36C25525R0136 0002.docx
DOCX document 25 KB Posted
- Attached to
- H259--657A4-25-107, Triennial Electrical Testing Federal contract opportunity
- Solicitation number
- 36C25525R0136
About this file
This document is an Amendment (Standard Form 30) for Solicitation 36C25525R0136, specifically for Triennial Electrical Testing at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The amendment provides comprehensive answers to 19 bidder questions regarding electrical system testing requirements, including detailed specifications for testing medium voltage cables, transformers, generators, lightning protection systems, and infrared scanning across multiple buildings.
Key testing requirements include performing electrical tests in accordance with NFPA 70B and NFPA 110, with specific tasks such as VLF testing on medium voltage cables, load bank testing for generators, assessment of lightning protection systems, and infrared scanning of all panels and buildings. The solicitation requires the contractor to dispose of four unused capacitors in Building 20, validate existing one-line electrical diagrams, and provide a temporary generator to maintain power continuity during testing. The Department of Veterans Affairs Network Contracting Office is administering the solicitation, with a current effective date of 10-06-2025 and no additional questions to be accepted from bidders.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25525R0136 0006.docx | DOCX document | |
| 36C25525R0136 0005.docx | DOCX document | |
| 36C25525R0136 0004.docx | DOCX document | |
| S06-657A4-25-107-LPS - Existing System Notes for Facility File.pdf | ||
| S06-657A-25-107-SPG22461-Poplar Bluff VA Arc Flash Study-Systems Studies-Rev 1.pdf | ||
| 36C25525R0136 0003.docx | DOCX document | |
| S06-657A4-25-107-STL24210-250 SB Services-VA Poplar Bluff Report Additional Disconnect Testing.pdf | ||
| S06-657A4-25-107-FINAL STL22279-250 VA Hospital-Poplar Bluff MO Report.pdf | ||
| S06-657A4-25-107-Gen Fuel Tank and Temp Gen Laydown Locations.pdf | ||
| 36C25525R0136 0001.docx | DOCX document | |
| S06-657A4-25-107 Pre-Bid Site Visit Attendance.pdf | ||
| S02-657A4-25-107-Electrical - One-Line Diagrams - 9-8-2023-.pdf | ||
| 36C25525R0136_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-06-2025 657A4-25-107 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25525R0136 09-16-2025
X X X N/A 657A4-25-107 - Triennial Electrical Testing, Poplar Bluff VA Health Care System, Poplar Bluff, MO. The above solicitation is hereby amended as follows:
A. To provide answers to bidders' questions. (attached) B. To provide the location of generator, fuel tank and temp generator, (attached) All Terms and Conditions of this solicitation remain the same.
MATTHEW D. FINLEY
Contracting Officer 657A4-25-107 - Triennial Electrical Testing The purpose of this amendment (2) is to provide answers to bidders’ questions.
6574-25-107, TRIENNIAL ELECTRICAL TESTING
QUESTIONS AND ANSWERS FROM SITE VISIT AT JOHN J. PERSHING VAMC
(September 26, 2025)
1. Could you provide details on Summary Of Work, Item “L.1.xii” Capacitors/TVSS/PV Correction equipment shall be maintained per NETA-MTS. Remove unused PF Correction CAPs In Building 20. (page 31) Quantity, Location, photograph of the unused capacitors to be removed. Would contractor dispose of capacitors, or relocate them elsewhere?
A: There are four (4) capacitors that have been removed and are currently located in Bldg 20. Contractor shall dispose of capacitors.
2. Could you provide details on Summary Of Work, Item “P” Provide repair of Building 1 Lightning Protection. (page 31) Description of repair needed, type of repair needed, location of repair needed, parts or equipment needed to complete repair, photo of area needing repair.
A: The current system isn’t UL96 compliant nor is it expected to be upgraded. Contractor should assess existing system components and report any deficiencies found (i.e. broken anchors, etc.).
3. Can you please provide the latest electrical test report?
A: The latest One-line-Diagrams were included with the original solicitation (Document title S02-657A4-25-107-Electrical-One-Line_Diagrams – 9-8-2023-).
4. No relays were listed in the device inventory.
a. Do relays need to be included?
b. If so, how many relays?
c. Can they be simply inspected or do they require full testing, such as instantaneous/pickup testing?
A: MV relays in the Siemens Bldg adjacent to Bldg 20 are in scope and should be tested in accordance with NFPA 70B and NFPA 110.
5. On page 26, section F of the Summary of Work mentions only building 1. Is it correct to say that only the Infra-Red Scanning of Building 1 should be included in the price?
A: No, infrared of all panels and all buildings.
6. The inventory lists (9) Medium Voltage Cables. Please be specific if they should only have the ends inspected or if some electrical testing such as VLF or Tan Delta is required.
A: VLF would be preferred, but any non-destructive testing is acceptable.
7. The inventory lists (2) Medium Voltage Distribution Switchgear. These devices may contain a variety of devices, such as MV Circuit Breakers, Meters, Relays, PTs, and CTs. Please specify whether they can only be inspected, and if specific devices require testing, list them.
A: Testing must be performed in accordance with NFPA 70B and NFPA 110, including all devices listed within. Primary injection is preferred so long as the manufacturer instructions allow.
8. Can MV transformer testing be limited to IR scanning, oil sampling, and inspection?
A: Testing must be performed in accordance with NFPA 70B and NFPA 110.
9. If the answer to the previous question is no, should we perform tests for Polarization Index, Excitation Current, Turns Ratio, Insulation and Winding Resistance on the transformers? This results in longer shutdowns.
A: Testing must be performed in accordance with NFPA 70B and NFPA 110.
10. (3) Generators have been listed. Is any load banking testing required?
A: Testing must be performed in accordance with NFPA 70B and NFPA 110.
11. On page 26, section O of the Summary of Work mentions "O. Update/create accurate one-line diagrams in AutoCAD to be shared as both .dwg and .pdf files." Will the VAMC provide an AutoCAD file for the contractor to simply update the drawings, or should we price a drawing of the entire electrical system from scratch?
A: Validate existing one-line drawings. Fix or add discrepancies found.
12. Also on page 26, section P of the Summary of Work mentions "Provide repair of Building 1 Lightning Protection." Can you be more specific about the necessary repair?
A: The current system isn’t UL96 compliant nor is it expected to be upgraded. Contractor should assess existing system components and report any deficiencies found (i.e. broken anchors, etc.)
13. On page 37 in section "7. VA Owned Transformers and Oil Filled Switches" the testing of Oil Filled Switches is requested, but the quantity is not listed. How many devices should be priced?
A: The station only has switches under oil within our transformers.
14. Will we have the opportunity to ask further questions after the answers are provided? Perhaps new questions may arise.
A: No more questions will be accepted. Vendors are encouraged to make their best offer with the information provided.
15. Solicitation indicates government furnished documents are to include Electrical Power System Study information (coordination study, short-circuit analysis, arcflash hazard analysis, available protective device settings), and prior Triennial electrical surveys. These documents are not currently published with solicitation, please provide.
A: The latest One-line-Diagrams were included with the original solicitation (Document title S02-657A4-25-107-Electrical-One-Line_Diagrams – 9-8-2023-).
16. Confirm the power outage test is to be conducted only for the purpose of determining that emergency power systems work properly, and load bank testing is not required.
A: Tests are mutually exclusive, one is a joint commission requirement for facility operations while the other is outlined in NFPA 70B and NFPA 110. Both tests require 4 hours.
17. Will load bank testing be required for independent systems (emergency generators and uninterruptible power systems (UPS))?
A: Yes, generators must be load bank tested. Please reference NFPA 70B, NFPA 110, and manufacturer suggested maintenance for UPS’s.
18. Fuel requirements for emergency generator(s):
a. Confirm fuel is only to be provided for one (1) Kohler 13.8 kV generator, and not for the smaller Caterpillar and Generac generators.
A: Please refill tank after testing.
b. Kohler generator is trailer mounted. Where is fuel tank, and what is total tank capacity.
A: Fuel Tank is located immediately next to the generator. See attached document: S06-657A4-25-107-Gen Fuel Tank and Temp Gen Laydown Locations.
i. Confirm that fuel will be provided as required throughout the period of performance, not for a one-time fuel.
A: Yes, one-time refill of tank required after testing.
c. Contractor is required to provide a temporary generator to support existing emergency switchgear during testing to maintain power continuity to Medical Center.
A: Correct.
i. Is space available adjacent to Medical Center for installation of temporary generator.
A: Yes, by the eye clinic entrance immediately next to the ATS building with conduits in place for connection to our system. See provided documents.
ii. Are floor plans available showing location of switchgear to placement of emergency generator.
A: Yes, please see provided documents.
iii. Is utilization (% load) details available for existing Kohler generator?
A: Yes, displayed on SCADA system and side of engine panel. Typically the OEM will perform the manufacturer maintenance.
19. Are original design documents, deficiency studies or photos available for the building 1 lightning protection system which is to be repaired?
A: No repair required, just requiring assessment unless significant damages are found. We do not have original design documents, deficiency studies, or photos available.
See attached document: S06-657A4-25-107-Gen Fuel Tank and Temp Gen Laydown Locations.
File details come from the government source that posted it. Updated .