This document is a mechanical piping drawing (MP103) for the third floor of a VA Medical Center project, specifically related to the removal and replacement of end-of-life HVAC infrastructure. The drawing details mechanical piping routes, equipment relocations, and specific technical requirements, including heat tracing for piping, relocating split system condensing units, and coordinating pipe penetrations with existing elevator equipment. The drawing is part of the 657A4-21-800 project at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri, and was prepared by Alesia Architecture P.C. with contributions from IMEG Corp. and AMI Environmental Inc.
The drawing provides technical specifications for mechanical systems, showing piping routes, equipment locations, and specific technical notes such as routing and sizing piping per manufacturer recommendations. The document is dated March 13, 2025, and is part of a larger project to replace HVAC infrastructure in Building 1, with a focus on laboratory service HVAC systems and specific air conditioning units. The drawing is scaled at 1/8" = 1'-0" and is marked as fully sprinklered, indicating comprehensive fire safety considerations in the mechanical system design.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORAGE
3C-041C
HOSPITALIST
3C-041B
CORRIDOR C NORTH
3C-01A
PROVIDE HEAT TRACE FOR PIPING
FROM EXIT OF BUILDING
ENVELOPE TO CONNECTIONS TO
COILS WITHIN UNITS ABOVE.
4" LPS
1 1/2" LPC
3" CWR UP AND DN
3" CWS UP AND DN
RELOCATED EXISTING SPLIT
SYSTEM CONDENSING UNIT
AND ALL PIPING, BRACKETS,
CONTROLS, WIRING,
ACCESSORIES, ETC.
COORDINATE EXACT
LOCATION WITH NEW DUCT
LAYOUT AND OWNER.
CU-E
COORDINATE PIPE
PENETRATIONS WITH
EXISTING ELEVATOR MACHINE
ROOM EQUIPMENT AND NEW
WORK ON ROOF.
LIQ
SUC
CU-LAB
1" LPS
1" LPC
4" LPS DN
1 1/2" LPC DN
ROUTE AND SIZE
PIPING PER
MANUFACTURER'S
RECOMMENDATIONS.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
657A4-21-800REMOVE AND REPLACE END OF
LIFE HEATING, VENTILATON, AND
AIR CONDITIONING
BID DOCUMENTS
JOHN J. PERSHING VETERANS' ADMINISTRATION
MEDICAL CENTER 1500 N. WESTWOOD BLVD. POPLAR
BLUFF, MO 63901-3318
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132
E
Aw
F
D
Ac Ae
C
B
KEY PLAN
A u to d e s k D o c s /2
-1
A
-2
-3
V A
P o p la r B lu ff
R e m o v e a n d R e p la c e
L a b A
H U a n d A
H U
/6
A
-2
-3
.B
.M
E P
T
R
.1
R e p l L a b A
H U
A
H U
C .r v t
/1
/2
:1
:2
P
M
MP103
THIRD FLOOR - MECHANICAL PIPING
RUSARN BHAACH
08/30/2024
N O R
HT
1/8" = 1'-0"
THIRD FLOOR - MECHANICAL PIPING
Revisions: Date:
Addendum No.1 13 MAR 25
| Sheets |
| MP103 - THIRD FLOOR - MECHANICAL PIPING |
File details come from the government source that posted it. Updated .