ATTACHMENT 6 Seed Project 549-22-231 Drawings.pdf
PDF 11 MB Posted
- Attached to
- Y1DA--NCO17 Central Texas Construction MATOC Federal contract opportunity
- Solicitation number
- 36C25723R0013
About this file
This document is a set of construction drawings for the Seed Project 549-22-231, which is related to the Department of Veterans Affairs' solicitation for a Multiple Award Task Order Contract (MATOC) for Central Texas Construction. The solicitation number is 36C25723R0013 and it is a 100% competitive Service-Disabled Small Business Set-Aside under NAICS code 236220. The MATOC will be awarded by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 17. The drawings provide technical specifications and details for the construction work to be performed under this MATOC contract.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VETERANS DRIVE
VETERANS DRIVE
DRIVE
AR
BO
R
AN
N
ANN ARBOR
ENTRANCE
EASTER AVE.
AN
N
A R
BO
R
D R
IV
E
GLADEW
ATER
SOFTBALL &
RECREATION
AREA
SCI
ENTRANCE
SPINAL CORD
INJURY CENTER EAST
ENTRANCE74
RADIATION
ONCOLOGY
BUILDING
CLINICAL ADDITION
SOUTH
ENTRANCE
MAIN
ENTRANCE
MAIN
MEDICAL CENTER
ENTRANCE
SOUTH
ENTRANCE
LANCASTER ROADLANCASTER ROAD
TRANSITIONAL
CARE UNIT
STAFF
GARAGE
(BELOW)
PROJECT SITE:
HR MENTAL HEALTH
RENOVATION
DALLAS VA MEDICAL CENTER
CLINICAL ADDITION
SOUTH
ENTRANCE
MAIN
ENTRANCE
MAIN
MEDICAL CENTER
ENTRANCE
SOUTH
ENTRANCE
LANCASTER ROADLANCASTER ROAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023
TITLE SHEET
CR HK
G-001
100% CONSTRUCTION DOCUMENTS 04/20/2023
BID SET 08/11/2023
SHEET INDEX
ELECTRICAL
DWG. NO. SHEET TITLE
GENERAL
TITLE SHEETG-001
PLUMBING
DWG. NO. SHEET TITLE
ARCHITECTURAL
ARCHITECTURAL FLOOR PLAN - DEMOLITION AD-101
ARCHITECTURAL FLOOR PLAN - NEWA-101
MECHANICAL
ARCHITECTURAL FLOOR PLAN - DIMENSIONSA-102
ARCHITECTURAL REFLECTED CEILING PLANA-111
ARCHITECTURAL ROOF PLANA-120
GENERAL NOTES
SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.
MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES AND REGULATIONS PER ALL FEDERAL AND STATE
REGULATIONS.
THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.
CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE IMPORTANCE OF PROPER SCHEDULING AND PHASING OF THE WORK SO AS TO CAUSE MINIMUM DISTURBANCE TO THE ACTIVITIES IN THE OTHER AREAS OF THE BUILDING WHICH REMAIN OCCUPIED. THE
CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED BY THE GOVERNMENT.
CONTRACTOR SHALL PERFORM WORK ONLY AFTER THE GATHERING OF EXACT FIELD DIMENSIONS OF THE BUILDING STRUCTURE AND
CEILINGS, ETC. WHICH MAY AFFECT THE INSTALLATION OF THE NEW SYSTEMS.
THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED
WITHOUT INTERFERENCE OR DELAY.
CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.
ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.
PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT & DUCTWORK PER SPECIFICATIONS.
CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORTS AND BRACING PER SMACNA REQUIREMENTS.
ANY EQUIPMENT OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSE RELATING TO VERIFY THE AS-BUILT DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS SHALL BE BORN BY THE CONTRACTOR.
ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING
LATEST IBC AND ASCE 7-05 CHAPTER 13.
ALL PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA GUIDELINES AND IMC.
EQUIPMENT SPECIFIED ON THESE DRAWINGS ARE BASIS OF DESIGN ITEMS. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL ADDITIONAL DESIGN AND CONSTRUCTION COSTS INCURRED BY THE USE OF ANY PRODUCT OTHER THAN THE BASIS OF DESIGN.
MEDICAL CENTER, DALLAS, TX
DEPARTMENT OF VETERANS AFFAIRS
V.A. HOSPITAL DALLAS, TX
VA PROJECT #549-22-231
HR MENTAL HEALTH BUILDING RENOVATION
1.
2.
3.
4.
5.
6.
7.
15.
10.
11.
12.
13.
14.
9.
16.
17.
8.
SITE PLAN
A-401
PROJECT SCOPE
ARCHITECTURAL INTERIOR ELEVATIONS, PLUMBING FIXTURE LEGEND
BUILDING CODE ANALYSIS
A-501 ARCHITECTURAL DOOR SCHEDULE
ARCHITECTURAL FLOOR PLAN - INTERIOR FINISHESA-103
STRUCTURAL
STRUCTURAL GENERAL NOTESS-001
S-200 S-201
STRUCTURAL FOUNDATION PLAN
STRUCTURAL ROOF FRAMING PLAN
MECHANICAL FRONT SHEETM-0.1
MECHANICAL SCHEDULEM-0.2
MECHANICAL DEMOLITION PLANM-1.0
MECHANICAL NEW PLANM-2.0
MECHANICAL DETAILS
MECHANICAL DETAILS
MECHANICAL ROOF DEMOLITION PLANM-1.1
MECHANICAL ROOF NEW PLANM-2.1
M-4.0 M-4.1
PLUMBING FRONT SHEET
PLUMBING DOMESTIC WATER FLOOR PLAN
PLUMBING ROOF PLAN
PLUMBING DETAILS
PLUMBING DEMOLITION FLOOR PLAN
PLUMBING WASTE & VENT FLOOR PLAN
PLUMBING SCHEDULES
P-001
PD-101
P-101 P-102 P-120 P-400 P-501
TOPOGRAPHIC SURVEY - FOR REFERENCE ONLYA-001
ARCHITECTURAL BUILDING SECTIONS & ELEVATIONSA-201
S-101 STRUCTURAL TYPICAL DETAILS
S-301 SECTION AND DETAILS
MECHANICAL DETAILS
MECHANICAL CONTROL DIAGRAM
M-4.2 M-5.0
ELECTRICAL FRONT SHEETE-0.1
E-0.2 ELECTRICAL SYMBOL LEGEND
ED-1.0 ELECTRICAL DEMOLITION PLAN- LIGHTING
ELECTRICAL DEMOLITION PLAN- POWER & SIGNAL
ELECTRICAL SIGNAL PLAN
ELECTRICAL DEMOLITION PLAN- FIRE ALARM & SIGNAL
ED-1.1
ED-1.2
ELECTRICAL POWER PLANEP-2.0
EP-2.1
ES-3.1
ELECTRICAL HVAC PLAN
E-0.3 ELECTRICAL SINGLE LINE DIAGRAM
E-0.4 ELECTRICAL LIGHTING FIXTURE SCHEDULE
EL-1.0 ELECTRICAL LIGHTING PLAN
ELECTRICAL PHOTOMETRIC CALCULATION NORMAL PLAN
ELECTRICAL PHOTOMETRIC CALCULATION EGRESS PLAN
EL-4.1
EL-4.2
ELECTRICAL DETAILS SHEETE-5.0
E-0.5 ELECTRICAL PANEL SCHEDULES
ARCHITECT/ENGINEER OF RECORD
NORTH
FLOOR PLAN - DEMOLITION
F1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
OFFICE
A115
OFFICE
A114
OFFICE
A113
OFFICE
A116BREAK RM
A112
OFFICE
A111
OFFICE
A110
WOMEN
A118
OFFICE
A107
OFFICE
A106
OFFICE
A105
OFFICE
A104
OFFICE
A103
OFFICE
A102
OFFICE
A126
OFFICE
A127
RECEPTION
A128
WAITING
A100
ENG. CLO.
A129
MEN
A122
OFFICE
A123
OFFICE
A120
ENG. CLO.
A119
OFFICE
A121
OFFICE
D104
OFFICE
D105
OFFICE
D107
OFFICE
D108
JANITOR
D106
71A 71B 71C
71D
(DAV)
(TVC)(HOTDESKING)(MH)
(METHADONE - N.I.C.)
(DENTAL - N.I.C.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL FLOOR PLAN
DEMOLITION
HK
AD-101
100% CONSTRUCTION DOCUMENTS 04/20/2023
EXISTING WALL
EXISTING WALL TO BE REMOVED
LEGEND
1. REMOVE EXISTING CEILING WHERE NEW CEILING IS SHOWN,
SEE REFLECTED CEILING PLAN 71-A111.
2. VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO
EXCAVATION, DEMOLITION, AND/OR RELOCATION. PROTECT
ALL UTILITIES AS REQUIRED.
GENERAL NOTES:
KEY NOTES:
REMOVE EXISTING STAIR & PAVING FOR NEW RAMP.1
REMOVE EXISTING PLANTER FOR NEW RAMP.2
REMOVE EXISTING LAWN & PAVING FOR NEW RAMP & STAIR.3
REMOVE EXISTING STEPS FOR NEW STAIR.4
REMOVE EXISTING EQUIPMENT PAD.5
EXISTING PAVING TO REMAIN.6
REMOVE EXISTING STAIR FOR NEW STAIR.7
OFFICE
A101 2
REMOVE EXISTING PAVING.8
CORRIDOR
A125
REMOVE EXISTING PLANTER. RE-GRADE AREA TO LOWER
FINISH GRADE TO 6" BELOW BUILDING FINISH FLOOR.9
RELOCATE EXISTING AREA DRAIN OUT OF THE WAY FOR
NEW RAMP. REROUTE UNDERGROUND PIPES AS REQUIRED.10
RELOCATE EXISTING ELECTRICAL BOX OUT OF THE WAY FOR
NEW RAMP. REROUTE UNDERGROUND CONDUITS AS
REQUIRED.
BID DOCUMENTS 08/11/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
TOPOGRAPHIC SURVEY FOR
REFERENCE ONLY - DATED 5/24/2012
HK
A-001
100% CONSTRUCTION DOCUMENTS 04/20/2023
NOTE:
DRAWING NOT TO SCALE,
USE GRAPHIC SCALE
FLOOR PLAN - NEW
F1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
OFFICE
A115
OFFICE
A114
OFFICE
A113
OFFICE
A116BREAK RM
A112
OFFICE
A111
OFFICE
A110
GROUP RM
A117
WOMEN
A118
OFFICE
A107
OFFICE
A106
OFFICE
A105
OFFICE
A104
OFFICE
A103
OFFICE
A102
OFFICE
A126
OFFICE
A127
RECEPTION
A128
WAITING
A100
ENG. CLO.
A129
MEN
A122
OFFICE
A123
OFFICE
A120
ENG. CLO.
A119
OFFICE
A121
OFFICE
B101
OPEN OFFICE
B100
OFFICE
C204
RECEPTION
C202
STORAGE
C206
OFFICE
C208
OFFICE
C209
WAITING
C200
ENG. CLO.
C213
OFFICE
D104
OFFICE
D105
OFFICE
D107
OFFICE
D108JANITOR
D106
WAITING
D100
OFFICE
B102
OFFICE
B103
71A 71B 71C
71D
RECEPTION
D102
(DAV)
(TVC)(HOTDESKING)(MH)
RAMP
(METHADONE - N.I.C.)
JANITOR
A124
STO.
D101
MEN
C212
OFFICE
C210
OFFICE
C203
ENG. CLO.
C205
OFFICE
C207
WOMEN
C211
MEN
D109
WOMEN
D110
M.H.
M.H.
CORRIDOR
C201
CORRIDOR
D103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL FLOOR PLAN
NEW
HK
A-101
B2 A401
B1 A401
OFFICE
A101
OFFICE
A109
OFFICE
A108
(DENTAL - N.I.C.)
EXISTING WALL
NEW WALL,
SEE D1/A401 - PARTITION TYPE-2
LEGEND
100% CONSTRUCTION DOCUMENTS 04/20/2023
CORRIDOR
A125
EXISTING DOOR
NEW DOOR
EXIST EXIST
EXIST EXISTING INTERIOR WINDOW
N
NEW INTERIOR WINDOW
SEE A401 FOR ELEVATIONS
1. SEE 71-A102 FOR DIMENSIONS.
2. VERIFY EXACT LENGTH OF RAMP IN FIELD BASED ON GROUND
ELEVATIONS. SEE 71-A-001 FOR TOPOGRAPHIC SURVEY.
3. CONSTRUCTION PHASING:
3.1. PHASE 1: EXISTING TENANTS TO VACATE 71-A & 71-B.
COMPLETE CONSTRUCTION IN 71-A & 71-B. MOVE 71-C &
71-D TENANTS INTO 71-A & 71-B.
3.2. PHASE 2: COMPLETE CONSTRUCTION IN 71-C & 71-D.
MOVE NEW TENANTS INTO 71-C & 71-D.
GENERAL NOTES:
KEY NOTES:
EXISTING CERAMIC TILE FINISH TO REMAIN.1
NEW RAMP. COORDINATE RAMP PLACEMENT WITH
EXISTING MANHOLE LOCATION AT NORTH SIDE OF
BUILDING.
NEW EQUIPMENT PAD. COORDINATE PLACEMENT WITH
EXISTING MANHOLE. SEE MECH.3
RELOCATE EXISTING AREA DRAIN. COORDINATE WITH NEW
EQUIPMENT PAD LOCATION. SEE PLUMB.4
EXISTING AREA DRAIN TO REMAIN.5
EXISTING MANHOLE. VERIFY EXACT LOCATION.6
M.H.
NEW STAIR.7
EXISTING LAWN.8
8 TYP.
NEW AREA DRAIN. CONNECT TO EXISTING PIPES. SEE
PLUMB.9
NEW CONCRETE PAVING.10
EXISTING CONCRETE PAVING TO REMAIN.11
12 NEW EQUIPMENT PAD. SEE MECH.
B1 A201
B1 A201
A1 A210
A1 A201
C1 A201
D1 A201
D2 A201
1:12UP
UP
R
AM
P
1:
R
AM
P 1:
R
AM
P
1:
UP
UP
UP
UP
AFTER REMOVING EXISTING PLANTER, RE-GRADE AREA TO
LOWER FINISH GRADE TO 6" BELOW BUILDING FINISH FLOOR.13
C1/A401
C2 /A
N N
N
N
EXTEND EXISTING WALL 9" ABOVE SUSPENDED CEILING.
SEE DETAIL D2/A401.14
NEW WOOD WAINSCOT RAIL TO MATCH EXISTING ON
OPPOSITE CORRIDOR WALL.15
C3/A401
RAMP 1:12
UP
UP
RAMP 1:12
M.H.
M.H.
EXISTING UNDERGROUND RE-ENFORCED CONCRETE PIPE.
FIELD VERIFY EXACT LOCATION AND DEPTH PRIOR TO
CONSTRUCTION.
RELOCATE EXISTING AREA DRAIN OUT OF THE WAY FOR
NEW RAMP. REROUTE UNDERGROUND PIPES AS REQUIRED.
SEE PLUMB.
RELOCATE EXISTING ELECTRICAL BOX OUT OF THE WAY FOR
NEW RAMP. REROUTE UNDERGROUND CONDUITS AS
REQUIRED.
EXISTING AREA DRAIN TO REMAIN.19
UP
FLOOR PLAN - DIMENSIONS
F1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
OFFICE
D104
OFFICE
D105
OFFICE
D107
OFFICE
D108
JANITOR
D106
WAITING
D100
71A 71B 71C
71D
RECEPTION
D102
(DAV)
(TVC)(HOTDESKING)(MH)
R
AM
P 1:
STO.
D101
MEN
D109
WOMEN
D110
M.H.
CORRIDOR
D103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL FLOOR PLAN
DIMENSIONS
HK
A-102
8'-6"
10'-5"
4'-6" 8'-0"
EQ. EQ. EQ.
'-5
1 2"
'-1 1"
'-1
1"
'-1 1 2"
8' -4
1 4" 8'
-4 1 4"
8' -4
1 4" 7'
-1 1"
9'-9
4" 7'-1" 11'-8
4"
1' -6
1' -6
1'-0"
5' -0
1'-0"
'-0
5'
-0
'-0
4'-4"
5'-0" 14'-1" 5'-4" 4'-0" 4'
-4
(METHADONE - N.I.C.)
(DENTAL - N.I.C.)
EQ
EQ
7' -1
1"
1' -0
'-6
100% CONSTRUCTION DOCUMENTS 04/20/2023
OFFICE
A115
OFFICE
A114
OFFICE
A113
OFFICE
A116BREAK RM
A112
OFFICE
A111
OFFICE
A110
GROUP RM
A117 WOMEN
A118
OFFICE
A109
OFFICE
A108
OFFICE
A107
OFFICE
A106
OFFICE
A105
OFFICE
A104
OFFICE
A103
OFFICE
A102
OFFICE
A101
OFFICE
A126
OFFICE
A127
RECEPTION
A128
WAITING
A100
ENG. CLO.
A129
MEN
A122
OFFICE
A123
OFFICE
A120
ENG. CLO.
A119
OFFICE
A121
OFFICE
B101
OPEN OFFICE
B100
OFFICE
B102
OFFICE
B103
OFFICE
C204
RECEPTION
C202
STORAGE
C206
OFFICE
C208
OFFICE
C209
ENG. CLO.
C213
MEN
C212
OFFICE
C210
OFFICE
C203
ENG. CLO.
C205
OFFICE
C207
WOMEN
C211
WAITING
C200
'-0
5'
-6
ALIGN
ALIGN
ALIGN
M.H.
5' -0
5' -0
8"
4'-4
8"
RAMP 1:12
UP
R
AM
P 1:
UP
UP
UP
UP
3T
4R
7"
3' -0
1'
-0
2T
3R
7"
2' -0
1' -0
1' -0
1'
-0
1'-0"
1' -0
1. VERIFY EXACT LENGTH OF RAMP IN FIELD BASED ON GROUND
ELEVATIONS. SEE 71-A-001 FOR TOPOGRAPHIC SURVEY.
GENERAL NOTES:
4'-0"
'-1
0"
6'-0"
1' -0
1'-0"
M.H.
UP
R
AM
P
1:
UP
RAMP 1:12
UP
UP
RAMP 1:12
M.H.
M.H.
7' -0
1 4" 7'
-0 1 4"
4' -9
'-6
5'
-0
3' -0
6'
-3 1 4"
5' -0
1'
-0
'-8
5'-4" 15'-0" 1'-0"
5' -4
5'
-4
5'-4"
1' -0
5T
6R
7"
FLOOR PLAN - INTERIOR FINISHES
F1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
OFFICEOFFICEOFFICE OFFICE
BREAK RM
OFFICE
OFFICE
GROUP RM
WOMEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
RECEPTION
WAITING ENG. CLO.
MEN
OFFICE
OFFICE
ENG. CLO.
OFFICE
OFFICE
OPEN OFFICE
OFFICE
RECEPTION
STORAGE
OFFICE
OFFICE
WAITING
ENG. CLO.
OFFICE OFFICE OFFICE OFFICEJANITOR
WAITING
OFFICE OFFICE
RECEPTION
RAMP
RAMP
(METHADONE - N.I.C.)
JANITOR
STO.
MEN
OFFICE
OFFICE
ENG. CLO. OFFICE
WOMEN
MEN
WOMEN
CORRIDOR
CORRIDOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
CORRIDOR
C
D
E
F
KEY NOTES:
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL FLOOR PLAN
INTERIOR FINISHES
HK
A-103
OFFICE
CARPET
VINYL SHEET FLOOR
MOSAIC CERAMIC TILE,
NON-SLIP
OFFICE
SEALED CONCRETE
OFFICE
(DENTAL - N.I.C.)
CPT-01
VSF-01
LEGEND
100% CONSTRUCTION DOCUMENTS 04/20/2023
CONC-01
EXISTING CERAMIC TILE FINISH TO REMAIN.
CT-01
VSF-01
VSF-01
VSF-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CONC-01
(DENTAL - N.I.C.)
CPT-01
CPT-01
CPT-01 CPT-01 CPT-01 CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
VSF-01
VSF-01
VSF-01
VSF-01
CPT-01
CPT-01
CONC-01
CT-01
CT-01
CONC-01
CPT-01
CPT-01
CPT-01
CPT-01
CPT-01
VSF-01
CPT-01
VSF-01
VSF-01
CPT-01
CPT-01
CONC-01
CPT-01
CPT-01
VSF-01
VSF-01
VSF-01
VSF-01
VSF-01CPT-01 CPT-01 CPT-01
CT-01
CT-01
NOTE: PATTERNS ARE FOR GRAPHICAL REPRESENTATION, NOT ACTUAL FLOOR PATTERN.
71A 71B 71C
71D
(DAV)
(TVC)(HOTDESKING)(MH)
M.H.
M.H.
UP
R
AM
P
1:
RAMP 1:12
UP
UP
RAMP 1:12
M.H.
M.H.
UP
REFLECTED CEILING PLAN
F1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL
REFLECTED CEILING PLAN
HK
A-111
2 X 4 LED LIGHT FIXTURE
1 X 4 LED LIGHT FIXTURE
RECESSED LED LIGHT FIXTURE
EXIT LIGHT
8'-6"
CEILING HEIGHT A.F.F.
(8'-6" U.N.O. TYPICAL)
SUPPLY AIR DIFFUSER
RETURN AIR GRILLE
SUSPENDED GYPSUM
BOARD CEILING
2 X 2 LAY-IN CEILING
NEW
LEGEND
4'-0" LED WALL MOUNT
PATIENT BED FIXTURE
6" X 2'-0" RECESSED INDIRECT
LIGHT FIXTURE
2 X 2 LAY-IN CEILING
EXISTING
100% CONSTRUCTION DOCUMENTS 04/20/2023
1. REMOVE EXISTING CEILING WHERE NEW CEILING IS SHOWN.
2. MAINTAIN ORIGINAL UPPER GYPSUM BOARD CEILING. PATCH
AND REPAIR OPENINGS.
3. 2 x 2 LAY-IN CEILING TILES TO BE 3" FIBERGLASS INSULATED
TILES.
4. PROVIDE 3'x5' CEILING ACCESS DOOR FOR NEW ATTIC SPACE
UNDER NEW ROOF AT BUILDING 71-B HOTDESKING.
GENERAL NOTES:
(METHADONE - N.I.C.)
(DENTAL - N.I.C.)
71A 71B 71C
71D
(DAV)
(TVC)(HOTDESKING)(MH)
ROOF PLAN
A1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
A
B
C
D
E
C
A
D
E
B
6 5 4 3 2 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2022 CR
ARCHITECTURAL ROOF PLAN
HK
A-120
EXISTING SLOPED ROOF.1
2TYP.
RAISE NEW ROOF RIDGE TO MATCH EXISTING ROOF RIDGE.
NOT USED.
1 TYP.1
NEW SLOPED ROOF - ASPHALT SHINGLES TO MATCH
EXISTING.
100% CONSTRUCTION DOCUMENTS 04/20/2023
5 NEW FLAT ROOF.
B1 A201
B1 A201
A1 A201
A1 A201
C1 A201
6 REMOVE EXISTING SLOPED ROOF.
REMOVE EXISTING SKYLIGHTS, TOTAL 15. RETURN ALL
SKYLIGHTS TO VA.
SL
O
PE
: M
IN
.1
/4 " P
ER
F
O O
T
SL
O
PE
: M
IN
.1
/4 " P
ER
F
O O
T
D1 A201
KEY NOTES:
D2 A201
TYP.
TYP.
1. COORDINATE ALL ROOF ACCESSORIES WITH MEP. SEE MEP
DRAWINGS.
2. REPAIR ALL ROOF OPENINGS TO WATERTIGHT CONDITION
WHERE SKYLIGHTS AND EQUIPMENT HAVE BEEN REMOVED.
3. REPAIR ALL INTERIOR CEILING OPENINGS WHERE SKYLIGHTS
HAVE BEEN REMOVED. MATCH EXISTING FINISH.
GENERAL NOTES:
BUILDING SECTION
A1
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR
ARCHITECTURAL BUILDING SECTIONS
& ELEVATIONS
HK
A-201
KEY NOTES:
EXISTING ROOF.1
REMOVE EXISTING FLAT ROOF TRUSS.
4 NEW ROOF FRAMING. SEE STR.
100% CONSTRUCTION DOCUMENTS 04/20/2023
6 5 4 3 2 1
SOUTH ELEVATION
C1
SCALE: 1/8" = 1'-0"
6 5 4 3 2 1
E D C B A
BUILDING SECTION
B1
SCALE: 1/8" = 1'-0"
3 24
NEW FLAT ROOF WITH INSULATION. SEE STR.
45 43
NEW ASPHALT SHINGLE ROOF TO MATCH EXISTING.
EXTEND EXISTING FRAMING TO UNDER THE NEW ROOF.
SEE STR.
EXTEND BRICK FASCIA TO UNDER SIDE OF NEW ROOF.
MATCH EXISTING.
EXTEND EXISTING FRAMING TO UNDER THE NEW ROOF.
SEE STR.
NEW ATTIC VENT GRILL. MATCH EXISTING.
14 37 41 4 3
SUSPENDED ACOUSTICAL T-BAR CEILING.
EAST ELEVATION
D1
SCALE: 1/8" = 1'-0"
E D C B A
1 2
NORTH ELEVATION
D2
SCALE: 1/8" = 1'-0"
3' -0
3' -6
3' -0
3' -0
3' -6
11 NEW CONCRETE EQUIPMENT PAD. SEE STR.
11 11
11 11
12 NEW CONCRETE STAIR WITH METAL RAILING. SEE STR.
13 NEW CONCRETE RAMP WITH METAL RAILING. SEE STR.
13 12
13 12 13 13
3' -6
TY
P.
TY
P.
TY
P.
TY
P. TY
P.
TY
P.
3' -6
TY
P.
3' -0
TY
P.
3' -0
3' -0
TY
P.
A2
SCALE: 1/4" = 1'-0"
RESTROOMS - C211 & C212
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEATH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR HK
A-401
ARCHITECTURAL ENLARGED
FLOOR PLANS, INTERIOR ELEVATIONS,
& WALL DETAILS
D
MEN
D109
WOMEN
D110
WOMEN
C111
MEN
C112
1' -6
1' -6
"1' -6
4'
-6
1' -6
A1
SCALE: 1/4" = 1'-0"
RESTROOMS - D109 & D110
A4 -A A3
-A A3
-C
KEY NOTES:
CERAMIC TILE, TYP.1
C
E
A4
SCALE: 1/4" = 1'-0"
INTERIOR ELEVATIONS
RESTROOMS - C211 & C212
PLUMBING FIXTURE AND
ACCESSORIES MOUNTING
HEIGHTS LEGEND *
NOTE DESCRIPTION
WATER CLOSETS
(MEASURED FROM FLOOR
TO TOP OF SEAT)
34" MAX.
19" MIN.
17"-19"
33"-36"
48" MAX.
38" - LAV
LAVATORIES & SINKS
(MEASURED FROM FLOOR
TO TOP OF RIM)
GRAB BARS
(MEASURED FROM FLOOR
TO CENTERLINE OF BAR)
TOILET TISSUE DISPENSER
(MEASURED FROM FLOOR
TO CENTER OF ROLL)
SOAP DISPENSER
(MEASURED FROM FLOOR
TO TOP OF PUSH BUTTON)
29" MIN. KNEE
CLEARANCE
44" MAX. FLUSH
CONTROL
a
DIMENSIONS
b c d e
8"
MIN.
9"
MIN.
6"
MAX.
PAPER TOWEL DISPENSER
(MEASURED FROM FLOOR
TO TOP OF TOWEL SLOT OR
OPERATING MECHANISM,
WHICHEVER IS HIGHER)
40" MAX. 74" MIN.
54" MAX.-SIDE 38" MAX.-SIDE
TOILET SEAT COVER
DISPENSER
(MEASURED FROM FLOOR
TO TOP OF SLOT OR
OPERATING MECHANISM)
48" MAX.-FRONT 38" MAX.-FRONT
FRAMED MIRROR
(MEASURED FROM FLOOR
TO BOTTOM OF
REFLECTING SURFACE)
* MOUNTING HEIGHTS ARE BASED ON THE TEXAS ACCESSIBILITY STANDARDS (TAS)
EFFECTIVE APRIL 8, 2022, AND THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY
GUIDELINES (ADAAG) UNO.
PLUMBING FIXTURE AND
ACCESSORIES SCHEDULE **
NOTE DESCRIPTION
WATER CLOSETS
SEE PLUMBINGLAVATORIES & SINKS
GRAB BARS
TOILET TISSUE DISPENSER
SOAP DISPENSER
PAPER TOWEL DISPENSER
FRAMED MIRROR/SHELF
MODEL NUMBER
SEE PLUMBING
SURFACE-MOUNTED TOILET ROLL HOLDER FOR 6"
DIAMETER TOILET ROLL
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
44" - SHOWER
** PROVIDE SPECIFIED PRODUCT OR APPROVED EQUAL.
A4-B
B A
C
E
A3
SCALE: 1/4" = 1'-0"
INTERIOR ELEVATIONS
RESTROOMS - D109 & D110 SIM. (MIRROR IMAGE)
B A
A3-B
C
LAVATORY
PLUMBING FIXTURE AND ACCESSORIES MOUNTING HEIGHTS
TO
P
O F
PU
SH
B U
TT
O
N
H
SOAP
DISPENSER
TO
P
O F
PU
SH
BU
TT
O N
F
TO
P O
F
TO
W
EL
S
LO
T
PAPER
TOWEL
DISPENSER
J
HAND
DRYER
T
FEMININE
NAPKIN
DISPOSAL
TO
P
O F
U N
IT
L
TRASH
RECEPTACLE
TO
P
O F
O
PE
N
IN
G
U
S
FEMININE
NAPKIN
VENDOR
TO
P
O F
C O
IN
S
LO
T
R
COAT
HOOK
TO
P
O F
H O
O K
Q
TOWEL
BAR
TO
P
O F
BA
R
A-a
A-b
MIRROR
EQUIP. PERMITTED
ONLY IN SHADED
AREA
TO
P
O F
R
IM
A-d
A-c
A-e
BO
TT
TO
M
O F
R
EF
LE
C
TI
N
G
SU
R
FA
C E
TO
P
O F
KN
EE
C
LE
AR
AN
C
EK-
a
K-b
TO
P
O F
R
EF
LE
C
TI
N
G S
U R
FA
C
E
URINAL
B-a
B-b
TO
P
O F
C O
N
TR
O L
TO
P
O F
R
IM
C -a
C -b D
G
TO
P O
F
SE
AT
O F
R O
LL
O F
BA
R
WATER
CLOSET
TO
P
O F
C O
N
TR
O L W
TO
P
O F
TO
W
EL
S
LO
T
COMBINATION
PAPER TOWEL
DISPENSER/
TRASH
RECEPTACLE
V
TO
P O
F U
N
IT
MOP AND
BROOM
HOLDER
100% CONSTRUCTION DOCUMENTS 04/20/2023
H C GF G
A3-D
D 1 TYP.
D
A4-C
1 TYP.
C
D F CH
TOILET SEAT COVER
DISPENSER
BOTTOM OF DECK
4 7/8"
FIRE STOP MATERIAL-
BOTH SIDES
ACOUSTICAL INSULATION
FIRE STOP MATERIAL-
BOTH SIDES
5/8" TYPE "X"
GYPSUM BOARD
2x4 @ 16" O.C.
(LATERALLY BRACE @ 16'-0"
VERTICALLY MAXIMUM,
WHERE APPLICABLE)
3" = 1'-0" 0" 6"3" 1'-0"
PARTITION TYPE-2 UL DESIGN
NO. U465
CEILING
BASE
STC 49
BOTTOM OF DECK
5/8" GYPSUM BOARD
2x4 @ 16" O.C. (LATERALLY
BRACE @ 16'-0" VERTICALLY
MAXIMUM, WHERE APPLICABLE)
4 7/8"
9" M
IN
. CEILING
3" = 1'-0" 0" 6"3" 1'-0"
PARTITION TYPE-1
BASE
STC 30
3 5/8" DWS @ 16" O.C. (LATERALLY
BRACE @ 16'-0" VERTICALLY
MAXIMUM, WHERE APPLICABLE)
ACOUSTICAL SEALANT
BOTH SIDES
ACOUSTICAL INSULATION
D1
PARTITION TYPES
C1
SCALE: 1/4" = 1'-0"
INTERIOR ELEVATION
WAITING - C200
2 3
SLIDING GLASS WINDOW WITH LOCK, TYP.2
PLASTIC LAMINATE COUNTER, TYP.3
C2
SCALE: 1/4" = 1'-0"
INTERIOR ELEVATION
WAITING - D100
3'-8" 3'-8"
3' -0
3'
-2
3' -0
3'
-2
3'-8" 3'-8"
2 3
C3
SCALE: 1/4" = 1'-0"
INTERIOR ELEVATION
CORRIDOR - D103
BOBRICK B-2013 - AUTOMATIC WALL-MOUNTED
FOAM SOAP DISPENSER
BOBRICK B-6806 SERIES 1-1/2" DIAMETER
STAINLESS STEEL GRAB BARS WITH SNAP FLANGE
NEW WOOD WAINSCOT RAIL TO MATCH EXISTING
ON OPPOSITE CORRIDOR WALL.4
WOOD STUDS
BOBRICK B-292 1836 - WELDED-FRAME
MIRROR/SHELF COMBINATION
BOBRICK B-2974 - SURFACE-MOUNTED AUTOMATIC,
UNIVERSAL ROLL PAPER TOWEL DISPENSER
BOBRICK B-221 - SURFACE-MOUNTED SEAT-COVER
DISPENSER
F1
DOOR TYPES
NOT TO SCALE
F2
HM DOOR FRAME TYPES
NOT TO SCALE
HOLLOW METAL1
FLUSH WOOD
2"
VARIES - VIF
1/2"
3' -6
2'
-3
4"
LAMINATED
GLASS
9"
SCHED. WIDTH
FLUSH WOOD
WITH VISION
SC
H
ED
H
T.
SCHED. WIDTH
SC
H
ED
H
T.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS
RENOVATE BLDG. 71
FOR MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
95% CONSTRUCTION DOCUMENTS 03/20/2023
08/11/2023 CR HK
A-501
ARCHITECTURAL DOOR SCHEDULE
A117 GROUP ROOM 3'-0" 7'-0" 1-3/4" WOOD STAINED HM N -N -PTD1 1, 2, 3, 41
100% CONSTRUCTION DOCUMENTS 04/20/2023
A119 ENGINEER CLOSET 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
A124 JANITOR CLOSET 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
A125 CORRIDOR 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
B101 OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
B102 OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
B103 OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
WAITING 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
CORRIDOR 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
ENGINEER CLOSET 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
STORAGE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
C200
C201
C202
C203
C204
C205
C206
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
OFFICE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
WOMEN 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
MEN 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
ENGINEER CLOSET 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
C207
C208
C209
C210
C211
C212
C213
WAITING 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
STORAGE 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
RECEPTION 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
JANITOR 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
MEN 3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
3'-0" 7'-0" 1-3/4" WOOD STAINED HM NN PTD1 1, 2, 3, 41
D100
D101
D102
D106
D109
D110 WOMEN
A117
A119
A124
A125
B101
B102
B103
C200
C201
C202
C203
C204
C205
C206
C207
C208
C209
C210
C211
C212
C213
D100
D101
D102
D106
D109
D110
S-001
GENERAL NOTES
ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO SPECIFICATIONS, PLANS AND ALL
GOVERNING ORDINANCES.
ALL WORKS SHALL COMPLY WITH IBC 2021, VA H-18-8 SEISMIC DESIGN REQUIREMENTS
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF THE JOB PRIOR TO
STARTING CONSTRUCTION AND THE OWNER, ARCHITECT OR ENGINEER SHALL BE NOTIFIED
IMMEDIATELY OF ANY DISCREPANCIES OR INCONSISTENCIES. DO NOT SCALE DIMENSIONS, WHERE
NO DIMENSIONS ARE PROVIDED, CONSULT WITH CONTRACTING OFFICER FOR CLARIFICATION
BEFORE PROCEEDING WITH THE WORK.
ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR AND CODE
REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN EXPENSE AND AT NO
EXPENSE TO THE CONTRACTING OFFICER.
ALL SYMBOLS AND ABBREVIATIONS USED IN THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATIONS IS REQUIRED, THE CONTRACTOR SHALL NOTIFY
THE ARCHITECT OR ENGINEER PRIOR TO PROCEEDING WITH THE WORK.
NO OPENINGS, POCKETS, NOTCHES, BLOCKOUTS, ETC., ARE ALLOWED STRUCTURAL ELEMENTS
UNLESS DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE ARCHITECTS OR ENGINEER OF
ANY OPENINGS, POCKETS, ETC., SHOWN BY OTHER DRAWINGS BUT NOT SHOWN ON THE
STRUCTURAL DRAWINGS.
THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE
DURING CONSTRUCTION. SUCH MEASURES INCLUDE BUT NOT LIMITED TO BRACING, SHORING, ETC.
OBSERVATION VISITS TO THE SITE BY OWNER, ARCHITECT, OR ENGINEER SHALL NOT INCLUDE THE
INSPECTION OF BRACING, SHORING, ETC.
CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS, ROOF, ETC. THE
LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING
LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREET AND
UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES.
SEE MECHANICAL, ELECTRICAL AND/OR ARCHITECTURAL DRAWINGS FOR LOCATION AND SIZE OF
PIPE, VENT, DUCT, AND OTHER SIMILAR OPENINGS, AND EMBEDDED OR ATTACHED ITEMS.
NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL
DETAILS.
DO NOT SCALE DRAWINGS.12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
CONTRACTORS RESPONSIBLE FOR THE CONSTRUCTION OF A WIND OR SEISMIC FORCE RESISTING
SYSTEM/COMPONENT LISTED IN THE "STATEMENT OF SPECIAL INSPECTION" SHALL SUBMIT A
WRITTEN STATEMENT OF RESPONSIBILITY TO THE LADBS INSPECTORS AND THE OWNER PRIOR TO
THE COMMENCEMENT OF WORK ON SUCH SYSTEM OR COMPONENT PER SEC 1709.1.
13.
REINFORCING
ALL REINFORCING SHALL CONFORM TO ASTM A-615 SPECIFICATIONS, 2-2628(B) GRADE 60 EXCEPT #3
BARS MAYBE GRADE 40. WELDED BARS SHALL BE ASTM A-706
REINFORCING BARS SHALL BE SPLICED AND BENT IN STRICT ACCORDANCE WITH THE DRAWINGS AND DETAILS AND C.R.S.I. PUBLICATIONS. NO KINKS ALLOWED. ALL BARS SHALL BE CLEAN PRIOR TO
CONCRETE PLACEMENT.
PROVIDE DOWELS OF SAME SIZE AND NUMBER FROM ADJACENT POUR. BOTH VERTICALLY AND
HORIZONTALLY TO MATCH TYPICAL REINFORCING SHOWN. LAPS TO BE IN ACCORDANCE WITH THE
DRAWINGS AND DETAILS. DOWELS SHALL BE CLEANED AFTER POUR.
USE LOW HYDROGEN ELECTRODES, GRADE E-70 OR E-90, FOR WELDING OF REINFORCING BARS.
SHOP DRAWINGS FOR REINFORCING STEEL SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER
FOR APPROVAL PRIOR TO FABRICATIONS.
FIELD WELDING OR BENDING OF REINFORCING IS NOT PERMITTED EXCEPT AS INDICATED ON THE
DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER.
6.
5.
4.
3.
2.
1.
CONCRETE
LIGHTWEIGHT AGGREGATES (CONFORMING TO ASTM C330) SHALL BE APPROVED BY THE ENGINEER, AND THEIR MAXIMUM SIZE SHALL BE ONE INCH.
HARDROCK AGGREGATES SHALL CONFORM TO ASTM C33. THEIR MAXIMUM SIZE SHALL BE 1-1/2
INCHES FOR FOOTINGS GRADE BEAMS AND 1 INCH FOR ALL OTHER WORK.
CEMENT SHALL CONFORM TO ASTM C150 TYPE I OR II.
CONCRETE SHALL BE AS FOLLOWS:
CONTINUOUS INSPECTION IS REQUIRED FOR ALL CONCRETE WITH A DESIGN STRENGTHS OVER 2000 PSI.
ONLY ONE GRADE OF CONCRETE SHALL BE POURED ON THE JOB AT ONE TIME.
A STATEMENT OF MIX DESIGN SHALL BE MADE FOR CONCRETE WITH DESIGN STRENGTH OVER 2500 PSI. COPIES OF THE MIX DESIGN SHALL BE SUBMITTED TO THE OWNER, ARCHITECT, ENGINEER, AND
BUILDING DEPARTMENT FOR APPROVAL BEFORE USE.
NOTE: A HIGHER GRADE OF CONCRETE MAY BE SUBSTITUTED FOR THOSE SHOWN ABOVE, BUT WILL
BE SUBJECT TO THE CODE REQUIREMENTS OF THE HIGHER GRADE.
ALL REINFORCING SHOWN CONTINUOUS SHALL BE LAPPED PER ACI 318 CLASS B SPLICE OR 40
DIAMETERS (GRADE 60) AT SPLICES, AND SHALL BE MADE AWAY FROM POINTS OF MAXIMUM
STRESS. MINIMUM LAP SHALL BE 2'-0" LONG.
FORMS FOR CONCRETE STRUCTURAL MEMBERS (SLABS, BEAMS, ETC.) SHALL NOT BE STRIPPED
UNTIL THE CONCRETE HAS REACHED ITS DESIGNED STRENGTH.
ALL CONCRETE IS DESIGNED BY ULTIMATE STRENGTH DESIGN METHOD.
A MIX THAT PRODUCES THE LOWEST SLUMP COMPATIBLE WITH PROPER PLACEMENT SHALL BE
USED (4-1/2" MAXIMUM SLUMP UNLESS OTHERWISE APPROVED BY THE STRUCTURAL ENGINEER.)
CONCRETE GROUT SHALL BE NON SHRINKING WITH SUFFICIENT WATER TO ALLOW POURING.
ULTIMATE COMPRESSIVE STRENGTH (F'C) AT 28 DAYS SHALL BE EQUAL TO 3000 PSI MINIMUM.
DRY PACK CONCRETE SHALL BE ONE PART PORTLAND CEMENT AND ONE PART SAND WITH
SUFFICIENT WATER TO ALLOW A SMALL AMOUNT OF PASTE TO COME TO THE SURFACE.
ALL SLEEVES NOT SPECIFICALLY SHOWN ON THE DRAWINGS SHALL BE LOCATED BY THE TRADES
INVOLVED AND SHALL BE APPROVED BY THE ENGINEER.
BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF ALL
OPENINGS, SLEEVES, CURBS, CONDUITS, BOLTS, INSERTS, ETC., RELATING TO WORK.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
2. TIES AND STIRRUPS
1. MAIN BARS IN BEAMS AND COLUMNS
C. NOT EXPOSED TO EARTH OR WEATHER
1. CAST-IN-PLACE - NON STRESSED
1-1/2" 2"
2"
3" A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH
CONCRETE COVER OVER REINFORCING SHALL BE AS FOLLOWS:
B. EXPOSED TO EARTH OR WEATHER
HARDROCK 3000 PSIB. RAMP SLABS/ STAIRS
A. FOOTINGS / PIERS HARDROCK 3000 PSI 145 PCF
145 PCF
STRENGTH
AGGREGATES
DRY
@ 28 DAYS WEIGHTLOCATION
1. SPECIAL INSPECTION PER IBC 2021 CHAPTER 17 BY A PERSON WHOSE QUALIFICATIONS ARE ACCEPTABLE TO THE STRUCTURAL ENGINEER OF RECORD AND SHALL BE REQUIRED FOR THE FOLLOWING WORK:
A. CONCRETE STRENGTH GREATER THAN 2500 psi
B. POST INSTALLED ANCHORS WEDGE AND EPOXY ANCHORS.
2. INSPECTION REPORTS SHALL BE PROVIDED TO ENGINEER OR ARCHITECT OF RECORD WITHIN ONE WEEK OF
INSPECTION
3. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL RESPONSIBLE FOR THE DESIGN OF THE STRUCTURE, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR
OPERATION REQUIRING SPECIAL INSPECTION.
4. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR:
THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH
A. THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. THE INSPECTOR MAY NOT ALTER, MODIFY, ENLARGE OR WAIVE ANY OF THE REQUIREMENTS OF THE DOCUMENTS.
B. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, THE
PROFESSIONAL-OF-RECORD, AND THE CONTRACTOR. ALL DISCREPANCIES SHALL BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF UNCORRECTED,
SUBMIT A COMPLETE LIST OF ALL OUTSTANDING DISCREPANCIES ON A WEEKLY BASIS TO THE OWNER, THE BUILDING OFFICIAL, AND THE PROFESSIONAL-OF-RECORD, UNTIL ALL CORRECTIONS HAVE BEEN
COMPLETED.
C. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE WORK
REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE, IN
CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE
WORKMANSHIP PROVISIONS OF THE BUILDING CODE.
5. WHERE SPECIAL INSPECTION REQUIREMENTS DUPLICATE THE REQUIREMENTS OF OTHER SPECIFIED
TESTING, DUPLICATE INSPECTIONS SHALL NOT BE REQUIRED
SPECIAL INSPECTION PER 2021 IBC
6. CONTRACTOR SHALL PAY AND PROVIDE FOR SPECIAL INSPECTION FOR CONCRETE, WELDING TORQUE BY SMITH EMERY OR OTHER CERTIFIED AND SPECIALIZED STATE AND LOCAL CERTIFIED INSPECTION FIRM.
TIMBER
DECKING & SHEATHING 2x, 3x, 4x
COMM'L INDEX
STUDS/JOIST SHALL BE PROVIDED AS FOLLOWING:
HOLES SHOULD BE DONE AS FOLLOWS:
PROVIDE NEW FOUNDATION BOLTS WITH 1/4"x2 1/2" SQ. PLATE WASHER EMBEDDED IN NEW CONCRETE
WHERE INDICATED UNLESS NOTED OTHERWISE.
SILL PLATES AND LEDGERS SHALL HAVE A MINIMUM OF TWO BOLTS PER PIECE, WITH ONE BOLT WITHIN
NINE INCHES OF EACH END PIECE.
CROSS BRIDGING SHALL BE PROVIDED AT EIGHT FEET ON CENTER (8'-0" O.C.) MAXIMUM FOR ALL JOISTS AND RAFTERS MORE THAN EIGHT INCHES IN DEPTH. USE AN APPROVED METAL TYPE BRIDGING OR BLOCKING.
ALL BOLTS SHALL CONFORM TO ASTM A-307 OR ASTM A-36 WITH CUT THREADS.
ALL BOLTS SHALL BE RETIGHTENED PRIOR TO APPLICATION OF PLASTER, PLYWOOD, ETC.
ALL BOLTS BEARING ON WOOD SHALL HAVE WASHERS UNDER HEAD AND/OR NUT.
HOLES FOR BOLTS SHALL BE BORED 1/32 INCH TO 1/16 INCH LARGER THAN NOMINAL BOLT DIAMETER. (THIS
INCLUDES HOLES FOR ANCHOR BOLTS IN SILL PLATES.)
2x FULL DEPTH SOLID BLOCKING SHALL BE PLACED BETWEEN JOISTS OR RAFTERS AT ALL SUPPORTS.
STRUCTURAL MEMBERS SHALL NOT BE CUT FOR PIPES, ETC., UNLESS SPECIFICALLY NOTED OR DETAILED.
ALL STRUCTURAL PLYWOOD SHALL BE IN ACCORDANCE WITH P.S. 1-83, GRADE AS NOTED ON PLANS AND
SHALL HAVE EXTERIOR GLUE. USE APA GRADE MARKED PANELS.
ALL WOOD EXPOSED TO WEATHER OR IN CONTACT WITH SOIL, AND ALL WOOD BEARING ON CONCRETE OR MASONRY IF LESS THAN FOUR FEET (4'-0") ABOVE GRADE, SHALL BE PRESSURE TREATED DOUGLAS FIR.
GLU-LAMS SHALL BE TREATED AFTER FABRICATION.
ALL STRUCTURAL LUMBER SHALL BE GRADED IN ACCORDANCE WITH GRADING AND DRESSING RULES #16 OF THE WEST COAST LUMBER MAN'S INSPECTION BUREAU, LATEST EDITION SHALL BEAR A GRADE STAMP.
ALL LUMBER SHALL BE DOUGLAS FIR OR SOUTHERN PINE SURFACED DRY WITH 19% MOISTURE
CONTENT AND OF THE FOLLOWING GRADES UNLESS OTHERWISE NOTED.
15.
C.) DOUBLE STUDS AT DOOR, WINDOW, MECHANICAL DUCT OPENING, ETC.
B.) THREE STUDS AT CORNERS OF EXTERIOR WALLS.
A.) DOUBLE STUDS AT CORNERS OF INTERIOR WALLS.
14.
C. INSTALLATIONS SHALL BE PERFORMED BY TURNING WITH A WRENCH, NOT DRIVING WITH A HAMMER.
SOAP OR OTHER LUBRICANTS SHALL BE USED ON THE SCREWS OR IN THE LEAD HOLE TO FACILITATE
INSTALLATION AND PREVENT DAMAGE TO THE SCREW.
THE LEAD HOLE FOR THE THREADED PORTION SHALL HAVE A DIAMETER EQUAL TO 60 TO 75 PERCENT OF
THE SHANK DIAMETER AND A MINIMUM LENGTH EQUAL TO LENGTH OF THE THREADS.
B.
THE CLEARANCE HOLE FOR THE SHANK SHALL HAVE THE SAME DIAMETER OF THE SHANK, AND THE
SAME DEPTH OF PENETRATION AS THE LENGTH OF UNTHREADED SHANK.
A.
13.
11.
10.
9.
8.
12.
2.
3.
4.
5.
6.
7.
BLOCKING, FURRING, ETC. NO. 2
MISCELLANOUS LUMBER
6x6 & LARGER NO. 1 4x6 & LARGER NO. 1 4x4 & SMALLER NO. 1
POST & MULLIONS
6x OR LARGER SEL STR
BEAMS
2x6 TO 3x16 INCLUSIVE NO. 1 2x4 TO 4x4 INCLUSIVE NO. 1
JOIST & RAFTERS
STUDS NO. 2
TOP PLATES, OTHER PLATES NO. 1
1.
SEL STR
PREFABRICATED WOOD TRUSSES:
1. TRUSS FABRICATION:
A. STRUCTURAL DESIGN OF THE TRUSSES SHALL INCLUDE ALL DEAD LOADS, LIVE
LOADS REQUIRED BY IBC, INCLUDING MECHANICAL / ELECTRICAL LOADS ,
FIRE SPRINKLER LOADS AND ALL CHORD AXIAL LOADS DUE TO SEISMIC / WIND
FORCES.
B. THE TRUSSES SHALL BE DESIGNED TO CARRY THE FOLLOWING MINIMUM
LOADS (U.N.O)
ROOF LIVE LOAD 20 PSF
TOP CHORD DEAD LOAD 10 PSF
BOTTOM CHORD DEAD LOAD 10 PSF
UPLIFT 20 PSF
SELF WEIGHT OF TRUSSES AND ANY APPLICABLE CONCENTRATED LOAD
2. TRUSSES SHALL HAVE A HORIZONTAL RESTRAINED AT ONE END ONLY
GENERAL NOTES
NAILING SCHEDULE
JOIST OR RAFTERS AT ALL BEARINGS - TOENAIL
THIS NAILING IS TYPICAL UNLESS OTHERWISE NOTED OR DETAILED. TYPICAL NAILS SHALL BE
COMMON WIRE NAILS. SPECIFICALLY DETAILED CONNECTIONS SHALL BE COMMON WIRE NAILS.
BRIDGING TO JOIST, TOENAIL EACH END
BLOCKING BETWEEN JOISTS OR RAFTERS
TOP PLATE TO STUD, END NAIL TO BEAM OR
TOP PLATE, TOENAIL @ BOTTOM
STUD TO SOLE PLATE
DOUBLE STUDS, FACE NAIL
DOUBLED TOP PLATES, FACE NAIL
TOP PLATES, LAPS AND INTERSECTIONS, FACE NAILS
DOUBLE TOP PLATE SPLICE (4'-0" MIN.) EACH SIDE OF BUTT IN TOP
PLATE FACE NAIL
2x LEDGER TO STUDS - NAILS EACH STUD 6" LEDGER OR LESS
1 INCH BRACE TO EACH STUD AND PLATE, FACE NAIL
BUILT-UP CORNER STUDS FACE NAIL
CEILING JOISTS TO PLATE - TOENAIL
CEILING JOISTS TO PARALLEL RAFTERS - FACE NAIL
CEILING JOISTS, LAPS OVER PARTITIONS
CONTINUOUS HEADER TO STUD, TOENAIL
INTERRUPTIONS OF DOUBLE TOP PLATES OR STRAP W/ SOLE PLATES FOR
BEAMS, PIPES, ETC.
CONTINUOUS RIM JOIST OR RAFTER TO TOP PLATES -
TOE NAIL AT BOTTOM
FOR EACH ADDITIONAL TWO INCHES IN DEPTH OF LEDGER
BUILT-UP GIRDER AND BEAMS 20D @ 32" O.C. @ TOP & BOTTOM &
STAGGERED 2-20D AT ENDS & AT EACH SPLICE.
JOIST OR RAFTER TO SIDES OF STUDS 8 INCH JOIST OR LESS
FOR EACH ADDITIONAL TWO INCHES IN DEPTH OF JOIST
WALL SHEATHING (GYPSUM BOARD, PLYWOOD, ETC.) NAILING OR SCREWS
PER CODE MINIMUM OR AS SHOWN ON PLANS WITH NAILS OR SCREWS TO
ALL STUDS TOP AND BOTTOM PLATES.
ALL CONNECTING HARDWARE, JOIST HANGERS, TIE STRAPS, ETC., SHALL BE SIMPSON "STRONG TIE"
UNLESS OTHERWISE NOTED OR SHOWN. FILL ALL CONNECTOR HOLES WITH NAILING PER
MANUFACTURER'S CURRENT CATALOG, SIMPSON C-2001
MACHINE APPLIED NAILING - USE OF MACHINE APPLIED NAILING IS SUBJECT TO SATISFACTORY JOBSITE
DEMONSTRATION FOR EACH PROJECT AND THE APPROVAL BY THE PROJECT ARCHITECT OR
STRUCTURAL ENGINEER AND DISTRICT STRUCTURAL ENGINEER FROM DIVISION OF STATE ARCHITECT.
THE APPROVAL IS SUBJECT TO CONTINUED SATISFACTORY PERFORMANCE. (MACHINE NAILING WILL NOT BE APPROVED IN 5/16 INCH PLYWOOD IF NAIL HEADS PENETRATE THE OUTER PLY MORE THAN WOULD BE NORMAL FOR A HAND HAMMER OR IF MINIMUM ALLOWABLE EDGE DISTANCES ARE NOT MAINTAINED. THE
PERFORMANCE WILL BE DEEMED UNSATISFACTORY.)
ALL NAILING SHALL CONFORM TO TABLES SET FORTH IN TITLE 24 OF CALIFORNIA CODE OF REGULATIONS
EXCEPT SPECIFICALLY DETAILED CONNECTIONS, USE ONLY COMMON NAILS.
2 INCH PLANKS AND DECKING - FACE NAIL BEARING
@ CONT. BEARING
25.
24.
3-8d
3-16d ADDITIONAL 1-16d 2-8d 2-10d 2-10d OR 2-16d
4-8d, TOENAIL 16d @ 24"o.c.
16d @ 16"o.c.
2-16d 8-16d
8d @ 6"o.c.
2-16d ADDITIONAL 1-16d 2-8d
16d @ 24" O.C.
3-8d 3-16d 3-16d 4-8d 2-16d EACH
16d @ 16"o.c.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
1-1 1 2 "x 18 GA.
8-16d EACH END
2-16d END NAIL 2-16d 3-8d
BLOCKING BETWEEN STUDS, EACH END TOE NAILSB.
BLOCKING BETWEEN JOISTS OR RAFTERS TO JOISTS OR
RAFTERS - TOENAILS EACH SIDE, EACH END
A.
ALL WOOD DIAPHRAGM AND SHEAR WALL NAILING SHALL BE COMMON NAILS OR GALVANIZED BOX.26.
4. TRUSSES SHALL BE CUSTOM DESIGNED TO FIT EXISTING FIELD CONDITIONS. THE TRUSS DRAWINGS
SHALL BE STAMPED BY A REGISTERED PROFESSIONAL ENGINEER.
5. TRUSS SHOP DRAWINGS AND CALCULATIONS SHALL BE FURNISHED TO THE CONTRACTING OFFICER
FOR REVIEW PRIOR TO FABRICATION.
3. WEB MEMBERS OF TRUSSES SHALL FORM TRIANGULATED PANELS.
6. THE DESIGN AND FABRICATION OF THE WOOD TRUSSES SHALL MEET THE FOLLOWING:
a). THE LATEST EDITION 'NATIONAL DESIGN SPECIFICATIONS' BY AMERICAN WOOD COUNCIL.
b). ANSI/TP11 NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD
CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT VA DALLAS RENOVATE BLDG.71 FOR
MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
08/11/2023
95% CONSTRUCTION DOCUMENTS 03/20/2023
100% CONSTRUCTION DOCUMENTS 04/20/2023
BID SET 08/11/2023
4" MI
N.
NO
PI
PE
S
HE
RE
4" MI
N.
6" MI
N.
1'-6" MIN.
9"
6" MI
N.
NO EXCAVATION
BELOW THIS LINE
ALL SLEEVES TO BE 1"
CLEAR ALL AROUND
PIPE.
PLACE CONCRETE FILL AROUND SLEEVE
PRIOR TO POURING FOUNDATION. MAKE SAME
WIDTH AS FOOTING AND FULL WIDTH OF PIPE
TRENCH. (2'-0" MIN.)
PIPE
PIPE
TAMPED SAND
COMPACTED BACKFILL
FINISH GRADEWALL
FOUNDATION
PIPE
(E) FTG WALL
MAX 8"Ø
OPENING
1 1 2" CLR
OPENING DETAIL @ (E) WALL
AFTER SET CLEAN TO REMOVE
ALL LAITANCE AND SCUM TO
EXPOSED COARSE AGGREGATE
6" MIN CONT.
CLEAN OUT TYP.
CLEAN OUT BOTTOM
OF FOOTING PRIOR TO
FOUNDATION POUR
STAKES NOT PER-
MITTED WITHIN
FOOTING SECTION
FORMWORK NOT
PERMITTED BELOW GRADE
UNLESS FULLY FORMED
2x PLANKING
CONT. TYPICAL
3 1 2" HIGH STARTER WALL FOR
CONCRETE & MASONRY WALLS
BELOW GRADE WHERE
APPLICABLE
FOUNDATION CONCRETE MAY BE PLACED DIRECTLY INTO
EXCAVATION (AS SHOWN) PROVIDED THE TRENCH WALLS ARE
STABLE AS DETERMINED BY THE SOIL ENGINEER.
1.
FOUNDATIONS SHALL BEAR ON ACCEPTABLE SOIL, PER THE
SOIL REPORT, AS DETERMINED BY THE SOIL ENGINEER.
2.
NOTES:
FOOTING WIDTH
PLUS 2"
'd' BAR DIAMETER
'D' = BAR BEND DIAMETER
6d FOR #3 THRU #8 8d FOR #9, #10, AND #11
CAP STIRRUPS MAY BE USED
WHEREVER 135 deg. CLOSED STIRRUPS
ARE SHOWN IN GRADE BEAM ONLY.
MAX.
SLOPE
4d
2 12" MIN.
WIRE REINFORCING TOGETHER
180 DEG. BEND OFFSET 90 DEG. BEND
NOTE:
'd' BAR DIAMETER
135 DEG. BEND
'd' BAR DIAMETER
CAP STIRRUP
NOTE:
EXTEND BAR STRAIGHT
AS FAR AS POSSIBLE
AND BEND
FACE OF SUPPORT
TOP BARS ARE HORIZONTAL BARS SO PLACED THAT MORE THAN 12"
OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR
BAR DEVELOPMENT LENGTH (Ld) SCHEDULE
ACI CLASS A TENSION SPLICE = 1.0 Ld LAP SPLICES FOR ACI CLASS B TENSION SPLICE = 1.3 Ld
BAR SIZE
TOP BARS
#3 #4 #5 #6 #7 #8 #9 #10 #11
OTHER BARS
f'c = 3000 PSI f'c = 4000 PSI
TOP BARS OTHER BARS
4" MIN.
6d
3" CL
R.
SE
E A
RC
H D
WG
S.
1'- 6"
1'-0"
SEE ARCH'L. DWGS. SEE ARCH'L. DWGS.
1'-6"
#3 @ 15" O.C.
EA. WAY
#3 NOSING
BAR
1 1 2"
CLR.
#3 x 4'-0" LC @ 15" O.C.
DOWELS
4" MIN
COMPACTED FILL
ALT. DOWELSALT. DOWELS
2-#3 CONT.2-#3 CONT.
2-#3 CONT.
#4 x @ 12" O.C.
#4 @ 12" O.C.
VERT
#4 @ 12" O.C.
VERT
#4 @ 12" O.C.
HORIZ.
#4 @ 12" O.C.
HORIZ.
#4 @ 12" O.C.
HORIZ.
#4 @ 12" O.C.
HORIZ.
DOWELS TO MATCH
VERT. REINF.
DOWELS TO MATCH
VERT. REINF.
#4 @ 16" O.C.
VERT.6"
MI
N.
" M
IN.
6" TYP.
6"
MI
N.
2-#4 CONT.
ALT. BENDS
6" CONC. WALL
(TYP.) #4 x @ 12" O.C.
12" TYP.
ALT. BENDS 2-#4 CONT.
2-#4 CONT.
4'- 0"
MA
X
VARIES
VARIES
C.J. OPTIONAL AS REQ'D
BY CONTRACTOR (TYP.)
12"
" M
IN
OMIT CURB WHERE
WALL OCCURS
SWITCHBACK RAMP DETAIL
8"
TYP.
CONC. RAMP & FOOTING 4" THK RAMP
SLAB
#4 DOWELS @12" x
TYP.
ALT. BENDS
#4 @12" OC
" M
IN
4"
(N) MTL HANDRAIL
SEE ARCH'L
4"
#4 CONT.
COMPACTED FILL
PRESSURE TREATED SILL
PLATE (SEE SCHEDULE) EDGE NAILING
TO SILL PLATE TYP. ANCHOR BOLTS PER
SCHEDULE, MIN. 2 BOLTS PER
WALL
PANEL SEE SCHEDULE
HOLDOWN ANCHOR (IF REQ'D.)
SEE PLAN & SCHED.
EDGE NAILING AROUND OPENING
2x BLK'G. TOP & BOTT. OF OPN'G.
& ONE STUD SPACE EA.
SIDE W/ A35 SIMPSON
ANGLE EACH END.
2-2x OR 4x PER PLAN @
EA. END OF SHEAR WALL
CONT. TOP PLATES
PER PLAN & DETAILS
EDGE NAILING TO TOP
PLATE SEE SCHEDULE
3x BLK'G. AT PLYWOOD
SPLICE TYP.
FIELD NAILING
SEE SCHEDULE
2x STUDS @ 16" O.C. U.N.O.
SEE SCHEDULE
OPENING IN PANEL
ALL NAILS SHALL BE COMMON NAILS.
WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL, PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR FRAMING SHALL BE 3" NOMINAL OR THICKER AND THE
NAILS ON EACH SIDE SHALL BE STAGGERED.
1.
GENERAL NOTES FOR PLYWOOD WALLS
2.
S-101
TYPICAL DETAILS
TYPICAL UTILITY PIPE DETAIL AT FOOTING 21"=1'-0"
TYPICAL STAIR ON GRADE DETAIL 31"=1'-0"
TYPICAL REINF. BENDING AND SPLICE DETAIL 41"=1'-0"
TYPICAL RAMP DETAIL 51"=1'-0"
STUD WALL WITH PLYWOOD SHEATHING DETAIL 61"=1'-0"
-- 71"=1'-0"
-- 81"=1'-0"
-- 91"=1'-0"
101"=1'-0"
-- 111"=1'-0"
-- 121"=1'-0"
131"=1'-0"
TYPICAL FOOTING TRENCH DETAIL 11"=1'-0"
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT VA DALLAS RENOVATE BLDG.71 FOR
MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
08/11/2023
95% CONSTRUCTION DOCUMENTS 03/20/2023
100% CONSTRUCTION DOCUMENTS 04/20/2023
RAMP
RAMP
M.H. M.H.
RAMP
B2 A401
B1 A401
123456
A
B
C
D
E
123456
A
B
C
D
E
NORTH
FOUNDATION PLAN - EXISTING
SCALE: 1/8" = 1'-0"
NOTES:
1. FOR GENERAL NOTES SEE SHEETS S-001
2. FOR TYPICAL DETAILS SEE S-101.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
OF THE JOB PRIOR TO STARTING CONSTRUCTION, AND THE CONTRACTING
OFFICER REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY OF ANY
DISCREPANCIES OR INCONSISTENCIES. DO NOT SCALE DRAWINGS, WHERE NO
DIMENSIONS ARE PROVIDED, CONSULT WITH GOVERNMENT REPRESENTATIVE
FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
S-301
S-301
S-200
FOUNDATION PLAN
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT VA DALLAS RENOVATE BLDG.71 FOR
MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
08/11/2023
95% CONSTRUCTION DOCUMENTS 03/20/2023
100% CONSTRUCTION DOCUMENTS 04/20/2023
ROOF PLAN - PROPOSED
SCALE: 1/8" = 1'-0"
NEW TRUSSES
123456
A
B
C
D
E
NEW TRUSSES @ 24" OC
123456
A
B
C
D
E
(N) 2x6 @ 24" OC (N) 2x6 @ 24" OC
'-9
3 4"
'-9 3 4"
S-301
S-301
S-301
S-301
NOTES:
1. FOR GENERAL NOTES SEE SHEETS S-001
2. FOR TYPICAL DETAILS SEE S-101.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
OF THE JOB PRIOR TO STARTING CONSTRUCTION, AND THE CONTRACTING
OFFICER REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY OF ANY
DISCREPANCIES OR INCONSISTENCIES. DO NOT SCALE DRAWINGS, WHERE NO
DIMENSIONS ARE PROVIDED, CONSULT WITH GOVERNMENT REPRESENTATIVE
FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
EXISTING ROOF TRUSSES TO BE REMOVED
PRIOR TO INSTALLATION OF NEW TRUSSES.
EXISTING FLAT
ROOF TRUSSES
EXISTING BEARING WALLS
TO REMAIN. TYP
(N) 3 4" THK PLYWOOD STRUCT 1
W/ 10d COMMON NAILS AT
4" OC @ B & E AND 12" FIELD
(TYP.)
S-201
ROOF FRAMING PLAN
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT VA DALLAS RENOVATE BLDG.71 FOR
MENTAL HEALTH
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-231
Building 71 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 02/10/2023
12/27/2022
08/11/2023
95% CONSTRUCTION DOCUMENTS 03/20/2023
100% CONSTRUCTION DOCUMENTS 04/20/2023
2" PLYWOOD W/ 10d @ 4" NAILS
@ BOUNDARIES AND EDGES
12" FIELD. BLOCK ALL EDGES
2x CONT BLKG
SIMPSON MSTA36 STRAP
@ 48" OC
BN
(E) 2x4 STUD WALL
(E) ROOF FRAMING
(E) ROOF FRAMINGPREFABRICATED WOOD TRUSS
(N) 1 2" PLYWOOD (N) 1 2" PLYWOOD
(E) 2x4 STUD WALL
(N) PLYWOOD
TYP
(N) B.N.
(TYP.)
(E) 2x JOIST
(N) 2x SHAPED PLATE W/ 12d NAILS @ 12" OC STAGG & 2-12d TO (E) 2x JOIST TYP
(N) 2x STUD WALL
(E) 2x RJ
(E) 2x CJ
(N) 2-2x PLs
(N) B.N.(N) B.N.
(E) SHEATHING
(E) SHEATHING
(N) 2x6 @ 16" OC
(N) 2x 6 @ 16" OC
A A
SECTION A-A
(N) 2x CONT BLKG
(N) 2x ROOF JOIST
(N) 2x SHAPED
PLATE
SECTION
(N) 2x8 RIDGE BD
SIMPSON MSTA36 STRAP
@ 32" OC
(N) 2x BLKG @ 32" OC (N) 2x BLKG @
32" OC
(N) 4-10d NAILS
TO EA BLKG TYP
(N) 2x JOIST
10'-0" MAX
2" THK PLYWOOD
(E) ROOF FRAMING
(N) ROOF TRUSS
2" THK PLYWOOD
(N) CONT 2x8 SHAPED PL W/ 2-12d…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .