36C25625R0079 ICRA B1 4 East Abate Floor.pdf

PDF 196 KB Posted

Attached to
Z2DA--CON Project #667-25-188 Abate Floor Mastic, Bldg 1 & Bldg 33
Solicitation number
36C25625R0079
Issued by

About this file

This document is an Infection Prevention & Control (ICRA) Matrix form for a floor mastic abatement project at the Overton Brooks VA Medical Center, dated 02/27/2025, located in Building 1, 4 East. The form categorizes construction activities into four types (A, B, C, and D) based on the scale, duration, and potential for dust and debris generation, ranging from non-invasive inspections (Type A) to major demolition and construction activities (Type D).

The matrix also identifies risk groups from low to highest risk, with areas like public hallways and mechanical rooms at the low end, and OR suites, transplant units, and invasive imaging suites at the highest risk level. The document provides a detailed matrix for determining the appropriate infection control precaution class (I-V) based on the construction project type and the patient risk group, with specific notes for environmental conditions that could affect human health. The form is digitally signed by Carol Phillips and is part of a pre-solicitation notice for a Service-Disabled Veteran-Owned Small Business (SDVOSB) contract opportunity with a project cost estimated between $250,000 and $500,000.

View the file

Other files

File Type Posted
36C25625R0079 0003.docx DOCX document
667-25-188 RFI Register 05082025.docx DOCX document
36C25625R0079 0002.docx DOCX document
36C25625R0079 0001.docx DOCX document
Abate Floor Mastic B1 B33 Sign-in Sheet.pdf PDF
36C25625R0079.docx DOCX document
Attachment 2_Drawings.pdf PDF
36C25625R0079 SPECS_667-25-188.pdf PDF
36C25625R0079 EXHIBIT B.docx DOCX document
36C25625R0079 Class V Precautions B1 4 East Abatement.pdf PDF
36C25625R0079 SOW Final_667-25-188.pdf PDF
Attachment 3_Asbestos Survey.pdf PDF
Attachment 1_ Room_Space Schedule.pdf PDF
36C25625R0079 EXHIBIT D.docx DOCX document
36C25625R0079 ICRA Bldg 33 Abate Floor .pdf PDF
36C25625R0079 EXHIBIT E.docx DOCX document
36C25625R0079 EXHIBIT C.docx DOCX document
36C25625R0079 Class II Precautions Bldg 33 .pdf PDF
36C25625R0079 EXHIBIT F.docx DOCX document
Attachment 4_Preliminary Phase Plan.pdf PDF
36C25625R0079 WD LA20250031 Mod 1 dtd 02282025 .pdf PDF
36C25625R0079 EXHIBIT A.docx DOCX document
SOW_Project 667-25-188.pdf PDF
36C25625R0079 Pre Sol.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VA Medical Center Infection Prevention & Control

Project: Abate Floor Mastic, B1, 4 East Date: 02/27/2025

Type A

Inspection and non-invasive activities. Includes but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile/50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type B

Small-scale, short duration activities; minimal dust and debris. Includes but not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection/repair of firewalls and barriers, install conduit/cabling, & access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Type C

Large-scale, long duration activities; moderate amount of dust and debris. Includes but not limited to:

• Removal of preexisting floor covering, walls, casework, or other building components.

• New drywall placement.

• Renovation work in a single room.

• Non-existing cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Type D

Major demolition and construction activities. Includes but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Step Two: Circle the Risk Group(s) affected. Select the higher group, when more than one group will be affected.

Low Risk* Medium Risk High Risk Highest Risk

*Not in patient care areas

• Public hallways & gathering areas

• Office areas

• Breakrooms

• Bathrooms or locker rooms

• Mechanical rooms

• EMS closets

• Waiting areas

• Clinical engineering

• Materials management.

• SPS Decon area

• Kitchen, cafeteria, gift shop, coffee shop, food kiosks.

• Patient care rooms/clinics

• All acute inpatient units

• Emergency department

• Occupation Health

• Pharmacy general areas

• Medication, clean utility & sterile supply rooms

• Imaging/diagnostic suites

• Laboratory.

• All transplant & ICUs

• All oncology units.

• OR suites & restricted areas.

• Procedural suites.

• Pharmacy compounding areas

• SPS: Prep and HLD areas

• Transfusion services.

• Dedicated isolation wards/units.

• Invasive imaging suites:

Step Three: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk.

Construction Project Type

Patient Risk Group Type A Type B Type C Type D

IC

M a tr ix LOW Risk Group1 I II II III

MEDIUM Risk Group1 I II III2 IV2

HIGH Risk Group1 I III IV2 V2

HIGHEST Risk Group1 III IV2 V2 V2

1. Amend as follows for environmental conditions that could affect human health (i.e., sewage, mold, asbestos, gray water, and black water). Class IV Precautions for LOW and MEDIUM Risk Groups and Class V Precautions for HIGH and HIGHEST Risk Groups.

2. Infection Control documents required for Class III Precautions in Type C projects and all Class IV & V Precautions.

2025-02-27T08:59:25-0600
CAROL PHILLIPS

File details come from the government source that posted it. Updated .