657A4-21-800-Revised Spec Section 22 40 00.pdf

PDF 55 KB Posted

Attached to
Z2DA--657A4-21-800, TF - FCA - Remove and Replace End-of-Life HVAC Infrastructure Building 1
Solicitation number
36C25525R0009
Issued by

About this file

This document is a detailed technical specification (Section 22 40 00) for plumbing fixtures for a Veterans Affairs medical center renovation project located in Poplar Bluff, Missouri. The specification provides comprehensive requirements for various plumbing components including water closets, lavatories, sinks, emergency fixtures, drinking water dispensers, and associated equipment, with specific technical details on materials, dimensions, finishes, and installation standards.

Key technical specifications include requirements for stainless steel components, laminar flow control devices, fixture carriers, and emergency fixtures like shower and eye/face wash stations. The document outlines precise technical specifications such as mounting heights, flow rates, materials composition, and installation methods, emphasizing compliance with accessibility standards (ADA), lead-free requirements, and specific performance standards from organizations like ASME, NSF, and ASTM. The specification is part of a larger project to remove and replace end-of-life heating, ventilation, and air conditioning infrastructure in Building 1 at the medical center, with a focus on detailed technical requirements for plumbing fixture installation.

View the file

Other files

File Type Posted
S06-36C25525R0009 0008.pdf PDF
S06-36C25525R0009 0007.pdf PDF
S06-36C25525R0009 0006.pdf PDF
657A4-21-800-Revised Drawing MP103.pdf PDF
36C25525R0009 0005.pdf PDF
657A4-21-800-AE Addendum Narrative1.pdf PDF
657A4-21-800-ATTACHMENT 3-Surety Form_Rv.pdf PDF
657A4-21-800-Revised Drawings PL000 PL100 PL101 PL102 PD100 PD101.pdf PDF
657A4-21-800-2018 Final Asbestos Survey Combined_Reduced File Size.pdf PDF
S06-36C25525R0009 0004.pdf PDF
S06-657A4-21-800 - Pre-Bid meeting Attendance Roster.pdf PDF
36C25525R0009 0003.pdf PDF
36C25525R0009_1.pdf PDF
S02 657A4-21-800-ATTACHMENT 6 Price Estimate Template V1.2.xlsx XLSX spreadsheet
P09-657A4-21-800-Attachmnet 5-Drawings-Modular Building Complex Volume 1.pdf PDF
P09-657A4-21-800-Attachmnet 4-Bid Specs-Volume 3-Divs 21-23_Rev_02052025.pdf PDF
P09-657A4-21-800-Attachmnet 4-Bid Specs-Volume 2-Divs 08-13.pdf PDF
P09-657A4-21-800-Attachmnet 5-Drawings-Building 1 Volume 2.pdf PDF
P09-657A4-21-800-Attachmnet 4-Bid Specs-Volume 1-Divs 00-07.pdf PDF
P09-657A4-21-800-Attachmnet 5-Drawings-Building 1 Volume 1.pdf PDF
S02-657A4-21-800-ATTACHMENT 3-Surety Form.pdf PDF
P09-657A4-21-800-Attachmnet 4-Bid Specs-Volume 4-Divs 26-33.pdf PDF
S02-657A4-21-800-ATTACHMENT 2-Performance Relevancy Survey.pdf PDF
P09-657A4-21-800-Attachmnet 5-Drawings-Modular Building Complex Volume 2.pdf PDF
P09-657A4-21-800-Attachmnet 5-Drawings-Building 1 Volume 3.pdf PDF
S02-657A4-21-800-ATTACHMENT 1 Past Performance Questionnaire.pdf PDF
36C25525R0009 0002.docx DOCX document
36C25525R0009 0001.docx DOCX document
36C25525R0009.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remove and Replace End of Life Heating, Ventilation and Air Conditioning

VA Project 657A4-21-800 12-01-22

22 40 00 - 1 Addendum No. 1

SECTION 22 40 00

PLUMBING FIXTURES

PART 1 - GENERAL

1.1 DESCRIPTION

A. Plumbing fixtures, associated trim and fittings necessary to make a complete installation from wall or floor connections to rough piping, and certain accessories.

B. A complete listing of all acronyms and abbreviations are included in

Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

E. Section 07 92 00, JOINT SEALANTS: Sealing between fixtures and other finish surfaces.

F. Section 08 31 13, ACCESS DOORS AND FRAMES: Flush panel access doors.

G. Section 10 21 13, TOILET COMPARTMENTS: Through bolts.

H. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

I. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS: Requirements for commissioning, systems readiness checklist, and training.

J. Section 22 13 00, FACILITY SANITARY AND VENT PIPING.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. The American Society of Mechanical Engineers (ASME):

A112.6.1M-1997 (R2012)..Supports for Off-the-Floor Plumbing Fixtures for Public Use

A112.19.1-2013..........Enameled Cast Iron and Enameled Steel Plumbing

Fixtures

A112.19.2-2013..........Ceramic Plumbing Fixtures

A112.19.3-2008..........Stainless Steel Plumbing Fixtures

C. American Society for Testing and Materials (ASTM):

A276-2013a..............Standard Specification for Stainless Steel Bars and Shapes

22 40 00 - 2 Addendum No. 1

B584-2008...............Standard Specification for Copper Alloy Sand

Castings for General Applications

D. CSA Group:

B45.4-2008 (R2013)......Stainless Steel Plumbing Fixtures

E. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-2006............Metal Finishes Manual

F. American Society of Sanitary Engineering (ASSE):

1016-2011...............Automatic Compensating Valves for Individual

Showers and Tub/Shower Combinations

G. NSF International (NSF):

14-2013.................Plastics Piping System Components and Related

Materials

61-2013.................Drinking Water System Components – Health

Effects

372-2011................Drinking Water System Components – Lead Content

H. American with Disabilities Act (A.D.A)

I. International Code Council (ICC):

IPC-2015................International Plumbing Code

1.4 SUBMITTALS

A. Submittals, including number of required copies, will be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Information and material submitted under this section will be marked

“SUBMITTED UNDER SECTION 22 40 00, PLUMBING FIXTURES”, with applicable paragraph identification.

C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, connections, and capacity.

D. Operating Instructions: Comply with requirements in Section 01 00 00, GENERAL REQUIREMENTS.

E. Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22

08 00, COMMISSIONING OF PLUMBING SYSTEMS.

F. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING

SYSTEMS.

22 40 00 - 3 Addendum No. 1

1.5 QUALITY ASSURANCE

A. Bio-Based Materials: For products designated by the USDA’s Bio-

Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-

Preferred Program, visit http://www.biopreferred.gov.

1.6 AS-BUILT DOCUMENTATION

A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.

B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions will be inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation will be included in the operation and maintenance manual. The operations and maintenance manual will include troubleshooting techniques and procedures for emergency situations.

Notes on all special systems or devices such as damper and door closure interlocks will be included. A List of recommended spare parts

(manufacturer, model number, and quantity) will be furnished.

Information explaining any special knowledge or tools the owner will be required to employ will be inserted into the As-Built documentation.

C. The installing contractor will maintain as-built drawings of each completed phase for verification; and, will provide the complete set at the time of final systems certification testing. Two full size sets of as-built drawings are to be provided and one electronic copy provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.

D. Certification documentation will be provided to COR 10 working days prior to submitting the request for final inspection. The documentation will include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits specified.

22 40 00 - 4 Addendum No. 1

PART 2 - PRODUCTS

2.1 MATERIALS

A. Material or equipment containing a weighted average of greater than

0.25 percent lead is prohibited in any potable water system intended for human consumption, and will be certified in accordance with NSF 61 or NSF 372. Endpoint devices used to dispense water for drinking will meet the requirements of NSF 61.

B. Plastic pipe, fittings, and solvent cement will meet NSF 14 and will be

NSF listed for the service intended.

2.2 STAINLESS STEEL

A. Corrosion-resistant Steel (CRS):

1. Plate, Sheet and Strip: CRS flat products will conform to chemical composition requirements of any 300 series steel specified in ASTM

A276.

2. Finish: Exposed surfaces will have standard polish (ground and polished) equal to NAAMM finish Number 4.

B. Die-cast zinc alloy products are prohibited.

2.3 STOPS

A. Provide lock-shield loose key or screw driver pattern angle stops, straight stops or stops integral with faucet, with each compression type faucet whether specifically called for or not, including sinks in solid-surface, wood and metal casework, laboratory furniture and pharmacy furniture. Locate stops centrally above or below fixture in accessible location.

B. Furnish keys for lock shield stops to the COR.

C. Supply from stops not integral with faucet will be chrome plated copper flexible tubing or flexible stainless steel with inner core of non-toxic polymer.

D. Supply pipe from wall to valve stop will be rigid threaded IPS copper alloy pipe, i.e. red brass pipe nipple, chrome plated where exposed.

E. Mental Health Area: Provide stainless steel drain guard for all lavatories not installed in casework.

2.4 ESCUTCHEONS

A. Heavy type, chrome plated, with set screws. Provide for piping serving plumbing fixtures and at each wall, ceiling and floor penetrations in exposed finished locations and within cabinets and millwork.

22 40 00 - 5 Addendum No. 1

2.5 LAMINAR FLOW CONTROL DEVICE

A. Smooth, bright stainless steel or satin finish, chrome plated metal laminar flow device will provide non-aeration, clear, coherent laminar flow that will not splash in basin. Device will also have a flow control restrictor and have vandal resistant housing. Aerators are prohibited.

B. Flow Control Restrictor:

1. Capable of restricting flow from 32 ml/s to 95 ml/s (0.5 gpm to 1.5 gpm) for lavatories; 125 ml/s to 140 ml/s (2.0 gpm to 2.2 gpm) for sinks P-505 through P-520, P-524 and P-528; and 174 ml/s to 190 ml/s

(2.75 gpm to 3.0 gpm) for dietary food preparation and rinse sinks or as specified.

2. Compensates for pressure fluctuation maintaining flow rate specified above within 10 percent between 170 kPa and 550 kPa (25 psig and 80 psig).

3. Operates by expansion and contraction, eliminates mineral/sediment build-up with self-cleaning action, and is capable of easy manual cleaning.

2.6 CARRIERS

A. ASME A112.6.1M, with adjustable gasket faceplate chair carriers for wall hung closets with auxiliary anchor foot assembly, hanger rod support feet, and rear anchor tie down.

B. ASME A112.6.1M, lavatory, concealed arm support. All lavatory chair carriers will be capable of supporting the lavatory with a 250-pound vertical load applied at the front of the fixture.

C. Where water closets, lavatories or sinks are installed back-to-back and carriers are specified, provide one carrier to serve both fixtures in lieu of individual carriers. The drainage fitting of the back to back carrier will be so constructed that it prevents the discharge from one fixture from flowing into the opposite fixture.

2.7 WATER CLOSETS

A. (P-101) Water Closet (Floor Mounted, ASME A112.19.2, Figure 6) elongated bowl, siphon jet 4.8 L (1.28 gallons), floor outlet. Top of seat will be 435 mm to 438 mm (17-1/8 inches to 17-1/4 inches) above finished floor.

1. Seat: Industrial, extra heavy duty, chemical resistant, solid plastic, open front less cover for elongated bowls, integrally

22 40 00 - 6 Addendum No. 1 molded bumpers, concealed check hinge with stainless steel post.

Seat will be posture contoured body design. Color will be white.

2. Fittings and Accessories: Floor flange fittings-cast iron; Gasket-wax; bolts with chromium plated cap nuts and washers.

3. Flush valve: Large chloramines resistant diaphragm, semi-red brass valve body, exposed chrome plated, non-hold open ADA approved side oscillating handle hard-wired electric sensor operated with manual override, water saver design per flush with maximum 10 percent variance, top spud connection, adjustable tailpiece, one-inch IPS screwdriver back check angle stop with vandal resistant cap, high back pressure vacuum breaker, solid-ring pipe support, and sweat solder adapter with cover tube and cast set screw wall flange. Set centerline of inlet 292 mm (11-1/2 inches) above seat. Seat bumpers will be integral part of flush valve. Valve body, cover, tailpiece and control stop will be in conformance with ASTM B584 Alloy classification for semi-red brass.

2.8 LAVATORIES

A. Dimensions for lavatories are specified, Length by width (distance from wall) and depth.

B. Brass components in contact with water will contain no more than 0.25 percent lead content by dry weight. Faucet flow rates will be 3.9 L/m

(1.5 gpm) for private lavatories and either 1.9 L/m (0.5 gpm) or 1.0 liter (0.25 gallons) per cycle for public lavatories.

C. (P-420) Lavatory (Sensor Control, Counter Mounted ASME A112.19.2) vitreous china, self-rimming, approximately 483 mm (19 inches) in diameter and 143 mm (5-5/8 inches) deep with punching for faucet on 102 mm (4 inches) centers. Mount unit in countertop. Support countertop with ASME A112.19.1, Type 1, chair carrier with exposed arms.

1. Faucet: Brass, chrome plated, gooseneck spout with outlet 102 mm to

127 mm (4 inches to 5 inches) above rim. Electronic sensor operated, 102 mm (4 inches) center set mounting, wiring box, 120/24 volt solenoid plug in transformer, UL approved transformer, back check valves. Provide laminar flow control device, 0.5 GPM in compliance with project water conservation requirements. Mount Mixing valve under lavatory, mixing valve shall not be wye pattern style.

Breaking the light beam will activate the water flow. Flow will stop when user moves away from light beam. All connecting wiring between

22 40 00 - 7 Addendum No. 1 transformer, solenoid valve and sensor will be cut to length with no excess hanging or wrapped up wiring allowed.

2. Drain: Cast or wrought brass with flat grid strainer, offset tailpiece, chrome plated. Set trap parallel to wall.

3. Stops: Angle type. See paragraph “Stops”.

4. Trap: Cast copper alloy, 38 mm by 32 mm (1 1/2 inches by 1 1/4 inches) P-trap, adjustable with connected elbow and 1.4 mm thick (17 gauge) tubing extension to wall. Set trap parallel to the wall.

Exposed metal trap surface and connection hardware will be chrome plated with a smooth bright finish.

5. Provide cover for exposed piping, drain, stops and trap per A.D.A.

2.9 SINKS

A. Dimensions for sinks and laundry tubs are specified, length by width

(distance from wall) and depth.

B. (P-502) Service Sink (Square, Floor Mounted) stain resistant terrazzo, 609 mm by 609 mm by 305 mm (24 inches by 24 inches by 12 inches) with

152 mm (6 inches) drop front. Terrazzo, composed of marble chips and white Portland cement, will develop compressive strength of 20684 kPa

(3000 psig) seven days after casting. Provide extruded stainless steel cap on front side.

1. Faucet: Solid brass construction, 9.5 L/m (2.5 gpm) combination faucet with replaceable Monel seat, removable replacement unit containing all parts subject to wear, integral check/stops, mounted on wall above sink. Spout will have a pail hook, 19 mm (3/4 inch) hose coupling threads, vacuum breaker, and top or bottom brace to wall. Four-arm handles on faucets will be cast, formed, or drop forged copper alloy. Escutcheons will be either forged copper alloy or CRS. Exposed metal parts, including exposed part under valve handle when in open position, will have a smooth bright finish.

Provide 914 mm (36 inches) hose with wall hook. Centerline of rough in is 1219 mm (48 inches) above finished floor.

2. Drain: Seventy six millimeter (3 inches) cast brass drain with nickel bronze strainer.

3. Trap: P-trap, drain through floor.

C. (P-527) Sink (CRS, Single Compartment, drop-in Sinks) self-rimming, back faucet ledge, approximately 559 mm by 559 mm (22 inches by 22 inches) with single compartment inside dimensions approximately 406 mm by 483 mm by 191 mm (16 inches by 19 inches by 6 1/2 inches) deep. Will

22 40 00 - 8 Addendum No. 1 be minimum of 1.3 mm thick (18 gauge) CRS. Corners and edges will be well rounded:

1. Faucet: Solid brass construction, 5.7 L/m (1.5 gpm) deck mounted combination faucet with Monel or ceramic seats, removable replacement unit containing all parts subject to ware, swivel gooseneck spout with approximately 89 mm (3-1/2 inches) reach with spout outlet 191 mm (7 inches above deck and 102 mm (4 inches) wrist blades. Faucet will be polished chrome plated.

2. Gooseneck spout: Spout and trim shall be solid brass construction and be chromium plated with smooth bright finish. Provide laminar flow device.

3. Drain: Drain plug with cup strainer, stainless steel.

4. Trap: Cast copper alloy 38 mm (1 1/2 inches) P-trap with cleanout plug. Provide wall connection and escutcheon.

4. Provide cover for exposed piping, drain, stops and trap per A.D.A.

D.(P-528) Sink (CRS, Single Compartment, drop-in Sinks, Foot Pedal

Control) self-rimming, back faucet ledge, approximately 559 mm by 559 mm (22 inches by 22 inches) with single compartment inside dimensions approximately 406 mm by 483 mm by 191 mm (16 inches by 19 inches by 6

1/2 inches) deep. Will be minimum of 1.3 mm thick (18 gauge) CRS.

Corners and edges will be well rounded. Provide valve plate for foot pedal control.:

1. Faucets: Solid brass construction, single gooseneck spout with outlet 127 mm to 203 mm (5 inches to 8 inches) above flood rim of sink. Provide laminar flow control device. Wall mounted, mechanical pedal mixing valve with self-closing pedal valve with stops, renewable seats, and supply from valve to spout, indexed lift up pedals having clearances of not more than 13 mm (1/2 inch) above the floor and not less than 356 mm (14 inches) from wall when in operation. Supply pipe from wall to valve stop will be rigid threaded IPS copper alloy pipe. Supply pipe from valve to faucet will be manufacturer's option. Exposed brass parts will be chrome plated with a smooth bright finish.

2. Gooseneck spout: Spout and trim shall be solid brass construction and be chromium plated with smooth bright finish. Provide laminar flow device.

3. Drain: Drain plug with cup strainer, stainless steel.

22 40 00 - 9 Addendum No. 1

4. Trap: Cast copper alloy 38 mm (1 1/2 inches) P-trap with cleanout plug. Provide wall connection and escutcheon.

2.10 DISPENSER, DRINKING WATER

A. Standard rating conditions: 10 degrees C (50 degrees F) water with 27 degrees C (80 degrees F) inlet water temperature and 32 degrees C (90 degrees F) ambient air temperature.

B. (P-604) Electric Water Cooler (Mechanically Cooled, Wall Hung, Self-contained, Wheelchair) bubbler style, 30 l/h (8 gph) minimum capacity, lead free. Top will be CRS anti-splash design. Cabinet, CRS, satin finish, approximately 457 mm by 457 mm by 635 mm (18 inches by 18 inches by 25 inches) high with mounting plate. Set bubbler 914 mm (36 inches) above finished floor. Unit will be push bar operated with front and side bar and automatic stream regulator. All trim polished chrome plated. Provide with bottle filler option.

2.11 EMERGENCY FIXTURES

A. (P-707) Emergency Shower and Eye and Face Wash (Free Standing):

1. Shower Head: Polished chrome plated, 203 mm (8 inches) in diameter, install head 2134 mm (84 inches) above floor. Equip with stay-open ball valve, chrome plated. Operate valve with 610 mm (24 inches) stainless steel pull-rod with triangle handle. Pull-down opens valve; push-up closes valve. Flow rate will be 75.7 L/m (20 gpm).

2. Emergency Eye and Face Wash: CRS receptor. Equipment with a 13 mm

(1/2 inch) stay open ball valve operated by push flag handle. Mount eye and face wash spray heads 1067 mm (42 inches) above finished floor. Flow rate will be 11.4 L/m (3 gpm).

3. Provide with thermostatic mixing valve to provide tepid water from

30 to 35 degrees C (85 to 95 degrees F).

4. Shower head and emergency eye and face wash will be mounted to stanchion with floor flange through floor waste connection and P-trap. Paint stanchion same color as room interior. Provide with signage to easily locate fixture.

B. (P-708) Emergency Eye and Face Wash (Wall Mounted): CRS, wall mounted, hand operated. Mount eye and face wash spray heads 1067 mm (42 inches) above finished floor. Receptor will be complete with drain plug with perforated strainer, P-trap and waste connection to wall with

22 40 00 - 10 Addendum No. 1 escutcheon. Provide with thermostatic mixing valve to provide tepid water from 30 to 35 degrees C (85 to 95 degrees F). Flow rate will be

11.4 L/m (3 gpm).

B. (P-709) Emergency Eye and Face Wash (Pedestal/Deck Mounted): CRS receptor, pedestal mounted, hand operated. Mount eye and face wash spray heads 1067 (42 inches) above finished floor through floor waste connection and P-trap. Paint pedestal same color as room interior.

Provide with thermostatic mixing valve to provide tepid water from 30 to 35 degrees C (85 to 95 degrees F). Flow rate will be 11.4 L/m (3 gpm). Coordinate installation with fixture trim and VA.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Fixture Setting: Opening between fixture and floor and wall finish will be sealed as specified under Section 07 92 00, JOINT SEALANTS. Bio-based materials will be utilized when possible.

B. Supports and Fastening: Secure all fixtures, equipment and trimmings to partitions, walls and related finish surfaces. Exposed heads of bolts and nuts in finished rooms will be hexagonal, polished chrome plated brass with rounded tops.

C. Through Bolts: For free standing marble and metal stud partitions refer to Section 10 21 13, TOILET COMPARTMENTS.

D. Toggle Bolts: For hollow masonry units, finished or unfinished.

E. Expansion Bolts: For brick or concrete or other solid masonry. Will be

6 mm (1/4 inch) diameter bolts, and to extend at least 76 mm (3 inches) into masonry and be fitted with loose tubing or sleeves extending into masonry. Wood plugs, fiber plugs, lead or other soft metal shields are prohibited.

F. Power Set Fasteners: May be used for concrete walls, will be 6 mm (1/4 inch) threaded studs, and will extend at least 32 mm (1 1/4 inches) into wall.

G. Tightly cover and protect fixtures and equipment against dirt, water and chemical or mechanical injury.

H. Where water closet waste pipe has to be offset due to beam interference, provide correct and additional piping necessary to eliminate relocation of water closet.

I. Aerators are prohibited on lavatories and sinks.

22 40 00 - 11 Addendum No. 1

J. If an installation is unsatisfactory to the COR, the Contractor will correct the installation at no cost or additional time to the

Government.

3.2 CLEANING

A. At completion of all work, fixtures, exposed materials and equipment will be thoroughly cleaned.

3.3 COMMISSIONING

A. Provide commissioning documentation in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.

B. Components provided under this section of the specification will be tested as part of a larger system.

3.5 DEMONSTRATION AND TRAINING

A. Provide services of manufacturer’s technical representative for four hours to instruct VA Personnel in operation and maintenance of the system.

B. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING

SYSTEMS.

- - - E N D - - -

File details come from the government source that posted it. Updated .