This document is a set of foundation and structural construction details for a site preparation addition project involving a new MRI unit at the Veterans Administration John Cochran Division facility in St. Louis, Missouri. The drawings, dated June 30, 2009, were prepared by Swim, Schuchat, & Cornett Engineering, Inc. and Fox Architects, and depict detailed structural specifications for foundation work, grade beams, drilled piers, basement walls, and various connection details.

The drawings specify reinforced concrete construction with detailed rebar scheduling, including multiple sections showing foundation walls with embedded anchor plates, grade beams with (#5 and #6) reinforcement at specified spacing intervals, drilled pier details, and connections to existing structural elements. Key materials and methods noted include Hilti Kwik-Con II anchors at 12-inch on-center spacing, exterior drainage tile pitched to sump, waterproofing per architectural specifications, and coordination with plumbing drawings for sump details. Additional specifications address slab-on-grade construction with vapor retarders, haunch details, curtain wall connections to existing walls, revolving door slab construction with bonding release agents, and existing beam cutout procedures. The drawings reference multiple detail sheets and cross-sections at various scales ranging from 1/8-inch to 3/4-inch equals one foot, providing comprehensive guidance for structural construction sequencing and material placement for the addition project.

View the file

Other files

File Type Posted
Answers to questions 46-53 657-24-111JC 02.docx DOCX document
36C25526R0167 0005.docx DOCX document
657-CSI-332_1-SS5.pdf PDF
36C25526R0167 0004.docx DOCX document
36C25526R0167 0003.docx DOCX document
Questions and Responses 1- 43 657-24-111JC.docx DOCX document
ThinkForm_St. Louis VAMC Renovate Lobby_RBM Survey Report 1.pdf PDF
36C25526R0167 0002.docx DOCX document
REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
36C25526R0167 0001.docx DOCX document
Sign in Sheet.pdf PDF
REVISED CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK_r 02.docx DOCX document
S04- Pre-bid visit agenda 657-24-111JC pdf.pdf PDF
36C25526R0167.docx DOCX document
P09 657-24-111JC DRAWINGS.pdf PDF
P09 657-24-111JC Specs Combined.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

I

99' - 11 1/4" 1st FLR. TSL =

(5)-#6 TOP & BOT.

(3)-#6 EA. FACE

#5 STIRRUPS

@ 10"O.C.

1' - 6"1' - 0"6"

3'

0"

DOWELS TO

MATCH VERT.

#5 @ 18"O.C. E.F.

#4 @ 18"O.C.

2'-0"

2'-0"

#6 @ 18"O.C.

E.F.

BEAM

PER PLAN

6" METAL STUD

BRICK VENEER

PER ARCH

DECK

PER PLAN

#6 @ 18"O.C.

E.F.

#5 @ 18"O.C.

E.F.

3/16" HILTI KWIK-CON II OR

EQUAL @ 12"O.C. (1" EMBEDMENT)

EXTERIOR DRAIN

TILE. PITCH

TO SUMP.

SEE PLUMBING

DRAWINGS

10"x14"x3/8" EMBED PL.

W/(4)-1/2" DIA x 6" HCA

1/4

TYP

WATER PROOFING

PER ARCH

#4 @ 18"O.C.

2' -0

2'-0"

5"

TOW/F.F.= 100' - 0"

99' - 6"

1st FLR TOS=

89' - 0"

TSL BASEMENT

I

DRILLED PIER

PER PLAN

1' - 0" PER PLAN

99' - 11 1/4" 1st FLR. TSL =

PILASTER @ COLUMN

POUR INTEGRAL W/

CONC. WALL (TYP.)

REINF. PER SCHD.

(5)-#6 TOP & BOT.

(3)-#6 EA. FACE

#5 STIRRUPS

@ 10"O.C.

DOWELS TO

MATCH VERT.

3'

0" 3' - 0"

BRICK VENEER

PER ARCH DECK

PER

PLAN

(12)-#7

VERT, BARS

BEAM

PER PLAN

COL.

PER PLAN

(2)-#4 TIES

AT TOP

12"x18"x3/8" EMBED PL.

W/(4)-1/2" DIA x 6" HCA

WALL BEYOND

1/4

TYP.

HORIZ. WALL

REINF. CONT.

THOUGH

PILASTER

A A

EXTERIOR

DRAIN

TILE. PITCH

TO SUMP.

SEE PLUMBING

DRAWINGS

TOP= 99' - 6"

COL. BASE PL.

SEE COL. SCHEDULE

GRADE BEAM

PER PLAN

TOW/ F. F.= 100' - 0"

3/16" HILTI KWIK-CON II OR

EQUAL @ 12"O.C. (1" EMBEDMENT)

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

43a

NEW BEAM

PER PLAN

EXIST BEAM

PER PLAN

EXIST WALL

99' - 11 1/4" 1st FLR. TSL =

8' -0

N

E W

O P

E N

IN

G

NEWEXIST

SEE SQUEEZE

LINTEL DETAIL

1-SS3

AD

D

IT

IO

N C

U T

1/2" EXP.

MTL.

(3)-#4 DOWEL & DRILL

4" INTO EXIST SLAB &

RETAIN WALL & EPOXY

WITH HILTI HY150

SEE 7/1-SS8

FOR EXP. JT.

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

2343a

99' - 11 1/4" 1st FLR. TSL =

EXIST NEW

FOAM BOARD

DRILLED PIER

PER PLAN

GRADE BEAM

PER PLAN DRILLED PIER

PER PLAN

COL. PER PLAN COL. PER PLANCOL. PER PLANEXIST COL.

EXIST BEAM

EXIST BEAM

EXIST WALL

EXIST FOOTING

BEAM PER PLAN

BEAM PER PLAN BEAM PER PLAN

89' - 0"

TSL BASEMENT

VAPOR

RETARDER

TYP.

1' - 6"

2'

0"

PE

R

P

LA

N

SLAB ON GRADE

PE RPLAN

TYP.

3"

SLAB DOWELS

#4 @ 18"O.C.

PROVIDE 90 DEG

HOOK AT SLAB

STEEL TYP. EA. FACE

(5)-#6 T&B

#4 TIES

@ 12"O.C.

89' - 0"

TSL BASEMENT

L

GRADE BEAM

PER PLAN

SLAB ON GRADE

PER PLAN

VAPOR

RETARDER

TYP.

SLAB DOWELS

#4 @ 18"O.C.

PROVIDE 90 DEG

HOOK AT SLAB

REINF. TYP. EA. FACE

(14)-#6

#4 TIES

@ 14"O.C.

(4)-#6 1' - 6"

6'

0"

PL

AN

SE

E

J

CONSTRUCTION

JOINT

43a

EXIST BEAM

EXIST WALL

EXIST FTG

NEW SLAB

ON GRADE

PER PLAN

81' - 0"V.I.F. EXIST

FTG EL.

89' - 0"

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

Ie

99' - 11 1/4" 1st FLR. TSL =

V.I.F.

6 1/2"

" V

.I.

F.

WALL TO REMAIN

EXISTING FND

SL

AB

T O

R

EM

AI

N

EX

IS

T

FL

O O

R

2"

(2)-#4 x

CONT.

VERIFY W/

CURTAIN MFG.

NEW #4 DWL. @ 48"O.C.

DRILL & EPOXY W/

HILTI HY 150

8"

8"

EXIST WALL

EXIST BEAM

EXIST FOOTING

(12)-#7

#4 TIES @

14" O.C.

WALL REINF.

SEE 7/1-SS7

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

99' - 11 1/4" 1st FLR. TSL =

2' - 8"

(5)-#6 TOP & BOT.

(3)-#6 EA. FACE

#5 STIRRUPS

@ 10"O.C.

DOWELS TO

MATCH VERT.

#5 @ 18"O.C. E.F.

#6 @ 18"O.C.

E.F.

12" THICK

HAUNCH

(2)-#6

(2)-#6

GRADE BEAM

PER PLAN

SUNSHADE/WINDOW

SYSTEM

PER ARCH

#4 @ 18"O.C.

2'-0"

2'-0"

EXTERIOR DRAIN

TILE. PITCH

TO SUMP.

SEE PLUMBING

DRAWINGS

(4)#5

#4 @ 18"O.C.

SLOPE

(2)-#6

3"

(2)-#3 TIES @ 6" O.C.

(2)-#4 1'-0"

1' -0

3/16" HILTI KWIK-CON II OR

EQUAL @ 12"O.C. (1" EMBEDMENT)

#4 @ 18"O.C.

2' -0

2'-0"

3/ 4"

1' - 0"

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

99' - 11 1/4" 1st FLR. TSL =

6" G

R

AV

EL

1/ 4"

S

LA

B

(4)#5

#4 @ 18"O.C.

(5)-#6 TOP & BOT.

(3)-#6 EA. FACE

#5 STIRRUPS

@ 10"O.C.

DOWELS TO

MATCH VERT.

#5 @ 18"O.C. E.F.

#6 @ 18"O.C.

E.F.

GRADE BEAM

PER PLAN

#4 @ 18"O.C.

2'-0"

2'-0"

EXTERIOR DRAIN

TILE. PITCH

TO SUMP.

SEE PLUMBING

DRAWINGS

SUNSHADE/WINDOW

SYSTEM

PER ARCH

SLOPE

4"

3/16" HILTI KWIK-CON II OR

EQUAL @ 12"O.C. (1" EMBEDMENT)

#4 @ 18"O.C.

2' -0

2'-0"

TOW/ F. F.= 100' - 0"3/

4"

5"

1' - 0"

99' - 6" 1st FLR TOS=

99' - 11 1/4" 1st FLR. TSL =

1'

6"

REVOLVING

DOOR GLAZING

REVOLVING DOOR

GLAZING

REVOLVING

DOOR PIVOT

BEARING

ASSEMBLY BY

OTHERS

APPLY BONDING RELEASE

AGENT TO TOP OF WALL AND

DECK UNDER REVOLVING

DOOR SLAB

#6 @ 12"O.C.

T&B

#6 @ 12"O.C.

T&B

6"

95% COMPACTED

STANDARD PROCTOR

100%

COMPACTED

GRAVEL

3" C

LR

SIDEWALK

PER CIVIL

TERRAZZO

FLOOR

COORDINATE

WITH ARCH

SLAB CONSTRUCTION

JOINT TO FOLLOW

RADIUS OF DOOR

GLAZING

#6 @ 18"O.C.

E.F.

#6 T&B DRILL &

EPOXY

INTO WALL W/

6" MIN. EMBED

1' - 11 1/2"

1'

0"

3/16" HILTI KWIK-CON II OR

EQUAL @ 12"O.C. (1" EMBEDMENT)

3/ 4"

I

43a

Ie

TYPICAL PILASTER

PER 8/1-SS7

INFILL

CONC.

EXIST WALL &

COLUMN. VERIFY

IN FIELD

PER TYPICAL

SQUEEZE LINTEL

DETAIL 1-SS3

NEW WATER PROFING

PER ARCH

WATER STOP-RX 101

MIN. 3" COVERAGE

VERIFY WITH ARCH

(TYP)

99' - 6" 1st FLR TOS=

89' - 0"

TSL BASEMENT

M

99' - 11 1/4" 1st FLR. TSL =

(5)-#6 TOP & BOT.

(3)-#6 TYP.

#5 STIRRUPS

@ 10"O.C.

DOWELS TO

MATCH VERT.

GRADE BEAM

PER PLAN

EXTERIOR

DRAIN

TILE. PITCH

TO SUMP.

SEE

PLUMBING

DRAWINGS

SEE 7/1-SS7 FOR

WALL REINF.

FOAM BLOCKING

1' - 0" 1' - 0" 1' - 0"

3"

/8

11"

1/2" HILTI HY 150 MAX

ADHESIVE ANCHORS

EPOXY 4 1/2" DEEP

@48" O.C.

L3 1/2x3 1/2x1/4 LINTEL

G.C. TO VERIFY

LOCATION

TEMPORARY

PIN SUPPORTS

BOTTOM OF NEW ROOF

@ ADDITION

EXIST. WALL WITH

BRICK VENEER

EXIST. COMPOSITE BEAM

ABOVE TO

REMAIN

BELOW TO

BE REMOVED

Swim, Schuchat, & Cornett Engineering, Inc.

Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877

18207 Edison Avenue

C

CO

PY

RI

GH

T 2

2-S

SC

E

NG

IN

EE

RI

NG

, IN

C.

C

06-30-09SITE PREP ADDITION

NEW MRI UNIT

Ad m in is tr a ti o n

Ve te ra n s

DRAWING NO.

OfDwg.

Project No.

Date

DrawnCheckedBuilding Number

Project Title

Approved: Service Director

Approved: Division Chief

Drawing Title th re e in ch es on e fo ot on e an d on e-ha lf in ch es on e fo ot on e in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot th re e-ei gh ts in ch on e fo ot on e-qu ar te r in ch on e fo ot on e-ei gh t in ch on e fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

A B

C D

E F

DateRevisions

D ra w in g sc a n n e d a n d ve c to ri ze d b y M a n ze r, S a n c h e z

A ss o c

In c

(3

AS BUILT DOCUMENTS FULLY SPRINKLERED

657-CSI-332

VAJC ST. LOUIS, MO.

JOHN COCHRAN DIVISION

Location

U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285

St. Louis, Missouri 63101-1236 fox@fox-arch.com www.fox-arch.com Main: 314.621.4343 Fax: 314.621.0261

500 Washington Avenue Suite 1250

3/4" = 1'-0"7 SECTION @ FND WALL @ STEEL BEAM @ GB-3

3/4" = 1'-0"8 SECTION @ FND WALL @ PILASTER @ BEAM

3/4" = 1'-0"12 SECTION @ EXIST BASEMENT @ NEW OPENING

1/4" = 1'-0"14 SECTION @ GRADE BEAM

1" = 1'-0"3 TYPICAL INTERIOR DETAIL @ GB-1

3/4" = 1'-0"10 SECTION @ GB-2

1/2" = 1'-0"5 SECTION @ EXIST WALL

KNP JRC 1-SS7

FOUNDATION SECTION &

60 61

DETAILS

3/4" = 1'-0"19

SECTION @ CUTAINWALL @ EXIST WALL @

BASEMENT & 1ST FLR.

1" = 1'-0" A-A 24x24 AND 24x29 PILASTER DETAIL

3/4" = 1'-0"22 SECTION @ HAUNCH

3/4" = 1'-0"23 SECTION @ FRONT

3/4" = 1'-0"20 SECTION @SLAB @ REVOLVING DOOR

1/2" = 1'-0"18

DETAILS @ NEW BASEMENT WALL @ EXIST

BASEMENT WALL

3/4" = 1'-0"30 SECTION

3/4" = 1'-0"11

EXIST. BEAM CUTOUT @ SECOND FLOOR

CEILING

File details come from the government source that posted it. Updated .