAN
2" SAN 2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN 2" SAN
2" SAN
4" SAN
1 1/2" SAN
4" SAN
1 1/2" SAN
1 1/2" SAN
1 1/2" SAN
2" SAN2" SAN
2" SAN
4" SAN4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN2" SAN
2" SAN
2" SAN
2" SAN
2" AW
2" SAN2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN2" SAN
2" SAN
2" SAN
2" SAN
3" SAN
3" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
3" SAN
3" SAN
4" SAN
4" SAN
4" SAN
4" SAN
6" SAN
2" SAN
1 1/2" SAN
4" SAN4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
4" SAN2" SAN
2" SAN
2" SAN
4" SAN
8" SAN
4" SAN
2" SAN
2" SAN2" SAN
1 2" SAN
2" SAN 4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
3TYP.
TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
A1
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :0
P
M
P-100A1
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA A1
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA A1
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
REPLACEMENT.
C
D
E
F
17 16 15 14 13 12 11 10
10" SAN
8" SAN
8" SAN
6" SAN UP
3" AW UP
S T
A
IR
CHASE #14
CHASE #13
E -9
.3
D -9
.3
E.1 -9
.3
F-9 .3
B.1 -9
.4
D -1
D -1
C -1
C -1
B .1
-1 1.
B .1
-1
B .1
-1 3.
D -1
D -1
D -1
3.
D -1
D -1
4.
B .1
-1 4.
B .1
-1
B .1
-1 6.
D -1
6.
D -1
D .2
-1 6.
E-1
E -1
6.
E .2
-1 6.
F-1 6.
D .1
-1 4.
D .1
-1
D .1
-1 3.
D .1
-1
D .1
-1
D .1
-1
D .1
-1
D .1
-9 .3
E-1
E-1 1E-1
E-1
E -1
3.
E-1
E -1
4.
E .1
-1 4.
E .1
-1
E .1
-1 3.
E .1
-1
E .1
-1
E .1
-1
E .1
-1
F-1
F-1
F-1
F-1
F-1
F-1 4.
D .1
-1
B .1
-1
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
E : 1
/P -1
A
MATCHLINE
FOR CONTINUATION SEE: 1/P-100D
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
B.1
D.2
E.1
E.2
D.1
X.69.313.314.116.1 X.713.113.213.414.2 X.9 X.8
8" SAN
2" SAN
2" SAN2" SAN4" SAN
2" SAN
4" SAN
2" SAN
2" SAN2" SAN2" SAN
2" SAN
2" SAN
2" SAN
3" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN 2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
10" SAN
8" SAN
4" SAN
4" SAN
2" SAN 4" SAN
4" SAN
4" SAN
2" SAN 2" SAN
2" SAN
3" SAN
8" SAN
4" SAN
2" SAN
2" SAN2" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN
3" SAN
3" SAN
4" SAN
2" SAN 2" SAN 2" SAN 2" SAN
3" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
3TYP.
TYP.
TYP.
TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
A2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :0
P
M
P-100A2
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA A2
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA A2
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
G
H
J
K
L
M
9 8 7 6 5 4 3 2 1
3" AW 2" AW3" AW
2" AW
2" AW
3" AW
8" SAN
3" AW
2" AW
3" AW
2" AW
3" AW
2" AW
2" AW
2" AW
2" AW
3" SAN
2" SAN
2" SAN
8" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
8" SAN
2" AW
2" AW
3" AW
2" AW
2" SAN
6" SAN UP
4" SAN UP
6" SAN DN
3" AW UP
3" AW DN
8" SAN
8" SAN
4" SAN UP
4" SAN DN4" SAN UP
4" SAN DN
4" SAN
STAIR #15
STAIR #16
CHASE #4
CHASE #1
CHASE #3
CHASE #2
G -9
.2 G -9
X.3 -X
.A
X.3 -X
.B
G -8
G -7
X.1 -X
.A
G -6
G -5
.1 G -5
G -4
G .1
-2 .1
G -4
.2
X .5
-X .D
X .4
-X .D
X .C
-8
J- X.1
J-
H -7
J-
H -5
.1
J.
2-
5.
J.
2.
1-
J.
2-
X.1
J.
2-
4.
H -4
.1 H -4
H -3
H -2
J-
J-
H -5
X.5 -X
.E
J.
3-
J.
3-
4.
J.
3-
J.
4-
2.
K -4
L-
L-
L.
1-
2.
M -3
M -4
M -4
.1
M -5
.1 M
-6 M
-7
M -8
M -9
X .K
-9
X .J -9
X .4
-X .G
X .H
-8 X .1
-X .H
L-
L-
K -7
K -6
K -5
.1
K -5
K -4
.1
X .5
-X .G
M -9
.2
J.
3-
X .4
-X .F
J-
J-
J-
J.
1-
2.
J.
2-
J.
2-
J.
3-
5.
J.
3-
X .5
-X .F
X.4 -X
.E
M -5
K -3
L-
K -2
H -6
L-
MATCHLINE
FOR CONTINUATION SEE: 1/P-100A1
M A
T C
H L
IN
E F
O R
C O
N T
IN
U
A T
IO
N
S E
E : 1
/P -1
D
MATCHLINE
FOR CONTINUATION SEE: 1/P-100C1
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
4" SAN
2" SAN3" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
S T
A
IR
9.1 7.1 2.13.13.24.25.19.29.25 4.1X.1X.2X.3X.4X.5X.6
G.1
J.1
J.2
J.3
J.4
L.1
X.A
X.B
X.C
X.D
X.E
X.F
X.G
X.H
X.J
X.K
J.2.1
2" SAN
4" SAN
2" SAN4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
3" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN 4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN4" SAN
2" SAN
2" SAN
2" SAN2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" AW
2" AW
2" SAN
2" SAN
4" SAN
2" AW
4" SAN
3" AW
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN2" SAN
4" SAN
4" SAN 3" AW
2" SAN
2" AW
8" SAN
8" SAN
8" SAN
2" SAN
2" SAN
2" SAN
3" SAN
4" SAN
3" AW
H -1
2" SAN
2" SAN
4" SAN
ALL SANITARY
DRAIN PIPING IS
NEW IN THIS AREA
TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
AREA B
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :0
P
M
P-100B
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA B
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA B
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
N
O
P
Q
9 8 7 6 5 4 3 2
R
S
4" AW
2" AW
3" AW
3" AW
3" AW
2" AW
2" AW
2" AW
2" AW
4" AW
4" AW
3" AW
4" AW
4" AW
2" AW
2" SAN
2" SAN
2" SAN
2" SAN
4" AW
3" SAN 3" SAN
4" AW
4" SAN
4" AW
3" AW
3" AW
3" AW
4" AW
4" AW
2" AW
2" AW
3" AW
2" AW
3" AW
3" AW 3" AW 3" AW
2" AW
2" AW 2" AW
2" AW
2" AW
2" AW
2" AW
8" SAN
2" SAN
2" SAN
4" SAN4" SAN
4" SAN
2" AW
8" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3" AW 3" AW 3" AW
3" AW
3" AW
3" AW
2" AW3" AW
3" AW
2" AW
2" AW
3" AW
3" AW
3" AW 3" AW
3" AW
3" AW
2" SAN
2" SAN
4" SAN
4" AW4" SAN
2" SAN
4" AW
4" SAN
4" SAN
3" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" AW
4" SAN UP
6" SAN DN
4" AW DN
4" SAN UP
8" SAN DN
2" AW UP
4" AW DN
2" AW
2" AW
4" SAN
2" AW
2" AW
3" AW
3" AW
3" AW3" AW3" AW3" AW
2" AW
3" AW
2" AW
3" AW
3" AW
3" AW
4" SAN
4" SAN
4" SAN
2" AW
2" AW
4" SAN
4" SAN2" AW
2" AW
2" AW
2" AW
4" SAN
8" SAN
3" AW
3" AW
2" SAN
3" SAN
2" SAN
3" SAN
3" SAN
2" AW
2" AW
3" AW
3" AW
2" SAN
2" SAN
4" AW
4" AW4" AW
2" SAN
3" AW
4" AW
2" SAN
2" SAN
S T
A
IR
CHASE #6
CHASE #5
N .4
-9 .2
N .4
-9 N .4
-8
N .2
-6
N .2
-5 .1
N .2
-5 N .2
-4 .1
N .2
-4
N .2
-3
N .4
-2 .1
N .7
-2 .1
N .7
-4 .2
N .7
-5 .1
N -8
O -8
O -9
O -9
.2
O .1
-9 .2
O .1
-9
O .1
-8
Q -9
.2 Q -9
Q -8
R -8R
-9
Q .1
-5 .1
Q .1
-4 .2
Q .1
-2 .1
O .1
-2 .1
N -9
P -9
.2
P -9
MATCHLINE
FOR CONTINUATION SEE: 1/P-100B
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
-1 C
3" AW
3" AW 3" AW 3" AW
3" AW
3" AW
3" AW
2" SAN
2" AW
9.1 7.1 2.13.13.24.25.19.29.25 4.1X.1X.2X.3X.4X.5X.6
N.2
N.4
N.7
O.1
Q.1
O.2
N.3
2" AW8" SAN
2" SAN
2" SAN
3" AW
3" AW
3" AW3" AW
3" AW
4" AW
4" AW
3" AW
4" SAN
3" AW
4" SAN
4" AW
4" AW
2" AW
2" AW
2" SAN
3" SAN
3" AW4" AW
3" AW
4" SAN
2" AW
2" SAN
S -9
S -8
ALL SANITARY
DRAIN PIPING IS
NEW IN THIS AREA
TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
C1
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :0
P
M
P-100C1
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA C1
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA C1
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600
SERIES FOR FIXTURE AND PIPE SCHEDULES AND A-100
SERIES FOR FIXTURE LOCATIONS.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING
FIXTURE TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
P
Q
17 16 15 14 13 12 11 10
R
S
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN 3" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN4" SAN4" SAN4" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN 4" SAN
4" SAN
4" SAN 4" SAN 4" SAN 4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
6" SAN UP
6" SAN DN
3" AW UP
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN 2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN 4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN UP
6" SAN DN
S T
A
IR
CHASE #7
CHASE #8
N .3
-1 4.
N .3
-1
N .4
-1
O -1
4.
O -1
3.
N .3
-1 3.
N .3
-1
N .4
-1
N .4
-1
O -9
.3
O -1
O .1
-9 .3
O .1
-1
O .1
-1
O -1
O -1
O -1
3.
O -1
Q .1
-1 6.
Q .1
-1 4.
Q .1
-1 3.
Q .1
-1 1.
Q .1
-9 .4
N -1
N -1
N -1
N -1
4.
N -1
P -9
.3
O .2
-1 3.
3 O .2
-1
P-1
O .2
(1
- 2
3/ 8"
)-X .8
P-1
O .2
-1 4.
O .1
-1
Q -1
Q -1
R -1
R -1
S-1
S-1
O .2
-1
N .3
-1
N -1
N -1
3.
M A
T C
H L
IN
E F
O R
C O
N T
I N U
A T
IO
N
S E
E : 1
/P -1
C
MATCHLINE
FOR CONTINUATION SEE: 1/P-100D
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN 4" SAN 4" SAN
4" SAN
2" SAN
2" SAN2" SAN
EXISTING 6" SAN
DN PIPE TO BE
REPLACED WITH
NEW 6" SAN PIPE
NO ACCESS, PIPE
CONDITION NOT
ASSESSED
X.69.313.314.116.1 X.713.113.213.414.2 X.9 X.8
N.2
N.4
N.7
O.1
Q.1
O.2
N.3
2" SAN
2" SAN
4" SAN4" SAN
2" SAN
2" SAN2" SAN
2" SAN
2" SAN
2" SAN2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
Q -9
.3
N .4
-9 .3
3TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
C2
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :1
P
M
P-100C2
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA C2
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA C2
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
J
K
L
M
18 17 16 15 14 13 12 11 10
10" SAN
10" SAN
8" SAN
10" SAN
10" SAN
4" SAN
10" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
3" SAN
4" SAN
2" SAN
2" SAN
2" SAN
6" SAN UP
6" SAN DN
6" SAN UP
6" SAN DN
6" SAN UP
10" SAN DN
4" SAN
10" SAN
4" SAN UP
4" AW UP
3" SAN UP
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
STAIR #12
STAIR #11
CHASE #9
CHASE #12
CHASE #10
CHASE #11
G -9
.3 G .1
-1 6.
1 G -1
G -1
4.
G -1
3.
G -1
G -1
G -1
G -1
X .7
-X .D
X .6
-X .G
X .7
-X .G
M -1
3.
M -1
M -1
4M -1
4.
M -1
L.
1-
.1
M -9
.3
X.7 -X
.E
J.
2-
.2
J.
2-
J.
2-
.1
J.
3-
.2
J.
3-
J.
3-
J.
3-
.1
J.
3-
J.
2-
H -1
4.
H -1
J-
H -1
3.
H -1
J-
H -1
X.8 -X
.B
X .1
0- X .A
X.8 -X
.A
X .9
-X .C
X .1
0- X .C
X .6
-X .D
X .6
-X .F
X.6 -X
.E
J.
2-
X.1
J.
2-
J.
3-
X.1
G -1
H -1
J.
1-
.1
J.
3-
.1
J.
4-
.1
K -1
4.
K-1
L-
L-
K -1
3.
K-1
X .1
0- X .H
L-
K-1
X .9
-X .H
X .H
-1
X .8
-X .J
X.8 -X
.KX
.1
0- X .K
M -1
M -1
K-1
L-
L-
M A
T C
H L
IN
E F
O R
C O
N T
IN
U
A T
IO
N
S E
E : 1
/P -1
B
MATCHLINE
FOR CONTINUATION SEE: 1/P-100A2
MATCHLINE
FOR CONTINUATION SEE: 1/P-100C2
X.69.313.314.116.1 X.713.113.213.414.2 X.9 X.8
G.1
J.1
J.2
J.3
J.4
L.1
X.A
X.B
X.C
X.D
X.E
X.F
X.G
X.H
X.J
X.K
J.2.1
2" SAN
3" SAN
3" SAN
3" SAN
2" SAN
2" SAN
10" SAN
4" SAN
4" SAN
3" SAN
4" SAN3" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
3" SAN
3" SAN
3" SAN
3" SAN
2" SAN
4" SAN
4" SAN
2" SAN
3" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
3" SAN
2" SAN
2" SAN
2" SAN 2" SAN
4" SAN
4" SAN 4" SAN
2" SAN
3" SAN
3" SAN
10" SAN
3" SAN
3" SAN
4" SAN
4" SAN 4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN2" SAN
2" SAN
3" SAN
4" SAN
2" SAN
3" SAN
3" SAN
2" SAN
H -1
H -1
H -1
J-
J-
J-
J-
K-1
K-1
K-1
L-
L-
CHASE #17
TYP.
TYP.
ALL SANITARY
DRAIN PIPIN IN
THIS AREA IS NEW
ALL SANITARY
DRAIN PIPIN IN
THIS AREA IS NEW
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
AREA D
B500 KEY PLAN
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :1
P
M
P-100D
PLUMBING SANITARY SEWER PLAN - GROUND
FLOOR INTERSTITIAL - AREA D
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - GROUND FLOOR INTERSTITIAL - AREA D
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
C
D
E
F
12 11 10 9 8 7
S T
A
IR
S T
A
IR
CHASE #15
CHASE #14
CHASE #16
CHASE #13
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
2" SAN
E-1
E-1
D -1
D -1
C -1
C -1
B-1
B-1
A-1 0A-1
C -8
C -9
B -8
B -9
A -8
A -9
E -9
E -8
F-9 F-8
D -8
F-1
F-1
MATCHLINE
FOR CONTINUATION SEE: 1/P-104B
MATCHLINE
FOR CONTINUATION SEE: 1/P-104D
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
4" SAN UP
4" SAN DN
3" AW UP
4" AW DN
4" SAN UP
4" SAN DN
3" AW UP
3" AW DN
4" SAN UP
4" SAN DN
2" AW UP
2" AW DN
4" SAN UP
4" SAN DN
3" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN
2" SAN
9.1 7.1
B.1
D.2
E.1
E.2
9.29.25
D.1
X.1X.2X.3X.4X.5X.69.3X.7X.9 X.8
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN 4" SAN
4" SAN
3" SAN
3" SAN
4" SAN 4" SAN
2" SAN4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
3" SAN
4" SAN
2" SAN
3" SAN
3" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN 4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
3" SAN
2" SAN
2" SAN
2" SAN
4" SAN
3 TYP.
TYP.
3 TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION DOCUMENTS
SUBMISSION - ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical:
B500 KEY PLAN
AREA A
35% SCHEMATIC DESIGN SUBMISSION 09/14/2017
65% DESIGN DEVELOPMENT SUBMISSION 10/11/2017
ISSUED FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION 11/01/2017
B
IM
/6
-1
-1
W
L R e tr o fi t S e w e r
S y s te m B s t, th th
F L /6
-1
-1
W
L V
A G
L A
H C
S -R e tr o fi tS e w e r-
B M
E P
.r v t
/1
/2
:5 :1
P
M
P-104A
PLUMBING SANITARY SEWER PLAN - FOURTH
FLOOR INTERSTITIAL - AREA A
TRIPLE C The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
(562) 452-7175
Mat Perkins
P2S Engineering
5000 East Spring Street, 8th Floor
Long Beach, CA 90815
(562) 497-2999
Mikhail Fuks, P.E.
RETROFIT SEWER SYSTEM B500
FIRST, FIFTH & SIXTH FLOORS
11301 Wilshire Blvd., Los Angeles, CA 90073
691-17-104WL
B500
NOVEMBER 17, 2017 M. PERKINS K. LUKE
1/8" = 1'-0"
PLUMBING SANITARY SEWER PLAN - FOURTH FLOOR INTERSTITIAL - AREA A
1 PROVIDE NEW SANITARY DRAIN PIPING. SEE P-600 SERIES
FOR FIXTURE AND PIPE SCHEDULES AND A-100 SERIES FOR
FIXTURE LOCATIONS.
2 POINT OF NEW CONNECTION, SEE DETAIL 1/P-501.
3 POINT OF CONNECTION OF NEW RISER TO EXISTING FIXTURE
TYP.
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE PLUMBING FLOOR PLAN DRAWINGS FOR ADDITIONAL
INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PLUMBING PIPING, WITH
STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO PROVIDE DIELECTRIC UNION FOR PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
E. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
F. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
G. PHASING SCHEDULE SHALL BE BASED UPON MINIMIZING DISRUPTIONS
TO EXISTING BUILDING OPERATION.
H. CONTRACTOR SHALL PROVIDE BARRIERS AS REQUIRED TO PREVENT
CONTAMINATION FROM SEWAGE SPILLS AND WASTE MATTER. STATIC-
FREE DUST BARRIERS FORMED WITH PLASTIC SHEETS SHALL BE
PROVIDED (USING FACILE OR GRIFFOLYN WITH FIRE RATING) WITH THE
APPROVAL OF THE COR.
I. WASTE AND VENT PIPING IS SLOPED AT 1/4" PER 100' (2%).
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ASBESTOS CONTAINING
MATERIAL, ALL WORK WITHIN THE AFFECTED AREA SHALL IMMEDIATELY
STOP AND THE CONTRACTOR SHALL NOTIFY THE COR. NO WORK MAY
RESUME WITHOUT COR'S WRITTEN PERMISSION.
K. ABANDON OR REMOVE DISCONNECTED PORTIONS OF EXISTING PIPING
AS NECESSARY TO MAKE NEW CONSTRUCTION POSSIBLE.
L. THE SEISMIC BRACING AND ANCHORAGE OF PIPING SHALL BE IN
ACCORDANCE WITH GUIDELINES FOR SEISMIC RESTRAINTS OF
PLUMBING SYSTEMS PUBLISHED BY SMACNA.
M. SEISMIC PIPE BRACING SHALL CONFORM TO VA PLUMBING AND
SEISMIC DESIGN MANUALS, H-18-8 .
N. FOR THE PROJECT PHASES AND STAGES, ALL NEW REPLACEMENT
PIPING SHALL BE INSTALLED WITH THE MOST CURRENT REQUIREMENT
FOR SEISMIC RESTRAINTS.
O. ALL WORK ON SANITARY SEWER AND CHEMICAL WASTE AND VENT
PIPING SHALL BE IN ACCORDANCE WITH VA SPECIFICATIONS: 22 05 11,
22 08 00, 22 13 00 AND 22 66 00 AND THE VA PLUMBING DESIGN MANUAL,
2014 OR MOST CURRENT VERSION.
P. ALL NEW SANITARY AND CHEMICAL WASTE PIPING SHALL BE DATE
STAMPED ACCORDING TO SPECIFICATIONS: 22 13 00, 22 66 00 AND 09 91
00. PIPE COUPLING SLEAVE COLOR SHALL BE GREEN AND DISTINCT
FROM EXISTING PIPING TO REMAIN.
Q. NO VENT PIPING HAS BEEN IDENTIFIED AS DEFECTIVE TO BE
REPLACED. MONITOR EXISTING VENT PIPING FOR FUTURE
REPLACMENT.
R. CONTRACTOR SHALL COORDINATE WITH OWNER FOR TIMES
OF SHUT DOWN TO MAKE CHANGES TO SANITARY DRAINAGE.
THIS SHOULD BE DONE AT LEAST 2 WEEKS IN ADVANCE.
GENERAL SHEET NOTES
Revisions: Date:
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
ALL SANITARY
DRAIN PIPING IN
THIS AREA IS NEW
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/2019
J
K
L
M
9 8 7 6 5 4 3 2 1
STAIR #15
STAIR #16
CHASE #4
CHASE #1
CHASE #3
CHASE #2
4" SAN
4" SAN
2" SAN
3" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3" SAN
4" SAN
4" SAN
3"…