Pre Bid RFIs with Responses 36C25724B0018.docx

DOCX document 24 KB Posted

Attached to
Z2DA--FY25 36C257-24-AP-4158 | Replace Burners and Controls Project #549A4-22-422(VA-25-00003929)
Solicitation number
36C25724B0018
Issued by

About this file

The provided document contains Pre-Bid Requests for Information (RFIs) and responses related to Solicitation 36C25724B0018, which is for the Replace Burners and Controls Project #549A4-22-422 for the Department of Veterans Affairs. The RFIs cover details about the specified Weishaupt burner model, NOx emission levels, burner turndown requirements, fuel oil atomization method approval, and documentation requirements. The responses indicate that the Weishaupt burner model is obsolete, but the equivalent updated model can be used, that the NOx requirement is less than 30 PPM, and the burner turndown is 10:1 for both natural gas and #2 fuel oil. The responses also confirm that pressure atomization for fuel oil has been approved as an equal method to low pressure air atomization, and that digital signatures will be accepted for bid submissions.

View the file

Other files

File Type Posted
Abstract of Offers 36C25724B0018 Boiler and Controls Replacement signed.pdf PDF
36C25724B0018 0008.docx DOCX document
Revised SOW Replace Burners and Controls.docx DOCX document
RFI Pertaining to the Updated SOW.docx DOCX document
36C25724B0018 0007.docx DOCX document
36C25724B0018 0006.docx DOCX document
Sign-in Sheet.pdf PDF
Water Softer Requirements.pdf PDF
36C25724B0018 0005.docx DOCX document
36C25724B0018 0004.docx DOCX document
36C25724B0018 0003.docx DOCX document
Revised SOW Replace Burners and Controls.pdf PDF
36C25724B0018 0002.docx DOCX document
RFIs Replace Burners Controls Project 549A422422.pdf PDF
Replace Boiler Burner and Controls 100 percent Specs.pdf PDF
SOW Replace Burners and Controls Revised.pdf PDF
PCRA ICRA Replace burners and controls.pdf PDF
36C25724B0018 0001.docx DOCX document
Replace Boiler Burner and Controls 100.pdf PDF
Bonham Boiler Burner Response.pdf PDF
36C25724B0018_1.docx DOCX document
100 Design Replace Boiler Burner and Controls.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid RFI’s | 36C25724B0018 | Replace Burners and Controls

1)Project documents detail a Weishaupt Burner Model # RGL/1-B3LN as being specified for thisproject. No information can be found on this product and Weishaupt has indicated that this model
is obsolete. Please provide the correct Weishaupt Burner Model number to be used for thisproject.

Answer: I AM SURE THE A/E AND CONTRACTOR CAN FIND THE UPDATED EQUILVILANT FROM WEISHAUPT.

2)Please provide the most recent BEI inspection report which should detail non-conforming items
on the boilers.

Answer: NO, THE NEW BURNER INSTALATION WILL CHANGE SOME BURNER TEST. WHICH HAVE BEEN APPROVED BY OHE.

3) Confirm that NoX Emission Levels as detailed in (Specification Section 23 52 39 Part 2.3, C, 5, c) is correct and the requirement is less than 30 PPM NoX.

Answer: The burner is designed to operate with < 30 ppm NOx corrected @ 3 percent O2 throughout the firing range, when firing natural gas. See reference: EPA/625/5-86/020, Nitrogen Oxide Control for stationary Combustion Sources. Follow burner manufacturer’s recommendations for optimum operational efficiency at low NOx burner operation.

4)What version of the Boiler Plant Safety Device Testing Manual does this project need to
comply with?

Answer: 8th edition. Or the most current edition at time of installation

5)What is the required burner turndown on Natural Gas Firing if different than
(Specification Section 23 52 39 Part 2.3, 4, A) which indicates 10:1?

Answer: 10:1 will do.

6) What is the required burner turndown on #2 Fuel Oil Firing?

Answer: 10:1

7)Regarding MemorandumDated December 22, 2023
SubjectCode/Design Deviation Request Response
Project 549A4-22-422
As this memorandum reads OHE has approved pressure atomization as an equal method
to low pressure air atomization when buring fuel oil.
Since OHE only addressed the burner’s method of atomizing the fuel oil,
potential additional controls and the development of site-specific testing methods,
Are the balance of the components required to make the new burners and existing boilers fullyfunctional required to comply with their respective specification sections as detailed in the writtenproject specification dated 12 January 2024?

Answer: OHE HAS APPROVED THE WEISHAUPT BURNERS FOR INSTALLATION.

8)Regarding MemorandumDated December 22, 2023
SubjectCode/Design Deviation Request Response
Project 549A4-22-422
As this memorandum reads OHE has approved pressure atomization as an equal method
to low pressure air atomization when burning oil.
Since OHE only addressed the burner’s method of atomizing the fuel oil, potentialadditional controls and the development of site-specific testing methods,
Are the burner performance requirements to comply with their respective specification sections asdetailed in the written project specification dated 12 January 2024?

Answer: OHE HAS APPROVED THE WEISHAUPT BURNERS FOR INSTALLATION

9) Has the burner manufacturer provided documentation that the burner design precludes reliable operation with UV Scanners? Reference Spec Section 23 09 11 Part 2.2 D.

Answer: SHOULD ASK THE MANUFACTURER. WEISHAPUPT BURNERS ARE USED IN OTHER VA ENERGY PLANTS.

10) The provided Specifications include a Table of Contents which include 01 00 00 – General Requirements; however, there is no such specification sections included within the documents. Please provide this if it was accidently omitted.

Answer: N/A

11) On page 15 of solicitation it states that bids should be “manually signed”. Given that this is an email submission please confirm that digital signatures will be accepted.

Answer: YES.

File details come from the government source that posted it. Updated .