ATTACHMENT 5 671A4-20-160 Replace Boilers B19 IFC Plans SEALED 2024-04-03 R1.pdf
PDF 45 MB Posted
- Attached to
- Y1DA--NCO17 Central Texas Construction MATOC
- Solicitation number
- 36C25723R0013
About this file
This document appears to be ATTACHMENT 5 to the solicitation for the Y1DA--NCO17 Central Texas Construction MATOC contract opportunity issued by the Department of Veterans Affairs. The attachment contains IFC (Issued For Construction) plans for the replacement of boilers at Building 19. The solicitation is a 100% competitive Service-Disabled Small Business Set-Aside under NAICS code 236220 for construction services. The plans detail the technical specifications and drawings for the boiler replacement project, which is part of the larger MATOC contract. No further details on pricing, response dates, or award information are provided in this attachment.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
TITLE SHEET
PG SS
GI-001
GENERAL NOTES
SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.
MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES AND REGULATIONS PER ALL FEDERAL AND STATE
REGULATIONS.
THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.
CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE IMPORTANCE OF PROPER SCHEDULING AND PHASING OF THE WORK SO AS TO CAUSE MINIMUM DISTURBANCE TO THE ACTIVITIES IN THE OTHER AREAS OF THE BUILDING WHICH REMAIN OCCUPIED. THE
CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED BY THE GOVERNMENT.
CONTRACTOR SHALL PERFORM WORK ONLY AFTER THE GATHERING OF EXACT FIELD DIMENSIONS OF THE BUILDING STRUCTURE AND
CEILINGS, ETC. WHICH MAY AFFECT THE INSTALLATION OF THE NEW SYSTEMS.
THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED
WITHOUT INTERFERENCE OR DELAY.
CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.
ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.
PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT & DUCTWORK PER SPECIFICATIONS.
CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORTS AND BRACING PER SMACNA REQUIREMENTS.
ANY EQUIPMENT OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSE RELATING TO VERIFY THE AS-BUILT DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS SHALL BE BORN BY THE CONTRACTOR.
ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING
LATEST IBC AND ASCE 7-05 CHAPTER 13.
ALL PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA GUIDELINES AND IMC.
EQUIPMENT SPECIFIED ON THESE DRAWINGS ARE BASIS OF DESIGN ITEMS. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL ADDITIONAL DESIGN AND CONSTRUCTION COSTS INCURRED BY THE USE OF ANY PRODUCT OTHER THAN THE BASIS OF DESIGN.
SOUTH TEXAS VA HEALTH CARE SYSTEM, KERRVILLE, TX
DEPARTMENT OF VETERANS AFFAIRS
V.A. HOSPITAL KERRVILLE, TX
VA PROJECT #671A-20-160
LOCATION PLAN
1.
2.
3.
4.
5.
6.
7.
15.
10.
11.
12.
13.
14.
9.
16.
17.
N
BUILDING AREA
N
SHEET INDEX
PLUMBING
DWG. NO.SHEET NO. SHEET TITLE
GENERAL
TITLE SHEETGI-0011
ELECTRICAL
ELECTRICAL FRONT SHEETE-001
ELECTRICAL SYMBOLS, LEGENDS AND ABBREVIATIONSE-002
ELECTRICAL PANEL SCHEDULESE-003
ELECTRICAL EXISTING SINGLE LINE DIAGRAME-004
ELECTRICAL NEW SINGLE LINE DIAGRAME-005
ELECTRICAL BOILER PLANT DEMOLITION LIGHTING PLANEDL-100
ELECTRICAL BOILER PLANT DEMOLITION POWER PLANEDP-100
ELECTRICAL BOILER PLANT LIGHTING PLANEL-200
ELECTRICAL BOILER PLANT POWER PLANEP-200
ELECTRICAL SITE PLANES-300
PLUMBING LEGENDS, ABBREVIATIONS, SYMBOLS, AND SCHEDULESP-001
DEMOLITION PLUMBING PLAN IN BOILER PLANTPD-100
NEW PLUMBING PLAN IN BOILER PLANTPP-100
ELECTRICAL DETAILSE-400
DWG. NO.SHEET NO. SHEET TITLE
MECHANICAL
MECHANICAL FRONT SHEETM-0012
MECHANICAL SCHEDULESM-0023
MECHANICAL SCHEDULESM-0034
M-0045 MECHANICAL DETAILS
M-0056 MECHANICAL DETAILS
M-0067 MECHANICAL DETAILS
M-0078 MECHANICAL DETAILS
M-0089
MECHANICAL BOILER PLANT PIPING DIAGRAM
11 NATURAL GAS AND FUEL OIL-BURNER AND IGNITER FUEL STANDARD PIPING DIAGRAM
MECHANICAL SITE PLANMS-10013
SITE PLAN
N
PROJECT SCOPE
THE PROJECT WILL REPLACE EXISTING BOILERS, STEAM LINES, AND ALL ASSOCIATED PIPING AND EQUIPMENT FROM THE BOILER ROOM AT BUILDING 19. NEW BOILERS, STEAM LINES, PIPING, AND ALL ASSOCIATED EQUIPMENT WITH THE BOILER SYSTEM WILL BE INSTALLED. PHASING WILL BE REQUIRED. NEW BOILERS WILL SERVICE EXISTING STEAM LINES TO THE LAUNDRY AND MAIN HOSPITAL.
8.
BID ITEMS
BID ITEM I - ALL WORK SHOWN ON DRAWINGS AND IN SPECIFICATIONS. NEW WORK SHALL INCLUDE MECHANICAL, PLUMBING, AND
ELECTRICAL. WORK SHALL BE COMPLETED IN ### CALENDAR DAYS.
MECHANICAL CONTROL DETAILSMI-00728
MECHANICAL CONTROLSMI-10029
MECHANICAL
MECHANICAL DETAILS
M-009 MECHANICAL DETAILS
MH-201 NEW MECHANICAL ROOF PLAN
DEMOLITION MECHANICAL EQUIPMENT PLAN IN BOILER PLANTMD-100
DEMOLITION MECHANICAL PIPING PLAN IN BOILER PLANTMPD-100
DEMOLITION MECHANICAL ROOF PLANMD-101
NEW MECHANICAL EQUIPMENT IN BOILER PLANT PLANMH-200
NEW MECHANICAL PIPING PLAN IN BOILER PLANTMP-200
M-010 M-011
MECHANICAL CONTROLSMI-101
MECHANICAL CONTROLSMI-102
MECHANICAL CONTROLSMI-103
NEW MECHANICAL BOILER ROOM GAS MONITORING PLANMH-300
TEMPORARY MECHANICAL EQUIPMENT PLAN FOR BOILER PLANTMH-100
MECHANICAL CONTROL DETAILSMI-001
MECHANICAL CONTROL DETAILSMI-002
MECHANICAL CONTROL DETAILSMI-003
MECHANICAL CONTROL DETAILSMI-004
MECHANICAL CONTROL DETAILSMI-005
MECHANICAL CONTROL DETAILSMI-006
33 MECHANICAL CONTROLSMI-104
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
VHASTXHernaM4 Text Box
WORK SHALL BE COMPLETED IN 180 CALENAR DAYS.
GENERAL NOTES
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS
SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, DIFFUSERS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE
FOR FILTERS AT 50% LOADING.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
9. STEAM HEADER SET PRESSURE: ___ kPa [PSIG] NORMAL ___ kPa [PSIG] LOW DEMAND PERIODS
10. ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL
11. SEISMIC PROVISIONS // REQUIRED - SEE SPECS // NOT REQUIRED // ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED
12. ALL WORK AND WALL AND ROOF PENETRATIONS SHALL BE COORDINATED WITH STRUCTURAL JOISTS AND BEAMS. PROVIDE OFFSETS IN PIPES
AND DUCTS TO AVOID CUTTING OF BEAMS AND JOISTS.
13. SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.
14. MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION.
WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH INSTALLED.
15. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.
16. CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
17. THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED WITHOUT
INTERFERENCE OR DELAY.
18. CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.
19. ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
20. EXACT LOCATIONS OF ALL EQUIPMENT AND AIR DISTRIBUTION SHALL BE COORDINATED WITH LIGHTING AND OTHER WORK.
21. CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORT PER SMACNA REQUIREMENT.
22. ANY EQUIPMENT, DUCTWORK, OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE RECORD DRAWINGS IN AUTOCAD FORMAT TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSES RELATING TO VERIFY THE RECORD DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS SHALL BE BORN BY THE CONTRACTOR.
23. NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES AS REQUIRED TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE, PROVIDING EQUIVALENT DUCT SIZE TO THE DIMENSION SHOWN. COORDINATE CLOSELY WITH OTHER SECTIONS TO MINIMIZE NECESSITY OF TRANSITIONS. NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED
TRANSITIONS OR OTHER SPECIAL CHANGE SHAPE PIECES.
24. CUTTING, BORING, SAW CUTTING OR DRILLING THROUGH THE STRUCTURAL ELEMENTS TO BE DONE ONLY WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE USER AND APPROVED BY ENGINEER OF RECORD. OBTAIN FACILITY APPROVAL BEFORE COMMENCING ANY WORK.
25. THE CONTRACTOR SHALL DEVELOP A TESTING AND COMMISSIONING PLAN PRIOR TO THE START OF CONSTRUCTION.
26. THE CONTRACTOR SHALL PROVIDE 20'x12' CONSTRUCTION TRAILER FOR THE BOILER OPERATORS. THE TRAILER SHALL HOUSE THE SAFETY CONTROLS AND PANELS FOR THE TEMPORARY BOILERS. AUDIBLE AND VISIBLE ALARMS SHALL BE PROVIDED. ALL PANELS AND SAFETY EQUIPMENT AND CONTROLS ARE TO BE FURNISHED AND INSTALLED BY THE TEMPORARY BOILER PROVIDER. SAFETY EQUIPMENT SHALL INCLUDE
2 MUSHROOM SWITCHES TO CLOSE THE GAS SUPPLY VALVES WHEN PRESSED.
27. REFER TO VHA SAFETY DEVICE TESTING MANUAL 7TH EDITION OR CURRENT AND PERFORM TASKS CALLED FOR THE INSTALLATION, START UP
COMMISSIONING AND OPERATIONS OF BOILERS.
28. ALL PIPES LOCATED OUTDOORS AND UNHEATED SPACES SHALL BE PROVIDED WITH HEAT TRACE TO PRECLUDE FREEZING OF LIQUIDS.
MECHANICAL SYMBOLS
10x8ø
10x8
FLAT OVAL DUCTWORK
NK=
R/D
NK=
AND VOLUME DAMPER
TRANSITION ON CENTER
FLEXIBLE CONNECTOR
VOLUME DAMPER
SQUARE-THROATED TEE
VOLUME DAMPER
RADIUS ELBOW
RADIUS TEE
8"ø
RECTANGULAR-TO-ROUND TRANSITION
TAKE-OFF TAP TO RECTANGULAR DUCT
COMBINATION FIRE SMOKE DAMPER (CFSD)
CONICAL TAP TO RECTANGULAR DUCT AND
TRANSITION WITH FLAT SIDE
CHANGE IN ELEVATION WITH RELATION TO AIR FLOW
SQUARE-THROATED ELBOW W/TURNING VANES
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
ROUND DUCTWORK (SIZE, DIAMETER)
ACOUSTICALLY LINED DUCTWORK
DEMOLITION SYMBOL FOR
DEMOLITION OF EXISTING DUCTWORK.
EXISTING EQUIPMENT, PIPING, AND DUCTWORK.
BACKDRAFT DAMPER
BDD
FIRE DAMPER (FD)
EXHAUST DUCT RISER
RETURN DUCT RISER IN PLAN
SUPPLY DUCT RISER IN PLAN
ACCESS REQUIRED FOR EQUIPMENT SERVICE
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
POINT OF DISCONNECT
POINT OF CONNECTION BETWEEN NEW AND EXISTING
ABBREVIATIONS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CENT CENTRIFICAL
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CO2 CARBON DIOXODE
CP CONDENSATE PUMP
CR CEILING REGISTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ESP EXTERNAL STATIC PRESSURE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
(E) EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPS LOW PRESSURE STEAM
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
MECHANICAL SHEET INDEX
M-001 MECHANICAL FRONT SHEET
M-002 MECHANICAL SCHEDULES
M-003 MECHANICAL SCHEDULES
M-004 MECHANICAL DETAILS
M-005 MECHANICAL DETAILS
M-006 MECHANICAL DETAILS
M-007 MECHANICAL DETAILS
M-008 MECHANICAL DETAILS
M-009 MECHANICAL DETAILS
M-010 NATURAL GAS AND FUEL OIL-BURNER AND IGNITER FUEL
STANDARD PIPING DIAGRAM
M-011 MECHANICAL BOILER PLANT PIPING DIAGRAM
MS-100 MECHANICAL SITE PLAN
MD-100 DEMOLITION MECHANICAL EQUIPMENT PLAN IN BOILER PLANT
MPD-100 DEMOLITION MECHANICAL PIPING PLAN IN BOILER PLANT
MD-101 DEMOLITION MECHANICAL ROOF PLAN
MH-100 TEMPORARY MECHANICAL EQUIPMENT PLAN FOR BOILER PLANT
MH-200 NEW MECHANICAL EQUIPMENT IN BOILER PLANT PLAN
MP-200 NEW MECHANICAL PIPING PLAN IN BOILER PLANT
MH-201 NEW MECHANICAL ROOF PLAN
MH-300 NEW MECHANICAL BOILER ROOM GAS MONITORING PLAN
MI-001 MECHANICAL CONTROL DETAILS
MI-002 MECHANICAL CONTROL DETAILS
MI-003 MECHANICAL CONTROL DETAILS
MI-004 MECHANICAL CONTROL DETAILS
MI-005 MECHANICAL CONTROL DETAILS
MI-006 MECHANICAL CONTROL DETAILS
MI-007 MECHANICAL CONTROL DETAILS
MI-100 MECHANICAL CONTROLS
MI-101 MECHANICAL CONTROLS
MI-102 MECHANICAL CONTROLS
MI-103 MECHANICAL CONTROLS
MI-104 MECHANICAL CONTROLS
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
TAB TESTING, ADJUSTING, BALANCE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP. TYPICAL
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
IT'S THE LAW
CALL BEFORE YOU DIG
DIGALERT IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION OF BELOW GROUND PIPING, CONDUITS AND UTILITY PATHWAYS IN THE IMMEDIATE VICINITY OF THE WORK, WHETHER SHOWN ON THE DRAWINGS OR NOT. CONTRACTOR SHALL MARK ALL EXISTING PIPING, CONDUITS AND UTILITY PATHWAYS AFFECTED BY THE WORK USING AN UNDERGROUND PIPE LOCATOR TO DETERMINE THE POSITION OF PIPES AND CONDUITS ON THE SURFACE. THE CONTRACTOR SHALL ADD THE EXISTING UNDERGROUND UTILITIES FOUND BY BLUESTAKING TO THE RECORD DRAWINGS. CONTRACTOR SHALL OBTAIN APPROVAL OF MARKING FROM CONSTRUCTION MANAGER PRIOR TO COMMENCING ANY DEMOLITION OR DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT ARISE FROM THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND MARK ANY AND ALL UNDERGROUND UTILITIES. TRENCHING FOR NEW UNDERGROUND CONDUITS IN AREAS WHERE EXISTING UNDERGROUND UTILITIES ARE PRESENT SHALL BE EXCAVATED BY HAND USING EXTREME CAUTION SO AS NOT TO DISTURB EXISTING UTILITIES. UNDERGROUND POWER AND COMMUNICATION PULLBOXES, WHERE SHOWN ON THE SITE PLAN, AND ARE DETERMINED TO BE IN CONFLICT WITH EXISTING UTILITIES AFTER EXCAVATION BY HAND SHALL BE RELOCATED TO A POSITION AS CLOSE AS POSSIBLE TO THE
LOCATION SHOWN ON THE DRAWINGS.
X-RAY REQUIREMENTS
1. PERFORM X-RAY PRIOR TO DRILLING HOLES ON THE WALL AND/OR FLOOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL FRONT SHEET
PM SS
M-001
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL SCHEDULES
PM SS
M-002
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL SCHEDULES
PM SS
M-003
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Scale
NONE
Scale
NONE
Scale
NONE
Scale
NONE
Scale
NONE
Scale
NONE 8 1
10 5 3WATER METER INSTALLATION
STEAM SAFETY VALVE
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
STEAM LINE WALL PENETRATION DETAIL
TRAPEZE PIPE SUPPORT
STEAM METER DETAIL
NOTES:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM
TO RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
1/2" [15mm] STEEL PIPE OR
STEEL TUBING TO SENSORS
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW, LEVEL)
BLOWDOWN
PT
ELEVATION
CW OR
SW
BYPASS
WATER METER
3'-6" [1.1M]
FLOOR
ELEVATION
SUPPORT BRACKET
ANCHORED TO WALL
OR COLUMN
80 MESH
STRAINER
N.C.
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY
METER MANUFACTURERS
TT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
FLOW METER
INTERFACE WITH
BACNET SYSTEM
DIFFERENTIAL PRESSURE
(DP) CELL STEAM FLOW
MEASUREMENT
SHUTOFF VALVE
TO METERING SYSTEM
BUILDING INCOMING
MAIN STEAM
PT
D
PROVIDE UNION UNLESS SAFETY
VALVE HAS FLANGED OUTLET
SAFETY VALVE
OPEN DRAIN
(NOTE 3)
CONNECTION TO PRESSURE
VESSEL OR PIPE
VENT PIPE THROUGH ROOF SUPPORT
AS INDICATED ON DWGS. (NOTES 1, 2)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
20mm [3/4"] DRAIN TO
FLOOR DRAIN OR
OPEN SIGHT DRAIN
(NOTE 4)
mm [1"
610mm [24"
MAX]
76mm [3"]
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT
BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI
B31.1. POWER PIPING CODE, APPENDIX II.
2. VENT PIPE SHALL TERMINATE 1829mm [6'] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHICH
PERSONNEL MAY OCCUPY.
4. NO OTHER DRAIN SHALL BE CONNECTED TO THE DRIP PAN ELBOW DRAIN PIPE.
FLEXIBLE
CONNECTOR
2m m [6"
MI
N.
mm [12
2m m [6"
MI
N.
[12
MI
N.
5m m
DRIP LEG (TYP.)
20mm [3/4"] DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM
TRAP (TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE SAME AS STEAM
MAIN UNLESS OTHERWISE NOTED.
STEAM LINE DRIP POCKET
20mm [3/4"] MIN.
FROM DRIP
CONNECTION DRIP RETURN
10mm [3/8"] TEST
CONNECTION
STEAM TRAP ASSEMBLY
RODSSTRUCTURALLOAD ON
NOTE:
1. THIS SCHEDULE IS BASED ON FOUR EQUAL-SIZED PIPE ARRANGEMENTS FOR PIPE 5" AND SMALLER. THE SCHEDULE ALSO LIMITS THE NUMBER FOR 6" PIPES
TO THREE AND 8" PIPES TO TWO. HOWEVER, ANY COMBINATION OF PIPES CAN BE USED IF THE TOTAL COMBINED WEIGHT OF THE PIPES ON A TRAPEZE IS EQUAL TO OR LESS THAN THE MAXIMUM DEAD LOAD NOTED AND THE MAXIMUM TRAPEZE SPAN AND SIZE OF DIAGONAL BRACES NOTED IN THE SCHEDULE
ARE MAINTAINED.
2. PROVIDE TRANSVERSE AND LONGITUDINAL BRACES AT 40 FEET MAXIMUM FOR PIPES SMALLER THAN 4" AND AT 20 FEET MAXIMUM FOR PIPES 4 TO 8 IN.
INSTALL ONE TRAVERSE BRACE AND ONE LONGITUDINAL BRACE AT EACH END OF THE TRAPEZE.
3. PLACE STANDARD FLAT WASHER BETWEEN SHEET METAL ANGLES AND NUT,
LONGITUDINAL BRACE ONE EA. END OF TRAPEZE (SLOPE
SAME AS TRANSVERSE BRACE) LONGITUDINAL BRACE AT
OPPOSITE END NOT SHOWN FOR CLARITY)
HOLD DOWN CLAMP
FOR PIPE SIZE SEE TABLE ABOVE
SEE DETAIL ''A'' FOR
TRAPEZE SECTION
DETAIL 1
TRANSVERSE BRACING
SAME AS OTHER SIDE
CONNECTION TYPE A THRU
D VENT PL 3"x1
4", E THRU H
BENT PL 4"x3
8"
1-3 4" SQ. x 18" PL
WASHER
HANGER ROD
4 ft, 0 in.
4 ft, 0 in.
4 ft, 0 in.
4 ft, 0 in.
4 ft, 0 in.
3 ft, 10 in.
3 ft, 6 in.
VERTICAL SUPPORT
SAME AS OPPOSITE SIDE.
MAXIMUM TRAPEZE SPAN (SEE TABLE ABOVE)
CONNECTION TO SUPPORTING STRUCTURE
(1/2 in. cable)
3x3x1
3x3x1
(1/2 in. cable)
(1/2 in. cable)
(lb.)
TRAPEZE
3-1/2 540
2-1/2 320
(in.)
3 (1/2 in. cable) 3x3x1
3x3x1
(1/2 in. cable)
(1/2 in. cable) 3x3x1
ANGLES
(in.)
3x3x12ga
(CABLE SIZE)
3x3x1
(1/4 in. cable)
8 x 31
4 x 16ga
8 x 31
4 x 16ga
ADD VERTICAL ANGLE FROM
SCHEDULE WHEN 'L' GREATER THAN
MAX. LENGTH SEE DETAIL "B"
3/4
3/4
(in.)
8 x 31
4 x 16ga
8 x 31
4 x 16ga
8 x 31
4 x 16ga
8 x 31
4 x 16ga
8 x 31
4 x 16ga
SPAN
5/8
5/8
7/8
3/4
5/8
(in.)
2 MAX
C.L. OF BOLT EQ.
C.L. OF ANGLE
2" MAX.
TRANSVERSE
BRACE
1 MIN
6" M
AX
11 2"
TRAPEZE SUPPORT
DETAIL 2
THREADED ROD
W/REQ'D STIFFENER
8"
DETAIL ''A''
NOTE:
1. MAKE CERTAIN THAT PIPE IS CLAMPED
TIGHTLY BY HOLD DOWN CLAMP.
CONNECTION TO SUPPORTING
STRUCTURE (TYP)
MEMBER
SUPPORTING
F
F 1
5/8
GG
F
F
3/4
7/8
E
MEMBERS
F
5/8
(in.)
3- 1/4
EQ
EQ
(in.)
HEX NUT
PL3"x1
4" HOLD
DOWN CLAMP
TYP
2" STUD NUT
W/SPRING
2" STUD NUT
W/SPRING7
8"
TRAPEZE
MAXIMUM
MAX.
DEAD
SIZE
PIPE
VERTICAL
TRANSVERS &
LONGITUDINAL SIZE
TRAPEZE
3ANGLE
BOLT TO LENGTHCONNECTION
TYPE TO ROD
SIZE
MAX.
FOR
PIPE
SMACNA TABLE AA-8 SHL AA
1-6 1-6
DETAIL ''B''
HANGER ROD ATTACHMENT
TO STIFFENER ANGLE
PLAN
1/4" STIFFENER
3/16
(TYP.)
CG
(TYP)
CG(WT=7,000 # )
CHANNEL BASE FRAME
BY MANUFACTURER
MIN. 10" EDGE DIST. (TYP.)
1.5" DISTANCE (TYP.)
6" CONCRETE PAD,
REFER TO STRUCTURAL
"HILTI" KWIK BOLT TZ2
1/2"Ø x 4 " MIN.
EMBEDMENT. TYP.
(ESR #4266) (1) EACH
BRACKET
L3"x3"x1/4"x6" WELDED ANGLE
CLIP SEE PLAN VIEW FOR
MOUNTING LOCATIONS.
LOCATION OF ANCHORS
(TYP.-4) SEE DETAIL BELOW
OUTLINE OF EQUIPMENT
102.0"
54.0"
6"(TYP.)
1.5"3/16
(TYP.)
3 SIDES
EQUIPMENT MOUNTING DETAIL
19"
3/8" 11 1/2"
1"
2"
ANCHOR
PLATE
10 GAGE
LEAK PLATE
VENT (TYP)
WELDING
NECK FLANGE
1" VENT
10 GAUGE LEAK PLATE,
4" O.D. LARGER THAN
CASING. WELD TO CASING.
ANCHOR PLATE WELDED
TO CASING AND PIPE
WATER PROOFING
MEMBRANE
AIR SPACE
INSULATION
STEEL
PIPE
STEEL CASING
MEMBRANE
CLAMP
1" DRAIN
CAP
1/4
1/8
1/81/4
PIPE FITTING AND VALVE INSULATION
Scale
NONE 7
METAL COVERED TREATMENT
END CAP
CAULKING
INSULATION
JACKETING WHERE REQUIRED
APPLIED METAL OR PVC
OVERSIZED PIPE INSULATION
PIPE INSULATION WITH FIELD-
COLLAR OF OVERSIZED PIPE
PVC END CAP
INSULATION SYSTEM
SNAP FORM FITTING
STAINLESS STEEL TACKS
PIPE INSULATION
BLANKET
GLASS FIBER INSULATION
COVER FROM HOT METAL
TO SEAL AND TO PROTECT
SILICON CAULK OPENING
END CAP
FILL INSULATION
GLASS FIBER
PRE-FORMED METAL
SCREWS OR RIVETS
COVER SECURED WITH
PIPE INSULATION
COLLAR OF OVERSIZED
THE ABOVE DETAILS ARE TO DEMONSTRATE THE REQUIRED INSULATION PRACTICE FOR THE
PROJECT. THESE HAVE BEEN SHOWN FOR A FLANGE AND A VALVE ONLY, BUT ARE INTENDED TO DEMONSTRATE HOW THE INSULATION IS TO BE APPLIED AT ALL UNIONS, FLANGES, COUPLINGS, STRAINERS, VALVES, FITTINGS AND STEAM TRAPS.
INSULATION SHALL BE APPLIED OVER ALL UNIONS, FLANGES, COUPLINGS, STRAINERS, VALVES, FITTINGS AND ALL STEAM TRAPS. THIS APPLIES TO ALL PIPING SYSTEMS EXCEPT FIRE PROTECTION, SANITARY DRAIN, AND SOME CHROMIUM PLATED PIPING TO PLUMBING FIXTURES. INSULATION SHALL BE MARKED INDICATING THE LOCATION OF AND IDENTITY OF THE ITEM COVERED. THE INSULATION SYSTEM SHALL BE REMOVABLE AND REPLACEABLE AS INDICATED BY END CAP AND CAULK SYSTEM.
WHERE UNIONS, FLANGES, COUPLINGS, STRAINERS, VALVES, FITTINGS AND STEAM TRAPS ARE LOCATED IN THE KITCHEN AREAS OF THE PLANS, ALL PIPE INSULATION SHALL BE COVERED WITH CHROME PLATED OR STAINLESS STEEL SLEEVES, OR PVC JACKETING TO PROVIDE A CLEANABLE SURFACE. ALUMINUM JACKETING WILL NOT BE ALLOWED. THE JOINTS SHALL ALL BE SEALED WITH SILICON CAULK.
VALVES AND TEES SHALL BE INSULATED WITH FIBER GLASS BLANKET AND PRE-FORMED PVC FITTING COVERS. THE SAME COVERS ARE USED FOR TEES AS FOR VALVES BY CUTTING OUT THE BLANK END.
CUT-OUT IS ALSO MADE HERE FOR VALVE STEM.
Scale
NONE 4PRESSURE TRANSMITTER INSTALLATION
Scale
NONE 9HEAT TRACING DETAILS
NOTES: 1
NO SCALE
NO SCALE
NO SCALE
NO SCALE
INSTALLATION DETAIL
HOT-COLD JOINT
PIPE STRAPS
1'-6"
INSTALLATION AT VALVES
VALVE
HEAT TRACE CONTROL BOX DIAGRAM
CONTACTOR
NO
END CAP
SECTION THRU PIPE
PROVIDE WEATHER RESISTANT LABELING ON
EXTERIOR OF JACKET IDENTIFYING PIPES AS BEING
"ELECTRIC TRACED" WITH VOLTAGE INDICATED.
PIPE STRAPS AT
APPROX.
18" INTERVALSPIPE INSULATION
WATERPROOF
JACKET OVER
INSULATION
ALUMINUM
FOIL TAPE
SELF REGULATING
HEAT TRACE
CABLE
HEAT TRACE
CABLE
THERMOSTAT WITH
AMBIENT AIR SENSOR.
SET ON AT 35°F
TO POWER
SUPPLY AT
DISCONNECT
SWITCH
WATER TIGHT
CONTROL BOX
ALUMINUM FOIL
TAPE AND
INSULATION NOT
SHOWN.
SELF REGULATING
TYPE HEAT TRACE
CABLE
HEAT TRACE
CABLE EVENLY
DISTRIBUTED
ALONG PIPE
PIPE INSULATION
AND ALUMINUM FOIL
TAPE NOT SHOWN
Scale
NONE 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL DETAILS
PM SS
M-004
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Scale
NONE
Scale NONE 5 4 3HIGH PRESSURE STEAM TRAP DISCHARGE INTO PUMPED CONDENSATE RETURN LINEINSTALLATION OF THERMOMETER WELLS
BO
CF
CB
D
BOILER
(TYPICAL)
ECONOMIZER
(TYPICAL)
V
D
OSD
VT
R
D
CV-6,7,8
10-260°C [50-500°F]
FW
PD
FWPD
FW
PD
FWPD
SRV-1
FW
PD
-2
FW
PD
-1
FR
OM
FE
ED
W
AT
ER
PU
MP
S
20mm [3/4"]
VENT INTO
BOILER ROOM
20mm [3/4"]
STACK
BW
S
BO
51mm [2]
TO
S
AM
PL
E
CO
OL
ER
20mm 3/4" FROM
CHEMICAL FEEDER
TO BO TANK
OR, IF SPECIFIED, TO
BLOWDOWN HEAT
RECOVERY
BO
2ND BO LINE REQUIRED IF
BOILER HAS TWO BO
CONNECTIONS
FWPD
CONTROLLER
BOILER WATER LEVEL CONTROL SCHEMATIC
(SEE SPECS FOR TYPE OF SYSTEM)
CV-6,7,8
BOILER WATER LEVEL
TRANSMITTER
BOILER STEAM FLOW
TRANSMITTER
BOILER FEEDWATER PRESSURE
TRANSMITTER
SI
NG
LE
E
LE
ME
NT
SY
ST
EM
DU
AL
E
LE
ME
NT
SY
ST
EM
TH
RE
E
EL
EM
EN
T
SY
ST
EM
0-150°C [30-300°F]
0-2000kPa
[0-300PSIG]
CV
-9
,10 ,11
M
PROVIDE CONTROL VALVES HERE THAT WOULD
MODULATE IN UNISON (ONE OPENS, THE OTHER
ONE CLOSES) TO PREVENT TOO LOW A FLUE
GAS TEMPERATURE OUT OF THE ECONOMIZER.
PROVIDE TEMPERATURE
TRANSMITTERS
HERE
0-2000kPa
[0-300PSIG]
20mm [3/4"]
Scale NONE 1BOILER FLOW DIAGRAMScale
NONE 2NOT USED
A SIZE, TRAP DISCHARGE LINE 15mm [1/2"] 20mm [3/4"]
32mm [1-1/4"]25mm [1"]SIZE, 45° WELDING NIPPLEB
C LENGTH OF EXPANDED MAIN AHEAD OF TRAP
DISCHARGE PIPE
175mm [7"] 175mm [7"]
415mm [16-1/2"]
50mm [2"]LENGTH OF EXPANDED MAIN FOLLOWING
PERFORATED PIPE
LENGTH OF PERFORATED PIPED
E
RETURN MAIN SIZE UP TO 40mm [1-1/2"] 75mm [3"] & OVER
SAME SIZE65mm [2-1/2"]EXPANDED RETURN MAIN SIZE
WELD CAP
EXPANDED RETURN MAIN CAP
REDUCER
INCREASER
A
B
A
A
RETURN
MAIN
FLOW
SECTION-EXPANDED RETURN MAIN
EDC
PERFORATED
TUBE
NOTES:
1.
2.
3.
15mm [1/2"] PERFORATED TUBE SHALL HAVE 40 - 16mm [1/8"] DIAMETER HOLES SPACED 40mm [1-1/2"]
O.C. IN 4 ROWS.
20mm [3/4"] PERFORATED TUBE SHALL HAVE 78 - 6mm [1/8"] DIAMETER HOLES SPACED 40mm [1-1/2"]
O.C. IN 6 ROWS.
HOLES IN TUBE SHALL BE SPACED EQUALLY AROUND PERIMETER.
415mm [16-1/2"]
50mm [2"]
50mm [2"]
EXPANDED RETURN MAIN
PERFORATED TUBE 1"x1/8" [25x6mm] THICK
GUIDE FINS WELDED TO PERFORATED
TUBE
SECTION A-A
GREATER THAN 50mm [2"] DIA. PIPE 50mm [2"] DIA. & SMALLER
VERTICAL
GREATER THAN 50mm [2"] DIA. PIPE 50mm [2"] DIA. & SMALLER
HORIZONTAL
65mm [2 1/2"] DIA.
NOTE:
PROVIDE THE APPROPRIATE WELL DEPTH TO HAVE THE NECESSARY
INSULATION STAND-OFF DISTANCE.
65mm [2 1/2"] DIA.
ECONOMIZER MOUNTING DETAIL
SUIT
LENGTH TO
LENGTH TO SUIT
TYP.
EXISTING ROOF BAR JOIST
REQD., TYP.
TYP.
1/4"
2"X2"X1/4"
2"X2"X1/4" (TYP.)
1/4"
5/8" HANGER ROD (TYP. 4)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL DETAILS
PM SS
M-005
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Scale
NONE
Scale NONE 7 5 3FIRE TUBE BOILER AUXILIARY WATER LEVEL SAFETY PIPING ACCESS PLATFORM ARRANGEMENT
Scale
NONE
Scale
NONE 1
STEAM SAFETY VALVE
EQUIPMENT ANCHORING - PACKAGED BOILER AND DEAERATOR AND CONDENSATE STORAGE TANKS
D
PROVIDE UNION UNLESS SAFETY
VALVE HAS FLANGED OUTLET
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL OR PIPE
VENT PIPE THROUGH ROOF SUPPORT AS
INDICATED ON DWGS. (NOTES 1, 2)
PIPE THREADED INTO ELBOW (SAME
SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
20mm [3/4"] DRAIN TO FLOOR
DRAIN OR OPEN SIGHT DRAIN
(NOTE 4)
mm [1"
M
IN
610mm
[24" MAX]
76mm [3"]
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A
TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45 DEG. ELBOWS.
2. VENT PIPE SHALL TERMINATE 1829mm [6'] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHERE PERSONNEL MAY OCCUPY.
4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
FLEXIBLE CONNECTOR
Scale NONE 4Scale
NONE 6
CONCRETE
FOUNDATION
BOILER BASE
FRAME
PLATE WELDED TO BASE
(PLATE DESIGNED BY BOILER
FRAME MANUFACTURER)
ANCHOR BOLTS SIZE AND
QUANTITY DETERMINED
BY CONTRACTOR BASED
ON BOILER FURNISHED
NOTES:
1. REFER TO SYMBOL AND SCHEDULE SHEETS FOR SEISMIC FORCE DESIGN INFORMATION
2. PROVIDE SLOTTED HOLES IN PLATES TO ALLOW THERMAL EXPANSION IF RECOMMENDED
BY BOILER MANUFACTURER
ANCHOR BOLT
PLATE
CONC.
FOUNDATION
REBAR
BOILER BASE
FRAME
CONC.
PIERS
TANK
SADDLES
ANCHOR
BOLTS
(TYPICAL)
PLAN
SLOTTED HOLE
LENGTH = BOLT SIZE
15mm [+0.5"] EACH
SIDE
10mm [3/8"] THK.
STEEL PLATE
BOLTED TO PIER
TANK
SADDLE
CONCRETE
PIER
SADDLE
BEAM
ALTERNATE FOR
TANKS
SUPPORTED BY
STEEL BEAMS
REINFORCEMENT
PLATES
BOLTS
ELEVATION
REBAR
ANCHOR BOLT
FLOOR
PLAN
ELEVATION
BOILER
DESIGNER NOTE;
STATE LOCATION AND
QUANTITY OF
REINFORCEMENT PLATES
ELEVATION
CONCRETE
BASE
BOILER ROOM
FINISHED FLOOR
AUXILIARY LOW WATER CUTOFF
SHUNT SWITCH (LOCATE WITHIN
900mm [3'] OF ALWCO DRAIN VALVE)
BURNER
600mm [2'] MAX.
SIGHTFLOW INDICATOR WITH
ROTOR (ORIENT WINDOWS TO
FACE UP AND DOWN)
20mm [3/4"]
TO BLOWOFF LINE
15mm [1/2"]
STEAM PRESSURE GAGE (0-2000kPa
[0-300 PSIG])
HIGH PRESSURE CUTOUTS
FEEDWATER LEVEL CONTROL
UNIT LOW WATER CUTOFF
BOILER
PLUGGED CROSS (TYPICAL)
AUXILIARY LOW WATER CUTOFF LOW
WATER ALARM HIGH WATER ALARM
STEAM NOZZLE
20mm [3/4"]
TO BLOWOFF
LINE
SIGHTFLOW INDICATOR
WITH ROTOR (ORIENT
WINDOWS TO FACE UP AND
DOWN)
mm
[1
32mm [1 1/4"]
GAGE GLASS
LOW WATER CUTOFF SHUNT SWITCH
(LOCATE WITHIN 3' [900mm] OF LWCO
AND GAGE GLASS DRAIN VALVES)
BALL VALVES PROHIBITED (TYP)
32mm [1 1/4"] mm
[1
32mm [1 1/4"]
LC
LADDER HANDRAIL
BOILER
ACCESS PANEL
STACK
ECONOMIZER
SAFETY
VALVE
VENT THRU ROOF
VENT
MANWAY
NON-RETURN
STOP-CHECK VALVE
762mm [2'-6"]
PLATFORM
300mm [12"]
BURNER
PLAN VIEW
HANDRAIL
TOP OF
BOILER
CASING
(N) LADDER,
BY BOILER
MANUFACTURER
STEAM LEAD
NON-RETURN
STOP-CHECK VALVE
25mm [1"]
BOILER
(E) CONCRETE PAD
BOILER ROOM FLOOR
BURNER
ELEVATION
NOTE:
SUPPORT PLATFORM FROM FINISHED FLOOR
OR FROM BOILER IF BOILER MANUFACTURER
PROVIDES BOILER ATTACHMENTS AND
APPROVES INSTALLATION.
HANDLE FOR VALVE TO BE
ACCESSED FROM PLATFORM
(N) PLATFORM,
BY BOILER
MANUFACTURER
SEISMIC CONNECTIONS TO CONCRETEPIPE STAND DETAIL
BOILER BLOWOFF TANK
305mm [12"]
ALIGN WITH CENTER OF WEAR PLATE
L TANK (NORMAL WATER LEVEL)
152mm [6"]
152mm [6"]
VT
R
BO
HPR
CW
CW
32mm [1 1/4"]
OFL
FULL CIRCUMFERENCE
WEAR PLATE
PLAN VIEW
LEG (4 REQD.)
HPR
BO
CW
50mm [2"]
PLUGGED
COUPLING (TYP)
WEAR PLATETEMPERATURE
CONTROL VALVE
(TCV-1)
32mm [1 1/4"]
20mm [3/4"]
THERMAL BULB
50mm [2"] PIPE
SIZE IN AREA OF
THERMAL BULB
0-150°C
[30-300°F] (TYP)
WELL
CROSS
OFL
FROM STEAM ATOMIZING
BURNER AND OIL HEATER TRAPS
0-200 kPa [0-30 PSIG]
FROM BOILERS
GAUGE GLASS (25mm [1/2"] MIN.DIA)
INTERNAL OFL PIPE (WATER SEAL)
152mm [6"]
STEEL
ANGLES
GROUT
PLUGS
ELEVATION
NOTE:
TANK SHALL BE MANUFACTURED AND FURNISHED IN ACCORDANCE WITH THE ASME BOILER AND
PRESSURE VESSEL CODE AND AMERICAN NATIONAL STANDARD ANSI/ASME BPV VIII-1. INSPECTION AND REGISTRATION ARE WITH THE NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS
20mm [3/4"] OPENING
(SYPHON BREAKER)
50mm [2"] DRAIN
FINISHED
FLOOR
PLATE
OPEN SIGHT DRAIN
MANHOLE 305x406mm [12"x16"]
32mm [1 1/4"]
NC
ROD COUPLING
JAMB NUT
THREADED ROD
EXPANSION
ANCHOR BOLT
TO CONCRETE
ANGLE
DOUBLE NUTS
THREADED ROD
10x BOLT
DIA. MIN.
EXPANSION
ANCHOR BOLT
TO CONCRETE
3'-6" MAX. FOR DOUBLE
PIPE SUPPORT MAX. OF
2 PIPES PER STANDINSULATED PIPE (TYP.)
INSULATION SHIELD (TYP.)
FEE & MASON FIG. 291
ADJUSTABLE PIPE
SUPPORT
6" TO 2-1/2"
THREADED REDUCER
6"Ø STANDARD PIPE
'-0
" M
AX
CONTRACTOR TO PROVIDE
ENGINEERED STRUCTURAL
CONCRETE SUPPORTS.
STRUCTURAL SUPPORTS ARE
TO BE DESIGNED AND STAMPED
BY REGISTERED ENGINEER.
SUBMIT SHOP DRAWING FOR
APPROVAL.
FINISHED GRADE
6"Ø STANDARD PIPE
STL. BEAM
SEE STRUCTURAL
INVERTED ANGLE
IRON SADDLE
TYP. WHERE
SADDLE SITS
ON BEAM3/16"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE BOILERS / STEAM
LINES, BUILDING 19
KERRVILLE, TX
671A4-20-160
Project Director
04/03/2024Revisions: Date:
700 N. CENTRAL AVENUE, SUITE 520, GLENDALE, CA 91203
www.schwabeng.com Project No.: S6052721.00
MECHANICAL DETAILS
PM SS
M-006
AutoCAD SHX Text C
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Scale
NONE 7 5ROOF PENETRATION FLASHING DETAIL
Scale NONE 1WATER SAMPLE COOLERS BOILER WATER AND FEEDWATER Scale
NONE 2EQUIPMENT ANCHORING - PACKAGED BOILER AND DEAERATOR AND CONDENSATE STORAGE TANKS Scale
NONE 3
NOT USED
TEMPORARY BOILER PIPING CONNECTION DETAIL
D
SW
FW
S
BW
S
BW
S
BW
S
15mm [1/2"]
FROM EACH BOILER
8mm [1/4"] FROM
DEAERATOR
20mm [3/4"]
COOLING WATER
8mm [1/4"]
SAMPLE
OUTLET
20mm [3/4"]
ANTI-SYPHON
VACUUM BREAKER
0-83°C [30-180°F]
SAMPLE COOLER
PROVIDE SEPARATE COOLERS FOR BWS AND FWS.
MOUNT BWS COOLER 1.2M [4'] ABOVE FINISHED
FLOOR ON WALL OR COLUMN. MOUNT FWS COOLER
0.6M [2'] ± ABOVE MEZZANINE FLOOR AT
DEAERATOR.
15mm [1/2"]
ELEVATION
FD
SW
PROVIDE SAME WATER SAMPLE AS
COOLER'S PIPING ARRANGEMENT
AND EQUIPMENT FOR THE BOILER
WATER AS SHOWN FOR THE
FEEDWATER SAMPLE COOLER.
CONCRETE
FOUNDATION
BOILER BASE
FRAME
PLATE WELDED TO BASE
(PLATE DESIGNED BY BOILER
FRAME MANUFACTURER)
ANCHOR BOLTS SIZE AND
QUANTITY DETERMINED BY
CONTRACTOR BASED ON
BOILER FURNISHED
NOTES:
1. REFER TO SYMBOL AND SCHEDULE SHEETS FOR SEISMIC FORCE DESIGN INFORMATION
2. PROVIDE SLOTTED HOLES IN PLATES TO ALLOW THERMAL EXPANSION IF RECOMMENDED
BY BOILER MANUFACTURER
ANCHOR BOLT
PLATE
CONC.
FOUNDATION
REBAR
BOILER BASE
FRAME
CONC.
PIERS
TANK
SADDLES
ANCHOR
BOLTS
(TYPICAL)
PLAN
SLOTTED HOLE LENGTH =
BOLT SIZE 15mm [+0.5"]
EACH SIDE
10mm [3/8"] THK. STEEL
PLATE BOLTED TO PIER
TANK
SADDLE
CONCRETE
PIER
SADDLE
BEAM
ALTERNATE FOR
TANKS
SUPPORTED BY
STEEL BEAMS
REINFORCEMENT
PLATES
BOLTS
ELEVATION
REBAR
ANCHOR BOLT
FLOOR
PLAN
ELEVATION
BOILER
DESIGNER NOTE;
STATE LOCATION AND QUANTITY OF
REINFORCEMENT PLATES
STEAM TRAP PIPING
STEAM RISER
STEAM MAIN
12" MIN
6" LONG DIRT
POCKET (FULL SIZE)
FULL SIZE
OF TRAP
GLOBE
VALVE
GATE VALVE
INVERTED BUCKET TRAPSTRAINER
CHECK VALVE
DRIP MAIN RETURN
GATE VALVE
6" STEAM SUPPLY
SEE STEAM TRAP PIPING
14" MIN.
10" MIN.
TEMP BOILER
CONNECTION
3'-0": AFF
SUPERVISED STARTUP GLOBE VALVE
Scale
NONE 4 VERTICAL PIPE SUPPORT DETAIL
SECURE TO BRICK WALL WITH
SUPPORT W/BOLTS
SP-69 TYPE 8
STANDARD RISER
AND HEX NUTS
PLAN VIEW
VARIES
TO SUIT
CLIP WITH BOLTS
2"x2"x1/4" ANGLE
& HEX NUTS
X"Ø MASONRY ANCHORS,
TYP. 4 PLACES
SIDE ELEVEATION
RISER SUPPORT TO ANGLE
CLIP, TYP.
THRU BOLT STANDARD
ALL WELDED CONSTRUCTION
1-1/2"x1-1/2"x1/4"
SECURE TO BRICK WALL WITH
X"Ø MASONRY ANCHORS,
TYP. 4 PLACES
2"x2"x1/4" ANGLE CLIP
WITH BOLTS AND HEX
TO SUIT
XX"Ø EXHAUST
DUCT
1-1/2"x1-1/2"x1/4"
NUTS
SP-69 TYPE 8 STANDARD
RISER SUPPORT W/BOLTS
AND HEX NUTS
1/4"
TYP.
XX"Ø EXHAUST
DUCT
(TYP.)
NOTE
CONDENSATE TMP CONNECTION IS
SIMILAR EXCEPT 4" AND WITHOUT THE
STEAM TRAP AND ITS PIPING.:
ROOF PENETRATION PATCH DETAILScale NONE 8 NOT USED Scale
NONE 6
BIRD SCREEN
24 GA. GALV. VENT CAP
24 GA. GALV. VENT
BASE-PRIME FLANGE,
SET IN MASTIC AND NAIL
@ 3" O.C. STAGGERED
MODIFIED BITUMEN
ROOF SYSTEM
1/2" GLASS - FACED
GYPSUM ROOF BD.
RIGID INSULATION
EXISTING CONCRETE DECK
VENT
TRT'D WOOD BLK'G. TO
MATCH HT. OF INSUL.
SCREW TO DECK @ 6" O.C.
MODIFIED BITUMEN ROOF SYSTEM
1/2" GLASS-FACED GYPSUM
ROOF BOARD
INSULATION
EXISTING CONCRETE DECK
3/8" STL PLATE W/(4)
3/8" HILTI BOLTS MIN.
3 1/2" EMBEDFIELD
VERIFY
CONC. FILL
EXISTING CONCRETE DECK
NOTE : FIELD VERIFY AND REMOVE
PIPING AT ALL ABANDONED ROOF
PENETRA…