Abstract of Offers 36C25724B0018 Boiler and Controls Replacement signed.pdf

PDF 916 KB Posted

Attached to
Z2DA--FY25 36C257-24-AP-4158 | Replace Burners and Controls Project #549A4-22-422(VA-25-00003929)
Solicitation number
36C25724B0018
Issued by

About this file

This document is an Abstract of Offers for Solicitation 36C25724B0018 to Replace Boiler Burners and Controls at the Sam Rayburn Memorial VA Center in Bonham, Texas.

The solicitation was issued on November 7, 2024 and bids were due on September 16, 2024. The Government Estimate for the project was $1,600,235, including a 20% Performance and Payment Bond. Five offers were received, ranging from $1,825,144 to $2,654,359. The apparent low bidder was M Wilkinson Construction Company at $1,825,144. All offerors acknowledged the 3 amendments issued. The procurement was a 100% Service-Disabled Veteran-Owned Small Business set-aside, issued by the Department of Veterans Affairs, Veterans Integrated Service Network 17.

View the file

Other files

File Type Posted
36C25724B0018 0008.docx DOCX document
Revised SOW Replace Burners and Controls.docx DOCX document
RFI Pertaining to the Updated SOW.docx DOCX document
36C25724B0018 0007.docx DOCX document
36C25724B0018 0006.docx DOCX document
Sign-in Sheet.pdf PDF
Water Softer Requirements.pdf PDF
36C25724B0018 0005.docx DOCX document
36C25724B0018 0004.docx DOCX document
Pre Bid RFIs with Responses 36C25724B0018.docx DOCX document
36C25724B0018 0003.docx DOCX document
Revised SOW Replace Burners and Controls.pdf PDF
36C25724B0018 0002.docx DOCX document
RFIs Replace Burners Controls Project 549A422422.pdf PDF
Replace Boiler Burner and Controls 100 percent Specs.pdf PDF
SOW Replace Burners and Controls Revised.pdf PDF
PCRA ICRA Replace burners and controls.pdf PDF
36C25724B0018 0001.docx DOCX document
Replace Boiler Burner and Controls 100.pdf PDF
Bonham Boiler Burner Response.pdf PDF
36C25724B0018_1.docx DOCX document
100 Design Replace Boiler Burner and Controls.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Network Contracting Office NCO 17 1901 Veterans Memorial Dr. Building 171 Temple, TX 76504

Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418

Replace Boiler Burners and Controls

Performance and Payment Bonds

36C25724B0018 1

Rhonda Richardson Contracting Officer

20% 20%

11/7/20249/16/2024

$1,220,000.00

$26,000.00 $1,246,000.00

$1,561,421.00

$38,814.00 $1,600,235.00

M Wilkinson Construction Company Firewatch Contracting of FL, LLC yes yes

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

36C25724B0018

Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418

20%

3 4 5 6

$1,793,049.00

$32,095.00 $1,825,144.00

Utility Systems Solutions, Inc

20% 20% 20%

Rock JV, LLC

$1,954,492.00

$40,508.00 $1,995,000.00

Witchita Falls Tri-tech, LLC

$2,459,298.00

$28,374.00 $2,487,672.00

Venergy Group, LLC

$2,528,257.41

$75,847.72 $2,604,105.13

YES YES yes

YES

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

36C25724B0018

Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418

20%

7 8

Bridger National Construction

$2,639,840.00

$14,519.00 $2,654,359.00

Brand Construction, LLC

20%

$4,174,777.00

$45,000.00 $4,219,777.00

YES YES

Abstract of Offers, 36C25724B0018, Page 1
Abstract of Offers, 36C25724B0018, Page 2
Abstract of Offers, 36C25724B0018, Page 3
2024-11-07T15:21:42-0600
RHONDA RICHARDSON

File details come from the government source that posted it. Updated .