AMMENDMENT 0005 ATTACHMENT_657.313A.75.AE101.A7.pdf
PDF 396 KB Posted
- Attached to
- 657-26-105, Upgrade Interior Physical Security
- Solicitation number
- 36C25526R0064_1
About this file
This document is an architectural first floor plan for an energy plant and utility infrastructure facility. The plan, drawn at 1/8" = 1'-0" scale, depicts a comprehensive layout of mechanical, electrical, and support spaces totaling approximately 23,000 square feet across multiple zones. Primary functional areas include a 7,000 SF Chiller Bay (1A 100), a 7,500 SF Boiler Bay (1A 101), a 4,000 SF Generator Bay (1C 103), and a 1,100 SF Switchgear room (1C 101). The facility also contains administrative and operational support spaces including offices, break rooms, lockers, toilets, showers, entry vestibules, and equipment storage areas. Equipment rooms are designated for Terminal Room-A and Terminal Room-B, with dedicated housekeeping and control room facilities.
The architectural team is led by Christner Inc. (St. Louis, Missouri), with structural engineering by KPFF Consulting Engineers, mechanical/electrical/plumbing design by KJWW Engineering Consultants, and civil engineering by Stock & Associates Consulting Engineers. Additional consultants include Code Consultants, Inc. for fire protection, Kwame Building Group for estimating, and Altec Environmental Consulting for hazardous materials assessment. The plan shows fire-rated door (FD) locations throughout, blast protection zones, and future expansion areas. The document was approved on 4/19/2012 with Amendment 7 dated 4/20/2012, indicating this represents a mature design phase of a federal infrastructure project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
F E
C
THE HIGHLIGHTED ITEMS SHOWN ARE PHYSICAL SECURITY. THE
PROSPECTIVE OFFERER IS TO TABULATE COSTS FOR THESE ITEMS
SEPARATELY FROM THE BASE BID COSTS. COSTS FOR PHYSICAL
SECURITY ITEMS ARE NOTED AS A SEPARATE LINE ITEM ON THE
PROPOSAL FORM. SEE SPECIFICATIONS FOR A DESCRIPTION OF THE
INDIVIDUAL PHYSICAL SECURITY ITEMS.
NOTE: NOT ALL PHYSICAL SECURITY NUMBERS USED THIS PAGE
PS5
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS (SEE STRUCTURAL DRAWINGS FOR
MORE DETAIL)
PS6
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS
PS7
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS.
PS8
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS. CONCRETE FOUNDATIONS. (SEE
STRUCTURAL DRAWINGS FOR MORE DETAIL)
PS9
STEEL FRAMING/ CONCRETE FOUNDATIONS HORIZONTAL BLAST
RESISTANT DOOR MOTORS/ CONTROLLERS / WIRING TO OPERATE
HORIZONTAL BLAST RESISTANT DOOR. (SEE STRUCTURAL &
ELECTRICAL DRAWINGS FOR MORE DETAIL)
PHYSICAL SECURITY
AE202
D1
AE201
AE201
AE202
D1
F1
F1
Control Room
1B 108
300 SF
Air Lock
C1-5
0 SF
C1
AE300
F1
AE300
Men's Toilet
1B 103a
100 SF
Entry
1B 103
70 SF
Men's Lockers
1B 103b
60 SF
Women's Lockers
1B 101b
60 SF
Entry
1B 101
70 SF
Women's Toilet
1B 101a
100 SF
Recyclable Storage
1B 102
120 SF
Break Room
1B 100
225 SF
Entry Room
1B 109
150 SF
Terminal Room-B
1B 105
100 SF
Shower
1B 103c
50 SF
Shower
1B 101c
50 SF
Switchgear
1C 100
950 SF
Switchgear
1C 101
1100 SF 1221
Switchgear
1C 102
1200 SF
Areaway
1C 104
700 SF
Areaway
1C 105
700 SF
203' - 9"
Vest.
C1-1
0 SF
Corridor
C1-6
0 SF
Chiller Bay
1A 100
7000 SF
Terminal Room-A
1B 107
100 SF
Office
1B 106
150 SF
Housekeeping
1B 104
40 SF
Sound Lock
C1-4
0 SF
Corridor
C1-3
0 SF
FD
FD
FD
FD
FD
/8
FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD
FD
AE520
F1
Substation
SITE
2400 SF
FD
FD
FD
FD
FD
FD
FD
FD
FD
5 5
5 5
F5
AE302
AE201A1
AE401
F8
AE504
A6
AE504
C1
AE504
D1
E1
AE502
AE520
F4
Corridor
C1-2
0 SF
Generator Bay
1C 103
4000 SF
1B 100.1
1B 102
C
.4
3' - 5"
/4
6' - 0 5/16"
9' - 0 3/4" 13' - 0 11/16"
A
.4
D
.3
8' - 5" 10' - 7 7/8" 8' - 5" 15' - 4 11/16" 8' - 5" 39' - 3" 14' - 9" 1' - 0"
3' - 5" 4' - 3 1/2"
16' - 0 3/4"
MO
6' - 4"
MO
3' - 8" 19' - 2"
M O
M O
M O
M O
/1
M O
M O
M O
M O
M O
MO
3' - 4" 3' - 3"
MO
6' - 4" 20' - 1"
MO
4' - 0"
6' - 3 1/2"
M O
/8
H12d
A
.4
H12fH12f
H12f
H12d
H12f
H12dH12d
H8f
MO
7' - 0"
1' - 4"
1' - 4"
M O
M O
3' - 5" 10' - 3 1/2"
1B 106
C1 41A 100.1
1B 108
B
1B 107
1B 105
C1 5 1C 104.2
1C 104.1
C
.2
C
.3
1C 101.3
1C 105.2
1C 105.1
C
.11 A
.3
1A 101.2
C
.1 C
.2
C
C
.1
C
M O
/1
54' - 0"
1C 101.2
AE504
A1
A
.2
AE504
A3
1' - 0" 6' - 0" 16' - 0" 17' - 3" 1' - 0"
AE504
A8
AE504
C8
B
.2
1B 101.1
B
.2
A
.1
B
1B 103.1
B L
B A
B L
B
B L
B A
B L
B B
BL 1B108C
3' - 8"
MO
3' - 8"
FD
1A 100.3
/2
1110984
A
G
321 5 6 7
F
D
C
B
E
H
J
A.6
3.7
A.1
C.5
Blast_N
Blast_W
Blast_S
3' - 0" 18' - 10 7/16" 3' - 10 3/8"
8' - 0 1/16"
1' - 7 3/16"
.0
90.0°
/8
AE520 F9
8" 8"
1' - 4"
1D 100.1
1' - 9"
H12d
H12d
H12d
H12d
2' - 0"8"
H12d
H12d
H12d
H12d
1' - 0"
11.1 12.5 13.1 14.1 15.1 15.9
D.1
C.6
C.1
A.8
A.4
A.2
12 13 14 15
2' - 5"8' - 3 3/4"
Boiler Bay
1A 101
7500 SF
FD
500'-4" 500'-4" 500'-4"
500'-4"500'-8"
500'-8"
501'-0"
500'-8"
500'-8"
DEPRESSED CONC
FOR GUIDERAIL
(CROSS-HATCHED AREA)
EDGE OF GB
EDGE OF GB
AE520 F9
OPH
FUTURE EXPANSION
1D 100.2
/2
STEEL BLAST RESISTANT
ROLLING SECURITY DOOR
14 14
14 14
14 14 14 14 14 14
14 14 14
14 14 14
171717
AE502
C7 F2
AE302
A6
GENERAL PLAN NOTE:
FINAL FLOOR DRAIN LOCATIONS TO BE DETERMINED
ACCORDING TO SELECTION OF FINAL EQUIPMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: ENERGY PLANT & UTILITY
INFRASTRUCTURE
657-313A Office ofOffice ofOffice ofOffice of ConstructionConstructionConstructionConstruction and Facilitiesand Facilitiesand Facilitiesand Facilities ManagementManagementManagementManagement o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT
TO WHICH THEY ARE AFFIXED, AND
WE EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
Department of Veterans Affairs118
NORTH
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
MECHANICAL/ELECTRICAL/PLUMBING:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
ST. LOUIS, MO 63146
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, LLC
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
CERTIFICATE OF
AUTHORITY: 000842
4/19/2012 2:39:31 PM
FIRST FLOOR PLAN
06 JULY 2012 JDL MW
AE101
DWG 95 OF
FULLY SPRINKLERED
KEYED NOTES - PLAN
1 ALIGN
2 SLOPE FLOOR 1/4"/FT TO DRAIN
3 ACCESS LADDER - SEE F9/AE520
4 FIRE EXTINGUISHER AND BRACKET
5 PIPING TRENCH - SEE STRUCTURAL
6 GUARDRAIL - SEE DETAIL C9/AE520
7 DEPRESSED SLAB/PIT - SEE STRUCTURAL
8 16' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
9 14' - 8" HIGH MECHANICAL DAMPER - SILL @ 3' - 4" AFF
10 10' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
11 8" HIGH CONC CURB - SEE STRUCTURAL
12 PROVIDE STUD FURRING, THERMAL BATTS AND VAPOR
RETARDER AT FOUNDATION WALL SIM TO F1/AE303
13 LINE OF ACOUSTICAL BARRIER ABOVE
14 CONC EQUIPMENT PAD - SEE STRUCTURAL
15 OVERHANG ABOVE
16 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 495'
17 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 501'
18 REMOVEABLE GUARDRAIL (SIM TO C9/AE520) @ 3'-6"
AFF. ANCHOR TO WALL
19 SHEET WALL PROTECTION
20 WATERPROOFING MEMBRANE & INSULATION
DRAINAGE PANELS
PS8
PS8
1/8" = 1'-0"D1AE201
F1 FIRST FLOOR PLAN
No. Date Revisions
1 4/20/12 AMENDMENT 7
File details come from the government source that posted it. Updated .