36C25723R0013 Conformed Through Amendment A0005.pdf

PDF 679 KB Posted

Attached to
Y1DA--NCO17 Central Texas Construction MATOC Federal contract opportunity
Solicitation number
36C25723R0013
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document is a solicitation for a Multiple Award Task Order Contract (MATOC) for construction and two-phase design-build services at Veteran Integrated Service Network (VISN) 17 locations in Texas, including the North Texas, Central Texas, South Texas, and Valley Coastal Bend Veteran Health Care Systems.

The MATOC will be a competitive 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220 with a $45 million small business size standard. The Government intends to award 2 to 15 IDIQ contracts with a 5-year base period. Task orders will have a minimum value of $2,000 and a maximum of $20 million, with a total MATOC ceiling of $500 million. Offerors must be verified SDVOSBs, have bonding capacity of at least $20 million, and submit proposals by August 19, 2024. Award will be based on a tradeoff between past performance and price, with past performance being significantly more important. A "seed" project at the Kerrville VA Medical Center with a magnitude between $2-5 million is included for price evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--NCO17 Central Texas Construction MATOC, newest first.
File Type Posted
36C25723R0013 0010.pdf PDF
36C25723R0013 0010.pdf PDF
36C25723R0013 Conformed Through Amendment A0010.pdf PDF
36C25723R0013 0009.docx DOCX document
Prebid RFI - One Line Drawings 671A4-20-160 2024-08-18.pdf PDF
36C25723R0013 0008.docx DOCX document
MATOC and Seed Project Questions and Answers_2024-08-18.pdf PDF
MATOC and Seed Project Questions and Answers.pdf PDF
36C25723R0013 Conformed Through Amendment A0007.pdf PDF
36C25723R0013 0007.docx DOCX document
36C25723R0013 Site Visit Attendance List 671A4-20-160.pdf PDF
36C25723R0013 Site Visit Attendance List 671A4-20-160.pdf PDF
36C25723R0013 0006.docx DOCX document
KERRVILLE TX SITE MAP.pdf PDF
36C25723R0013 Conformed Through Amendment A0005.pdf PDF
ATTACHMENT 10 PCRA Permit 671A4-20-160.pdf PDF
ATTACHMENT 9 ICRA Permit 671A4-20-160.pdf PDF
ATTACHMENT 6 671A4-20-160 Replace Boilers B19 IFC Specifications 2024-04-03 R1.pdf PDF
ATTACHMENT 5 671A4-20-160 Replace Boilers B19 IFC Plans SEALED 2024-04-03 R1.pdf PDF
ATTACHMENT 4 Seed Project Pricing Sheet.docx DOCX document
36C25723R0013 RFI Responses Through Amendment A0005.docx DOCX document
36C25723R0013 0005.docx DOCX document
36C25723R0013 0004.docx DOCX document
ATTACHMENT 2 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
36C25723R0013 0003.docx DOCX document
36C25723R0013 Site Visit Attendance List.pdf PDF
36C25723R0013 Amendment 0002 Site Visit Location Change.pdf PDF
36C25723R0013 0002.docx DOCX document
ATTACHMENT 2 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 6 Seed Project 549-22-231 Drawings.pdf PDF
36C25723R0013 0001.docx DOCX document
ATTACHMENT 1 RELEASE OF CLAIMS.docx DOCX document
ATTACHMENT 8 VHA PCRA 2023_1.0.pdf PDF
ATTACHMENT 6 Seed Project 549-22-231 - Drawings.pdf PDF
ATTACHMENT 5 Seed Project 549-22-231 - Specifications.pdf PDF
ATTACHMENT 7 VHA ICRA 2023_1.0.pdf PDF
ATTACHMENT 4 Seed Project Pricing Sheet.docx DOCX document
ATTACHMENT 3 BACKGROUND INV.docx DOCX document
36C25723R0013.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATIONSOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 116

36C25723R0013 X

04-24-2024 to be determined 671A4-20-160

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

Jennifer Parker Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

Horacio Fernandez (254) 899-6044

Description: A Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Maintenance, Repair, and New Construction services for stations located in NCO 17 area locations: North Texas Veterans Health Care System (NTX) Dallas, TX; Central Texas Veterans Health Care System(CTX) Temple, TX; South Texas Veterans Health Care System (STX) San Antonio, TX; Valley Coastal Bend Veterans Health Care System (VCB) Harlingen, TX.

The aggregate value of this Multiple Award Task Order Contract (MATOC) acquisition shall not exceed $500,000,000.00 for all contracts.

The government contemplates award to two (2) or more but not-to-exceed fifteen (15) offerors, and shall reserve the right to make additional awards to offerors whose proposals fully comply with the submission instructions and offer the best value. The period of performance (POP) for all contracts resulting from this solicitation shall consist of a base period from date of award (to be determined) five-year maximum term.

The guaranteed minimum amount for each resultant award is $1,000.00 for the life of the contract, inclusive of options.

The MINIMUM ordering limit per task order is $2,000.00. The MAXIMUM ordering limit per task order is $20,000,000.00.

This acquisition shall be a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) in accordance with Public Law 109-461. An SDVOSB must be verifiable at https://veterans.certify.sba.gov/ and maintain verified SDVOSB status at the time of offer, at award, and through duration of any awarded contract and / or task order.

The applicable North American Industry Classification System (NAICS) code incorporated into this solicitation is 236220.

The small business size standard is $45,000,000.00.

This is a competitive acquisition that shall utilize a Tradeoff Process in accordance with FAR 15.101-1.

This acquisition features a "seed" project with a magnitudeIAW VAAR 836.204(f)(2) Between $2,000,000 and $5,000,000.

A bid bond in the amount of 20% or $3M of the offeror's bid amount is required. ***NOTE: YOU MUST PARTICIPATE IN THE PROPOSAL PROCESS OF THE SEED PROJECT (Project #671A4-20-160) TO BE CONSIDERED AS AN AWARDEE FOR THE MATOC.***

A pre-proposal conference is scheduled for June 20, 2024, at 10:00 AM (CT) at the Kerrville VA Medical Center 3600 Memorial Blvd Kerrville, TX 78028 at Building 19.

Offerors shall request these plans and specifications via email from Horacio.Fernandez@va.gov.

All RFI/Questions shall be submitted via email to Horacio.Fernandez@va.gov.

Questions are due by 10:00 AM (CST) July 5, 2024.

***Proposals are due by 3:00 PM (CST) on August 19, 2024 via email to horacio.fernandez@va.gov.

Per TO Per TO

X X 52.211-10

X 10

1 03:00 PM CDT

08-19-2024

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Planning UID: VA-22-00054231

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504

Department of Veterans Affairs

FMS-VA-2 (101)

Financial Services Center PO Box 149971 Austin TX 78714-9971

(877) 353-9791 (512) 460-5540

X

Jennifer Parker

VA-VHA-RPOW-2024-0033

36C25723R0013

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

A.5 STATEMENT OF WORK

A.6. PROPOSAL PREPARATION INSTRUCTIONS (MATOC)

A.7 V.T.C.A. Tax Code §151.311

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.9 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) 46

2.10 52.246-26 REPORTING NONCONFORMING ITEMS (NOV 2021)

2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

2.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.13 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.14 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.15 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024) ...52

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED

ENTITIES (DEC 2023)

4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

PROHIBITION (DEC 2023)

4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) ALTERNATE I (APR 1984)

4.6 52.216-18 ORDERING (AUG 2020)

4.7 52.216-19 ORDER LIMITATIONS (OCT 1995)

4.8 52.216-22 INDEFINITE QUANTITY (OCT 1995)

4.9 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

4.10 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

4.11 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(FEB 2024)

4.12 52.222-32 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE

ADJUSTMENT (ACTUAL METHOD) (AUG 2018)

4.13 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.14 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.15 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

4.16 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)

ALTERNATE I (DEC 2007)

4.17 52.236-4 PHYSICAL DATA (APR 1984)

4.18 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.19 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.20 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.21 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.22 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.23 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.24 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.25 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.26 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.27 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.28 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.29 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.30 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.31 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.32 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..99

4.33 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.34 VAAR 852.246-71 REJECTED GOODS (OCT 2018)

4.35 MANDATORY WRITTEN DISCLOSURES

4.36 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN

2020)

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVIC

ES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB _____________

The contractor shall provide all labor, supervision, materials, equipment, to replace the boilers Building 19 per the A/E design, Project 671A4-20-160 at the Kerrville Medical Center 3600 Memorial Blvd, Kerrville, TX 78028.

0002 1.00 EA _____________

Cost of Performance and Payment Bonds.

GRAND TOTAL _____________

A.4 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION

QUANTIT

Y

DELIVERY

DATE

0001 1.00

0002 1.00

A.5 STATEMENT OF WORK

Multiple Award Task Order Contract Veterans Service Integrated Network 17

A. GENERAL INFORMATION

1. Title of Requirement: Multiple Award Task Order Contract (MATOC)

This procurement effort is for construction and two-phase design-build services at Veterans Integrated Service Network (VISN) 17 station locations including, but not limited to, North Texas Veterans Health Care System (NTX) Dallas, TX, , Central Texas Veterans Health Care System (CTX) Temple, TX, South Texas Veterans Health Care

System (STX) San Antonio, TX, Valley Costal Bend Veterans Health Care System (VCB) Harlingen, TX, and all connected community based outpatient clinics (CBOCs).

Contractors are expected to have the capability and qualifications to provide a wide array of construction services at locations specified.

The MATOC will require contractors to furnish all labor, materials, equipment, and expert supervision needed to accomplish the work in accordance with the Description/Specifications/Statement of Work provided with each task order under the assigned North American Industry Classification System (NAICS) code. Task Orders (TO) will vary in size and dollar amounts. TOs shall include, but are not limited to general construction categories which include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving and earthwork, carpentry, concrete, roofing, site work, excavation, interior renovation, carpet-window and door installation, electrical, steam fitting, plumbing, exterior and interior painting, plaster/stucco, demolition, masonry or metal stud and sheetrock work, installation of acoustical ceilings and light fixtures, HVAC installation and flooring installation. Work may involve some or all the above elements of work.

2. This requirement consists of establishing a MATOC resulting the award of two (2) or more Indefinite-Delivery Indefinite-Quantity (IDIQ) contracts with each IDIQ contract having a base period of five (5) years. These awardees will then be eligible to submit proposals in response to solicitations issued to the MATOC contractors. General construction requirements are delineated in the project specifications for the IDIQ contract and supplemented by individual TOs. The contractors shall provide all resources necessary to accomplish the deliverables described in this Statement of Work (SOW) and TO specific SOWs, specifications, and project drawings except as may otherwise be specified.

3. The period of performance for the MATOC IDIQ contract will have a five-year base period. The total guaranteed minimum quantity of service that the Government will acquire under the IDIQ contract is $2,000.00, which also represents a bona fide need of the current fiscal year. The guaranteed minimum award amount is for the entire contract duration. Firm‐fixed price TO will be negotiated for this contract. The MATOC TOs shall have a minimum value of $2,000.00 and a maximum value of $20,000,000.00 and no dollar limit per year up to a cumulative (all IDIQs inclusive) maximum of $500,000,000.00 for the entire MATOC IDIQ contract term.

Task orders shall have defined periods of performance. Funded TOs shall have a separate Notice to Proceed (NTP) issued to commence construction activities.

ITEM

NO.

PERFORMANCE

PERIOD DESCRIPTION

BASE YEAR

TBD

The MATOC is a competitive Indefinite Delivery/Indefinite Quantity (ID/IQ) construction and two-phase design build acquisition based on general specifications contained in the Statement of Work (SOW) within each Task Order.

Work to be performed shall consist of, but not be limited to, all phases of general construction, alteration, maintenance and repair of commercial and institutional buildings including mechanical, electrical, heating/air conditioning, demolition, painting, paving and earthwork, carpentry, concrete, roofing, site work, excavation, interior renovation, carpet/window/door installation, electrical, steam fitting, plumbing, exterior/interior painting, plaster/stucco, demolition, masonry or metal stud and sheetrock work, installation of acoustical ceilings and light fixtures, HVAC/Flooring installation, and other commercial and institutional construction related work required to support the Department of Veterans Affairs Medical Facilities in VISN 17.

4. Hours of Work and Scheduling: All work will be done during the normal work week Monday through Friday, except holidays, 7:00 AM to 4:30 PM unless otherwise scheduled, or identified in the TO SOW. Work will be scheduled through the Contracting Officer’s Representative (COR). Any contractor request to work outside the normal hours will be requested from the COR at least 48-hours in advance.

5. Federal Holidays: The following Federal legal holidays are observed by VISN 17 VAMC facilities:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday of November Christmas Day 25 December

Note: Any of the above holidays falling on Saturday will be observed on the preceding Friday;

holidays falling on Sunday will be observed on the following Monday. Contractor’s days to perform are reflected in the Performance Work Statement/Statement of Work.

B. CONTRACT AWARD MEETING

The contractor shall not commence performance on the tasks in the MATOC contract or for each subsequently issued TO SOW until the CO has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived.

C. GENERAL REQUIREMENTS

1. All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms.

2. Where a written milestone deliverable is required in draft form, the VA will complete their review of the draft deliverable within 10-business days from the date of receipt.

The contractor shall have 7-business days to deliver the final deliverable from date of receipt of the Government’s comments.

D. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES

1. Description of Tasks and Associated Deliverables: The MATOC contractor(s) shall be responsible for the construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional related structures. The primary NAICS code for the MATOC award is 236220 Commercial and Institutional Building Construction. NAICS Code 236220 has a Small Business Size Standard of $45M.

2. All work described above shall be completed in accordance with the drawings and specifications for the individual task order projects.

E. SCHEDULE FOR DELIVERABLES

1. The contract requires that the MATOC contractors submit, within ten (10) calendar days of NTP for each awarded TO, a schedule showing the order in which the work will be performed under the TO, including but not limited to, manpower and trade. The actual work elements to be accomplished will be recorded on the schedule. Develop schedule using the Critical Path Method (CPM), FAR 52.236-15 Schedules for Construction Contracts. The schedule will be submitted to the CO through the COR for approval.

2. In the event the contract is modified, changing the work, adding, or deleting work, or changing the completion date, a revised schedule will be submitted.

F. CHANGES TO STATEMENT OF WORK

Any changes to this SOW shall be authorized and approved only through written modifications to the TO by the CO. A copy of each modification will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor. Any discrepancy between the IDIQ contract or TO SOWs drawings and specifications, the specifications shall govern over the drawings and SOW, and the drawings shall govern over the SOW.

G. REPORTING REQUIREMENTS

1. The contractor shall provide the COR with daily written progress reports (daily logs).

These are due to the COR by the second workday following the end of each work week, throughout the TOs project duration.

2.The Contractor or Superintendent shall attend a weekly or bi-weekly meeting that will be conducted by the CO and COR as required by TO. The purpose of this meeting is to review the progress of the project and outstanding issues. Meeting notes will be taken by the Contractor and provided to the COR and CO.

3. The COR is required to provide quarterly progress reports to the CO by the fifth workday of the new quarter. This report shall also identify any problems that arose, along with a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved, with an explanation.

H. TRAVEL

Contractor shall be responsible for their travel costs, as well as all subcontractors.

I. GOVERNMENT FURNISHED PPOPERTY/EQUIPMENT (GFP/GFE)

The IDIQ contract does not have any GFP/GFE pre-designated for provision on a temporary or permanent basis to MATOC contractors. As each subsequently developed project requiring a task order is finalized Government shall evaluate its need to furnish any GFP/GPE.

J. CONTRACTOR EXPERIENCE REQUIREMENTS

1. The contractor must inform the task order project COR when personnel are removed from the contract for any reason.

2. If a key person becomes unavailable to complete the contract, proposed substitutions of key personnel shall be made to the COR and CO.

3. Contractor employees shall not be considered government employees for any purpose under this contract.

K. CONFIDENTIALITY AND NONDISCLOSURE

1. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this contract and subsequently issued TOs, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the contract.

2. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this contract or subsequently issued TOs. No information shall be released by the contractor(s). Any request for information relating to this contract or its subsequently issued TOs, presented to the contractor, shall be submitted to the CO for response.

3. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.

L. CONTRACTOR WORK SITE EMPLOYEE ACCESS/BEHAVIOR

1. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Example: wearing of distinctive clothing such as uniform, badges, patches, etc.

2. All contractor personnel working onsite at the VA facility shall check in and out with the VA Police of the respective VA facility. All security/access issues shall be addressed by the Onsite Contractor Project Manager. The Project Manager shall provide the Agency a list of all employees requiring access to Agency space. All contracted personnel must complete any required security checks and obtain an Agency security badge for access to all spaces. All contracted personnel are required to wear identification (I.D.) badges issued by the VA Police always on the Agency’s grounds. Contract employees shall always wear contractor badge, so it is visible to VA staff members.

3. The contractor shall be fully responsible for compliance with all VA, local, state, and Federal environmental/occupational safety laws, rules, and regulations. The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel, patients, and contract employees. The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working processes; example: lockout/tagout. All work for the duration of the contract and individually issued task order shall be performed by certified trained technicians.

4. It is the responsibility of the Contractor’s personnel to park in the appropriate designated parking areas when parking areas are designated by the VA. Parking information is available from the Agency’s police station. The Agency shall not validate or make reimbursement for parking violation of the Contractor’s personnel under any circumstances.

M. TASK ORDER ISSUANCE PROCEDURES

1. GENERAL

a. When the Government has a need for an order, the Government will issue a solicitation using the procedures outlined in FAR 16, but may employ the procedures of FAR 13, 14 or 15 as deemed necessary. If the TO will include design build services, the solicitation will be issued using the procedures outlined in FAR Subpart 36.3 - Two- Phase Design-Build Selection Procedures. Selection onto the MATOC IDIQ constitutes phase 1 of the solicitation. The TO solicitation is phase two of the two-phase procedure.

b. TOs will be awarded on Standard Form 1442.

c. The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs, except as authorized by duly executed TOs.

d. Each TO shall include as a minimum:

(i) Date of order.

(ii) Contract number and order number.

(iii) Contract item number and description, quantity, and unit price or estimated cost.

(iv) Delivery or performance schedule.

(v) Place of performance.

(vi) Any packaging, packing, and shipping instructions.

(vii) Accounting and appropriation data.

(viii) Method of payment and payment office.

e. Modifications to TOs will be issued on Standard Form (SF) 30.

f. MATOC contractors are expected to have the capacity and qualifications to meet a wide array of construction projects in all the identified locations. Each MATOC contractor is required to make a good faith effort to submit offers on all solicitations.

MATOC contractors are required to contact the CO within two days of notification if they cannot participate in the walk through or submit an offer and shall provide justification for not participating.

g. In accordance with FAR 16.505(a)(10), no protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a TO Contract except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract; or a protest of an order valued more than $10,000,000.

2. COMPETITION

a. Competition for issuance of TOs is limited to those awardees under this contract. All awardees will be given a fair opportunity to be considered for each TO unless the CO applies one of the exceptions noted below. Upon determining the need to issue a TO, all awardees will be considered equally against the stated criteria.

b. Unless one of the exceptions noted below applies, each TO will be awarded, because of competition to the contractor whose offer is the most advantageous to the Government considering the criteria specified.

c. The CO reserves the right to make award of a TO without competition based upon:

(1) One of the circumstances described below:

i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

ii. Only one awardee can provide the supplies or services at the level of quality required because the supplies or services ordered are unique or highly specialized.

iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

iv. It is necessary to place an order to satisfy a minimum guarantee.

END OF MATOC SOW

CONSTRUCTION STATEMENT OF WORK

VA | PROJECT NO. 671A4-20-160 REPLACE BOILERS B19

Kerrville Medical Center | South Texas Veterans Healthcare System | Kerrville, TX

Contracting Officer Project Manager /COR Project Alt. COR

Horacio Fernandez horacio.fernandez@va.gov

Maria Hernandez maria.hernandez2@va.gov

TBD

-- Existing Conditions --

Pre-Bid Site Investigation: Before submitting a proposal on the work specified herein, each offeror shall conduct a site visit to familiarize themselves with all existing conditions, identify limitations, and field verify dimensions. The Contractor shall document and submit any alternate suggestions of required materials for approval prior to submitting a proposal. No extra compensation will be allowed because of the Contractor’s misunderstanding as to the amount of work involved or because of his/her lack of knowledge of any existing conditions. Building 19 (B19) of Kerrville VA Medical Center is located at 3600 Memorial Blvd., Kerrville, TX 78028, as part of the South Texas Healthcare System. The Contractor shall contact the above project representatives prior to entry.

Facility Status:

1. Building 19 will be vacated and shall remain unoccupied throughout the period of performance (180 days estimated) of this contract.

2. Contractor staging area shall be coordinated with COR during the pre-bid site investigation.

NOTE: Adjacent areas to the building must remain accessible for the duration of the project. The Contractor shall provide required barriers to restrict access into the construction area without limiting accessibility to adjacent areas. The Contractor shall note that protection against dust, fumes, odors, noise, etc. shall be required as to not disturb/disrupt nearby VA Staff or operations.

-- Services –

Provide:

3.Professional healthcare construction services to include but not limited to:

a. General Construction

b. Quality Control

c. Construction Safety

d. Mechanical

e. Electrical

-- Documentation & Acronyms –

Applicable Documents:

4.The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply:

a. Federal Acquisition Regulations (FAR)

b. Veterans Administration Acquisition Regulations (VAAR)

c. Occupational Safety & Heath Administration (OSHA) Construction Safety

Regulations

d. American National Standards Institute (ANSI)

e. American Society of Mechanical Engineers (ASME) Code

f. National Fire Protection Association Codes & Standards (NFPA)

g. American Society of Heating, Refrigerating, and Air-Conditioning

Engineers (ASHRAE)

h. Latest VA Standards, Design Manuals, and Guidelines

i. National Electrical Code (NEC) Requirements

j. VA Directive 0057– Environmental Management Program

k. VHA Directive 7715- Safety and Health During Construction

l. VHA Directive 1192.01– Seasonal Influenza Prevention Program

m. VHA Directive 0710 – Personnel Security and Suitability Program

n. VHA COPERSEC Advisory 18-04 – Contractor background investigations

o. VHA Master Construction Specification (PG-18-1)

p. VA Design & Construction Procedures (PG-18-3)

Acronyms:

5.Glossary: Acronyms used in this SOW are listed below for easy reference:

a. CO Contracting Officer

b. COR Contracting Officer Representative

c. ISO Information Security Officer

d. ICIP Infection Control and Prevention

e. FAR Federal Acquisition Regulation

f. CFM Construction & Facilities Management

g. VA Veteran Affairs

h. EPA Environmental Protection Agency

i. PPE Personal Protective Equipment

j. SOW Statement of Work

k. DFR Daily Field Report

l. OSHA Occupational Safety and Health Administration

m. CP Competent Persons

n. AHA Activity Hazard Analysis

o. LOTO Lockout/tagout

p. NCHC National Criminal History Check

q. NEC National Electrical Code

r. NTP Notice to Proceed

s. RFI Request for Information

-- Project Scope –

GENERAL:

6.Kerrville VAMC intends to issue a construction contract for a project consisting of:

a. BASE BID, all work as required by the project plans and specifications, including general construction, demolition, mechanical and electrical upgrades, new plumbing, modification and renovation of existing Boiler Plant (B19). Contractor shall provide all labor, material, equipment, quality control, safety, and supervision required to replace boilers, equipment, and associated piping, demolish solar roof system, and electrical upgrades. The Contractor shall also develop a construction schedule with critical path and construction phasing utilizing their experience with healthcare facilities, the Contract documents, and the following general project outline:

i. The healthcare facility steam system operates year-round for HVAC (i.e., building heating and ac reheat), medical equipment sterilization and domestic water heating. It is crucial that all tie-in work associated with the steam and condensate systems will be accomplished and completed during the warmer months to minimize critical system shutdowns. All other work can be performed at any time as long as a phasing plan is submitted to the VA. The Contractor shall plan and coordinate work as to avoid any steam or electrical shutdowns unless approved by the medical administration. The Contractor's phasing plan is subject to final approval by the COR. Final approved phasing plan shall not be grounds for a change order.

ii. Before placement and installation of work subject to acceptance checks and tests, the Contractor shall coordinate and notify the COR in sufficient time to enable testing personnel to be present at the site in time for proper testing and field inspection.

iii. The initial phasing of this project will be carried out by use of two temporary boilers, one will be operating and the other will be a redundant unit, these units shall be supplied by the Contractor’s backup generator. Temporary connections (water, steam, fuel, and electric) are to be permanent in nature. Temporary steam connections are to be directly tied into the main steam supply header. The objective is to have no interruptions and boiler plant fully operational 24/7. The temporary boilers and emergency generator/electrical must be installed, fully operational, tested, and commissioned. After successful commissioning of temporary boiler system, switch existing system of HPS utilities to temporary system prior to demolition of the existing boiler plant.

iv. Once HPS utilities have successfully switched to the temporary system, all existing equipment, piping, equipment pads and accessories in existing boiler plant to be demolished per plans and specifications. Work includes but is not limited to:

1. Submit fingerprints and applications for site access cards.

2. Complete the required preconstruction items prior to NTP.

3. Attend infection control/prevention and safety training requirements.

4. Install and maintain temporary construction safety fence.

5. Provide temporary equipment and utilities with connections.

6. Replace existing boilers with fire tube boilers.

7. Provide new equipment pads, per plans and specifications.

8. New auxiliary equipment and computer controls compatible with Johnson Controls METASYS.

9. All new plant steam accessory equipment (tanks, pumps, condensate return, valves, piping, controls, metering, water treatment, etc.)

10.Demo and removal of existing equipment, per plans and specifications.

11.New main steam piping header(s) to tie into existing loop.

12.Replace regulator, emergency shutoff, and header for natural gas line and other required utilities.

13.New electrical circuit conduit, LED lighting fixtures, TVSS, UPS in control panels.

14.Replace DA tank and controls.

15.Full demolition of roof solar system and roof repairs.

16.Update building floor plan with new layout and equipment schedules.

17.Submit all required deliverables prior to closeout including warranties/guaranteed period services.

v. Replacement must comply with all applicable codes and standards and shall support 100% of the final design electrical energy/power load plus reserve capacity for future loads.

vi. Based upon the brittle nature of cast iron, the VA prohibits the use of cast iron or malleable fittings and components in high and medium pressure steam systems. All new construction or repairs must not use cast iron fittings and components or malleable fittings anywhere in the high-pressure and medium pressure steam system (15psi or above). All new construction or repairs must use cast steel or forged steel fittings only.

vii. Once the existing plant is fully commissioned the temporary system may be removed. Temporary connections shall remain to allow the

VA more flexibility in the event of a prolonged steam outage requiring use of temporary utilities.

b. The intent of the project is to replace the existing steam system, including the burner management system, and to upgrade the boiler plant electrical systems, DDC controls and auxiliary equipment utilizing the existing building envelope. All incidental work associated with the general contracting, demolition, construction, and installation works in the exterior and interior of the building shall be included in the base bid.

SPECIFICS:

7. STRUCTURE – Building 19 was constructed in 1922 and has always functioned as the power plant for VAMC Kerrville. Rectangular in plan, the building is divided into nine bays along its primary south elevation. The three western-most bays stand one-story tall, and the six eastern bays stand one and a half stories tall due to a heightened ceiling on that end of the building. There is an existing mezzanine catwalk with access ladder for personnel to inspect, operate, and provide maintenance. Due to age of building and historical significance, no new roof or wall penetrations will be permitted. Structural scope includes demolition of the existing solar roof system and equipment pads, roof and wall repairs, new construction of equipment pads, and accessibility alterations to existing catwalk.

The Contractor must prepare for the demolition of approximately 1,000 square feet of existing solar panels roof mounting frames and provide roof repairs over penetrations. Contractor shall demolish existing equipment pads, piping, supports, and repair roof or wall penetrations for equipment to be removed that is no longer needed. For equipment to be replaced, Contractor shall protect in place equipment pads and reuse existing roof/wall penetration for new equipment, piping, and supports.

8. ELECTRICAL – The focus is replacement of the existing three (3) Thermal Oil Boilers with the same number of firetube Boilers in the VA Kerrville Medical Center. Electrical scope involves coordination of the new power requirements for the new boilers, condensate supply, receiver pumps, deaerator, etc., and upgrades to the existing emergency generator. No new panels, transformers, or distribution boards will be added, new loads shall be fed from the existing motor control center 460v,3ph,600 Amp “MCC-K” located in the electrical room.

Additional power required for the auxiliary equipment and the controls will be provided from existing 120/208v panels located in the electrical room. Two temporary boilers will be provided during the construction phase, and these units shall be supplied by the Contractor’s backup generator. Protect in place the existing panels, transformer, and distribution boards to remain. Demolish and replace existing generator, lighting fixtures, controls, and equipment per plans and specifications. The existing 230kW,277/480V,3PH emergency generator will be replaced in the same location with a new upgraded diesel generator of similar size. The feeder from the new generator to the is existing ATS will be removed and will be new per the size mentioned in the feeder schedule. Upgraded controls system must match appearance and shall be DDC which require low voltage, new panels to be placed in the same location as existing Johnson Controls pneumatic control panels. Contractor shall remove existing lighting in the boiler plant building and replace with new LED fixtures of higher lumens.

Provide updated one-line diagrams, disconnect switchgear schedule, and feeder schedule together with new panel load summary.

9. MECHANICAL – The existing steam plant produces high pressure steam (125 PSIG) using three 8400 lb/hr thermal generators that heat a closed oil loop which routes the hot oil to three steam generators (Heat Exchangers). There should be no service interruptions to the system during construction. The three new 200 HP fire tube steam boilers were selected based on historical steam load studies and recent demand changes. One of the existing thermal generators that heat the oil loop used to create steam. These are identical and have their own flue stack for recovering exhaust heat back to the feedwater loop. All stacks will be demolished, and roof penetrations patched. Contractor may reuse existing roof penetrations; however, new stacks must be routed directly up, vertically, without any horizontal bends. Similarly, the existing water drain trenches in front and behind the thermal generators and can likely be reused as long as the new firetube boilers are able to fit on the existing pad, which is in good condition.

There are two existing air compressors one of which is not operational. Demolish the abandoned air compressor and equipment pad, only one air compressor is needed and shall be replaced onto the existing equipment pad. Work extends to the HPS piping main located in northwest corner of plant before running down to the existing steam tunnel (below grade). A steam load analysis was performed for the design of the three new 200 HP fire tube steam boilers. Each new boiler shall be installed with a new stack-mounted “shorty” economizer. Boiler replacement also includes new tray-type deaerator with two feedwater pump skids, a new condensate receiver tank, and two new condensate transfer pumps.

Provide final record as-built drawings with new equipment.

10.GENERAL CONSTRUCTION – After award the Contractor is required to provide a Payment Bond, a Performance Bond, Insurance certificate, Accident Prevention Plan, Quality Control Plan, Environmental Protection Plan, List of Proposed Subcontractors, a Schedule of Values and a Realistic Construction Schedule prior to issuance of the NTP. The administrative period, not to exceed 90 calendar days, shall allow for all preconstruction submittals to be approved and initiation of Contractor PIV badging prior to beginning construction. Once received and accepted, the period of performance for the above-mentioned project will begin with a NTP issued at a Pre-Construction Meeting. As part of this solicitation the General Contractor shall submit an updated electronic PDF preliminary schedule showing the methodology for accomplishing the project within the period of performance. The Contractor shall submit for approval by the COR a construction schedule in accordance with the contract specifications section 01 32 16.15 Project Schedules. Contractor to provide temporary storage and inventory of all relocated items to the COR. The Contractor shall provide their own dumpster and regularly dispose of all damaged items, removed items, and debris created from the construction and demolition in every aspect of this project. Construction sign and a copy of the PCRA permit shall be posted on the entrance to the project site all times.

11.QUALITY CONTROL – The Contractor’s Project Manager may also hold the role of QC Manager if they meet the requirements of the project specifications section 01 45 00 Quality Control and have experience as a QC Manager in healthcare construction of similar scope. All work to be in accordance with the project plans and specifications; Manufacturer’s instructions and recommendations shall be followed for all products used unless otherwise noted or instructed by the VA.

The Contractor shall only use products suitable for the job activity and site conditions, the use of sustainable products is required by the contract specifications section 01 81 13 Sustainable Construction Requirements. The Contractor will submit picture of affected area before, during, and after the renovation of each phase. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, sprinkler heads, piping, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work by the Contractor.

12.CONSTRUCTION SAFETY – The Contractors Site Superintendent may also hold the role of Site Safety and Health Officer if they meet the requirements of the project specifications section 01 35 26 Safety Requirements and have experience as SSHO in healthcare construction of similar scope. The Contractor shall adhere to all security, safety, infection control measures, and other VA policies while performing work at the VA Kerrville Medical Center site. General Contractor shall furnish & post a board where directed by the COR Safety Specialist that includes, but is not limited to, a copy of Rates and Wages, the Davis-Bacon poster & schedules, ILSM/ICRA/GEMS/Patient Safety signed determinations, Site Specific Emergency Contact information, Construction site fire response procedures & evacuation plan, post the number of accident free days, emergency force contact information with nearest hospital including directions, etc. The Contractor shall provide all PPE required for the employees and sub-contracting employees associated with this work. Weekly toolbox meeting shall be held at the beginning of each work week or as stated in the Contractor’s corporate/company Safety and Health Policy. The Contractor shall ensure all products/equipment used for this project are stored, handled, applied, and disposed of following the manufacturers’ instructions.

-- Environmental/Occupational Safety and Health (EOSH) --

EOSH Compliance:

13.All construction projects and project designs shall contain language that addresses the applicable EOSH requirements. Regulatory compliance with EOSH requirements for work performed at the above location can be found in:

a. Volume 29 of the CFR, Part 1910- Occupational Safety for General industry.

b. Volume 29 of the CFR, Part 1926- Occupational Safety for the Construction Industry.

c. Volume 40 of the CFR, Protecting of the Environment.

d. Volume 49 of the CFR, Part 397- Transportation of Hazardous Materials.

-- VHA Master Construction Specifications --

Expectation: The Contractor shall follow the submittal process for all applicable specification section: The Contractor shall supply a master submittal list to track all required submittal items and provide the COR an updated master submittal list weekly until the submittal process is completed. All submittals shall include appropriate project information, CQ/PM signature, adequate descriptive literature, catalog cuts, shop drawings and other data necessary for the Government to ascertain that the proposed equipment and materials comply with the contract document requirements. Catalog cuts submitted for approval shall be legible and clearly identify equipment being submitted (i.e. highlight, cloud, etc.). It is the Contractor’s responsibility to provide submittals that meet all necessary Federal, State and Local code requirements in order to be approved.

Failure to meet these requirements are the responsibility of the Contractor and do not justify a request of time extension.

14.The VA Master Construction Specifications contain work procedures, submittals, and material requirements designed to meet regulatory compliance requirements. The VA Master Construction Specifications to be used as the basis for this construction contract include but not limited to:

DIVISION 01 - GENERAL REQUIREMENTS

00 01 15 List of Drawings

01 00 00 General Requirements

01 32 16.15 Project Schedules

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

01 42 19 Reference Standards

01 45 00 Quality Control

01 57 19 Temporary Environmental Controls

01 58 16 Temporary Interior Signage

01 74 19 Construction Waste Management

01 81 13 Sustainable Construction Requirements

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 – CONCRETE

03 30 00 Cast-in-place Concrete

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing

22 11 00 Facility Water Distribution

22 13 00 Facility Sanitary and Vent Piping

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam Generation

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment

23 05 51 Noise and Vibration Control for Boiler Plant

23 07 11…

This is the start of the file's text. The full file is on GovTribe.