36C25518R0511 0001 36C25518R0511 0001.docx

View the file

Other files

File Type Posted
36C25518R0511-0001005.pdf PDF
36C25518R0511-0001002.pdf PDF
36C25518R0511-0001003.pdf PDF
36C25518R0511-0001001.docx DOCX document
36C25518R0511-0001004.pdf PDF
36C25518R0511-0001006.pdf PDF
36C25518R0511-002.pdf PDF
36C25518R0511-001.docx DOCX document
36C25518R0511-003.pdf PDF
36C25518R0511-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 589A4-17-181 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25518R0511 08-28-2018

X X X September 11, 2018 by 2:00 PM CDT Install Animal Research Air Handler, 589A4-17-181 A This amendment completes the following:

1. Changes to electrical Drawings Attached: E-001, E-101, E-501, M-601

2. Extends the Question and Answer period to August 31, 2018 submitted by 2:00 PM.

3. Questions and Answers received to date are included.

4. Site Visit Attendance Roster attached.

B. All other terms and conditions remain unchanged.

CONTINUATION PAGE

ANIMAL RESEARCH AIR HANDLER

QUESTIONS AND ANSWERS

1. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?

ANSWER: The project is sales tax exempt. The successful bidder will be given a Missouri sales tax exemption certificate at the time of notice to proceed.

2.Where will the designated parking area be for workers accessing the construction site?

ANSWER: The general contractor is allowed two parking spaces located in the gravel parking lot on the Southwest corner of the campus.

3. Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.

ANSWER: NO

4. During construction in an area where the ceilings or fire suppression system will be disrupted, will NFPA 241 apply? Will the government require additional security measures beyond NFPA code such as fire watch, temporary fire alarms, adjustments to sprinkler heads, etc.

ANSWER: The government will provide fire watch after normal business hours as necessary. Existing fire alarm devices will be scheduled in and out of service based on the schedule worked by the contractor. It will be the contractor’s responsibility to ensure the devices are protected from contamination during construction activities and restored to functional status at the end of each work shift. Sprinkler heads will only have to modified to provide compliant coverage for the final layout. Temporary removal of ceiling will not require relocating sprinkler heads.

5. Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?

ANSWER: Siemens Fire alarm provides the facility fire alarm. All coordination of outages should be scheduled through the COR.

6. Has the work area been checked for lead-based and asbestos?

ANSWER: The facility has completed an assessment and the area was previously abated. It is not expected that further asbestos or lead will be encountered in this project.

7. Are there any other hazardous materials or medicine that will have to be dealt with or require employees to use full PPE?

ANSWER: NO

8. Will the deductive alternate be subtracted from the base bid or does the VA want to see a negative number?

ANSWER: You should provide a the project cost without the work identified in the bid deduct. In other words Bid item 1 should be the cost for everything shown in the bid documents. Bid item 2 should be Bid item 1 minus the cost associated with the work identified as bid deduct.

9. Will employees be required to have any shots before entering the site?

ANSWER: NO

10. Due to current potentially significant tariffs being placed on the importation of building materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would increase pricing on all steel or wood materials, regardless of origin.

ANSWER:NO

11. Describe any and all tasks that may be required for this project as it relates to infectious control?

ANSWER: Reference spec section 01 00 10

12. Will the VA consider floor repairs to more than 10% of the total Sq ft of the project or if there is any underlayment deeper than 1/8” as an unforeseen condition?

ANSWER: There is very minimal floor work on this project. The contractor is responsible to protect the existing floor during construction. Any damage to the flooring will require replacement at the general contractors expense.

13. Will the GC need to have moisture tests included in price?

ANSWER: There is only patching of flooring, so not sure what is being asked.

14. What is the level of infectious disease control rating for this site?

ANSWER: This will be classified as a category IV ICRA requirements.

15. Please confirm that the qualified Super can fill the role of the SSHO on site?

ANSWER: As long as proper documentation is provided as required by the selection factors. The individual needs to be submitted for all positions.

16. Will the sign in sheet be released?

ANSWER: YES

17. Will there be any down time between phases?

ANSWER: Yes there will be time between when the space is turned over to the government and when the next phase will be turned over to the contractor. As long as the contractor maintains the schedule this time will be 5 days or less. If the contractor deviates from their schedule it may cause much longer delays. These delays will be at no cost to the government.

18. There are two sets of balance valves shown on the pre-heat piping. Are these to be eliminated as part of the bid deduct?

Answer: Yes the balance valves would be eliminated from the project if bid item 2 was taken.

19. What would the contractor access to the mechanical room Require?

Answer: The contractor would be allowed to install a temporary wall with a 42” door that would have panic hardware on the lab side and a keyed lock on the mechanical room side. Once this wall and door are installed the contractor would be able to use the adjacent double exterior doors to access the work site.

See attached document: List of Attachments.

See attached document: Install Animal Research Air Handler - Site Visit Sign In Roster.

See attached document: E-001 - ELECTRICAL SYMBOLS AND SCHEDULES.

See attached document: E-101 - PARTIAL ELECTRICAL FLOOR PLANS.

See attached document: E-501 - ELECTRICAL DETAILS.

See attached document: M-601 - MECHANICAL SCHEDULES.

File details come from the government source that posted it.