Abstract of Offers 36C25724B0018 Boiler and Controls Replacement signed.pdf
PDF 916 KB Posted
- Attached to
- Z2DA--FY25 36C257-24-AP-4158 | Replace Burners and Controls Project #549A4-22-422(VA-25-00003929)
- Solicitation number
- 36C25724B0018
About this file
This document is an Abstract of Offers for Solicitation 36C25724B0018 to Replace Boiler Burners and Controls at the Sam Rayburn Memorial VA Center in Bonham, Texas.
The solicitation was issued on November 7, 2024 and bids were due on September 16, 2024. The Government Estimate for the project was $1,600,235, including a 20% Performance and Payment Bond. Five offers were received, ranging from $1,825,144 to $2,654,359. The apparent low bidder was M Wilkinson Construction Company at $1,825,144. All offerors acknowledged the 3 amendments issued. The procurement was a 100% Service-Disabled Veteran-Owned Small Business set-aside, issued by the Department of Veterans Affairs, Veterans Integrated Service Network 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25724B0018 0008.docx | DOCX document | |
| Revised SOW Replace Burners and Controls.docx | DOCX document | |
| RFI Pertaining to the Updated SOW.docx | DOCX document | |
| 36C25724B0018 0007.docx | DOCX document | |
| 36C25724B0018 0006.docx | DOCX document | |
| Sign-in Sheet.pdf | ||
| Water Softer Requirements.pdf | ||
| 36C25724B0018 0005.docx | DOCX document | |
| 36C25724B0018 0004.docx | DOCX document | |
| Pre Bid RFIs with Responses 36C25724B0018.docx | DOCX document | |
| 36C25724B0018 0003.docx | DOCX document | |
| Revised SOW Replace Burners and Controls.pdf | ||
| 36C25724B0018 0002.docx | DOCX document | |
| RFIs Replace Burners Controls Project 549A422422.pdf | ||
| Replace Boiler Burner and Controls 100 percent Specs.pdf | ||
| SOW Replace Burners and Controls Revised.pdf | ||
| PCRA ICRA Replace burners and controls.pdf | ||
| 36C25724B0018 0001.docx | DOCX document | |
| Replace Boiler Burner and Controls 100.pdf | ||
| Bonham Boiler Burner Response.pdf | ||
| 36C25724B0018_1.docx | DOCX document | |
| 100 Design Replace Boiler Burner and Controls.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
Network Contracting Office NCO 17 1901 Veterans Memorial Dr. Building 171 Temple, TX 76504
Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418
Replace Boiler Burners and Controls
Performance and Payment Bonds
36C25724B0018 1
Rhonda Richardson Contracting Officer
20% 20%
11/7/20249/16/2024
$1,220,000.00
$26,000.00 $1,246,000.00
$1,561,421.00
$38,814.00 $1,600,235.00
M Wilkinson Construction Company Firewatch Contracting of FL, LLC yes yes
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
36C25724B0018
Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418
20%
3 4 5 6
$1,793,049.00
$32,095.00 $1,825,144.00
Utility Systems Solutions, Inc
20% 20% 20%
Rock JV, LLC
$1,954,492.00
$40,508.00 $1,995,000.00
Witchita Falls Tri-tech, LLC
$2,459,298.00
$28,374.00 $2,487,672.00
Venergy Group, LLC
$2,528,257.41
$75,847.72 $2,604,105.13
YES YES yes
YES
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
36C25724B0018
Replace Boiler Burners and Controls Sam Rayburn Memorial VA Center Bonham, TX 75418
20%
7 8
Bridger National Construction
$2,639,840.00
$14,519.00 $2,654,359.00
Brand Construction, LLC
20%
$4,174,777.00
$45,000.00 $4,219,777.00
YES YES
| Abstract of Offers, 36C25724B0018, Page 1 |
| Abstract of Offers, 36C25724B0018, Page 2 |
| Abstract of Offers, 36C25724B0018, Page 3 |
| 2024-11-07T15:21:42-0600 | |
| RHONDA RICHARDSON |
File details come from the government source that posted it. Updated .