657A4-21-800-AE Addendum Narrative1.pdf
PDF 32 KB Posted
- Attached to
- Z2DA--657A4-21-800, TF - FCA - Remove and Replace End-of-Life HVAC Infrastructure Building 1
- Solicitation number
- 36C25525R0009
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Poplar Bluff Remove and Replace End of Life HVAC
IMEG #17002131.14 Addendum # 1 Page 1 of 1
MECHANICAL/PLUMBING ADDENDUM #1
MECHANICAL:
SPECIFICATION ITEMS
None
DRAWING ITEMS
1. Drawing MP103: REVISE steam (LPS) and condensate (LPC) piping and tags as indicated on attached drawing.
PLUMBING:
SPECIFICATION ITEMS
1. Section 224000:
a. ADD P-528 description as indicated in attached specification section.
b. REMOVE P-708 description as indicated in attached specification section.
c. ADD P -709 description as indicated in attached specification section
DRAWING ITEMS
1. Drawing PL000: REVISE Plumbing Fixture Schedule as indicated on attached drawing.
2. Drawing PD100: REVISE ¾”V to ¾” VAC as indicated on attached drawing.
3. Drawing PD101: REVISE ¾”V to ¾” VAC as indicated on attached drawing.
4. Drawing PL100: REVISE ¾”V to ¾” VAC as indicated on attached drawing..
5. Drawing PL101: REVISE ¾”V to ¾” VAC as indicated on attached drawing.
6. Drawing PL102: REVISE plumbing fixture tags as indicated on attached drawing.
END OF MECHANICAL/PLUMBING ADDENDUM # 1
SRP/srp \\files\Active\Projects\2017\17002131.14\BidPhase\Pre-Bid RFIs\20250305\20250313_Addendum No 1\20250313 Adden1 VAPB_Narr.docx
Enclosures
File details come from the government source that posted it. Updated .