This document is an Amendment to Solicitation for a Triennial Electrical Testing project at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The solicitation is 100% set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with a cost range between $250,000 and $500,000. The project requires electrical testing and will be completed within 270 calendar days after notice to proceed, with proposals due on October 20, 2025 at 2:00 PM.
Key procurement details include a Best Value, Lowest Price Technically Acceptable (LPTA) source selection process, requirement for a 20% bid bond, and compliance with Davis-Bacon Act labor standards. Contractors must not subcontract more than 75% of the contract amount to non-certified SDVOSB/VOSB firms. Additional requirements include establishing an FTP site, maintaining daily logs, completing facility badging, and having a qualified superintendent present during all work. The solicitation is administered by the Department of Veterans Affairs Network Contracting Office located in Leavenworth, Kansas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25525R0136 0006.docx | DOCX document | |
| 36C25525R0136 0005.docx | DOCX document | |
| 36C25525R0136 0004.docx | DOCX document | |
| S06-657A4-25-107-LPS - Existing System Notes for Facility File.pdf | ||
| S06-657A-25-107-SPG22461-Poplar Bluff VA Arc Flash Study-Systems Studies-Rev 1.pdf | ||
| 36C25525R0136 0003.docx | DOCX document | |
| S06-657A4-25-107-STL24210-250 SB Services-VA Poplar Bluff Report Additional Disconnect Testing.pdf | ||
| S06-657A4-25-107-FINAL STL22279-250 VA Hospital-Poplar Bluff MO Report.pdf | ||
| S06-657A4-25-107-Gen Fuel Tank and Temp Gen Laydown Locations.pdf | ||
| 36C25525R0136 0002.docx | DOCX document | |
| S06-657A4-25-107 Pre-Bid Site Visit Attendance.pdf | ||
| S02-657A4-25-107-Electrical - One-Line Diagrams - 9-8-2023-.pdf | ||
| 36C25525R0136_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-29-2025 657A4-25-107 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25525R0136 09-16-2025
X X X N/A 657A4-25-107 - Triennial Electrical Testing, Poplar Bluff VA Health Care System, Poplar Bluff, MO. The above solicitation is hereby amended as follows:
A. Updated VAAR 852.219-75. Acknowledge 852.219-75 by signing certification blocks and return with proposal. (attached) B. To add the Pre-bid Conference Agenda.
C. To add the Pre-bid Conference Attendance Roster.
All Terms and Conditions of this solicitation remain the same.
MATTHEW D. FINLEY
Contracting Officer 657A4-25-107 - Triennial Electrical Testing The purpose of this amendment is to provide an updated VAAR 852.219-75, add the pre-bid conference agenda and add the pre-bid conference attendance roster.
A.1 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)
(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—
(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:
(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.
(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(iii) [X] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.
(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:
(i) Referral to the VA Suspension and Debarment Committee;
(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and
(iii) Prosecution for violating 18 U.S.C. 1001.
(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.
(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.
(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.
Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].
Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________ (End of Clause)
PRE-PROPOSAL CONFERENCE OUTLINE
PROJECT 657A4-25-107-Triennial Electrical Testing September 26, 2025 @ 1:00PM CDT
Introduction
(a) Good afternoon, thank you for taking the time to attend this pre-bid conference.
(b) Today we will first discuss contractual issues, project requirements, and finally conduct a walkthrough of the areas.
(c) Before we begin, let me first introduce myself and the Government staff.
CO – Matthew Finley (Not present) CS – Lucia Cowsert COR – Bryar Pim Alternate COR: Virgil (Tommy) Durrow Other VA staff – Dennis Larmie (Electrician)
(d) Please ensure that you have signed the attendance roster – this will be published along with any applicable amendment to the solicitation in SAM.gov.
I. Contractual Issues
1. General:
(a) Project Title: 657A4-25-107 - Triennial Electrical Testing, Poplar Bluff, VA Medical Center.
(b) Cost Range: $250,000 and $500,000. NAICS Code 238210 - Electrical Contractors and Other Wiring Installation Contractors.
(c) Completion Time: 270 calendar days after receipt of notice to proceed.
(d) Site Visit Questions are due in writing to the CO and CS at Matthew.Finley@va.gov and Lucia.Cowsert@va.gov, by 2:00 pm central time on Thursday, October 2, 2025, and must be from the prime contractor. An amendment will be issued to provide the answers to questions as well as to provide a copy of the attendance roster. If any questions warrant an amendment, one will be issued and posted to SAM.gov. All interested contractors are responsible to check the SAM.gov website prior to submitting a proposal to ensure that they have seen and acknowledged all amendments. Proposals are due, Monday, October 20, 2025, at 2:00 PM to Lucia.Cowsert@va.gov and Matthew.Finley@va.gov. All proposals are required to have a 120-day acceptance period.
(e) Fax or electronically faxed bids are NOT acceptable.
(f) The project is 100% set aside for Service-Disabled Veteran Owned Small Business. IAW VAAR 852.219-75, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. Make sure you acknowledge VAAR clause 852.219-75 by signing certification blocks of the clause and return with proposal to the Contracting Officer.
(g) Award will be made using the BEST VALUE, LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) Source selection process outlined in FAR Part 15. Note that offers that are not technically acceptable cannot be selected, regardless of price.
(h) Please review and comply with Project Specific Information Instructions outlined in the solicitation. You may be considered nonresponsive if required items are not submitted with your initial proposal. The Government plans to award without discussions. However, we reserve the right to open discussions if necessary.
(i) Make sure you are current with your Federal Contractor Veterans’ Employment Report (VETS-4212) in accordance with FAR 22.1302(b).
(j) Failure to acknowledge any, and all amendments issued to this solicitation shall be cause for rejection of the offer.
(k) Please keep side-bar conversations to a minimum. Pictures may only be taken while being escorted, cannot be taken with people in them and no photos of anything that could be considered VA “sensitive information”.
2. Disclaimer Statements:
(a) Remarks and explanations at the conference shall not qualify the terms of the solicitation.
(b) Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.
3. Bonds:
(a) A bid Bond in the amount of 20% of the bid price is required and must be submitted with your proposal submission.
(b) After award of the contract a Payment Bond and a Performance Bond in the amount of 100% of the contract value are due prior to a Notice to Proceed Letter being issued.
4. Buy American Act: The solicitation is subject to the Buy American Act, and it generally requires the use of American made products. Please keep this in mind when you are providing product submittal data.
5. Davis-Bacon Act: All labor performed under this contract is subject to the Davis-Bacon Act and related labor laws, to include the payment of at least the amounts shown in the wage determination in the solicitation. If the wage rate changes prior to the proposal due date, an amendment including the current rates will be issued.
6. Other Contracting Topics:
(a) Special Note regarding FAR 52.229-3: Federal, State and Local Taxes: Offerors are hereby notified that all state and local sales or use taxes for construction materials must be included in their bid or proposal price. It is solely the responsibility of the offeror to include all other applicable taxes in their bid or proposal price as well. The Government has determined that for this acquisition it cannot take advantage of any sales or use tax exemptions that may be available to it under applicable state law. Under no circumstances will any Contractor be designated as an agent of the Government for purposes of any tax exemption, nor will the Government authorize any Contractor’s use of any tax exemption directly applicable to the Government under this procurement.
A price change request upon award relating to the inclusion of state and local sales or use taxes will not be accepted.
(b) The contractor is expected to maintain insurance coverage during the contract period as directed in the specifications.
(c) Progress payments will be made no later than 14 days after receipt of an acceptable invoice.
(d) There are 2 important submittals that we need at contract start-up. They are the Schedule of Values, and a Construction Schedule.
(e) A FTP site such as Procore, Submittal Exchange or approved equal must be established and maintained by the contractor throughout project and close out phase.
(f) A qualified and approved superintendent must be present when work is occurring on site at all times. This individual will be responsible for submitting daily logs describing work preformed to the COR each day.
(g) All contractor staff must complete the badging process prior to commencing work at the medical center.
6. Questions: Are there any questions involving the general provisions of the solicitation pages?
II. Technical Issues – I will now turn the conference over to the COR. Please ensure that you stay together as a group during the walk thru so that information can be presented only once. Make sure you sign for a visitors badge and return to logistics at the end of the meeting.
See attached document: S06-657A4-25-107 Pre-Bid Site Visit Attendance.