This document is an Infection Prevention & Control Class II Precautions document for the Overton Brooks VA Medical Center, specifically for Building 33 Floor Abatement scheduled for February 27, 2025. The document outlines comprehensive infection control protocols for construction work, detailing specific requirements before, during, and after work activities to minimize patient care disruption and prevent contamination.

Key precautions include performing noninvasive work without blocking patient care, containing dust and debris, using only designated construction routes for waste removal, installing sticky dust collection mats, maintaining clean surroundings through HEPA vacuuming, and implementing negative air requirements to remove contaminants. The document emphasizes cleaning environmental surfaces, checking air registers, verifying HVAC system cleanliness and operational status, and ensuring that negative air devices remain operational after dust-creating activities to remove contaminants before removing critical barriers.

View the file

Other files

File Type Posted
36C25625R0079 0003.docx DOCX document
667-25-188 RFI Register 05082025.docx DOCX document
36C25625R0079 0002.docx DOCX document
36C25625R0079 0001.docx DOCX document
Abate Floor Mastic B1 B33 Sign-in Sheet.pdf PDF
36C25625R0079.docx DOCX document
Attachment 2_Drawings.pdf PDF
36C25625R0079 SPECS_667-25-188.pdf PDF
36C25625R0079 EXHIBIT B.docx DOCX document
36C25625R0079 Class V Precautions B1 4 East Abatement.pdf PDF
36C25625R0079 SOW Final_667-25-188.pdf PDF
Attachment 3_Asbestos Survey.pdf PDF
Attachment 1_ Room_Space Schedule.pdf PDF
36C25625R0079 EXHIBIT D.docx DOCX document
36C25625R0079 ICRA Bldg 33 Abate Floor .pdf PDF
36C25625R0079 EXHIBIT E.docx DOCX document
36C25625R0079 ICRA B1 4 East Abate Floor.pdf PDF
36C25625R0079 EXHIBIT C.docx DOCX document
36C25625R0079 EXHIBIT F.docx DOCX document
Attachment 4_Preliminary Phase Plan.pdf PDF
36C25625R0079 WD LA20250031 Mod 1 dtd 02282025 .pdf PDF
36C25625R0079 EXHIBIT A.docx DOCX document
SOW_Project 667-25-188.pdf PDF
36C25625R0079 Pre Sol.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VA Medical Center Infection Prevention & Control Class II Precautions

Rev May 2022

Minimum Required Infection Control Precautions Required for

Project: Building 33 Floor Abatement Date: February 27, 2025

C L

A S

S I I

P R

E C

A U

T

IO

N S

Before and During Work Upon Completion

1. Perform noninvasive work activity as to not block or interrupt patient care.

2. Perform noninvasive work activities in areas that are not directly occupied with patients.

3. Perform noninvasive work activity in a manner that does not create dust.

4. Special Note: Close area under renovation with either a partition or closing the cross-corridor doors.

5. Contain all trash and debris in the work area.

6. Construction Waste:

a. Transport container should be nonporous/smooth, cleanable, and have a hard lid.

b. Containers must be damp-wiped clean and free of visible dust/debris before leaving the contained work area.

c. When removing debris from the contained work area, utilize only the designated construction route.

7. Install a sticky (dust collection) mat at entrance of contained work area. Sticky mats must be changed routinely and when visibly soiled.

8. When area is not contained, maintain clean surroundings by damp mopping or HEPA vacuuming surfaces.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Negative Air Requirements:

A. The use of negative air must be designed to remove contaminates from the work area.

B. Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.