657-21-115JC_100 Bid Documents_3of5.pdf
PDF 5 MB Posted
- Attached to
- Z2DA--657-21-115JC - Correct Heating, Ventilation, and Air Conditioning Systems in Procedure Rooms
- Solicitation number
- 36C25526R0059
About this file
This is a comprehensive set of bid documents prepared by Romanyk Consulting for the U.S. Department of Veterans Affairs that includes plumbing, mechanical (HVAC), and controls design specifications for correcting heating, ventilation, and air conditioning systems in procedure rooms at the VA facility located at 915 North Grand Boulevard, St. Louis, Missouri (Project 657-21-115JC).
The plumbing scope includes installation of domestic cold water, sanitary waste, and vent piping systems; hub drains with trap primers; condensate drain lines from air handling units routed to hub drains; domestic water supply connections with reduced pressure zone backflow preventers; and connection of humidifier and heating/cooling coil condensate lines. The mechanical scope encompasses installation of air handling units with pre-filters (MERV 8) and final filters (MERV 13/14), duct-mounted steam humidifiers, heating and cooling coils, supply diffusers, exhaust fans with HEPA filtration capability, variable air volume (VAV) terminal units, and various ductwork and piping systems for heating/cooling water distribution. The controls scope requires a direct-digital control system integrated with the existing VA temperature control system, featuring airflow measurement stations, static pressure sensors, humidity sensors, room pressure monitoring, and complete sequences of operations for normal and epidemic operating modes. All work must comply with Department of Veterans Affairs standards, the International Plumbing Code and International Mechanical Code as adopted by the VA, and applicable NFPA standards. Contractors are responsible for pre-construction testing of existing systems, field verification of dimensions, coordination with other trades, protection of existing equipment, and proper disposal of demolition materials. The documents include detailed schedules for air handlers, exhaust fans, booster fans, filters, steam humidifiers, heating coils, pre-heaters, louvers, air devices, terminal units, and controls sequences with points matrices for isolation rooms, procedure rooms, and TB rooms.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION NOTES - PLUMBING
GENERAL NOTES - PLUMBINGSYMBOLS - LINE TYPES
SYMBOLS - PIPING
1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS. CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.
2. CONDUCT A PRECONSTRUCTION AIR AND WATER FLOW TEST OF EXISTING SYSTEMS AND MAINS SERVING EACH AREA AND FLOOR BEFORE STARTING ANY DEMOLITION
WORK. SUBMIT REPORT OF FLOWS AND FINDINGS TO ENGINEER AND OWNER.
3. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT
OPERATIONS.
4. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND OSHA.
5. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS, WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN CAP, SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL BE ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED ITEMS
FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.
6. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY. COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE OF
WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO ELIMINATE DEAD LEGS.
7. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.
8. SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE AREA.
9. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO
REMAIN CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.
10. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF VETERANS AFFAIRS (VA) STANDARDS.
2. ALL WORK SHALL BE IN CONFORMANCE WITH THE INTERNATIONAL PLUMBING CODE - LATEST EDITION ADOPTED BY THE VA. THE VA SERVES AS AUTHORITY HAVING
JURISDICTION.
3. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.
4. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR, MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR
INSTALLATION FOR A COMPLETE AND OPERATIONAL SYSTEM.
5. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A
NATIONALLY RECOGNIZED TESTING LABORATORY.
6. PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH APPROPRIATE FIRE PROOFING MATERIALS TO RESTORE FIRE RATING. REFER TO ARCHITECTURAL
DRAWINGS FOR FIRE RATED WALLS.
7. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS
DESIGNATED BY THE OWNER.
8. DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. REFER TO DIMENSIONED ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION.
9. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.
10. INFORMATION CONTAINED ON THE DRAWINGS IS IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC., AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY
REFERENCE, WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.
11. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL WRITTEN PERMISSION FROM THE ENGINEER IS
OBTAINED.
12. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES AND
CODE COMPLIANCE SHALL BE REQUIRED.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION ASSOCIATED WITH PERMITS, METERS, AND WATER MAINS.
14. WALL CLEANOUTS, ACCESS PANELS, ETC. TO BE LOCATED IN BACK OF- HOUSE AREAS UNLESS CONDITIONS DICTATE OTHERWISE. COORDINATE WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION.
15. PROVIDE ACCESS PANELS FOR VALVES, ETC. THAT ARE LOCATED IN CONCEALED AREAS. COORDINATE WITH GENERAL CONTRACTOR FOR EXACT LOCATION AND WITH
ARCHITECTURAL PLANS FOR FINISHES.
16. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, MEDICAL GAS OUTLETS, LABELS, SERVICE AND COMMISSIONING INTO OPERATION, TESTING AND CLEANING, FIRE AND LIFE
SAFETY REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS PERSONNEL.
17. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED
CLEARANCES.
18. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. NOT ALL RISERS, DROPS, OFFSETS, VALVES, ETC. ARE SHOWN. PROVIDE RISERS, DROPS, OFFSETS, VALVES, ETC. AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCES WITH OTHER TRADES. MAKE FINAL CONNECTIONS TO FIXTURES, EQUIPMENT, ETC. AS REQUIRED AND/OR PER MANUFACTURER'S RECOMMENDATIONS.
19. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR
EQUIPMENT, MATERIALS, ETC.
20. THE EXISTING PLUMBING SYSTEMS SHALL BE MODIFIED PER SPECIFIED PLANS AND SPECIFICATIONS. FIELD VERIFY EXISTING PLUMBING SYSTEMS REQUIREMENTS PRIOR
TO BIDDING.
21. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE CORRECTED AT
NO ADDITIONAL COST TO THE OWNER.
22. COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE AND OTHER ENGINEERED SYSTEMS. ROUTE ALL PIPING IN CONCEALED SPACES AND INSTALL PIPING AS HIGH AS POSSIBLE. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS NOTED. COORDINATE ROUTING OF PIPING TO MAINTAIN REQUIRED SERVICE CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.
INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.
23. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF THEIR PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER
KEEPING WITH THE HIGHEST STANDARDS OF THE TRADE.
24. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY OWNER AND ALL CONTRACTORS.
25. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION, COORDINATION, AND
INSTALLATION.
SYSTEM LABEL SYSTEM DESCRIPTION
?"SYS (EX) GENERAL PIPING - EXISTING TO REMAIN
?" GENERAL PIPING - TO BE DEMOLISHED
?"SYS GENERAL PIPING - NEW WORK
V VENT
CW DOMESTIC COLD WATER
SAN SANITARY WASTE
CONTINUATION BREAK
COUPLING
DIRECTION OF FLOW
DIRECTION OF PITCH
PIPE END CAP
RISE / DROP IN-LINE
TEE DOWN
TEE UP
TOP CONNECTION
UP & DN / RISER
BOTTOM CONNECTION
VALVE - CHECK
VALVE - SHUT-OFF, NORMALLY OPEN
VALVE - SHUT-OFF, NORMALLY CLOSED
VALVE - BALL, NORMALLY OPEN
VALVE - BALL, NORMALLY CLOSED
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:3
A
M
PLUMBING LEGENDS, SCHEDULES AND
ABBREVIATIONS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PG-001
WSFU WATER SUPPLY FIXTURE UNITS
WHA WATER HAMMER ARRESTER
WHE WATER HEATER
WH WALL HYDRANT
WCO WALL CLEANOUT
WC WATER CLOSET
W WASTE
VTR VENT THROUGH ROOF
VAC VACUUM
V VENT
TSTAT THERMOSTAT
TP TRAP PRIMER
TMV THERMOSTATIC MIXING VALVE
TCV TEMPERATURE CONTROL VALVE
ST STORM WATER DRAINAGE
SPR SPRINKLER LINE
SCH SCHEDULE
SAN SANITARY SEWER
RP RECIRCULATION PUMP
RD ROOF DRAIN
O² OXYGEN
N²0 NITROUS OXIDE
N² NITROGEN
MV MEDICAL VACUUM
MSB MOP SERVICE BASIN
MED MEDICAL
MA MEDICAL AIR
INV INVERT
IE INVERT ELEVATION
HYD HYDRANT
HWR HOT WATER RECIRCULATION (DOMESTIC/POTABLE)
HW HOT WATER (DOMESTIC/POTABLE)
HS HAND SINK
HD HUB DRAIN
HB HOSE BIBB
H&CW HOT AND COLD WATER
FU FIXTURE UNITS
FS FLOW SWITCH
FD FLOOR DRAIN
FCO FLOOR CLEANOUT
EWS EYE WASH STATION
DWV DRAIN WASTE VENT
DN DOWN
DHWS DOMESTIC HOT WATER SUPPLY
DHWR DOMESTIC HOT WATER RETURN (POTABLE)
DHW DOMESTIC HOT WATER (POTABLE)
DFU DRAINAGE FIXTURE UNITS
DCW DOMESTIC COLD WATER (POTABLE)
CW COLD WATER (DOMESTIC/POTABLE)
CV CONTROL VALVE
CS CLINICAL SINK
CO CLEANOUT
AP ACCESS PANEL
AG AIR GAP
PLUMBING ABBREVIATIONS
YR YEAR
WPD WATER SIDE PRESSURE DROP
WG WATER GAGE
WB WET-BULB (TEMPERATURE)
W WATTS
TSP TOTAL STATIC PRESSURE
TD TEMPERATURE DIFFERENCE
SQ M SQUARE METER
SQ FT SQUARE FOOT (FEET)
SP GR SPECIFIC GRAVITY
SCFM STANDARD CUBIC FEET PER MINUTE
SAT SUPPLY AIR TEMPERATURE
SI SQUARE INCHES
RPM REVOLUTIONS PER MINUTE
RLA RUN LOAD AMPERE
RAT RETURN AIR TEMPERATURE
RAF RADIO-FREQUENCY
PSIG POUNDS PER SQUARE INCH-GAGE
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSI POUNDS PER SQUARE INCH
PPM PARTS PER MILLION
PA PASCAL
NPLV NON-STANDARD PART LOAD VALUE
Nm NEWTON-METER
NC NOISE CRITERIA
MTD MEAN TEMPERATURE DIFFERENCE
M/S METERS PER SECOND
MM MILLIMETER
MIN MINIMUM
MHP MOTOR HORSEPOWER
MERV MINIMUM EFFICIENCY REPORTING VALUE
MCA MULTICHANNEL ANALYZER
MCA MAXIMUM CURRENT AMPACITY
MBH 1000 BTUH
MAX MAXIMUM
M METER
LWT LEAVING WATER TEMPERATURE
LVG LEAVING
LH LATENT HEAT
LGT LEAVING GLYCOL TEMPERATURE
LF LINEAR FOOT (FEET)
LBS/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
L/S LITERS PER SECOND
L/M LITERS PER MINUTE
L/H LITERS PER HOUR
LF LINEAR FEET (FOOT)
L LITER
kWH KILOWATT HOUR kW KILOWATT kPA KILO PASCAL
KG/HR KILOGRAM PER HOUR
KG KILOGRAM
IPLV INTEGRATED PART LOAD VALUE
IN-LB INCH-POUND
IN WG INCH WATER GAUGE
IN HG INCHES OF MERCURY
IN INCHES
HZ HERTZ
HT HEIGHT
HP HORSEPOWER
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR
GPD GALLONS PER DAY
GAL GALLONS
GA GAUGE
FT-WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FT FEET
FPS FEET PER SECOND
FPM FEET PER MINUTE
F FAHRENHEIT
EWT ENTERING WATER TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
ENT ENTERING
EGT ENTERING GLYCOL TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EAT ENTERING AIR TEMPERATURE
DP DEWPOINT
DIA DIAMETER
DEG DEGREE
dB DECIBEL
DB DRY-BULB TEMPERATURE
COP COEFFICIENT OF PERFORMANCE
CM/S CENTIMETER PER SECOND
CM CUBIC METER
CFT CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
C CENTIGRADE (CELSIUS)
BTUH BRITISH THERMAL UNIT PER HOUR
BTU BRITISH THERMAL UNIT
BHP BRAKE HORSE POWER
APD AIR SIDE PRESSURE DROP
UNITS OF MEASURE
XFER TRANSFER
WCPU WATER-COOLED PACKAGED UNIT
VAMCS VA MASTER CONSTRUCTION SPECIFICATIONS
VAHBS VA HOSPITAL BUILDING SYSTEM
VBA VETERANS BENEFITS ADMINISTRATION
VHA VETERANS HEALTH ADMINISTRATION
VA DEPARTMENT OF VETERANS AFFAIRS
UTIL UTILITY
UPC UNIVERSAL PLUMBING CODE
UL UNDERWRITER'S LABORATORY
TEMP TEMPERATURE
TYP TYPICAL
SS STAINLESS STEEL
SPEC SPECIFICATION
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTOR...
SI INTERNATIONAL SYSTEM OF UNITS
SHT SHEET
SEN SENSIBLE HEAT
SCI SPINAL CODE INJURY
SA SUPPLY AIR
RM ROOM
RO REVERSE OSMOSIS
RDS ROOM DATA SHEETS
REQD REQUIRED
RA RETURN AIR
R/E RETURN OR EXHAUST
PSS PRIMARY SECONDARY SYSTEM
PGW PROPYLENE GLYCOL-WATER SOLUTION
OR OPERATING ROOM
OD OUTSIDE DIAMETER
OC ON CENTER
OA OUTSIDE AIR
NTS NOT TO SCALE
NSPC NATIONAL STANDARD PLUMBING CODE
NOM NOMINAL
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NO NORMALLY OPEN
NIC NOT IN CONTRACT
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NFC NATIONAL FIRE CODES
NEMA NATIONAL ELECTRICAL MANUFACTURERS...
NEC NATIONAL ELECTRICAL CODE
NC NORMALLY CLOSED
NA NOT APPLICABLE (ALSO N/A)
MRI MAGNETIC RESONANCE IMAGING
MIN MINIMUM
MH MANHOLE
MER MECHANICAL EQUIPMENT ROOM
MECH MECHANICAL
MAX MAXIMUM
LPG LIQUID PROPANE GAS
ITAC INFORMATION TECHNOLOGY AIR CONDITIONING
IPC INTERNATIONAL PLUMBING CODE
ID INSIDE DIAMETER
ICU INTENSIVE CARE UNIT
I/O INPUT/OUTPUT
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH...
IBC INTERNATIONAL BUILDING CODE
HAC HOUSEKEEPING AIDE’S CLOSET
GS GALVANIZED STEEL
GA GAUGE
EX EXISTING (OR EXIST)
EPACT ENERGY POLICY ACT
EPA ENVIROMENTAL PROTECTION AGENCY
ELEC ELECTRIC OR ELECTRICAL
EL ELEVATION
ESMT EASEMENT
ETO ETHYLENE OXIDE
EA EXHAUST AIR
DWG DRAWING
DEMO DEMOLITION
CO2 CARBON DIOXIDE
CENT CENTRIFUGAL
BMT BONE MARROW TRANSPLANT
BLDG BUILDING
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASHRAE
AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASHP AIR SOURCE HEAT PUMP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AMB AMBIENT
AFG ABOVE FINISHED GRADE
AFF ABOVE FINISHED FLOOR
ADA AMERICANS WITH DISABILITIES ACT
A/E ARCHITECTS AND ENGINEERS
GENERAL ABBREVIATIONS
Revisions: Date:
user Snapshot
NOTES:
1. PIPE SIZES ARE TYPICAL UNLESS SPECIFIED DIFFERENTLY ON PLAN.
2. REFER TO 4/P-002 FOR TRAP ARM LENGTH DETAIL.
SAN BRANCH OR MAIN
(SEE PLANS FOR SIZE, 2" MIN.)
4" TO 2" REDUCER
TRAP
1 1/2" VENT
2" SAN
DRAIN LINE
CLEANOUT
PROVIDE A SECTION OF HIGH
COMPRESSION STRENGTH INSULATION
AT EACH HANGER POINT. INSULATION
MAY BE HALF ROUND OR FULL ROUND
AND EXTEND 2" BEYOND GALV. SHIELD
EACH WAY.
GALVANIZED IRON
SHEET SHIELD
INSULATION
STEEL PIPE SADDLE,
TACK WELDED TO PIPE,
FILL SADDLE WITH
INSULATION.
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN. (TYP.)
UNI-SIRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT OR,
FOR APPLICATIONS PERMITTED IN
SPEC SECTION 22 05 29, STEEL SADDLE
FILLED WITH INSULATION. (TYP.)
THREADED ROD.(TYP.)
PIPE INSULATION(TYP.)
INSULATION SHIELD (TYP.)
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
HIGH DENSITY INSULATION INSERT OR,
FOR APPLICATIONS PERMITTED IN
SPECIFICATIONS, STEEL SADDLE FILLED
WITH INSULATION.
NOTES:
1. REFER TO SPECIFICATIONS FOR MORE INFORMATION.
2. SERVICE: RECOMMENDED FOR SUSPENSION OF INSULATED (HOT OR COLD) PIPE WHEN FLEXIBILITY
OF THE CLAMP IS DESIREABLE.
½"
T=THICKNESS
STEEL PLATE
B
AC
45°
D
PIPE SIZE
A
B
C
D
T
ROD SIZE
CLEVIS SIZE
ROD TAP
PIN DIA.
PIN HOLE
GRIP
2"
1"
3 1/2"
3" 4" 6" 8" 10" 12"
3 1/2" 3 1/2" 3 1/2" 4 1/4" 4 1/4"
2" 2" 2" 2 1/2" 2 1/2"
1" 1" 1" 1 1/4" 1 1/4"
1/2" 5/8" 5/8" 3/4" 7/8" 1"
3/8" 3/8" 3/8" 3/8" 1/2" 1/2"
3/8" 1/2" 1/2" 5/8" 3/4" 7/8"
2" 2" 2" 2" 2 1/2" 2 1/2"
3/8" 1/2" 1/2" 5/8" 3/4" 7/8"
3/8" 1/2" 1/2" 5/8" 3/4" 7/8"
1/2" 5/8" 5/8" 3/4" 7/8" 1"
1/2" 1/2" 1/2" 1/2" 5/8" 5/8"
USE TURNBUCKLE IF BUILDING
CONNECTION DOES NOT PROVIDE
ADJUSTMENT
HEX NUT
PIPE SIZE
ROD
SIZE
GRINNELL ROD ATTACHMENT
CLEVIS FIG. 299
1/8" COTTER PIN
VERTICAL ELBOW
INSULATION
PIPE
ADJUSTABLE CLEVIS GRINNELL FIG. 65 OR
ADJUSTABLE CLEVIS GRINNELL FIG. 260
INSULATION
PIPE
HANGER ROD
INSULATION PROTECTION SHEILD: GRINNELL
FIG. 167 (SIZE RANGE 1/2" THRU 24" PIPE WITH
INSULATION THICKNESS OF 1/2", 3/4", 1", 1-1/2",
AND 2")
PIPE COVERING PROTECTION SADDLE
SINGLE PIPE ROLLER COMPLETE
GRINNELL FIG. #171
HANGER ROD
PIPE CL
PIPE CL
PIPE CL
PIPE CL
PROVIDE A SECTION OF HIGH
COMPRESSION STRENGTH INSULATION
AT EACH HANGER POINT. INSULATION
MAY BE HALF ROUND OR FULL ROUND
AND EXTEND 2" BEYOND GALV. SHIELD
EACH WAY.
PROVIDE A SECTION OF HIGH
COMPRESSION STRENGTH INSULATION
AT EACH HANGER POINT. INSULATION
MAY BE HALF ROUND OR FULL ROUND
AND EXTEND 2" BEYOND GALV. SHIELD
EACH WAY.
UNION (TYP.)
TAP OFF TOP OF PIPE WITH 1/2" VERTICAL
RISE. PROVIDE BALL SHUT-OFF VALVE.
AUTOMATIC TRAP PRIMER VALVE
/2
"C W
CEILING
CW SUPPLY LINE
NOTES:
1. TYPE 'K' SOFT COPPER.
2. PROVIDE SLOPE FOR GRAVITY FLOW OF WATER.
NOTES 1, 2
FLOOR DRAIN
D
1-1/4"
FROM FLOOR
DRAIN, HUB DRAIN,
OR STANDPIPE
VENT
SAN LINE
MIN.
2"
3"
1-1/2"
4" & UP
MAX.
2-1/2"
4"
6"
3"
8"
2' - 6"
5' - 0"
6' - 0"
3' - 6"
10' - 0"
DIRECTION OF FLOW
TRAP ARM LENGTH
(SEE CHART)
MIN. TRAP ARM LENGTH
(SEE CHART)
MAX. TRAP ARM LENGTH
"D" (NOM. PIPE SIZE)
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:3
A
M
PLUMBING DETAILS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PG-002
NTS
TYPICAL ABOVE CEILING HUB DRAIN DETAIL
NTS
PIPE SUPPORTS DETAIL
NTS
TRAP PRIMER (ABOVE CEILING SIMPLEX) DETAIL
Revisions: Date:
1" = 1'-0"
TRAP ARM DETAIL
SCOPE OF WORK
KEYNOTES
PLUMBING GENERAL NOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
E126
TOILET
E127
ANTE RM.
E128
PATIENT ISO.
E126
TOILET
E127
ANTE RM.
E128
PATIENT ISO.
HD-1
2" SAN
1 1/2" V
/4
C
D
01-AHU-E128
3/4" CD
3/4" CD
1/2" CW
3/4" CD 01-SH-E128
01-PP-101
01-PP-101
01-PP-101
01-PP-101
A164
PATIENT ISO.
A164A
TOILET
A165A
TOILET
A165
PATIENT ISO.
1/2" MA(EX)
1/2" O(EX)
1" VAC(EX)
A164
PATIENT ISO.
A164A
TOILET
A165A
TOILET
A165
PATIENT ISO.
HD-1
HD-1
01-AHU-A164
01-AHU-A165
3/4" CD
/2
V
S A
N
1/2" MA
1/2" O
1" VAC
1/2" MA(EX)
1/2" O(EX)
1" VAC(EX)
/4
C
D
01-SH-A164
/4
C
D
01-SH-A165
/4
C
D
3/4" CD
1/2" MA
1/2" O
1" VAC
/2
C
W
/2
C
W
3/4" CD
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:5
A
M
PLUMBING ENLARGED PLAN - LEVEL 01
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-101
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - E128
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - E128
NTS
KEYPLAN - LEVEL 01
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP LINE
ROUTED TO HUB DRAIN.
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 MODIFY, AS NECESSARY, COLD WATER SUPPLY, SANITARY, AND VENT PIPES TO
MAKE NEW CONNECTIONS FOR HUB DRAIN (2" SAN) AND 1/2" CW HUMIDIFIER SUPPLY
PIPES.
9 DEMOLISH MEDICAL GAS PIPING AND REROUTE TO AVOID NEW HVAC EQUIPMENT.
10 CONNECT MEDICAL GAS PIPING INTO EXISTING.
11 INSTALL 1/2" RPZ AT DOMESTIC WATER CONNECTION. PROVIDE DRAIN PAN UNDER
RPZ WITH DRAIN LINE ROUTED BACK TO HUB DRAIN.
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A164 & A165
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A164 & A165
Revisions: Date:
PLUMBING GENERAL NOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
01-PP-102
01-PP-102
D219
ANTE RM.
D220
TB RM.
D221
MICROBIOLOGY LAB
D219
ANTE RM.
D220
TB RM.
D221
MICROBIOLOGY LAB
3/4" CD
HD-1
1 1/2" V
2" SAN
1/2" CW
01-SH-D220
3/4" CD
/4
C
D
3/4" CD
01-VAV-D220-1
B124
PROCEDURE ROOM
B124
PROCEDURE ROOM
HD-1
/2
V
S A
N
/4
C
D
3/4" CD
3/4" CD 3/4" CD
3/4" CD
01-VAV-B124-1
01-VAV-B124-2
01-SH-B124
01-PP-102
01-PP-102
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:1
A
M
PLUMBING ENLARGED PLAN - LEVELS 01 & 02
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-102
NTS
KEYPLAN - LEVEL 02
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - D220
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - D220
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - B124
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - B124
NTS
KEYPLAN - LEVEL 01
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP LINE
ROUTED TO HUB DRAIN
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 PROVIDE A DRIP PAN BELOW VAV. CONNECT 3/4" CONDENSATE/DRIP LINE ROUTED
TO HUB DRAIN.
9 ROUTE 3/4" CD FROM VAV CONDENSATE DRAIN TO HUB DRAIN.
Revisions: Date:
PLUMBING GENERAL NOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
01-PP-103
01-PP-103
01-PP-103
01-PP-103
B503
BRONCHOSCOPY
SUITE
1/2" MA(EX)
1/2" O(EX)
3/4" VAC(EX)
3/4" CW(EX)
3/4" HW(EX)
C510A
ANTE
C510
ISOLATION
RECOVERY
1/2" MA(EX)
1/2" O(EX)
3/4" VAC(EX)
H W
(E X
H W
R (E
X
3/4" HW(EX)
3/4" HWR(EX)
H W
(E X
H W
R (E
X
C511
TOILET
C511A
TOILET
H510B
CORRIDOR
B503
BRONCHOSCOPY
SUITE
3/4" CD
/2
V
S A
N
HD-1
1/2" MA(EX)
1/2" O(EX)
3/4" VAC(EX)
3/4" HW(EX)
3/4" CW(EX)
1/2" CW
C510
ISOLATION
RECOVERY
C511A
TOILET
C511
TOILET
C510A
ANTE
01-AHU-C510
2" SAN
1 1/2" V
3/4" CD
HD-1
1/2" MA
1/2" O
3/4" VAC
/4
V
A C
/2
O
/2
M
A
1/2" MA(EX)
1/2" O(EX)
3/4" VAC(EX)
3/4" HW(EX)
3/4" HWR(EX)
H W
(E X
H W
R (E
X
H W
(E X
H W
R (E
X
121/2" CW
/4
C
D
H510B
CORRIDOR
01-SH-C510
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:2
A
M
PLUMBING ENLARGED PLAN - LEVEL 05
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-103
NTS
KEYPLAN - LEVEL 05
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - B503
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - C510
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - B503
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - C510
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP PIPE
ROUTED TO HUB DRAIN.
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 MODIFY, AS NECESSARY, COLD WATER SUPPLY, SANITARY, AND VENT PIPES TO
MAKE NEW CONNECTIONS FOR HUB DRAIN (2" SAN) AND 1/2" CW HUMIDIFIER SUPPLY
PIPES.
9 DEMOLISH MEDICAL GAS PIPING AND REROUTE TO AVOID NEW HVAC EQUIPMENT.
10 CONNECT MEDICAL GAS PIPING INTO EXISTING.
11 EXISTING HOT WATER SUPPLY AND RETURN. RELOCATE AS NECESSARY FOR NEW
HVAC EQUIPMENT.
12 INSTALL 1/2" RPZ AT DOMESTIC WATER CONNECTION. PROVIDE DRAIN PAN UNDER
RPZ WITH DRAIN LINE ROUTED BACK TO HUB DRAIN.
Revisions: Date:
PLUMBING GENERAL NOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
A658
ISOLATION
A658B
ANTE RM.
A658A
TOILET
A663A
TOILET
A663B
ANTE RM.
A663
ISOLATION
01-PP-104
01-PP-104
01-PP-104
01-PP-104
A663A
TOILET
A663B
ANTE RM.
A663
ISOLATION
01-AHU-A663
1 1/2" V
2" SAN
91/2" CW
/4
C
D
01-SH-A663
A658
ISOLATION
A658B
ANTE RM.
A658A
TOILET
HD-1
2" SAN
1 1/2" V
01-AHU-A658
3/4" CD
/4
C
D
3/4" CD
01-SH-A658
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:4
A
M
PLUMBING ENLARGED PLAN - LEVEL 06
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-104
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A658
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A663
NTS
KEYPLAN - LEVEL 06
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A663
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A658
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP PIPE
ROUTED TO HUB DRAIN.
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 MODIFY, AS NECESSARY, COLD WATER SUPPLY, SANITARY, AND VENT PIPES TO
MAKE NEW CONNECTIONS FOR HUB DRAIN (2" SAN) AND 1/2" CW HUMIDIFIER SUPPLY
PIPES.
9 INSTALL 1/2" RPZ AT DOMESTIC WATER CONNECTION. PROVIDE DRAIN PAN UNDER
RPZ WITH DRAIN LINE ROUTED BACK TO HUB DRAIN.
Revisions: Date:
PLUMBING GENERAL NOTES
C615
ISOLATION
C615A
ANTE RM.
CHASE
C615
ISOLATION
CHASE
C615A
ANTE RM.
HD-1
3/4" CD
S A
N
/2
V
1/2" CW
3/4" CD
01-SH-C615
01-AHU-C615
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
01-PP-105
01-PP-105
A720
PATIENT ISO.
A720A
ANTE
A720B
TOILET
A720
PATIENT ISO.
A720A
ANTE
A720B
TOILET
1/2" CW
AHU-A720
1 1/2" V
2" SAN
HD-1
/4
C
D
3/4" CD
01-SH-A720AHU-A720
01-PP-105
01-PP-105
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:5
A
M
PLUMBING ENLARGED PLAN - LEVELS 06 & 07
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-105
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - C615
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - C615
NTS
KEYPLAN - LEVEL 06
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP PIPE
ROUTED TO HUB DRAIN.
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 MODIFY, AS NECESSARY, COLD WATER SUPPLY, SANITARY, AND VENT PIPES TO
MAKE NEW CONNECTIONS FOR HUB DRAIN (2" SAN) AND 1/2" CW HUMIDIFIER SUPPLY
PIPES.
9 INSTALL 1/2" RPZ AT DOMESTIC WATER CONNECTION. PROVIDE DRAIN PAN UNDER
RPZ WITH DRAIN LINE ROUTED BACK TO HUB DRAIN.
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A720
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A720
NTS
KEYPLAN - LEVEL 07
Revisions: Date:
PLUMBING GENERAL NOTES
A707
PATIENT ISO.
A707B
TOILET
A707A
ANTE RM.
A707
PATIENT ISO.
A707B
TOILET
A707A
ANTE RM.
01-AHU-A707
2" SAN
1 1/2" V
3/4" CD
/4
C
D
3/4" CD
HD-1
1/2" CW
3/4" CD
A757
PATIENT ROOM
A757B
TOILET
A757A
ANTE RM.
A757
PATIENT ROOM
A757B
TOILET
A757A
ANTE RM.
01-AHU-A757
HD-1
2" SAN
1 1/2" V
/4
C
D
/4
C
D
3/4" CD
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
01-PP-106
01-PP-106
01-PP-106
01-PP-106
1. ALL DISTURBED WALLS, CEILINGS, AND FLOORS SHALL BE PATCHED TO MATCH
EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC
DETAILS ON THE REPAIRS.
2. DO NOT TERMINATE ANY CONDENSATE DRAIN (CD) DIRECTLY TO DRIP PAN. ALL CD
SHALL DRAIN TO HUB DRAIN ONLY.
3. ALL CONDENSATE DRAIN LINE (CD) SHOWN ON PLAN IS A SUGGESTED ROUTING.
ROUTE CD IN A PRACTICAL FASHION AND PITCH DRAIN LINE TOWARD HUB DRAIN.
4. REFER TO 2/01-P-002 FOR TYPICAL ABOVE CEILING HUB DRAIN DETAIL FOR
CONDENSATE DRAIN (CD) TERMINATION TO HUB DRAIN.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/1
/2
:1
:1
A
M
PLUMBING ENLARGED PLAN - LEVEL 07
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
AW MS+DAW
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-PP-106
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A707
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A707
1/2" = 1'-0"
PLUMBING ENLARGED DEMOLITION PLAN - A757
1/2" = 1'-0"
PLUMBING ENLARGED PLAN - A757
NTS
KEYPLAN - LEVEL 07
NO. DESCRIPTION
1 CONNECT 1/2" CW PIPE INTO EXISTING CW PIPE SERVING SINK. PROVIDE AN
ISOLATION VALVE IN AN ACCESSIBLE LOCATION IN CEILING SPACE.
2 1/2" CW PIPE TO SERVE HUB DRAIN TRAP PRIMER.
3 CONNECT 2" SAN PIPE INTO EXISTING SAN RISER IN CHASE.
4 CONNECT 1-1/2" VENT INTO EXISTING VENT IN CHASE.
5 DUCT MOUNTED STEAM HUMIDIFIER. DUCT SECTION SHOWN FOR REFERENCE.
6 PROVIDE A DRIP PAN BELOW AIR HANDLER. CONNECT 3/4" CONDENSATE/DRIP PIPE
ROUTED TO HUB DRAIN.
7 ROUTE 3/4" CD FROM AIR HANDLER CONDENSATE DRAIN TO HUB DRAIN.
8 MODIFY, AS NECESSARY, COLD WATER SUPPLY, SANITARY, AND VENT PIPES TO
MAKE NEW CONNECTIONS FOR HUB DRAIN (2" SAN) AND 1/2" CW HUMIDIFIER SUPPLY
LINES.
9 INSTALL 1/2" RPZ AT DOMESTIC WATER CONNECTION. PROVIDE DRAIN PAN UNDER
RPZ WITH DRAIN LINE ROUTED BACK TO HUB DRAIN.
Revisions: Date:
GENERAL NOTE
GENERAL DEMOLITION NOTES
SYMBOLS - LINE TYPES
SYMBOLS - PIPING
DUCTWORK SYMBOLSMECHANICAL SYMBOLS
DRAWING SYMBOLS
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF VETERANS AFFAIRS (VA) STANDARDS.
2. ALL WORK SHALL BE IN CONFORMANCE WITH THE INTERNATIONAL MECHANICAL CODE - LATEST EDITION ADOPTED BY THE VA. THE VA SERVES AS AUTHORITY HAVING
JURISDICTION.
3. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.
CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR, MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR
INSTALLATION FOR A COMPLETE AND OPERATIONAL SYSTEM.
4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A
NATIONALLY RECOGNIZED TESTING LABORATORY.
5. PENETRATIONS THROUGH FIRE RATED WALLS BY DIVISION 23 CONTRACTOR SHALL BE SEALED WITH APPROPRIATE FIRE PROOFING MATERIAL TO RESTORE FIRE RATING.
REFER TO ARCHITECTURAL DRAWINGS FOR FIRE RATED WALLS.
6. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS
DESIGNATED BY THE OWNER.
7. DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. REFER TO DIMENSIONED ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION.
8. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.
9. INFORMATION CONTAINED ON THE MECHANICAL DRAWINGS IS IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC., AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY REFERENCE, WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.
10. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL WRITTEN PERMISSION FROM THE ENGINEER IS
OBTAINED.
11. PROVIDE VOLUME BALANCING DAMPERS FOR ALL SUPPLY DIFFUSERS, RETURN AND EXHAUST GRILLES AND AT EACH INDIVIDUAL BRANCH VENTILATION, SUPPLY, RETURN
AND RELIEF DUCT.
12. PLACE DIFFUSERS AS CLOSE TO PLAN LOCATION AS POSSIBLE WITHOUT INTERFERING WITH OTHER CEILING DEVICES.
13. ALL NEW EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES
AND CODE COMPLIANCE SHALL BE REQUIRED.
14. PROVIDE ACCESS PANELS FOR VALVES, ETC. THAT ARE LOCATED IN CONCEALED AREAS. COORDINATE WITH GENERAL CONTRACTOR FOR EXACT LOCATION AND WITH
ARCHITECTURAL PLANS FOR FINISHES.
15. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, SERVICE AND COMMISSIONING INTO OPERATION, LABELS, TESTING AND CLEANING, FIRE AND LIFE SAFETY REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS PERSONNEL.
16. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED
CLEARANCES.
17. ALL DUCTWORK SIZES SHOWN ON DRAWINGS ARE CLEAR INTERIOR DIMENSIONS.
18. THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR AND COORDINATED WITH ARCHITECTURAL PLANS. IF THERMOSTATS ARE INSTALLED ADJACENT TO A
LIGHT SWITCH ALIGN MOUNTING HEIGHT WITH LIGHT SWITCH.
19. PROVIDE CONCEALING FLANGES AT ALL VISIBLE DUCT PENETRATIONS THROUGH WALLS.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INTERCONNECTING CONTROL WIRING.
21. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR EQUIPMENT, MATERIALS, ETC.
22. THE EXISTING MECHANICAL SYSTEMS SHALL BE MODIFIED PER SPECIFIED PLANS AND SPECIFICATIONS. FIELD VERIFY EXISTING MECHANICAL SYSTEMS REQUIREMENTS
PRIOR TO BIDDING.
23. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE CORRECTED AT
NO ADDITIONAL COST TO THE OWNER.
COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE AND OTHER ENGINEERED SYSTEMS. ROUTE ALL MECHANICAL SYSTEMS IN CONCEALED SPACES AND INSTALL COMPONENTS AS HIGH AS POSSIBLE. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS NOTED. COORDINATE ROUTING OF MECHANICAL SYSTEMS TO MAINTAIN REQUIRED SERVICE CLEARANCES AROUND ANY EQUIPMENT AND
ELECTRICAL ITEMS.
24. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS AT WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.
25. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF THEIR PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER
KEEPING WITH THE HIGHEST STANDARDS OF THE TRADE.
26. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY OWNER AND ALL CONTRACTORS.
27. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION, COORDINATION, AND
INSTALLATION.
28. PROVIDE DIRECT-DIGITAL CONTROL SYSTEM(S) AS INDICATED ON THE PROJECT DOCUMENTS, POINT LIST, INTEROPERABILITY TABLES, DRAWINGS AND AS DESCRIBED IN THESE SPECIFICATIONS. INCLUDE A COMPLETE AND WORKING DIRECT-DIGITAL CONTROL SYSTEM. PROVIDE ALL ENGINEERING, PROGRAMMING, CONFIGURATION/SETUP HARDWARE AND SOFTWARE, OPEN LICENSES, CONTROLS AND INSTALLATION MATERIALS, INSTALLATION LABOR, COMMISSIONING AND START-UP, TRAINING, FINAL PROJECT DOCUMENTATION AND WARRANTY. COORDINATE WITH VA TECHNOLOGY STAFF FOR INTEGRATION OF REQUIRED SITE NETWORK SECURITY INTEGRATION.
29. CONTROLS SHALL BE AN EXTENSION OF THE EXISTING OWNER PROVIDED TEMPERATURE CONTROL SYSTEM. PROVIDE A COMPLETE AND FUNCTIONAL EXPANDED CONTROL SYSTEM TO ADD ON TO THE EXISTING SYSTEM TO CONTROL ALL EQUIPMENT PROVIDED UNDER THIS CONTRACT. PROVIDE COMPONENTS AND PROGRAMMING THAT MATCH EXISTING SYSTEM AND ARE COMPATIBLE WITH THE EXISTING SYSTEM, INCLUDING BUT NOT LIMITED TO CONTROL BOARDS, THERMOSTATS, WIRING, AND ACCESSORIES. FIELD VERIFY EXISTING PROGRAMMING FOR REUSE AND/OR UPDATING. ALL NEW BUILDING CONTROLLERS SHALL BE NATIVE BACNET. ALL NEW BACNET CONTROLLERS, DEVICES AND COMPONENTS SHALL BE LISTED BY BACNET TESTING LABORATORIES.
30. SEQUENCES INCLUDED IN THE SUBMITTAL MUST REFLECT WHAT IS ACTUALLY GOING TO BE PROGRAMMED, INCLUDING SUGGESTED CHANGES TO THE PLANS. COPIED SEQUENCES FROM THE PLANS WILL NOT BE ACCEPTED. INCLUDE SYSTEM GRAPHICS INDICATING MONITORED SYSTEMS, DATA (CONNECTED AND CALCULATED) POINT
ADDRESSES, OPERATOR NOTATIONS, NETWORK CONFIGURATION, ETC.
31. ALL SOFTWARE WORK INVOLVING THIS INTEGRATION PROCESS IS THE RESPONSIBILITY OF THE TEMPERATURE CONTROL CONTRACTOR AND MUST BE COMPLETED BY A TECHNICIAN CERTIFIED WITH THE EXISTING SYSTEM. THE TCC MUST SUBMIT A COPY OF THE CERTIFICATION DOCUMENTATION FOR THE SYSTEM PROGRAMMER PRIOR TO
COMPLETING ANY WORK IN ORDER TO ENSURE THE INTEGRITY OF THE SYSTEM.
32. THE TCC IS ALSO RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUTERS, SWITCHES, JACE’S, SOFTWARE LICENSES, DRIVERS, ETC, AS NEEDED FOR A COMPLETE INSTALLATION INCLUDING FULL INTEGRATION. THE TCC IS RESPONSIBLE FOR ALL GRAPHICS GENERATION AND POINT MAPPING OF POINTS TO BE ADDED IN THE PROJECT. THE TCC SHALL UTILIZE THE EXISTING DATABASE AS AN EXAMPLE FOR ALL PROGRAMMING, GRAPHICS, ANIMATIONS, AND POINT MAPPING FOR WORK DONE ON
THE PROJECT IN ORDER TO MAINTAIN CONSISTENCY WITHIN THE BAS.
1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS. CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.
2. CONDUCT A PRECONSTRUCTION AIR AND WATER FLOW TEST OF EXISTING SYSTEMS AND MAINS SERVING EACH AREA AND FLOOR BEFORE STARTING ANY DEMOLITION
WORK. SUBMIT REPORT OF FLOWS AND FINDINGS TO ENGINEER AND OWNER.
3. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT
OPERATIONS.
4. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND OSHA.
5. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS, WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN CAP, SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL BE ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED ITEMS
FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.
6. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY. COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE OF
WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO ELIMINATE DEAD LEGS.
7. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.
8. SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE AREA.
9. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO
REMAIN CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.
10. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.
SYSTEM LABEL SYSTEM DESCRIPTION
?"SYS (EX) GENERAL PIPING - EXISTING TO REMAIN
?" GENERAL PIPING - TO BE DEMOLISHED
?"SYS GENERAL PIPING - NEW WORK
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
HHWS HEATING HOT WATER SUPPLY
TYPICAL MECHANICAL SYSTEM - SUPPLY PIPING
TYPICAL MECHANICAL SYSTEM - RETURN PIPING
HHWR HEATING HOT WATER RETURN
LPS LOW PRESSURE STEAM
LPC LOW PRESSURE CONDENSATE RETURN
CONTINUATION BREAK
COUPLING
DIRECTION OF FLOW
DIRECTION OF PITCH
PIPE END CAP
RISE / DROP IN-LINE
TEE DOWN
TEE UP
TOP CONNECTION
UP & DN / RISER
BOTTOM CONNECTION
VALVE - CHECK
VALVE - SHUT-OFF, NORMALLY OPEN
VALVE - SHUT-OFF, NORMALLY CLOSED
VALVE - BALL, NORMALLY OPEN
VALVE - BALL, NORMALLY CLOSED
10"x8"SA(EX)
LIMIT OF DEMOLITION
SUPPLY DIFFUSER/GRILLE (CEILING, SQUARE 4-WAY)
SEE NOTES 1, 2, 3.
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
FC
10"x8"SA
FLEXIBLE CONNECTION (FC) - EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS. VANE SYMBOL ARE NOT
SHOWN ON PLANS)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
DUCT LABELING NOTE:
• INSIDE DIMENSIONS: WIDTH x DEPTH
• SA = SUPPLY AIR
• RA = RETURN AIR
• OA = OUTSIDE AIR SUPPLY
• EA = EXHAUST AIR
EXISTING DUCT TO REMAIN
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED10"x8"
NEW DUCT
EXHAUST GRILLE
SEE NOTES 1, 2, 3.
SD-14
270 CFM
SUPPLY DUCT UP ("X")
EXHAUST DUCT UP ("Y")
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR
GRILLE BELOW DUCT
EXHAUST OR RETURN BOTTOM
REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR
TOP GRILLE (WALL TYPE)
RETURN DUCT UP ("/")
SUPPLY DUCT DOWN ("X")
EXHAUST DUCT DOWN ("Y")
RETURN DUCT DOWN ("/")
(ROUND) (RECT.)
EG-21
80 CFM
RETURN GRILLE (CEILING)
SEE NOTES 1, 2, 3.
RG-24
270 CFM
NOTES:
1. AIR TERMINAL LABEL:
AIR TERMINAL TYPE
BALANCED FLOW RATE
2. AIR TERMINAL TYPE:
Sx = SUPPLY, Rx = RETURN, Ex = EXHAUST xD = DIFFUSER xG = GRILLE xR = REGISTER (WITH INTEGRATED VOLUME DAMPER)
(EX. SG-14 = SUPPLY GRILLE)
3. REFER TO AIR DEVICE SCHEDULE FOR DETAILS.
NOTES:
1. DEVICE CONTROL/CONNECTION PANEL.
2. MANUFACTURER'S RECOMMENDED MAINTENANCE/OPERATIONAL CLEARANCE. KEEP
THIS AREA CLEAR AND ACCESSIBLE FOR COIL AND PANEL MAINTENANCE AND
REPAIR.
3.…