REVISED CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK_r 02.docx

DOCX document 25 KB Posted

Attached to
Z1DA--657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1
Solicitation number
36C25526R0167
Issued by

About this file

This is a calculation template for self-performed versus subcontracted work requirements for general construction contractors bidding on a federal construction project. The document establishes that contractors cannot pay more than 85% of government-provided funds to non-certified Service-Disabled Veteran-Owned Small Business (SDVOSB) or Veteran-Owned Small Business (VOSB) firms, with any further subcontracting by eligible subcontractors counting toward this 85% threshold. Material costs are excluded from subcontracting calculations. Offerors must provide a detailed cost breakdown by specification division, clearly separating personnel costs (including project management, superintendents, and administrative staff) from material and equipment costs, with home office overhead, profit/fee, and bond costs added after subtotals are calculated.

The template requires contractors to complete a four-step calculation of self-performed work by identifying total personnel costs across all tiers, subtracting non-SDVOSB subcontractor personnel costs, and determining the percentage of work to be self-performed by the prime contractor. The submission must be certified by an authorized representative with signature, date, printed name, title, telephone number, and email address. This requirement applies to Project #657-24-111JC, a Department of Veterans Affairs renovation project involving the Ambassador Suite and Main Lobby in Building 1 at a Veterans Integrated Service Network facility (Solicitation 36C25526R0167).

View the file

Other files

File Type Posted
Questions and Responses 1- 43 657-24-111JC.docx DOCX document
ThinkForm_St. Louis VAMC Renovate Lobby_RBM Survey Report 1.pdf PDF
36C25526R0167 0002.docx DOCX document
REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
36C25526R0167 0001.docx DOCX document
Sign in Sheet.pdf PDF
S04- Pre-bid visit agenda 657-24-111JC pdf.pdf PDF
36C25526R0167.docx DOCX document
P09 657-24-111JC DRAWINGS.pdf PDF
P09 657-24-111JC Specs Combined.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK, PROJECT # 657-24-111JC

Offerors for General construction contractors (NAICS code 236220). The contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division
SDVOB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

Division 04

$
$

Division 05

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $__________________

4. Self-performed work = Line 3/Line 1 x 100 = __________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

Signature Date

_______________________________________________________________________
Printed Name of Authorized RepresentativeTelephone Number
_______________________________________________________________________
Title of Authorized RepresentativeE-mail Address

File details come from the government source that posted it. Updated .