Answers to questions 46-53 657-24-111JC 02.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C25526R0167
About this file
This file is a Questions and Answers document providing clarifications on specifications and responsibilities for Solicitation 657-24-111JC, a renovation project for the Ambassador Suite and Main Lobby Building 1 at a Department of Veterans Affairs facility under Veterans Integrated Service Network 15. The document addresses eight technical inquiries (questions 46-53) submitted by prospective contractors regarding equipment substitutions, construction specifications, and material procurement responsibilities.
Key clarifications include: Dormakaba ESA200 door operators are acceptable substitutions for automatic sliders, and Dormakaba ED 100 hardware is acceptable if it meets specified door weight capacity and operating temperature requirements. Regarding the revolving door vestibule, the existing concrete slab is not recessed under carpet and is considered structural under the door perimeter; contractors must modify the existing slab to accommodate a recessed walk-off mat, with concrete removal coordinated accordingly. The contractor is responsible for providing and installing Armed Forces Branch Seals, Images of Heroes wall graphics, "Wall of Heroes" lettering (stainless steel, 6 inches tall), murals at the coffee station, and other wall lettering shown in contract documents, with high-resolution images to be supplied by the Architect-Engineer. The VA will provide the directory for the information desk, with the contractor responsible for coordinating power and data connections. Two tall base cabinets behind the information desk should be priced as 15-inch deep base cabinets per Drawing A-510 Detail 7. Wall covering specifications require Panolam Fiber Reinforced Laminate (Nevamar NW997 Clear Maple) as the basis of design. The proposal due date is November 12, 2026, at 2:00 p.m. CST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 657-CSI-332_1-SS7.pdf | ||
| 36C25526R0167 0005.docx | DOCX document | |
| 657-CSI-332_1-SS5.pdf | ||
| 36C25526R0167 0004.docx | DOCX document | |
| 36C25526R0167 0003.docx | DOCX document | |
| Questions and Responses 1- 43 657-24-111JC.docx | DOCX document | |
| ThinkForm_St. Louis VAMC Renovate Lobby_RBM Survey Report 1.pdf | ||
| 36C25526R0167 0002.docx | DOCX document | |
| REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx | DOCX document | |
| 36C25526R0167 0001.docx | DOCX document | |
| Sign in Sheet.pdf | ||
| REVISED CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK_r 02.docx | DOCX document | |
| S04- Pre-bid visit agenda 657-24-111JC pdf.pdf | ||
| 36C25526R0167.docx | DOCX document | |
| P09 657-24-111JC DRAWINGS.pdf | ||
| P09 657-24-111JC Specs Combined.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI’s 657-24-111JC Renovate Ambassador Suite & Main Lobby Bldg 1
46. Can Dormakaba ESA200 or ESA300 be a substitution for auto sliders?
a. ESA200 is acceptable substitution.
47. Can Dormakaba ED 100 door hardware-auto operators be a substitution request?
a. Substitution for auto door operators is acceptable for operators meeting specified door weight capacity and operating temperature.
48. Ref amendment 3, Q&A 45- The response notes “See Drawing S-504, Detail 02. Note, vestibule interior subfloor will have recess to accommodate walk-off mat.”
a. Detail 2 only shows the new concrete section on the interior of vestibule 100 being 3’-10-7/8” wide without and recess for a matt. Does the existing revolving door have recessed concrete under the existing carpet? How much of the concrete slab is to be removed when referencing keynote 11 on drawing AD102? Is the existing concrete slab reinforced with rebar and if so does it need to be removed for the recessed floor matt? Is the concrete at the revolving door considered structural?
b. The existing concrete is not recessed under the existing carpet. Concrete slab removal to be coordinated with selected recessed walk-off mat. Attached existing structural drawings 1-SS5 and 1-SS7, dated 6-30-09 do not show rebar reinforcing the slab. Contractor to modify existing slab as required to accommodate recessed walk-off mat. The concrete at the revolving door is considered structural under the perimeter of the door as shown on existing as-built 1-SS7.
49. Ref drawing A-304 detail 5- Who is providing and installing the Armed Forces Branch Seals? Detail 3- Who is providing and installing the 4- Images of Heroes? Who provides and installs the “Wall of Heroes” lettering? Is the lettering stainless steel and how tall are the letters? Will specification be provided for all floor and wall seals if the contractor is to provide and install them?
a. The Contractor will provide and install the Armed Forces Branch Seals. The Contractor will provide and install the Images of Heroes. The Contractor will provide and install the “Wall of Heroes” lettering in addition to all other lettering shown (Note: Drawing Sheet A-304, Detail 3; disregard “Detroit, Michigan” lettering). For pricing, the lettering is stainless steel and 6” tall. High resolution images for all floor and wall seals will be provided by the AE to the awarded Contractor. Installation shall be coordinated and executed by the Contractor.
50. Ref detail 6 on drawing A-304- Who provides the murals at the coffee station? If the contractor will specification be provided?
a. The Contractor will provide and install the murals at the coffee station and other wall murals shown in the contract documents. High resolution images will be provided by the AE to the awarded Contractor. Installation shall be coordinated and executed by the Contractor.
51. Ref drawing A-111 detail 1- Will the VA be providing the directory? If not can further details and specifications be provided?
a. VA to provide directory, Contractor to coordinate and provide power and data, similar to Main Lobby Information Kiosk.
52. Ref drawing A-113 Detail 1- There are 2 tall cabinets behind the information desk shown as item 001 but no further information on these cabinets is shown in the drawings. Will the VA be providing and installing these 2 tall cabinets?
a. These two cabinets to be priced as 15” deep base cabinets similar in detail to Drawing A-510, Detail 7, disregarding detail note reference for base frame cut-out.
53. Ref drawing A-304 detail 5 – The wall type shown in 0A which shown with 5/8 impact drywall and steel stud. Elevation 5 shows PL1 finish.
a. What substrate is required for the PL1 as it typically is not applied directly the drywall. Also wall type 0A does not show the PL1. Can further information be provided?
b. Basis of Design for the wall covering is Panolam Fiber Reinforced Laminate (FRL) Nevamar NW997 (Clear Maple).
File details come from the government source that posted it. Updated .