This is a 100% Bid Documents package for a federal construction project at the VA St. Louis Health Care System, John Cochran Division, issued January 31, 2023. The project involves correcting heating, ventilation, and air conditioning (HVAC) systems in procedure rooms within Building 01 to ensure compliance with VHA Directive 115JC, which addresses isolation and procedure room requirements. Project number 657-21-115JC encompasses 18 procedure rooms and related spaces across multiple floors of the 443,628 square-foot healthcare facility located at 915 North Grand Boulevard, St. Louis, Missouri 63106.
The scope of work includes HVAC modifications to patient isolation rooms, ante rooms, procedure rooms, recovery rooms, and associated support spaces on Levels 01, 02, 04, 05, 06, and 07. Key affected rooms include E128/127 (patient isolation/ante), B124 (minor procedure), A164/164A and A165/165A (patient isolation/toilet), D220/D219 (TB room/ante), B503 (bronchoscopy suite), C510/510A and C615/615A (isolation recovery/ante), and multiple additional patient isolation and treatment spaces (A658-A663, A707, A720, A757). The contract requires compliance with 2021 NFPA 101 Life Safety Code, 2021 IBC, 2021 IFC, 2022 IPC, 2021 IECC, 2021 IMC, 2021 IFGC, 2017 ABA, and 2020 NFPA 70. The project includes asbestos abatement coordination with SCI Engineering Inc., and the General Contractor is responsible for infection control risk assessment (ICRA) compliance, daily debris removal, site protection, permit procurement, utility coordination, and maintaining facility operations during construction. The consulting team includes Romanyk Consulting Corp. as architect/engineer, with Walter Staas as Contracting Officer Representative for the Department of Veterans Affairs, Network Contracting Office 15.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAPGENERAL NOTES
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A
COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW
ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE
PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES
AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH
RESPECT TO DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S
MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.
PROJECT TEAM
ENRIGHT AVE
DELMAR BLVD G
R
A N
D B
L V
D
N S
PRIN
G A
VE
BELL AVE
WINDSOR
5T
1T
PROJECT INFORMATION
THE VA ST. LOUIS HEALTH CARE SYSTEM, JOHN COCHRAN DIVISION, WILL CORRECT VARIOUS HVAC SYSTEMS WITHIN BUILDING 01 AT THE JOHN COCHRAN DIVISION OF THE VA ST. LOUIS HEALTHCARE SYSTEM TO ENSURE THEY ARE COMPLIANT WITH VHA DIRECTIVE 115JC. VHA DIRECTIVE 115JC IS RELATED TO ISOLATION AND PROCEDURE ROOMS. A PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) IS INCLUDED INTO THE DOCUMENTATION, AN HAZARDOUS WASTE ASBESTOS SURVEY WAS PROVIDED BY THE COR FOR THE PROJECT FOR USE TO DEVELOP A GC PROJECT PHASING SCHEDULE.
PROJECT NAME: CORRECT HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS IN PROCEDURE ROOMS
PROJECT NUMBER: 657-21-115JC
PROJECT LOCATION: ST. LOUIS VAMC – JOHN COCHRAN DIVISION, 915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
PROJECT PURPOSE/USE: HVAC IMPROVEMENTS
ROOMS IN SCOPE:
• E128/127 – PATIENT ISOLATION / ANTE
• B124 – MINOR PROCEDURE RM
• A165/165A – PATIENT ISOLATION / TOILET
• A164/164A – PATIENT ISOLATION / TOILET
• D220/D219 – TB RM / ANTE
• B503 – BRONCHOSCOPY SUITE
• C510/510A – ISOLATION RECOVERY / ANTE
• C615/615A – ISOLATION RECOVERY / ANTE
SCOPE OF WORK SUMMARY:
PROJECT MANAGER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wiezcorek, PE arlo.wieczorek@romanykconsulting.com
855.424.3838 x324
402.981.8882 cell
MECHANICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Yumei Wang P.E, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com
855.424.3838 x311
402.321.3766 cell
OWNER:
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway, Leavenworth KS 66048
CONTRACTING OFFICER REPRESENTATIVE:
St. Louis VAMC – John Cochran Division 915 North Grand Blvd.
St. Louis, MO 63106
Walter Staas Walter.Staas@va.gov
314.652.4100 x58723
ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Jim Booher AIA NCARB ASHE LEED AP Jim.Booher@romanykconsulting.com
855.424.3838 Ext 327
915.588.4800 Cell
PLUMBING ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
FIRE PROTECTION ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
• A658/658A/658B – ISOLATION / TOILET / ANTE
• A663/663A/663B – ISOLATION / TOILET / ANTE
• A757/757A/757B – PATIENT ROOM / ANTE RM / TOILET
• A707/707A/707B – PATIENT ISO / ANTE RM / TOILET
• A720/720A/720B – PATIENT ISO / ANTE / TOILET
BUILDING SUMMARY
ASBESTOS ABATEMENT:
SCI Engineering Inc.
130 Point West Boulevard St. Charles, MO 63301
Glen Grissom Ggrissom@sciengineering.com
636.757.1045
314.581.7570 cell
BUILDING IN SCOPE
CODE SUMMARY
PROPERTY LOCATION:
ST. LOUIS VAMC – JOHN COCHRAN DIVISION, 915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
AUTHORITY HAVING JURISDICTION
DEPARTMENT OF VETERAN AFFAIRS
RELEVANT CODES:
2021 NFPA 101 LIFE SAFETY CODE
2021 IBC INTERNATIONAL BUILDING CODE
2021 IFC INTERNATIONAL FIRE CODE
2022 IPC INTERNATIONAL PLUMBING CODE
2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE
2021 IMC INTERNATIONAL MECHANICAL CODE
2021 IFGC INTERNATIONAL FUEL GAS CODE
2017 ABAAS VA BARRIER FREE DESIGN STANDARDS
2020 NFPA 70 NATIONAL ELECTRIC CODE
FULLY SPRINKLERED
USE/OCCUPANCY CLASSIFICATION:
HEALTH CARE OCCUPANCY PER 2018 NFPA 101 CHAPTER 19
SQUARE FOOTAGE: 443,628 SF
CONSTRUCTION TYPE (TABLE 19.1.6.1) (TABLE A.4.1.1/CH.4.3):
REQUIRED FIRE RESISTANCE RATINGS (PER NFPA 220, TABLE 4.1.1)
HEALTHCARE/INPATIENT OCCUPANCY CONSTRUCTION TYPE II (222)
TABLE A.7.6 COMMON PATH, DEAD-END, AND TRAVEL DISTANCE LIMITS (BY OCCUPANCY)
LIFE SAFETY SYSTEMS:
FIRE DETECTION, ALARM, AND COMMUNICATION SYSTEM PROVIDED PER
2018 NFPA 101 CHAPTER 9.6
SUPERVISED AUTOMATIC SPRINKLER SYSTEM PROVIDED PER 2018 NFPA 101
CHAPTER 9.7.1
EXIT ACCESS CORRIDOR RATING:
ALLOWABLE PER 2018 NFPA 101 CHAPTER 20.3.6.1 & CHAPTER 38.3.6.1 (3)
NO RATING REQUIRED W/SPRINKLER SYSTEM
PROVIDED:
NO RATING
EXIT STAIR ENCLOSURE RATING:
2-HOUR CONNECTING FOUR STORIES OR MORE
PROVIDED: 2-HOUR
SHAFT ENCLOSURE RATING:
2-HOUR CONNECTING FOUR STORIES OR MORE
PROVIDED: 2 HOUR
OCCUPANCY
HEALTHCARE
CONSTRUCTION TYPE
CONSTRUCTION TYPE II (222)
COLUMNS SUPPORT FLOORS/\ SUPPORT ROOF ONLY 2 HR/1 HR
BEAMS EXTERIOR/BEAMS INTERIOR 2 HR/1 HR
FLOOR/CEILING ASSEMBLIES
ROOF/CEILING ASSEMBLIES
INTERIOR NON BEARING WALLS
EXTERIOR NON BEARING WALLS
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
INT/EXT (ROOF ONLY)
2 HR
1 HR
NON COMBUSTIBLE
0 HR
2 HR
2 HR
1 HR
OCCUPANCY
HEALTHCARE
COMMON PATH LIMIT
NO REQUIREMENT
DEAD END LIMIT TRAVEL DISTANCE LIMIT
NO REQUIREMENT 200'
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:
U.S. Department of Veterans Affairs
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
STAMP
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:3
:1
P
M
PROJECT COVER SHEET
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
JANUARY 31, 2023
01-GI-100
657-21-115JC
PROJECT NUMBER - 657-21-115JC
CORRECT HEATING, VENTILATION, AND AIR CONDITIONING
SYSTEMS IN PROCEDURE ROOMS
100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
100% BID DOCUMENTS
JANUARY 31, 2023
PLAN NORTH
TRUE NORTH
NORTH
Revisions: Date:
user Stamp
1i
0 GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
Ga5xFB1
WALL TYPE
WINDOW TYPE
ROOM NAME
ROOM NAME / NUMBER
REVISION TAG
NORTH
NORTH ARROW WITH TRUE
NORTH INDICATION
EGRESS ROUTE ID AND
SECTION LENGTH
ROOM
ROOM OCCUPANCY
150 SF
EGRESS : EGRESS ID
Egress Length
ROOM OCCUPANCY & AREA
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name Elevation
FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
A101
A101
ANNOTATION DRAWING SYMBOLS
INDEX OF DRAWINGS
202-A101
DISCIPLINE:
G - GENERAL
A - ARCHITECTURE
I - INTERIORS
F- FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOM
V - VENTILATION
SHEET TYPE
DESIGNATOR
BUILDING NUMBER
SHEET NUMBER
WITHIN SERIES
ARCHITECTURAL SYMBOLS
LEGEND
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT,
OR CEMENT PLASTER
BRICK
CMU
STONE
FIBERGLASS BATT
INSULATION
EXPANDED POLYSTYRENE
RIGID INSULATION
EXTRUDED POLYSTYRENE
RIGID INSULATION
POLYISOCYANURATE RIGID
INSULATION
GYPSUM BOARD
EXTERIOR GYPSUM
SHEATHING
EXTERIOR CEMENT
BOARD
COATED GLASS MAT
WATER RESISTANT
GYP BD
PLYWOOD
COVER BOARD
MATERIALS
CEILING SYMBOLS
MECHANICAL SUPPLY DIFFUSER
MECHANICAL RETURN GRILLE
MECHANICAL EXHAUST GRILLE
24" X 24" ACOUSTICAL CEILING
PANEL AND GRID
GYPSUM BOARD CEILING OR
SOFFIT
2' x 2' LED FLUORESCENT
FIXTURE - EMERGENCY NIGHT
LIGHT
RECESSED CAN DOWNLIGHT
CEILING ELEVATION A.F.F.X'-X"
EXIT SIGN
LED LIGHT
1' x 4' LED FLUORESCENT
FIXTURE
2' x 4' LED FLUORESCENT
FIXTURE
INDUSTRIAL LUMINAIRE
EMERGENCY LIGHT
2' x 2' LED FLUORESCENT
FIXTURE
OC
NURSE CALL DOME LIGHT WALL
MOUNTED
A
FIRE ALARM AUDIO/VISUAL
NOTIFICATION DEVICE-CEILING
MOUNTED.
CAM
LS
OCCUPANCY SENSOR
A1 A3
DAYLIGHT LEVEL SENSOR
CLOSED CIRCUIT CAMERA (CCTV)
CEILING MOUNTED
N
S SPEAKER
CLOSED CIRCUIT CAMERA (CCTV)CAM
VC VACANCY SENSOR
WAP CEILING INFORMATION OUTLET
FIRE ALARM VISUAL NOTIFICATION
DEVICE - WALL MOUNTED
V1
WALL CONTROL STATIONSW
NURSE CALL STATIONN
SMOKE,FIRE/SMOKE
DAMPER CONTROLLER
ARD
FIRE ALARM MANUAL PULL
STATION
F
FIRE ALARM SMOKE,
SMOKE DAMPER
SD
SD FIRE ALARM DUCT SMOKE
DETECTOR
D DIMMER LED
A FIRE ALARM AUDIO/VISUAL
NOTIFICATION DEVICE- WALL
MOUNTED.
A1 A3
S SWITCH
{LD}
{LS}
LIGHT DIMMER
LIGHT SENSOR
ARCHITECTURAL DRAWING ABBREVIATIONS
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALG ALUMINUM AND GLASS
AL ALUMINUM
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ELEV EQ ELEVATOR EQUIPMENT
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GSF GROSS SQUARE FEET
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HAC HOUSE AID KEEPING CLOSET
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
ISO ISOLATION
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHWR SHOWER
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SEE OTHER DISCIPLINES FOR
ADDITIONAL ABREVIATIONS
NOTE: NOT ALL MAY BE USED
ARCHITECTURAL SYMBOLS
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:1
P
M
SHEET INDEX & ABBREVIATIONS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-101
SHEET # SHEET TITLE
01-MG-010 CONTROLS SEQUENCES
01-MG-011 CONTROL SEQUENCES
01-MG-012 CONTROLS SEQUENCES
01-MG-013 CONTROL SEQUENCES
01-MG-014 CONTROL SEQUENCES
01-MG-015 CONTROL SEQUENCES
MECHANICAL
01-MD-101 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 01
01-MD-102 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 01
01-MD-103 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 02
01-MD-104 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 03
01-MD-105 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 04
01-MD-106 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 05
01-MD-107 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 06
01-MD-108 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 07
01-MD-109 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 07
01-MD-110 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 08
01-MD-111 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 09
01-MD-112 MECHANICAL DEMOLITION ENLARGED PLANS - LEVEL 10
01-MH-101 HVAC ENLARGED PLAN - LEVEL 01
01-MH-102 HVAC ENLARGED PLAN - LEVEL 01
01-MH-103 HVAC ENLARGED PLAN - LEVELS 01 & 02
01-MH-104 HVAC ENLARGED PLAN - LEVEL 03
01-MH-105 HVAC ENLARGED PLAN - LEVEL 04
01-MH-106 HVAC ENLARGED PLAN - LEVEL 05
01-MH-107 HVAC ENLARGED PLAN - LEVEL 06
01-MH-108 HVAC ENLARGED PLAN - LEVEL 07
01-MH-109 HVAC ENLARGED PLAN - LEVEL 07
01-MH-110 HVAC ENLARGED PLAN - LEVEL 07
01-MH-111 HVAC ENLARGED PLAN - LEVEL 08
01-MH-112 HVAC ENLARGED PLAN - LEVEL 09
01-MH-113 HVAC ENLARGED PLAN - LEVEL 10
01-MP-101 PIPING ENLARGED PLAN - LEVEL 01
01-MP-102 PIPING ENLARGED PLAN - LEVEL 01
01-MP-103 PIPING ENLARGED PLAN - LEVELS 01 & 02
01-MP-104 PIPING ENLARGED PLAN - LEVEL 05
01-MP-105 PIPING ENLARGED PLAN - LEVEL 05
01-MP-106 PIPING ENLARGED PLAN - LEVEL 06
01-MP-107 PIPING ENLARGED PLAN - LEVEL 06
01-MP-108 PIPING ENLARGED PLAN - LEVEL 07
01-MP-109 PIPING ENLARGED PLAN - LEVEL 07
01-MP-110 PIPING ENLARGED PLAN - LEVEL 07
ELECTRICAL
01-EG-001 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS
ELECTRICAL
01-EP-101 ELECTRICAL ENLARGED PLAN - LEVEL 01
01-EP-102 ELECTRICAL ENLARGED PLAN - LEVEL 01
01-EP-103 ELECTRICAL ENLARGED PLAN - LEVEL 01
01-EP-104 ELECTRICAL ENLARGED PLAN - LEVEL 01
01-EP-105 ELECTRICAL ENLARGED PLAN - LEVEL 01
01-EP-106 ELECTRICAL ENLARGED PLAN - LEVEL 02
01-EP-107 ELECTRICAL ENLARGED PLAN - LEVEL 03
01-EP-108 ELECTRICAL ENLARGED PLAN - LEVEL 05
01-EP-109 ELECTRICAL ENLARGED PLAN - LEVEL 05
01-EP-110 ELECTRICAL ENLARGED PLAN - LEVEL 05
01-EP-111 ELECTRICAL ENLARGED PLAN - LEVEL 06
01-EP-112 ELECTRICAL ENLARGED PLAN - LEVEL 06
01-EP-113 ELECTRICAL ENLARGED PLAN - LEVEL 06
01-EP-114 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-115 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-116 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-117 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-118 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-119 ELECTRICAL ENLARGED PLAN - LEVEL 07
01-EP-120 ELECTRICAL ENLARGED PLAN - LEVEL 09
01-EP-121 ELECTRICAL ENLARGED PLAN - LEVEL 10
ELECTRICAL
01-EG-400 ELECTRICAL SCHEDULES
01-EG-401 ELECTRICAL SCHEDULES
01-EG-402 ELECTRICAL SCHEDULES
01-EG-403 ELECTRICAL SCHEDULES
01-EG-501 ELECTRICAL DETAILS
01-EG-502 ELECTRICAL DETAILS
Grand total: 135
SHEET # SHEET TITLE
GENERAL
01-GI-100 PROJECT COVER SHEET
01-GI-101 SHEET INDEX & ABBREVIATIONS
01-GI-102 ICRA DETAILS
01-GI-103 ICRA DETAILS CLASS 1 & 2
01-GI-104 ICRA DETAILS CLASS 3
01-GI-105 CLASS IV ICRA DETAILS
01-GI-106 CLASS IV ALT ICRA DETAILS
01-GI-107 OVERALL PLAN - LEVEL 01
01-GI-108 OVERALL PLAN - LEVEL 02
01-GI-109 OVERALL PLAN - LEVEL 03
01-GI-110 OVERALL PLAN - LEVEL 04
01-GI-111 OVERALL PLAN - LEVEL 05
01-GI-112 OVERALL PLAN - LEVEL 06
01-GI-113 OVERALL PLAN - LEVEL 07
01-GI-114 OVERALL PLAN - LEVEL 08
01-GI-115 OVERALL PLAN - LEVEL 09
01-GI-116 OVERALL PLAN - LEVEL 10
01-GI-201 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 01
01-GI-202 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 02
01-GI-203 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 03
01-GI-204 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 04
01-GI-205 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 05
01-GI-206 LIFE SAFETY PLAN & INFECTION CONTROL- LEVEL 06
01-GI-207 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 07
01-GI-208 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 08
01-GI-209 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 09
01-GI-210 LIFE SAFETY PLAN & INFECTION CONTROL- PENTHOUSE
ARCHITECTURAL
01-AE-101 OVERALL CEILING PLAN - LEVEL 01
01-AE-102 OVERALL CEILING PLAN - LEVEL 02
01-AE-103 OVERALL CEILING PLAN - LEVEL 03
01-AE-104 OVERALL CEILING PLAN - LEVEL 04
01-AE-105 OVERALL CEILING PLAN - LEVEL 05
01-AE-106 OVERALL CEILING PLAN - LEVEL 06
01-AE-107 OVERALL CEILING PLAN - LEVEL 07
01-AE-108 OVERALL CEILING PLAN - LEVEL 08
01-AE-109 OVERALL CEILING PLAN - LEVEL 09
01-AE-110 OVERALL ROOF PLAN - PENTHOUSE
01-AE-401 ENLARGED PLANS - RM. E128
01-AE-402 ENLARGED PLANS - RMS. A164 & A165
01-AE-403 ENLARGED PLANS - RMS. B123 & D220
01-AE-404 ENLARGED PLANS - RMS. B503 & C510
01-AE-405 ENLARGED PLANS - RM. A658
01-AE-406 ENLARGED PLANS - RMS. C615 & A720
01-AE-407 ENLARGED PLANS - RMS. A707 & A757
01-AE-500 PARTITION TYPE
01-AE-501 CEILING SCHEDULE
FIRE PROTECTION
01-FG-001 FIRE PROTECTION LEGENDS, NOTES, AND ABBREVIATIONS
FIRE PROTECTION
01-FP-101 FIRE PROTECTION ENLARGED PLAN - LEVELS 01-05
01-FP-102 FIRE PROTECTION ENLARGED PLAN - LEVELS 06 & 07
PLUMBING
01-PG-001 PLUMBING LEGENDS, SCHEDULES AND ABBREVIATIONS
01-PG-002 PLUMBING DETAILS
PLUMBING
01-PP-101 PLUMBING ENLARGED PLAN - LEVEL 01
01-PP-102 PLUMBING ENLARGED PLAN - LEVELS 01 & 02
01-PP-103 PLUMBING ENLARGED PLAN - LEVEL 05
01-PP-104 PLUMBING ENLARGED PLAN - LEVEL 06
01-PP-105 PLUMBING ENLARGED PLAN - LEVELS 06 & 07
01-PP-106 PLUMBING ENLARGED PLAN - LEVEL 07
MECHANICAL
01-MG-001 MECHANICAL LEGENDS, SCHEDULES, AND ABBREVIATIONS
01-MG-002 MECHANICAL DETAILS
01-MG-003 MECHANICAL DETAILS
01-MG-004 MECHANICAL DETAILS
01-MG-005 MECHANICAL SCHEDULES
01-MG-006 MECHANICAL SCHEDULES
01-MG-007 MECHANICAL SCHEDULES
01-MG-008 CONTROLS SEQUENCES
01-MG-009 CONTROLS SEQUENCES
Revisions: Date:
Stamp
INFECTION CONTROL NOTES
INFECTION CONTROL GENERAL NOTES:
1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR
VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER
COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE
PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR
TO DECK.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND
CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE
CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES.
THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST
MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR
MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL
AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING
TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE.
ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.
3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE
MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH
EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT
DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING
SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.
PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND
N95 RESPIRATORS REQUIRED BY THE SAFETY SPECIFICATION.
4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION
CONTROL PERMIT BEFORE CONSTRUCTION BEGINS..
5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH
THE COR PRIOR TO CONSTRUCTON.
6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND
THE COR PRIOR TO IMPLEMENTATION.
7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA,
IF EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.
8. COORDINATE WITH MEP/FP.
9. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA
MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA
BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING
CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-PRESSURIZATION CRITERIA, AND
IDENTIFICATION AS NOTED ON SHEET GI-103 TO GI-106.
ENVIRONMENTAL CONTROLS:
TYPE OF CONSTRUCTION ACTIVITY - TYPE C:
WORK THAT GENERATES MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING FOR WALL COVERING
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.
INFECTION CONTROL PRECAUTIONS FOR CLASS II
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:1
P
M
ICRA DETAILS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-102
Revisions: Date:
user
VHASTLSTAASW
Image
VHASTLSTAASW
Text Box ICRA Barrier Additional Notes
ICRA barriers shall not be built during Medical Center business hours 8:00am-4:30pm M-F. Some areas may have additional time restrictions.
ICRA barriers at most rooms shall be Class IV. There must be an ante room.
The bid documents have examples of ICRA/ILSM forms that will be generated and posted for every construction containment barrier that the contractor will be required to adhere to for infection prevention within the Medical Center. Details of the ICRA/ILSM documents may change at any time per Infection Prevention or VA guidelines issued at that time. The contractor is required to adhere to these current standard ICRA/ILSM documents during the duration of the contract at no cost to the government. Failure to comply with the posted ICRA/ILSM will result in disciplinary action and the contractor and its employees required to attend an on-station VA provided training session at no cost to the government.
ICRA barriers at locations that will be active for less than 30 calendar days and have minimal dust generating activity may be allowed to have a plastic zippered door separating the ante room and construction zone. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.
ICRA barriers at some locations may be allowed to be a mobile containment unit or other similar mobile or modular containment system. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.
All gaps in the containment barrier must be taped and sealed. Taping is to be done in a manner as to not be destructive to existing infrastructure or the contractor is responsible for repair. Taping is to be inspected daily and any gaps resealed or retaped to maintain the required negative air pressure. Negative air outlet shall use a piece of hard flat material in the window with a hole in it for the tubing and use a round flange and attach the tubing with a band clamp or similar VA approved method.
Doors into ICRA barriers shall be:
· Metal and wipeable to maintain a dust free clean surface. No wood allowed.
· Pre-manufactured temporary wall systems are allowed per VA approval.
· ADA compliant threshold, or no threshold.
· Have a door closer.
· Door must close & latch on its own power while the negative air is operational.
· A door latch and lock compatible with the VA key core.
o CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (Storeroom function) Lock set for JC Large Format Interchangeable Core.
o A potential supplier - IDN-H Hoffman Inc. ~314-692-8391.
OUTSIDE OF BUILDING
COVER ALL
RETURNS AT
GRATE
/DIFFUSERS
E
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE
DIFFUSERS)
TAPE ALL SERVICES TO
PROTECT CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE).
PROVIDE STICKY MATS
( CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS)>
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
PROVIDE STICKY MATS
( CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS)>
INDICATOR MUST BE AT -0.01 OR GRAETER
(VERIFY DAILY), IF NOT VERIFY ALL OPENINGS
SUCH AS DOORS ARE CLSOED AND /OR
CHANGE OUT NEGATIVE AIR - PRE FILTER.
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
A P
P R
O X
A
.F .F
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE (VERIFY DAILY). IF NOT VERIFY ALL
OPENING SUCH AS DOORS ARE CLOSED AND/OR CHANGED OUT NEGATIVE AIR PRE
FILTER
ICRA, ILSM FIRE
WATCH MISC.
FORMS
PAPER CADDY
INDICATOR (REFER TO PLAN &
ELEVATION)
C.O.R WITH CONTACT
INFORMATION
XXXX XXX XXXX
XXXX XXX XXXX
XXXX XXX XXXX
XXXX XXX XXXX
CHILLER PLANT AFTER HORUS CONTACT PHONE
XXXX FIRE EMERGENCY DIAL 911
THIS IS A
RESTRCITED AREA
AREA UNDER
CONSTRUCTION
PERSONNEL ENTERING MUST HAVE : HARD HAT, SAFETY GLASSES, AND PROPER I.D.
COMING SOON!!!!
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -
F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
E R
IE
S
C E
IL
IN
G H
E
IG
H T
2X4 SUSPENDED
CEILING AS SCHEDULED
3 5/8" INSULATED WALL WITH 16
GA. METAL STUDS AT 16" O.C.
WITH 5/8" GYPSUM BOARD EACH
SIDE. WALL TO EXTEND TO ROOF
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE A
F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
E R
IE
S
C E
IL
IN
G H
E
IG
H T
2X4 SUSPENDED
CEILING AS SCHEDULED
3 5/8" INSULATED WALL WITH 16
GA. METAL STUDS AT 16" O.C.
WITH 5/8" GYPSUM BOARD EACH
SIDE. WALL TO EXTEND TO ROOF
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE B
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:1
P
M
ICRA DETAILS CLASS 1 & 2
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-103
1/4" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT - CLASS I & CLASS II
1/4" = 1'-0"
ICRA ELEVATION
1" = 1'-0"
ICRA WALL TYPES
Revisions: Date:
EITHER KEEP RUNNING
COVER ALL
RETURNS
TAPE ALL
SERVICES
FIRE EXTINGUISHER
ON
A
O
V
SUPPLY
DUCTS
OR COVER WHEN
RUNNINGTO KEEP DUST
OUT.
AT THE GRATE/DIFFUSERS
TO PROTECT
AGAINST
PORTABLE FLOOR BRACKET
CONTAMINATION
E
OPTIONAL EXHAUST
DUCTS(COVER THE
GRATES
AND THE DIFFUSERS)
TYPICAL IDEAL
CONSTRUCTION LAYOUT
OUTSIDE OF
BUILDING
CLASS III
PROVIDE STICKY
MATS(CHANGED END OF
SHIFT
(ILSM MAY REQUIRE
MORE THAN
ONE).
OR MORE IF NECESSARYTO MAINTAIN
CLEANLINESS).
INDICATOR MUST BE AT -0.01 OR
GREATER(VERIFY DAILY), IF NOT VERIFY ALL
OPENINGSUCH AS DOORS ARE CLOSED AND/OR
CHANGEOUT NEGATIVE AIR
PRE-FILTER.
POST ICRA, ILSM, FIRE INSPECTIONSHEETS VISIBLE TO
PUBLIC
SUSPENDED PLASTIC
ZIPPERWALL CURTAIN
BARRIER
PROVIDE STICKY
MATS(CHANGED END OF
SHIFT
OR MORE IF NECESSARYTO MAINTAIN
CLEANLINESS).
HEPA NEGATIVE AIR
UNIT
FIRE RATED
PLYWOOD
WEEKLY
CHANGED(OR MORE AS
NEEDED)
MONTHLY
CHANGEDHEPA
FILTER
PRE-FILTER
(REFER TO
ELEVATION)
F
LE
X
D U C T
AA
SCALE:
1/2"=1'-0"
COVER ALL
RETURNS
TAPE ALL
SERVICES
FIRE EXTINGUISHER
ON
A
O
V
AT THE GRATE/DIFFUSERS
TO PROTECT
AGAINST
PORTABLE FLOOR BRACKET
CONTAMINATION
E
TYPICAL ALTERNATIVE
CONSTRUCTION LAYOUT
OUTSIDE OF
BUILDING
CLASS III
PROVIDE STICKY
MATS(CHANGED END OF
SHIFT
(ILSM MAY REQUIRE
MORE THAN
ONE).
OR MORE IF NECESSARYTO MAINTAIN
CLEANLINESS).
INDICATOR MUST BE AT -0.01 OR
GREATER(VERIFY DAILY), IF NOT VERIFY ALL
OPENINGSUCH AS DOORS ARE CLOSED AND/OR
CHANGEOUT NEGATIVE AIR
PRE-FILTER.
POST ICRA, ILSM, FIRE INSPECTIONSHEETS VISIBLE TO
PUBLIC
SUSPENDED PLASTIC
ZIPPERWALL CURTAIN
BARRIER
PROVIDE STICKY
MATS(CHANGED END OF
SHIFT
OR MORE IF NECESSARYTO MAINTAIN
CLEANLINESS).
WEEKLY
CHANGED(OR MORE AS
NEEDED)
MONTHLY
CHANGEDHEPA
FILTER
PRE-FILTER
F
LE
X
AA
OPTIONAL EXHAUST
DUCTS(COVER THE
GRATES
AND THE DIFFUSERS)
HEPA NEGATIVE AIR
UNIT
D U C T
EITHER KEEP RUNNING
SUPPLY
DUCTS
OR COVER WHEN
RUNNINGTO KEEP DUST
OUT.
EXISTING WINDOW
FRAME
FIRE RATED
PLYWOOD
(TEMP. REMOVE
HEPA NEGATIVE AIR
UNIT
EXISTING FIRESPRINKLER
SYSTEM
EXISTING CONCRETE SLAB
FLOORING
FIRE/U.L. RATED
PLASTICTO PREVENT
DUST
GLASS
PANEL)
FIRE/U.L. RATED
PLASTICTO PREVENT
DUST
EXISTING
WALL
EXISTING
WALL
FINISHED FLOORING TO BE KEPT
CLEAN.FLOORS NOT BEING REPLACED TO
BE
(INSTALL PRIOR TO
CONSTRUCTION). PRIOR TO CONSTRUCTION).
INFILTRATION (INSTALL
CROSS-SECTION 'A-A'
SCALE:
1/2"=1'-0"
PROTECTED OR COVERED WITH
ROSENPAPER/FIRE RATED
PLYWOOD.
CLASS III
HEATED DETECTOR
CUT-OFF
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST (INSTALL PRIOR TO
CONSTRUCTION)
EXISTING WALL
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED OR COVERED WITH ROSEN
PAPER/FIRE RATED PLYWOOD
HEATED DETECTOR CUT-OFF
HEPA NEGATIVE AIR UNIT
EXISTING WALL
NEGATIVE AIR DUCT
DAMPEREXISTING FIRE SPRINKLER SYSTEM
EXISTING FLOOR
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:1
P
M
ICRA DETAILS CLASS 3
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-104
1/4" = 1'-0"
CLASS 3 ICRA PLANS
1/4" = 1'-0"
CLASS 3 ALT
1/2" = 1'-0"
CLASS 3 SECTION A
1/2" = 1'-0"
CLASS 3 SECTION B
POST ICRA, ILSM, FIRE INSPECTION
TEMP. ANTE
ROOM
HARD
BARRIER
EITHER KEEP RUNNING
COVER ALL
RETURNS
HEPA NEGATIVE AIR
UNIT
TAPE ALL
SERVICES
ABC TYPE FIRE EXTINGUISHER
ON
FIRE RATED
PLYWOOD
A
O
V
WEEKLY
CHANGED(OR MORE AS
NEEDED)
MONTHLY
CHANGEDHEPA
FILTER
PRE-FILTER
SUPPLY
DUCTS
OR COVER WITH FIRE
AT THE GRATE/DIFFUSERS
TO PROTECT
AGAINST
PORTABLE FLOOR BRACKET
SHEETS VISIBLE TO
PUBLIC
CONTAMINATION
(REFER TO
ELEVATION)
F
LE
X
D U C T
E
OPTIONAL EXHAUST
DUCTS(COVER THE
GRATES
AND THE DIFFUSERS)
TYPICAL IDEAL
CONSTRUCTION LAYOUT
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE(VERIFY DAILY), IF NOT VERIFY ALL
OPENINGSUCH AS DOORS ARE CLOSED AND/OR
CHANGEOUT NEGATIVE AIR
PRE-FILTER.
(LOCKED AT ALL
TIMES)
BLUE CORE
LOCKSET
AA
OUTSIDE OF
BUILDING
CLASS IV
ELEVATION1
WITH FIRE RATED
PLASTIC
SHEETING AND SECUREWITH DUCT
TAPE.
RATED PLASTIC
SHEETING
AND SECURE WITH DUCTTAPE TO KEEP DUST
OUT.
(ILSM MAY REQUIRE
MORETHAN ONE OR WALL
MOUNTED).
PROVIDE STICKY
MATS(CHANGED END OF
SHIFT
OR MORE IF NECESSARYTO MAINTAIN
CLEANLINESS).
(TYPICAL REGULATOR
INSTALLATION).
TYPE B
TYPE A
NEED INSPECTION TAG
AND MONTHLY
INSPECTION).
(INITIALS/DATED).
(REFER TOELEV.
DETAIL)
SCALE:
1/2"=1'-0"
EXISTING WINDOW
FRAME
FIRE RATED
PLYWOOD
(TEMP. REMOVE
HEPA NEGATIVE AIR
UNIT
EXISTING FIRESPRINKLER
SYSTEM
EXISTING CONCRETE SLAB
FLOORING
FIRE/U.L. RATED
PLASTICTO PREVENT
DUST
GLASS
PANEL)
FIRE/U.L. RATED
PLASTICTO PREVENT
DUST
EXISTING
WALL
EXISTING
WALL
FINISHED FLOORING TO BE KEPT
CLEAN.FLOORS NOT BEING REPLACED TO
BE
(INSTALL PRIOR TO
CONSTRUCTION). PRIOR TO CONSTRUCTION).
FLEX
DUCT
CART WITH CANVAS/1-1/4"
SQUARE
TUBE FRAME AND ZIPPER SIDE
ENTRY
PLASTIC
WINDOW
HEPA NEGATIVE AIR
UNIT
MOBILE CONTAINMENT
FLEX
DUCT
INFILTRATION (INSTALL
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART
SCALE:
1/2"=1'-0"
SCALE:
1/2"=1'-0"
PROTECTED OR COVERED WITH
ROSENPAPER/FIRE RATED
PLYWOOD.
CLASS IV
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:1
P
M
CLASS IV ICRA DETAILS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-105
1/4" = 1'-0"
CLASS 4 PLAN
1/2" = 1'-0"
CLASS 4 SECTIONS
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
VETERANS
HEALTH
ADMINISTRATION
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C S y s te m s i n P ro c e d u re R m /S t L o u is
P ro c R m s -1
J C
M
E P
V
.r v t
/3
/2
:5
:2
P
M
CLASS IV ALT ICRA DETAILS
JANUARY 31, 2023
657-21-115JC100% BID DOCUMENTS CORRECT HEATING, VENTILATION,
AND AIR CONDITIONING SYSTEMS
IN PROCEDURE ROOMS
RO MR
915 North Grand Blvd.
St. Louis, MO 63106
01-GI-106
GENERAL NOTES
SCOPE OF WORK
01-AE-402
01-AE-403
01-AE-401
01-AE-402
01-AE-401
01-AE-401
A120
EXAM
A162E
HEMO DIAL
TREAT BAY
H109B
CORRIDOR
A162F
HEMO DIAL
TREAT BAY
A162G
HEMO DIAL
TREAT BAY
A162H
HEMO DIAL
TREAT BAY
A162J
HEMO DIAL
TREAT BAY
A162A
HEMO DIAL
TREAT BAY
A162B
HEMO DIAL
TREAT BAY
A162C
HEMO DIAL
TREAT BAY
A162D
HEMO DIAL
TREAT BAY
A163A
EXAM
A163B
EXAM
A160
TOILET
A161
ELEC
A156
NURSE
STATION
A159
NOUR.
A158
OFFICE
A157
MED. PREP.
A164
PATIENT
ISO.
A164A
TOILET
A165A
TOILET
S105
STAIR 05
A165
PATIENT
ISO.
A155
MECH. RM.
A154
SOILED
H108
CORRIDOR H108B
SCALE
A166
HAC
A167
EQUIPMENT
REPAIR
A168
PERITONEAL
DIALYSIS
A169A
EXAM
A169B
EXAM
A170A
OFFICE
A170C
DIETITIAN
A170B
IV
TREATMENT
A170D
IV
TREATMENT
A154A
CLEAN
A174A
TOILET
A173A
TOILET
A153
CONFERENCE
RM.
A170F
OFFICE
A170E
SUPPLY
H109C
CORRIDOR
H108D
CORRIDOR
H109A
CORRIDOR
A173B
COATS
A168A
STORAGE
A172A
LOCKER RM.
A173
RECEPTION
A171
DECONTAMINATION
A170G
OFFICE
A172
LOUNGE
A174
WAITING
H109
CORRIDOR
A100
WAITING
RM.
A100A
RECEPTION
A100B
COFFEE
SHOP
A100C
STORAGE
A101A
TOILET
A101
VESTIBULE
A101B
TOILET
A101C
RELEASE
OF
INFORMATION
A101D
OPTICAL
SHOP
H105
CORRIDOR
A177
NEPHROLOGY
A177A
OFFICE
A177B
OFFICE
A177C
OFFICE
A177D
STORAGE
A177E
OFFICE
A177F
CLOSET
A177G
OFFICE
A102
ALARM
PANEL
A103
OFFICE
A135
RECEPTION
A134
WAITING
RM.
A104
SCREEN
A105
SCREEN
A106
LEAD
NURSE
A107
EXAM
A108
OFFICE
A109
OFFICE A110
BREAK
A111
EXAM
A112
EXAMA113
EXAM
A114
EXAM
A115
EXAM
A116
EXAM
A117
TOILET
A118
HAC
A119
ELEC
A110A
TOILET
H101
CORRIDOR
H102
CORRIDOR
A121
EXAM
A122
EXAM
A123
EXAM
A124
OPHTH.
CHIEF
RESIDENT
A125
OPHTH.
CHIEF
RESIDENT
A126
EXAM
A127
LASER
TREATMENT
A128
PROCEDURE
A129
EXAM
A130
EXAM
A131
CLINICAL
MANAGER
A132
EXAM
A133
IMAGING
SUPPLY
A132A
OFFICE,
CHIEF
A131A
ELEC
S102
STAIR 02
H103
CORRIDOR
A137A
ELEC
A136
OI&T
A136A
FIRE ALARM
SYSTEM
S101
STAIR 01A139
NEUROLOGY
CLINICA139F
WAITING
RM.
H123
CORRIDOR
A139E
NURSE
STATION
A139D
EXAM
A139C
EXAM
A139G
EXAM
A139H
EXAM
A139J
EXAM
A139K
EXAM
A139B
EXAM
A139A
EXAM
B100
AMBASSADOR
SUITE
B100A
MECH. RM.
B100B
OFFICE
B100D
OFFICE
B100E
OFFICE
B100F
OFFICE
B100G
OFFICE
B100H
OFFICE
B100I
ELEC.
CLOSET
B100J
OI&T S112
STAIR 12
H100A
INFORMATION
H100
LOBBY
B102B
MED. PREP.
B102A
MED. PREP.
B102
WAITING
RM.
B102D
ALCOVE
B102E
OFFICE
B102F
AGENT
CASHIER
H118
CORRIDOR
B103C
EQUIPMENT
STORAGE
B106
CONFERENCE
RM.
B107
ARMORY
B108
OFFICE,
CHIEF
C101
LOCKER RM.
C102
EVIDENCE
C103
OFFICE
C104
OFFICE
C105
OFFICE
C106
OFFICE
C107
HOLDING
CELL
C108
CONTROL
H122
ELEVATOR
LOBBY
H120
CORRIDOR
C146
TOILET,
MALE
B105
OI&T
B103
HAC
B104
CHUTE
A180
OFFICE
A181
OFFICE
A182
MECH. RM.
A183
OFFICE
A184
OFFICE
A185
OFFICE
A186
OFFICE
A187
OFFICEA188
OFFICEA189
EXAMA190
EXAM
A191
STORAGE
A192
STORAGE
A193
FIRE ALARM
A148
STORAGE
A149
OI&T
A149A
STORAGE
H111A
STORAGE
H111
ELEVATOR
LOBBY
H110
ELEVATOR
LOBBY
A140
OFFICE
A141
INTAKE
A142
INTAKE
A143
OFFICE
A144
EXAM A145
OFFICE
A146
OFFICE
A147
OFFICE
A151
TOILET
A150
OFFICE
H113
CORRIDOR
B145
OFFICE
B146
WAITING
RM.
B147
SUPPLY
B148
BREAK RM.
B149
OFFICE
B150
CONSULT
RM.
B149A
OFFICE
B149B
OFFICE
B121
STORAGEB122
TOILET,
FEMALE
S103
STAIR 03
B122A
TOILET
B124
PROCEDURE
ROOM
B125
OFFICE
B126
EXAM
B127
EXAM
B128
EXAM
B129
EXAM
B130
MECH. RM.
B131
EXAM
B132
EXAM
B133
EXAM
B134
EXAM
B135
EXAM
B136
EXAM
B137
TOILET
B138
EXAM
B139
EXAM
B140
EXAM
B141
EXAM
B142
EXAM
B143
OFFICE
B144
OFFICE
S104
STAIR 04
B142A
ELEC
H117
CORRIDOR
B119A
WAITING
ROOM
B119
WAITING
ROOM
B111
OFFICE
H124
CORRIDOR
B112
EXAM
B113
EXAM
B114
EXAM
B116
EXAM
B117
EXAM
B118
EXAM
B117A
OFFICE
C149
OFFICE
C138
LOCKER RM.
C140
ELIGIBILITY
C141
OFFICE
C141A
OFFICE
H125
CORRIDOR
C110
WAITING
RM.
C109
OFFICE
C109A
TRIAGE
C112
CONTROL
RM.
C113
TRIAGE
E125
TRIAGE
E126
TOILET
E127
ANTE RM.
E128
PATIENT
ISO.
E133
EXAM
TREATMENT
E101
EXAM
TREAT.
BAYS
E102
EXAM
E103
NURSE
STATION
E104
EXAM
E105
EXAM
E106
EXAM
E107
EXAM
E108
CLEAN
EQUIPMENT
E109
EXAM
E110
EXAM
E111
TOILET
E112
CLEAN
UTILITY
E113
SOIL
UTILITY
E114
CLEAN
LINEN
E115
AMBUL.
ATTEND.
E116
MED. PREP.
E117
OFFICE /
NOUR.
E118
LOCKER RM.
E119
TOILET
E120
LOCKER RM.
E121
HAC
E122
SECURE
HOLD
E123
SECURE
HOLD
C115
TOILET
C118
TOILET
C117
ELEC
E124
WAITING
RM.
E134
NURSE
STATION
E135
TOILET
H126
CORRIDOR
C111B
EXAM
C111A
EXAM
C114
CONFERENCE
RM.
C116
OFFICE
C119
OFFICE
C120
OFFICE
H128
CORRIDOR
C121
OFFICE
C122
FILE RM.
C123
OFFICE
C124
OFFICE
C125
OFFICE
C126
OFFICE
C127
OFFICE
C128
WAITING
C129
OFFICE
C122A
OFFICE
C130
OFFICE
C131
OFFICE
C132
OFFICE
C134
OFFICE
H133
CORRIDOR
C137
STORAGE
C148
OFFICE
C150
EXAM
C151
EXAM
C152
EXAM
H127
CORRIDOR
H130
CORRIDOR
H131
CORRIDOR
S106
STAIR 06
C173
OFFICE
C173A
TOILET
D143
EXAM
D120
EXAM
D121
EXAM
D122
EXAM
D123
OFFICE
D124
OFFICE D125
EXAM
D126
EXAM
D127
EXAM
D128
TOILET
D129
OFFICE C180
OFFICE
C179
OFFICE
C178
OFFICE
C177
TOILET
C176
EXAM
D174
EXAM
H141
CORRIDOR
H142
CORRIDOR
H140
CORRIDOR
S109
STAIR 09
D130
EXAM
D131
EXAM
D132
OFFICE
D133
OFFICE
D134
OFFICE
D135
OFFICE
D136A
OFFICE
D142
EXAM
D136B
CLEAN
SUPPLIES
D141
EXAM
D140
HAC
D139
EXAM
D138
EXAM
D137
EXAM
D136
NURSE
STATION
D101A
WAITING
RM.
D116
OFFICE
D117
OFFICE
D118
EXAM
H139
CORRIDOR
D112
OFFICE
D102
EXAM
D119
OFFICE
D111
OFFICE D110
OFFICE
CH-D-1
CHASE
S110
STAIR 10
H137
CORRIDOR
D144
ELEC
D145
OI&T
D146
OFFICE
H136
CORRIDOR
D103
BREAK RM.
D104
TOILET
D105
WORK RM.
D115
TOILET
D114
EXAM
D113
EXAM
D106
HAC
D107
EXAM
D108
EXAM
S108
STAIR 08
H138
CORRIDOR
E110A
STORAGEE110B
STORAGE
D147
OFFICE
D148
OFFICE,
CHIEF
H138A
CORRIDOR
D109
OFFICE
E112A
OXYGEN
STORAGE
C114A
STORAGE
H127A
CORRIDOR
H114A
CORRIDOR
H119
CORRIDOR
H113C
CORRIDOR
C146A
HAC
B120A
ELEC
H113A
CORRIDOR
A101E
BREAK RM.
H109E
CORRIDOR
H109D
CORRIDOR
A170I
OI&T
A103A
TOILET
H110B
F.E. CLOSET
A139I
STORAGE
H125B
ENTRYWAY
C109B
VESTIBULE
C175
EXAM
H125A
VESTIBULE
D101
NURSE
STATION
ELEV 10
S107A
VESTIBULE
S107
STAIR 07
H113B
F.E. CLOSET
H103A
F.E. CLOSET
A175
SUPPLY
F.E. CLST
H117A
F.E. CLOSET
C178A
CLOSET
Room
ELEV 1
ELEV 2
ELEV 3
ELEV 4
ELEV 5
ELEV 6
ELEV 7
ELEV 8
ELEV 9
CH-C-1
CHASE
CH-C-2
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CH-B-3
CHASE
CH-B-1
CHASE
CH-B-2
CHASE
CH-B-4
CHASE
CH-B-5
CHASE CH-B-6
CHASE
CH-A-12
CHASE
CH-B-7
CHASE
CH-C-3
CHASE
CH-B-8
CHASE
CH-B-9
CHASE
CH-C-4
CHASE
CH-C-5
CHASE
CH-D-5
CHASE
CH-D-2
CHASE
CH-C-7
CHASE
CH-C-8
CHASE CH-E-1
CHASE
CH-C-6
CHASE
CH-D-3
CHASE
CH-D-4
CHASE
CH-E-2
CHASE
01-MH-101
01-MD-101
01-MH-103
01-MD-101
01-MH-102
01-MD-102
01-EP-105
01-EP-105
01-EP-102
01-EP-102
01-EP-104
01-EP-104
01-EP-102
01-PP-101
01-PP-101
01-PP-101
01-PP-1014
01-PP-102
01-PP-102
01-FP-101
01-FP-101
01-FP-101
01-FP-101
01-FP-101
01-FP-101
01-EP-101
01-EP-103
1. G.C. SHALL VERIFY DIMENSIONS OF OWNER FURNISHED EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE REQUIRED.
2. EXTEND ALL RATED WALLS TO DECK PER UL ASSEMBLY REQUIREMENTS.
3. G.C. SHALL INSTALL IN-WALL METAL BACKING FOR ALL PARTITION-MOUNTED
EQUIPMENT, ACCESSORIES, PARTITION STOPS, ETC.
4. G.C. SHALL INSTALL FIRE-RETARDANT WOOD BLOCKING WITHIN WALLS BASED
ON CASEWORK ELEVATIONS AND ALL INTERIOR PARTITION ELEVATIONS.
5. ALL INTERIOR WALLS SHALL RECEIVE 5/8" TYPE 'X' GYPSUM BOARD.
6. G.C. SHALL PROVIDE UL APPROVED FIRE- RESISTIVE PENETRATION SYSTEMS
WHERE PLUMBING IS LOCATED IN A FIRE-RATED PARTITION ASSEMBLY.
7. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED AS NON-RATED SMOKE
PARTITIONS.
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .