Prebid RFI - One Line Drawings 671A4-20-160 2024-08-18.pdf
PDF 743 KB Posted
- Attached to
- Y1DA--NCO17 Central Texas Construction MATOC
- Solicitation number
- 36C25723R0013
About this file
The document appears to be a set of one-line drawings for the existing utilities within the Kerrville VA Medical Center campus. The drawings will assist with future analysis of the current system capabilities for planning future projects. The project, titled "A/E Design Services - AE Complete One Line Drawings", has a project number of 671A4-22-164 and is located at the Kerrville VAMC in Kerrville, TX. The drawings include floor plans for the mechanical piping, domestic water, and storm drainage, waste, and vent systems in Building 19. The drawings provide detailed information on the various utility system components and configurations within the building.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIVE OAK
LI
V E O
A K
H U
IS
A
C H
E
BLUEBONNET
B
LU
E B
O N
N E
T
A G
A R
IT
IT
A
R E
D O
A K
RED OAK
C Y
P R
E S
S
MOUNTAIN LAUREL
E L M
MESQUITE
M
ESQ
UITE
PECAN
PECAN
Y U
C C
A
M E
S Q
U
IT
E
W A
L N
U T
PECAN
PRICKLY PEAR
MOUNTAIN LAUREL
E L M
C Y
P R
E S
S
11A
98A 98B since 1908 since 1908
Ballard CLC, Inc.
Engineers ♦ Planners ♦ Surveyors 1009 Bayou Place, Alexandria, LA 71303
Tel: (318) 445-6571 Fax: (318) 448-0257
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
U.S. Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
89 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
E
D
C
B
A
F
Office of Construction and Facilities Management
THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ARCHITECT/ENGINEER OF
RECORD ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING
OR FOR ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS
A RESULT OF INCORRECT INFORMATION PROVIDED TO THE ARCHITECT/ENGINEER OF
RECORD.
THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY.
AS-BUILT DRAWINGS
B
IM
V
IS
N
K er rv ill e
O ne
L in e D oc um en ts
V
/K er rv ill e
O ne
L in e D ia gr am s.
rv t
6/ 1/
1:
:2
A
M
PROJECT NUMBER - 671A4-22-164
A/E DESIGN SERVICES - AE COMPLETE ONE LINE DRAWINGS
100% AS-BUILT DOCUMENTS - BUILDING 19 - MAY 31, 2023
COVER SHEET
AW DAW
100% AS-BUILT DOCUMENTS 671A4-22-164A/E DESIGN SERVICES - AE
COMPLETE ONE LINE DRAWINGS
671A4 - KERRVILLE VAMC, TX
MAY 31, 2023
19-GI100
SPRINKLERED
NTS
LOCATION PLAN - BUILDING 19
PROJECT SUMMARYINDEX OF DRAWINGS
PROJECT INFORMATION:
THIS PROJECT CONTAINS ONE-LINE DRAWINGS FOR THE SPECIFIED EXISTING UTILITIES WITHIN THE KERRVILLE VA MEDICAL CENTER CAMPUS. THESE DRAWINGS WILL ASSIST FUTURE ANALYSIS OF CURRENT SYSTEM(S) CAPABILITIES FOR FUTURE
PLANNING OF PROJECTS.
PROJECT NAME: A/E DESIGN SERVICES - AE COMPLETE ONE LINE DRAWINGS
PROJECT NUMBER: 671A4-22-164
PROJECT LOCATION: KERRVILLE VAMC - 3600 MEMORIAL BOULEVARD, KERRVILLE, TX 78028-3768
SCOPE OF WORK SUMMARY:
0 GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
ROOM NAME
ROOM NAME / NUMBER REVISION TAG
NORTH ARROW WITH TRUE
NORTH INDICATION
SECTION
ENLARGEMENT, DETAIL
Name Elevation
FLOOR LEVEL & NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
ANNOTATION DRAWING SYMBOLS
A101
PLAN NORTH
TRUE NORTH
BUILDING NUMBER ON
SITE/LOCATION PLANS
01-XXXX-0
DISCIPLINE DESIGNATOR (MAJOR):
G - GENERAL
P - PLUMBING
M - MECHANICAL
SHEET TYPE DESIGNATOR
BUILDING LEVEL
11-MP121
DISCIPLINE DESIGNATOR (MINOR)
BUILDING NUMBER
SHEET NUMBER WITHIN SERIES
DRAWING NUMBER INTERPRETATION
since 1908 since 1908
Ballard CLC, Inc.
Engineers ♦ Planners ♦ Surveyors 1009 Bayou Place, Alexandria, LA 71303
Tel: (318) 445-6571 Fax: (318) 448-0257
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
E
D
C
B
A
F
Office of Construction and Facilities Management
THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ARCHITECT/ENGINEER OF
RECORD ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING
OR FOR ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS
A RESULT OF INCORRECT INFORMATION PROVIDED TO THE ARCHITECT/ENGINEER OF
RECORD.
THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY.
AS-BUILT DRAWINGS
B
IM
V
IS
N
K er rv ill e
O ne
L in e D oc um en ts
V
/K er rv ill e
O ne
L in e D ia gr am s.
rv t
6/ 1/
1:
:2
A
M
PROJECT INFORMATION
AW DAW
100% AS-BUILT DOCUMENTS 671A4-22-164A/E DESIGN SERVICES - AE
COMPLETE ONE LINE DRAWINGS
671A4 - KERRVILLE VAMC, TX
MAY 31, 2023
19-GI101
SPRINKLERED
DRAWING INDEX - BUILDING 19
SHEET SHEET NAME
GENERAL
19-GI100 COVER SHEET
19-GI101 PROJECT INFORMATION
PLUMBING
19-PP110 BLDG. 19 - LEVEL 01 FLOOR PLAN - DOMESTIC WATER
19-PW110 BLDG. 19 - LEVEL 01 FLOOR PLAN - STORM DRAINAGE, WASTE & VENT
MECHANICAL
19-MP110 BLDG. 19 - LEVEL 01 FLOOR PLAN - MECHANICAL PIPING
3"HOR 3"HOR 3"HOR
3"HOR
P3
P2
P1
P4
P5 P6 P7
3"HOS 3"HOS 3"HOS
3"HOS
3" PCR
P C
R
"F
W S
LO
HI
F W
S
2"FWS
1-1/2"FWS
1-1/2"FWS
3"FWS
"F
W S
NC
3" BW
2"
3" BW
2"2"
B W
"H
P R
"H
P R
4"HPR
"H
P S
"H
P S
"H
P S
8"HPS
8"HPS
12"HPS
10"HPS
(FOR METERING)
M
12"HPS
H P
S
H P
S
H P
S
10" HPS
8"HPS
1-1/2"HPR 1-1/2"HPR
"R
H F
W R
HI
LO
3"RHFWR
"R
H F
W R
"R
H F
W R
R H
F W
R
4"RHFWR
R H
F W
R H
F W
R H
F W
P2 P1P3
"R
H F
W
"R
H F
W
"R
H F
W
3"RHFW
3"RHFW
BOILER
ROOM
OFFICE/
CONTROL
PIT
TUNNEL
LOCKER
ROOM
CONTROLS
OFFICE
ELECTRICAL
ROOM
STORAGE
BREAK
TUNNEL
FLOOR TRENCH,
COVERED WITH STEEL
PLATE (TYP)
KEYNOTES
SYMBOLS - PIPING
DE-AERATOR
FLASH TANK
DIRT LEG
REHEAT TANK
REVERSE
OSMOSIS
STATION
CARBON FILTERS
RO
STORAGE
TANK
BLEND
TANK
THERMAL
HEATER
STEAM
GENERATOR
THERMAL
HEATER
THERMAL
HEATER
STEAM
GENERATOR
STEAM
GENERATOR
REHEAT
TANK
PRV MPS 65#
6FLASH TANK
PRV HPS 125#
1. 10" MPS & 4" MPR TO/FROM HOSPITAL.
2. VALVE IN RISER AT STM GENERATOR CONNECTION (TYP).
3. VALVE IN ELBOW ABOVE (TYP).
4. FEEDWATER PUMPS.
5. 6" MPS/4"MPR TO/FROM LAUNDRY (BELOW GROUND).
6. 4" FLASG TANK VTR.
7. FLASH TANK DISCHARGE TO CONDENSATE RETURN IN TRENCH.
TYPICAL MECHANICAL SYSTEM - SUPPLY PIPING
TYPICAL MECHANICAL SYSTEM - RETURN PIPING
CHWS CHILLED WATER SUPPLY
VALVE - BALL, NORMALLY OPEN
VALVE - SHUT-OFF, NORMALLY OPEN
SYSTEM LABEL SYSTEM DESCRIPTION
CHWR CHILLED WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HHWR HEATING HOT WATER RETURN
HPS HIGH PRESSURE STEAM
HPR HIGH PRESSURE CONDENSATE RETURN
LPS LOW PRESSURE STEAM
LPR LOW PRESSURE CONDENSATE RETURN
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE CONDENSATE RETURN
BOTTOM CONNECTION
END DROP / DOWN
END UP / RISER
PIPE END CAP
RISE / DROP IN-LINE
TEE DOWN
TEE UP
TOP CONNECTION
UP & DN / RISER
BW BOILER WATER
PCR PROCESSED CONDENSATE RETURN
HOS HOT OIL SUPPLY
HOR HOT OIL RETURN
FWS FORCED WATER SUPPLY
RHFWR REHEAT FORCED WATER RETURN
RHFWS REHEAT FORCED WATER SUPPLY
FWR FORCED WATER RETURN
since 1908 since 1908
Ballard CLC, Inc.
Engineers ♦ Planners ♦ Surveyors 1009 Bayou Place, Alexandria, LA 71303
Tel: (318) 445-6571 Fax: (318) 448-0257
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
E
D
C
B
A
F
Office of Construction and Facilities Management
THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ARCHITECT/ENGINEER OF
RECORD ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING
OR FOR ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS
A RESULT OF INCORRECT INFORMATION PROVIDED TO THE ARCHITECT/ENGINEER OF
RECORD.
THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY.
AS-BUILT DRAWINGS
B
IM
V
IS
N
K er rv ill e
O ne
L in e D oc um en ts
V
/K er rv ill e
O ne
L in e D ia gr am s.
rv t
6/ 1/
1:
:2
A
M
BLDG. 19 - LEVEL 01 FLOOR PLAN -
MECHANICAL PIPING
AW DAW
100% AS-BUILT DOCUMENTS 671A4-22-164A/E DESIGN SERVICES - AE
COMPLETE ONE LINE DRAWINGS
671A4 - KERRVILLE VAMC, TX
MAY 31, 2023
19-MP110
SPRINKLERED
1/4" = 1'-0"
BLDG. 19 - LEVEL 01 FLOOR PLAN - MECHANICAL PIPING
PLAN NORTH
TRUE NORTH
NORTH
-1
/2
C W
/4
C
W
1-1/2" CW
1-1/2" CW
P8
BFP
BFP
1-1/4" SW
8"SW
/4
C
W
1/2" CW
/2
C
W
3/4"CW1/2"CW
"C
W
/4
"C W
3/4"CW
/4
"C W
3/4"CW
/4
"C W
3/4"CW
2"CW
"C
W
6"W
3/4"CW
BOILER
ROOM
OFFICE/
CONTROL
PIT
TUNNEL
LOCKER
ROOM
CONTROLS
OFFICE
ELECTRICAL
ROOM
STORAGE
BREAK
TUNNEL
FLOOR TRENCH,
COVERED WITH STEEL
PLATE (TYP)
SYMBOLS - PLUMBING
KEYNOTES
R.O.
MACHINE
R.O.
STORAGE
CARBON FILTERS
1 3
INSTANTANEOUS
WATER HEATER
UNDER COUNTER
CPVC PIPING
CPVC PIPING
HB
HB
HB DOWN IN PIT
THERMAL
HEATER
STEAM
GENERATOR
THERMAL
HEATER
THERMAL
HEATER
STEAM
GENERATOR
STEAM
GENERATOR
ICE
REHEAT
TANK
DE-AERATOR
BLEND
TANK
SOLAR WATER PUMP
BLOW DOWN WATER TRENCH
CW DOMESTIC COLD WATER
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RETURN
VALVE - BALL, NORMALLY OPEN
VALVE - SHUT-OFF, NORMALLY OPEN
SYSTEM LABEL SYSTEM DESCRIPTION
SHW DOMESTIC SOFT HOT WATER
SCW DOMESTIC SOFT COLD WATER
HWR140 DOMESTIC HOT WATER RETURN 140°
CD CONDENSATE DRAIN
HW140 DOMESTIC HOT WATER 140°
SWS SOLAR WATER SUPPLY
SWR SOLAR WATER RETURN
BOTTOM CONNECTION
END DROP / DOWN
END UP / RISER
PIPE END CAP
RISE / DROP IN-LINE
TEE DOWN
TEE UP
TOP CONNECTION
UP & DN / RISER
LABORATORY TEMPERED WATER
LABORATORY HOT WATER
LTW
LHW
HCW HARD COLD WATER
1. 8" STEEL SOLAR WATER MAIN. TRANSISTIONS TO 3" CVPVC AT FLOOR LEVEL. NOT IN
USE. SEE KEYNOTE 2.
2. 3" CVPVC SOLAR WATER LINE TERMINATED AND CAPPED IN VERTICAL. SOLAR WATER
LINE IS NOT IN SERVICE.
3. 4" STEEL DOMESTIC WATER SERVICE (CW), TRANSISTIONS TO 3" CVPVC AT FLOOR
LEVEL.
4. 1/2" CW & 1/8" HW SERVING SINK/LAV.
5. 3/4" CW & 3/4" HW SERVING SHOWER.
6. 1/4" CW LINES TO CHEMICAL SINK.
7. VALVE BOX AT GRADE.
8. ELECTRIC INSTANTANIOUS WATER HEATER MOUNTED ON WALL ABOVE ROOM.
9. 1-1/2" VENT ABOVE ROOM. VENT TIES INTO VERTICAL RISING DUCTWORK ABOVE.
10. CONNECT 3/4" CW INTO STEAM SYSTEM CONDENSATE RETURN MAKE-UP WATER.
11. PIPING SERVING THE REVERSE OSMOSIS AND WATER FILTER SYSTEMS ARE ALL
CPVC PIPE, FITTINGS, AND VALVES.
12. SUMP PUMP FOR PIT DRAINAGE. 2" GALVENIZED PIPE DOWN TO FLOAT AND CHECK
VALVE AT BOTTOM OF PIT.
since 1908 since 1908
Ballard CLC, Inc.
Engineers ♦ Planners ♦ Surveyors 1009 Bayou Place, Alexandria, LA 71303
Tel: (318) 445-6571 Fax: (318) 448-0257
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
E
D
C
B
A
F
Office of Construction and Facilities Management
THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ARCHITECT/ENGINEER OF
RECORD ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING
OR FOR ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS
A RESULT OF INCORRECT INFORMATION PROVIDED TO THE ARCHITECT/ENGINEER OF
RECORD.
THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY.
AS-BUILT DRAWINGS
B
IM
V
IS
N
K er rv ill e
O ne
L in e D oc um en ts
V
/K er rv ill e
O ne
L in e D ia gr am s.
rv t
6/ 1/
1:
:2
A
M
BLDG. 19 - LEVEL 01 FLOOR PLAN -
DOMESTIC WATER
AW DAW
100% AS-BUILT DOCUMENTS 671A4-22-164A/E DESIGN SERVICES - AE
COMPLETE ONE LINE DRAWINGS
671A4 - KERRVILLE VAMC, TX
MAY 31, 2023
19-PP110
SPRINKLERED
1/4" = 1'-0"
BLDG. 19 - LEVEL 01 FLOOR PLAN - DOMESTIC WATER
PLAN NORTH
TRUE NORTH
NORTH
4"SAN4"SAN4"SAN4"SAN
"S
A N
4"SAN
"S
A N
HD
SK
SK
LAV
WC
SH
FD HD
TD
-1
/2 "V
BOILER
ROOM
OFFICE/
CONTROL
PIT
TUNNEL
LOCKER
ROOM
CONTROLS
OFFICE
ELECTRICAL
ROOM
STORAGE
BREAK
TUNNEL
FLOOR TRENCH,
COVERED WITH STEEL
PLATE (TYP)
SYMBOLS - DWV PLUMBING
KEYNOTES
R.O.
MACHINE
R.O.
STORAGE
CARBON FILTERS
THERMAL
HEATER
STEAM
GENERATOR
THERMAL
HEATER
THERMAL
HEATER
STEAM
GENERATOR
STEAM
GENERATOR
REHEAT
TANK
SK
DE-AERATOR
BLEND
TANK
SAN SANITARY WASTE
ST (1,000) STORM DRAINAGE (SQ.F.T TOTAL)
V VENT
END UP / RISER
BOTTOM CONNECTION
SYSTEM LABEL SYSTEM DESCRIPTION
RISE / DROP IN-LINE
TEE DOWN
TEE UP
TOP CONNECTION
UP & DN / RISER
END DROP / DOWN
1. 8" STEEL SOLAR WATER MAIN. TRANSISTIONS TO 3" CVPVC AT FLOOR LEVEL. NOT IN
USE. SEE KEYNOTE 2.
2. 3" CVPVC SOLAR WATER LINE TERMINATED AND CAPPED IN VERTICAL. SOLAR WATER
LINE IS NOT IN SERVICE.
3. 4" STEEL DOMESTIC WATER SERVICE (CW), TRANSISTIONS TO 3" CVPVC AT FLOOR
LEVEL.
4. 1/2" CW & 1/8" HW SERVING SINK/LAV.
5. 3/4" CW & 3/4" HW SERVING SHOWER.
6. 1/4" CW LINES TO CHEMICAL SINK.
7. VALVE BOX AT GRADE.
8. ELECTRIC INSTANTANIOUS WATER HEATER MOUNTED ON WALL ABOVE ROOM.
9. 1-1/2" VENT ABOVE ROOM. VENT TIES INTO VERTICAL RISING DUCTWORK ABOVE.
10. CONNECT 3/4" CW INTO STEAM SYSTEM CONDENSATE RETURN MAKE-UP WATER.
11. PIPING SERVING THE REVERSE OSMOSIS AND WATER FILTER SYSTEMS ARE ALL
CPVC PIPE, FITTINGS, AND VALVES.
12. SUMP PUMP FOR PIT DRAINAGE. 2" GALVENIZED PIPE DOWN TO FLOAT AND CHECK
VALVE AT BOTTOM OF PIT.
since 1908 since 1908
Ballard CLC, Inc.
Engineers ♦ Planners ♦ Surveyors 1009 Bayou Place, Alexandria, LA 71303
Tel: (318) 445-6571 Fax: (318) 448-0257
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
E
D
C
B
A
F
Office of Construction and Facilities Management
THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ARCHITECT/ENGINEER OF
RECORD ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING
OR FOR ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS
A RESULT OF INCORRECT INFORMATION PROVIDED TO THE ARCHITECT/ENGINEER OF
RECORD.
THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY.
AS-BUILT DRAWINGS
B
IM
V
IS
N
K er rv ill e
O ne
L in e D oc um en ts
V
/K er rv ill e
O ne
L in e D ia gr am s.
rv t
6/ 1/
1:
:2
A
M
BLDG. 19 - LEVEL 01 FLOOR PLAN - STORM
DRAINAGE, WASTE & VENT
AW RAW
100% AS-BUILT DOCUMENTS 671A4-22-164A/E DESIGN SERVICES - AE
COMPLETE ONE LINE DRAWINGS
671A4 - KERRVILLE VAMC, TX
MAY 31, 2023
19-PW110
SPRINKLERED
PLAN NORTH
TRUE NORTH
NORTH1/4" = 1'-0"
BLDG. 19 - LEVEL 01 FLOOR PLAN - STORM DRAINAGE, WASTE & VENT
| Sheets |
| 19-GI100 - COVER SHEET |
| 19-GI101 - PROJECT INFORMATION |
| 19-MP110 - BLDG. 19 - LEVEL 01 FLOOR PLAN - MECHANICAL PIPING |
| 19-PP110 - BLDG. 19 - LEVEL 01 FLOOR PLAN - DOMESTIC WATER |
| 19-PW110 - BLDG. 19 - LEVEL 01 FLOOR PLAN - STORM DRAINAGE, WASTE & VENT |
File details come from the government source that posted it. Updated .