S05 - 0003_36C25225B0016_RFIs_537-24-102_8.21.25 - Published VA Responses.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z2DA--537-24-102 Correct Mental Health Safety Deficiencies
Solicitation number
36C25225B0016
Issued by

About this file

This document is a Request for Information (RFI) spreadsheet and related solicitation amendments for a VA project to correct Mental Health Safety Deficiencies at Jesse Brown VA Medical Center in Chicago, Illinois. The solicitation (36C25225B0016) involves renovating mental health facilities, with specific requirements including installing ligature-resistant sliding doors, replacing desks and cubbies, and modifying door hardware. Key project details include a bid opening extended to September 3, 2025, with a virtual bid submission process via email and Microsoft Teams. Contractors must provide documentation such as the VAAR 852.219-75 VA Notice of Limitations on subcontracting, and the project involves detailed specifications for built-in furniture, door schedules, and potential on-site logistics like dumpster placement and photographic documentation.

View the file

Other files

File Type Posted
S06 - 0006_36C25225B0016_RFIs_537-24-102_9.9.25.xlsx XLSX spreadsheet
36C25225B0016 0006.docx DOCX document
36C25225B0016 0005.docx DOCX document
S06 - 0005_36C25225B0016_RFIs_537-24-102_9.3.25 - VA responses.xlsx XLSX spreadsheet
S06 - 0004_36C25225B0016_RFIs_537-24-102_9.2.25 - VA responses.xlsx XLSX spreadsheet
36C25225B0016 0004.docx DOCX document
S06 - LCN_4510T.pdf PDF
S06 - 537-24-102_J-A - Door Closer_Executed.pdf PDF
S06 - Wage Determination_Updated_effective 8.22.25.pdf PDF
S06 - 0004_537-24-102 Construction Specifications 08-26-25_Door Closer.pdf PDF
36C25225B0016 0003.docx DOCX document
S06 - Wage Determination_Updated_effective 8.1.25.pdf PDF
S06 - 537-24-102_2nd Pre-bid Site Visit Sign-in Sheet.pdf PDF
36C25225B0016 0002.docx DOCX document
36C25225B0016 0001.docx DOCX document
S02 - SOW Exhibit E Rev2.pdf PDF
S02 - SOW Exhibit C Rev3.pdf PDF
S02 - Specifications 03-13-25.pdf PDF
S02 - 537-24-102_J-A_Executed.pdf PDF
S02 - SOW Exhibit D Rev2.pdf PDF
S02 - SOW Exhibit A.pdf PDF
36C25225B0016_1.docx DOCX document
S02 - Attachment 1_VAAR 852.219-75_REQUIRED.pdf PDF
S02 - Wage Determination_537-24-102_eff 7.18.25.pdf PDF
S02 - SOW Exhibit B Rev6.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contractor Request for Information
36C25225B0016
537-24-102 Correct MH Safety Deficiencies
NumberRFIVA ResponseAmendment #
1Are there any photos and dimensions of the existing desks and cubbies?Photo showing dimensions provided.0001
2Are existing cubbies and desk built-ins or separate structures?The existing units are built-in0001
3Can we please get a door schedule and hardware sets?SOW Exhibit B is the Door Schedule for the Inpatient Doors.

SOW Exhibit C is the Hardware Set for the Doors in Exhibit B.

SOW Exhibit E is the Door Schedule for Staff Doors.

Additionlal information is forthcoming regarding the Door Closer to be used on the Doors in Exhibit E.0003
4Can the Superintendent fulfill the Quality Control Manager (QCM) role?Yes, the SI can Fulfill the QCM role0003
5Can the Superintendent fulfill the Site Safety & Health (SSHO) role?Yes, the SI can Fulfill the SSHO role.0003
6Will the VA provide laydown/storage areas? If so, where will they be located?No0003
7Will the VA provide an area for a dumpster? If so, where will that be located?
Dumpsters may be able to be placed on short-term basis at one of the docks0003
8Are there any requirements regarding photographic documentation? Please confirm if this will be required as part of this project? If required, must this be a 3rd party service? Or can it be performed inhouse by general contractor?Photographic documentation can be performed by the GC.0003
9Will the VA be providing an electronic submittal program, or is it expected that the general contractor provides this? Are there programs or software that are acceptable?The GC shall provide access to Procore or other alternative0003
10Sliding Door Clearance To Electric Keyed Operators.The doors won't clear the Switch Panel. The Panel will have to be recessed
Add another layer of Drywall within the new door Frame to help recessing it.0003
Will the new sliding doors be installed /manufactured to clear the existing keyed operator switched?
If not, will the operator switches be,
a. Relocated to the opposite side of the sliding door
or
b. recessed.
11Welded Vinal Flooring PatchesThe Station will accept "as close as possible" color match0003
Will the Station provide attic stock vinyl flooring where needed when the walls are moved and no vinyl flooring had been installed?
Will Station accept “ As close as possible” in color match, understanding that there may exist conditions that the match is not close to the actual adjoining vinyl floor color?
12Because of the construction on the door wall, painting will be required.Painting the rest of the walls inside the rooms is intuitive, please add it to the scope.0003
Additionally, because of the “Cubby” replacement, there will be required new paint on that entire wall as well.
Does the Station want the contractor to paint the 3rd wall and the small window wall as well, resulting in new paint in the entire room, save for the ceiling?
There will be minor drywall compound work that is conditional to each room on the 3rd wall as well as the window wall if newly painted.
Suggest an allowance for each room.
13Nurse CallNurse Call shall remain intact.0003
Does Station want the Nurse Call to be removed and or relocated above each door to align in a coordinated semblance?
Or leave Nurse Call alone and in its original position?
14I am writing regarding Solicitation 36C25225B0016 – Correct Mental Health Safety Deficiencies, Project #537-24-102 at Jesse Brown VA Medical Center, Chicago, IL.The Bid opening is extended to 9/3/250003
Due to the complexity of the scope (ligature-resistant sliding doors, desks/cubbies, and door closers), as well as the need to coordinate with multiple vendors for compliance and wage determination requirements, we respectfully request a 30-day extension of the proposal due date. This additional time will allow us to gather complete vendor quotations, ensure Davis-Bacon Act compliance, and compile a fully responsive bid package.
We believe granting this extension will result in more competitive and complete proposals, ultimately benefiting the Government.
Thank you for your consideration, and we look forward to your confirmation.
15I wanted to check in to see if there is any consideration being given to extending the bid due date, currently scheduled for Monday at 10:00 AM. As of now, we are still awaiting responses to several RFIs, which are important for completing our proposal accurately.The Bid opening is extended to 9/3/250003

It would be helpful to know as soon as possible if there’s any update or change to the bid timeline. Please advise at your earliest convenience.