This file is a Request for Information (RFI) document for the Roadway and Sidewalk Improvements project at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The solicitation (36C25225B0009) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under the authority of 38 U.S.C. 8127, with a procurement deadline of March 2025. The project involves comprehensive roadway and sidewalk improvements, including asphalt pavement removal and replacement, installation of ADA ramps, concrete curb and gutter work, storm drainage extensions, pavement markings, and miscellaneous site improvements.

Key technical details include full depth asphalt pavement installation, adjusting utility structures to grade, extending existing storm pipes, installing concrete sidewalks and curbs, reinstalling signs and lighting poles, and adding pedestrian crossings and traffic markings. The project requires specific submittal requirements across multiple divisions, including detailed documentation for safety plans, quality control, environmental controls, and site-specific technical submittals. Work hours are restricted to 7:00 AM to 3:30 PM Monday through Friday, with special provisions for noise-generating activities and potential weekend/off-hours work requiring COR approval. Bidders must be SDVOSB verified in the VetCert database and comply with specific VA contracting requirements.

View the file

Other files

File Type Posted
S06_Att2 CON-IFB Amendment 0005 FHCC Esize Stormwater Reference for RFI Question 31_07032019.pdf PDF
36C25225B0009 0005.docx DOCX document
36C25225B0009 0004.docx DOCX document
S06_Att3 CON-IFB Amendment 0004 Addendum Earthwork Spec Correction 36C25225B0009 556-23-105_01302025.pdf PDF
S06_Att2 CON-IFB Amendment 0004 Remaoval Pages for RFI Question 7 and 8.pdf PDF
S06_Att1 CON-IFB Amendment 0004 RFI Pre-Bid Responses 36C25225B0009 556-23-105_03062025.xlsx XLSX spreadsheet
2S06_CON-IFB Amendment 0003 556-23-105_36C25225B0009.pdf PDF
S04_Site Visit Sign-In-Sheet 556-23-105 Roadway and Sidewalk Improvements_01242025.pdf PDF
36C25225B0009 0002.docx DOCX document
S02_DRAWINGS CD Stamped 556-23-105 CON-IFB 36C25225B0009_120520 File Size Reduced on 01242025.pdf PDF
36C25225B0009 0001.docx DOCX document
S02 - 556-23-105_Roadway_Sidewalk_Improvements_000-Drawing_CD_Stamped_20240904.pdf PDF
36C25225B0009_1.docx DOCX document
S02 - 556-23-105 Roadway Sidewalk_Spec 01 33 00 Submittal Register Template 12DEC24.pdf PDF
S02 - Wage determination - LAKE heavy highway 1224.pdf PDF
S02 - 556-23-105 Roadway Sidewalk GC - Addendum revising select specifications 12DEC24.pdf PDF
S02 - 556-23-105_Roadway_Sidewalk_Improvements_00-Specifications 5DEC24 -Rev 12DEC24.pdf PDF
S02 - 556-23-105_Roadway_Sidewalk_Improvements-Equipment_Specification_Sheets.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25225B0009

556-23-105 (CON - IFB) Roadway and Sidewalk Improvements for Pre -Bid Solicitation Questions - 02/03/2025
Captain James A Lovell Federal Health Care Center (FHCC) Solicitation for Bidders
This IFB Pre-Bid response is intended to clarify the scope, not conflict with it.
If a response appears to conflict with the scope, please contact the VA COR.
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 01/23/2025RESPONSE POSTED IN AMENDMENT NO.
1Need your help to get access to the sign-in sheet for the Jan 21st site walkthrough. I am a sub-contractor and will use this sheet to reach out to GCs for their ICRA Temporary Barrier Wall needs.We will post that in an amendment! That is correct…and amendment has been created but I am currently seeking help from the Helpdesk to assist in posting to SAM’s. I am hoping by COB today.0001
2Are you handling the bidding on this project? If so, I am looking to obtain a planholders list / Pre-bid meeting list if possible. If not, could you point me in the right direction?An amendment has been created but I am currently seeking help from the Helpdesk to assist in posting to SAM’s. The amendment will be posted with the Sign-in-Sheet for the site visit that took place on Tuesday, January 21, 2025. I am hoping by COB today.0001
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 01/31/2025RESPONSE POSTED IN AMENDMENT NO.
3Is there a link to join the pre-bid meeting virtually? We just found this solicitation on Sam.gov and would like to attend the pre-bid meeting but we are not local. Please let me know If there is a way we can call in to get further information on this project.Sorry for the late reply on this, but this event was a walk around site visit. And of course you are under no obligation to attend the site-visit!Responded to via email and Amendment 0004
4Can you please include a new RFI to clarify the NEGATIVE Pressure needs for this project.0004
1. Location - Is this needed only on the 2nd floor or are there any negative pressure needed on the 1st floor.All floors on the west side of building 134 (2/CI102) at minimum for dust control and the northwest wing of building 133 (1/CI102) per VA/COR discretion.
1.1 Please elaborate on sections of the plan documents need negative pressure. Every section that states ICRA or select sections..No negative pressure is needed
2. Phases - What phase of the project does need this negative pressure. Entire duration or any limited duration.Refer to sheet CI102 enlarge view 2/CI102 & potentially 1/CI102
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/04/2025RESPONSE POSTED IN AMENDMENT NO.
5I am reaching out to confirm whether a site visit has been scheduled for the Roadway and Sidewalk Improvements project at the Captain James A. Lovell Federal Health Care Center (VA Project #556-23-105).Solicitation Posted: 01/24/2025Responded to via email and Amendment 0004
Amendment 0001 Posted: 01/29/2025
Site Visit Scheduled for: 01/31/2025 @ 10:00 AM
Could you please confirm if a site visit is planned? If so, kindly provide the date, time, and any registration requirements for attendance.At this time there are no add additional site visit(s) scheduled for this solicitation.
Thank you for your time and assistance. I look forward to your response.
Very Respectfully,
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/04/2025RESPONSE POSTED IN AMENDMENT NO.
6We recently came across this project and are very interested, as well as in similar opportunities. We have performed many similar types of work and our company is a certified Small Business and a registered Veteran-Owned Small Business (VOSB).Per the solicitation (36C25225B0009) posted to SAMs Contract Opportunities on January 24th, 2025, page one (1) of the solicitation states:Responded to via email and Amendment 0004
We noticed that the project status does not currently indicate a VOSB set-aside. Could you confirm whether this designation could be considered? We have extensive experience serving as a Prime Contractor on city, state, and federally funded projects. Additionally, if a VOSB set-aside is established, it would provide us with opportunities to collaborate with larger businesses seeking competitive subcontractors in the area.“This procurement is a 100% set aside for CVE Verified Service-Disabled Veteran Owned Small Business Firms (SDVOSB) per the authority 38 U.S.C. 8127 (Public Law 109-461). In accordance with VAAR 819.7003(b), at the time of submission of bid, and prior to award of any contract, the bidder must represent to the CO that it is a (1) SDVOSB eligible under VAAR Subpart 819.70; (2) Small Business concern under the NAICS assigned to this acquisition; and (3) SDVOSB listed as verified in the VetCert database at: https://veterans.certify.sba.gov/.”
Attached is our company information for your reference. Please let us know if you require any additional details.
We appreciate your time and look forward to your response.“If submitting as a joint-venture, bidders must include a copy of the joint-venture agreement.”
Thanks in advance.“NOTE: VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction is included in this solicitation (see pages 54-56); signed certification must accompany bid submission to be considered for award.”
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/12/2025RESPONSE POSTED IN AMENDMENT NO.
7I would like to RFI regarding the HMA removal quantity on the roadway improvements at the Cpt. James A. Lovell Federal Health Care Center. As a preface, I am asking you not make this a formal addendum because I am particularly asking about my removal quantities:The total volume of the HMA removal is 779 CY.0004
8The bid quantity calls for over 27,000 SY of HMA removal, but I only come up with 17516 SY. I would not be bringing this up if the quantity was not such a large difference, I am wondering if I am missing a page or something – but I am confident I am not. Attached are the pages I received as part of the “Demolition Plan” in the drawings. Let me know if my numbers are correct or if I am missing something.The total area of the HMA removal is 18,691 SY.0004
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/14/2025RESPONSE POSTED IN AMENDMENT NO.
9CD - 103 Detail 15Please confirm what type of tree should be planted for the 2" caliber?The replacement tree should generally be the same species as the existing one. Please confirm with the VA if they have any other preferences, as we are not providing planting drawings or specifications.0004
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/14/2025RESPONSE POSTED IN AMENDMENT NO.
10Please confirm the construction hours. Are we able to start as early as 6:00 am? Please confirm any areas that require off-hour work.See the folllowing excerpt from the SOW regarding work hours:
3.Normal construction work hours are 7:00 AM to 3:30 PM Monday through Friday.
A.Normal work hours can be modified only by written approval of the COR, and at no additional cost to VA.
B.No work by the Contractor on Federal Holidays, and no work on the weekend when the Federal Holiday is on the respective Monday or Friday.
C.No work in stairs, corridors, lobbies, or other interior / exterior public areas shall be performed during the above-designated work hours.
D.Any work including and not limited to noise, vibration, dust, odors, core drilling, hammer-drilling, saw-cutting, equipment moving in public corridors, and or soil compaction shall be performed during the above-designated work hours only.
E.Crane lifts, or any work that closes drive isles, closes building entries, or closes public corridors shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.0004
11Are contractors able to provide trailers and/or storage boxes?Refer to Drawing CJ1040004
12Will the VA provide laydown/storage areas? If so, where will they be located?Refer to Drawing CJ1040004
13Will the VA provide an area for a dumpster? If so, where will that be located?Refer to Drawing CJ1040004
14Are CAD files available for all of the issued drawings? Or will they be available after award is made?A&E provided CAD files to VA, which is at the VA discretion to provide.0004
15Specification 013216.15, 1.3, A, please confirm that the schedule is to be created by third-party scheduling consultant, and cannot be created in house by Contractor.The specifications clearly state the requirement of an independent scheduling consultant for this project. This is confirmed.0004
16Should there be a Specification 329000 Planting or something similar in order to provide direction on requirements in replacement of and damaged grass areas with sod or seed?As the planting work is not within our scope, we did not include Specification 329000 or similar in our specs book.0004
17Will the VA be providing an electronic submittal program, or is it expected that the general contractor provides this? Are there programs or software that are acceptable?VA has a contract to run Submittal Exchange on the current projects. Upon selection of a GC the process will start to create a new submittal exchange TO for this project.0004
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/14/2025RESPONSE POSTED IN AMENDMENT NO.
18Please confirm requirements for required onsite personnel. Refer to specifications 013526 and 014500. It seems that the GC is required to have 1 or 2 onsite personnel full time while work is being performed? We interpret that we are required to have (1) SSHO/Safety and (1) member of the CQC organization at all times, but that the SSHO/Safety is part of the CQC, and therefore can serve both roles onsite. Please confirm.This tends to be asked with every project we solicit and the answer is the same.0004
In Spec section 01 35 26, 1.7, “SITE SAFETY AND HEALTH OFFICER” (SSHO) AND “COMPETENT PERSON” (CP)

A: The GC must provide 3 different persons on site. The Superintendent, SSHO, and Quality Control Manager.

Following Award and depending on the qualifications and demonstrated competency of GC site management, VA may be open to allowing the General Contractor Superintendent to act as the SSHO - conditional on retaining the right for the COR, CSO, or CO to summarily and immediately revoke the privilege as a result of observed performance deficiencies. While this is not guaranteed, in no case shall VA accept assignment of site management personnel to multiple projects concurrently. (52.236-6) B. Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs.

In Spec Section 01 45 00, 3.5 QUALITY CONTROL ORGANIZATION B. ..."The CQC System Manager cannot have any other duties except for quality control management." - Therefore the CQCM cannot also be the SSHO or Superintendent. They are part of that organization, but separate roles.

So in summary, if your Superintendent is qualified to serve as the SSHO, the COR/CO may allow that combination of roles to reduce your labor requirement on-site. The CQC Manager will be an additional required person with no other roles.
19Please confirm that the contractor is responsible to provide site surveys as per Specification 022113, and that this is not provided by VA or A/E? Per 1.4 Quality Insurance, A. 1. & 2., the surveys are to be performed by “Professional Land Surveyor” or “Professional Civil Engineer” – please confirm that these are to be independent 3rd party contractors? Or can these come from the GC organization?A current 811/utility locate/utility survey shall not be provided by the VA or A&E. 811/utility locate/utility survey typically involves 3rd party entities. However, if the GC is capable of performing these tasks provide documentation to the VA varying GC qualifications. The A&E Topographic & Utility locate was provided to the VA as Appendix 12, which includes the facility's as-built utility maps that the VA provided; this appendix is at the VA's discretion to provide.0004
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/17/2025RESPONSE POSTED IN AMENDMENT NO.
20Good morning,All of the documents are on SAM.GOV and can be accessed and downloaded as you like!Responded to via email and Amendment 0004
We are interested in bidding the above-mentioned project, are you able to help me obtain the bidding documents? Or point me in the right direction?
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 02/25/2025RESPONSE POSTED IN AMENDMENT NO.
21In the asphalt paving specs, 3.6 – Application of Seal Coat, mentions “… when sealing new asphalt paving, wait an entire year to allow for explansion…” wondering if a sealcoat will be necessary for project?It is not required, but if you choose to apply it, you must follow points D and E from Section 3.6.0004
22Will the structures in the road need to be adjusted as well?Yes, manholes and covers should be adjusted to align flush with the new pavement surface.0004
23There will be a certain amount of excavation for the 8” of CA-6 that goes under the full depth asphalt pavement?If I understand your question correctly, you are asking about the excavation quantity for the 8" layer of CA-6. The quantity is approximately 70 cubic yards (cy).0004
24Should we include short term pavement marking, for the sake of MOT continuity?Yes, short-term pavement markings should be included to maintain MOT continuity.0004
25Will the asphalt paving contractor be responsible for excavation to install the 8” CA-6 for the full depth asphalt pavement?”Yes, the asphalt paving contractor will be responsible for excavation to install the 8” CA-6 for the full depth asphalt pavement.0004
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 03/03/2025RESPONSE POSTED IN AMENDMENT NO.
26Please confirm that the bid # 556-23-105 Roadway and Sidewalk Improvements at Captain James A. Lovell FHCC can be submitted electronically.Please follow the instructions as outlined in the solicitation document:Responded to via email and Amendment 0005
Contracting Officer’s Special Instructions as follows (page 4 of solicitation):
After compiling all required information, submit the information in accordance with Block 13 of the SF 1442 (page 1 of the posted solicitation). Return the original and specified number of copies to the issuing office listed in Block 8 of the SF 1442 (page 1 of the posted solicitation).
BID PROPOSALS CANNOT BE EMAILED AND WILL NOT BE ACCEPTED
An amendment to extend the bid offer due date is expected to be posted today.
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 03/04/2025RESPONSE POSTED IN AMENDMENT NO.
27Confirming bid proposals can be emailed.I will be processing an amendment to extend the bid offer due date today.Responded to via email and Amendment 0005
28Please confirm that we can submit this bid tomorrow electronically.Please follow the instructions as outlined in the solicitation document:Responded to via email and Amendment 0005
Contracting Officer’s Special Instructions as follows (page 4 of solicitation):
After compiling all required information, submit the information in accordance with Block 13 of the SF 1442 (page 1 of the posted solicitation). Return the original and specified number of copies to the issuing office listed in Block 8 of the SF 1442 (page 1 of the posted solicitation).
BID PROPOSALS CANNOT BE EMAILED AND WILL NOT BE ACCEPTED
An amendment to extend the bid offer due date is expected to be posted today.
29Just following up from yesterday. I was just curious if we should be expecting another amendment.An amendment to extend the bid offer due date is expected to be posted today.Responded to via email and Amendment 0005
30SECTION 01 33 00 SUBMITTAL REGISTERIn Division 1, there is a lot of information required. Is this just a draft, or do we have to provide all of this information?Follow requirements in the Contract Documents, including the Specifications. Update the Submittal Register as needed. Related Specification excerpts include but are not limited to:

- Div 01 33 23 Shop Drawings... , Sec 1.3 Submittal Register: "Use 01 33 00 Submittal Register... This list may not be all inclusive and additional submittals may be required by the specifications or the Contracting Officer. The Contractor is not relieved from supplying submittals required by the contract documents but omitted from the submittal register..."

- Div 01 40 00 Quality Requirements, Sec 1.2 G: "Provide a submittal register listing all submittals required of this contract..."

- Div 01 33 00 Submittal Register... 0005

31 See attachment: There is missing information for current drain pipe size and new drain extension pipe sizing. We really need an existing drain plan and sizing for the new extensions. See attached Stormwater System Mapping dated 3 July 2019 (S06_Att2 CON-IFB Amendment 0005 FHCC Esize Stormwater Reference for RFI Question 31_3JUL19), which shows 12-inch diameter storm drains just South of the Lewis Ave gate entrance. Verify in field. 0005

There is no change in the drain pipe diameter as we are extending the existing pipe.

The new extension should match the current pipe size and material.

Page &P of &N

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

BRICK

LAMP POST BASE

SOUTHEAST BOLT ON

BM: 699.12

BOLT ON HYDRANT

NORTH UPPER FLANGE

BM: 698.27

SIGN

CONCRETE

COLUMNS

COL.

GATE

METAL

FENCE

FENCES

WALL

HILL DR.

W E

B

R D

MEDAL OF HONOR DR.

R46'

R2 7'

R27.6'

BUCKLEY RD

L

IS

A V

EE

T

E E

FO

S

G

WWWWW

T W W

STO

11.6' FOC TO FOC

13.0' BC TO BC

ST

CORNER TO BE CUT BACK,

FOR WIDER TURNING CURVE

133EF

11 5

9 4

188 7

TRAMWAY

TR

AMW

AY

TRAMW

TRAMWAY TRAMWAY TRAMWAY TRAMWAY TRAMWAY

TRAM

TRAMWAY TRAMWAY TRAMWAY TRAMWAY TRAMWAY TRAMWAY TRAMWAY

AM

TRAMWAY TRAMWAY

TRAMWAYTRAMWAYTRAMWAYTRAMWAY

TRAMWAYTRAMWAY

CD102

CD103

CD104

CD101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

C

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Au to de sk oc s:

//2

3.

ay et te vi lle ra ffi c St ud y/

.1

2_

A_ v2

2.

rv t

/5 /2

7:

:4

ROADWAY AND SIDEWALK

IMPROVEMENTS

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-23-105

N/A

09/05/2024

FULLY SPRINKLERED

Revisions: Date: KJC AWB

REVISED 100% STAMPED

CONSTRUCTION DOCUMENTS

ARCHITECT/ENGINEER OF RECORDCONSULTANT

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project No.: 22328

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidon.com

GD Project No.: 23.1019

N

0 6030

M

AT

H

IN

- S

KEY PLAN:

DEMOLITION PLAN

DEMOLITION PLAN KEYNOTES

" NOT ALL OF THESE KEYNOTES MAY BE APPLICABLE IN THIS SHEET"

1. MILL 1.5 INCH OF ASPHALT PAVEMENT

2. REMOVE CURB AND GUTTER

3. REMOVE LIGHTING POLE - SALVAGE FOR REUSE

4. REMOVE SIGN - SALVAGE FOR REUSE

5. REMOVE EXISTING RAMP

6. REMOVE CONCRETE SIDEWALK

7. REMOVE BRICK PAVEMENT

8. REMOVE PAVEMENT MARKING

9. REMOVE MOUNMENT SIGN, SALVAGE PLACARD FOR REUSE

10. REMOVE STORM STRUCTURE

11. REMOVE CANOPY - SALVAGE FOR REUSE

12. REMOVE HANDRAIL - SALVAGE FOR REUSE

13. REMOVE BOLLARD - SALVAGE FOR REUSE

14. REMOVE METAL FENCE

15. REMOVE TREE AND ROOT BALL, REPLACE WITH A 2" CALIPER CLOSE

TO THE REMOVED ONE.

mason

Area Measurement

31,725.11 sf

975.92 sf

Length Measurement

30'-0"

GRAVEL

GRAVEL

CONCRETE WALL

CONCRETE WALL

SECURITY

KEY POSTS

O

R49'

Y

MATCH LINE - SEE SHEET CD103

63,573.21 sf

2,180.56 sf

3,484.32 sf

BOLT ON HDYRANT

NORTHWEST FLANGE

BM: 721.68

TRANS PAD

CORNER OF

BM: 722.53

BM: 722.53

BM: 721.68

NORTHWEST FLANGE

BOLT ON HDYRANT

OVERHEAD

COLUMN

HANDRAILS

HANDRAIL

HANDRAIL

BRICK WALL

11011

R15.3'

R15.5'

R15.2'

R13.9'

W W W

133CA

11486

4 4

4 4

1 8

MATCH LINE - SEE SHEET CD102

MATCH LINE - SEE SHEET CD104

45,326.74 sf

3,489.44 sf

BM: 719.32

METAL FENCE

BM: 719.32

EMERGENCY POLE

TRANSFORMER

VAULT

R45.0'

R66.7'

IL

CAVIN RD.

CORNER TO BE CUT BACK, FOR

WIDER TURNING CURVE

MATCH LINE - SEE SHEET CD103

44,013.72 sf

540.52 sf

1,290.58 sf

1,033.48 sf

3,431.9 sf

9'-5 1/4" image1.emf

Roadway and Sidewalk Improvements

Captain James A. Lovell FHCC

SECTION 01 33 00

SUBMITTAL REGISTER

100% CD Submittald

12/12/2024

Version 06-01-24

APPROVAL

NEEDED

MATERIAL

SUBMIT TO

GOVERNMENT

SUBMIT BY BY DATE DATE REMARKS

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. r. s. t. u. v. w. x. y. z. aa.

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements

1.5 List of contact personnel and Headshot/Photos of all contractors entering jobsite x

1.5 Security Memorandum x

1.23 Progress and Completion Pictures x

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build

1.1/1.5 Initial/Interim Project Schedule x

1.1/1.5 Final Project Schedule x

1.3 Qualifications of scheduling consultant x

1.4 Periodic Schedule Updates X

01 33 23 Shop Drawings, Product Data, and Samples

- No Submittals Required - - - - - - - - - - - - -

01 35 26 Safety Requirements

1.4 Accident Prevention Plan (APP) x

1.4 Crane Critical Lift Plan x

1.4 Activity Hazard Analysis (AHA) x

1.4 Emergency Response Plan x

1.4 Fall Protection and Prevention Plan x

1.4 Qualification of Competent Person x

1.4 Qualification of Site Safety and Health Officer x

1.4 Licenses, Permits and Notifications x

1.4 Accident Reports x

1.4 USACE Prime Contractor Monthly Record of Work-Related Injuries/Illnesses & x

Safety Exposure Reports

1.4 Regulatory Citations and Violations x

1.4 Summary of Worker Compensation Claim x

1.4 Confined Space Entry Permit x

1.4 Hot Work Permit x

1.4 License Certificates x

01 40 00 Quality Requirements

2 Quality Control Plan x

2 Quality Assurance Plan x

2 Daily Contractor Quality Control Reports (CQC) x

01 41 00 Regulatory Requirements

01 42 16 Definitions, Abbreviations, and Acronyms

01 42 19 Reference Standards

01 45 00 Quality Control

1.4 Preconstruction Submittal X X X

1.4 Design Data X X X

1.4 Test Reports X X X

01 45 29 Testing Laboratory Services

1.3 Accreditation Requirements and Scope of Accreditation X X

Notice of Intent:

The project submittal registry is provided as a general outline of expectation for the project submittal requirements. The contracting team shall develop a master submittal registry within a digital automated format as outlined within each Division of the specifications. The developed master submittal registry shall utilize an automated tracking software such as Submittal Exchange or equal software as outlined within each Division's specifications. The Contracting team shall review each specification section provided with the project construction documents and account for necessary items within the final master submittal registry. It is the responsibility of the Contracting to provide and adhere to the submittal requirements outlined within the project specifications.

CONTRACTOR

SCHEDULE DATES

ACTION

CONTRACTOR CONTRACT NO.556-23-105 Roadway & Sidewalk ImprovementsTITLE AND LOCATION:

TYPE OF SUBMITTAL

CLASS-

IFICATION

q.

P

U

I

TRANSMITTAL

NUMBER

SPECIFCATION

PARAGRAPH

DESCRIPTION OF ITEM SUBMITTED

01 33 00 - 1

1.3 Written Reports X X

01 57 19 Temporary Environmental Controls

1.4 Environmental Protection Plan X X X X X

1.5 Demolition Debris Management Plan x

1.5 Monthly Construction & Demolition Debris Diversion and Disposal x

01 74 19 Construction Waste Management

1.5 Demolition Debris Management Plan x

1.5 Monthly Construction & Demolition Debris Diversion and Disposal x

01 91 00 General Commissioning Requirements

1.12 Preliminary Commissioning Plan Submittal X X X X X X

1.12 Final Commissioning Plan Submittal X X X X X

1.12 Systems Functional Performance Test Procedure X X X X X X

1.12 Pre-Functional Checklists X X X

1.12 Test and Inspection Reports X X X X

1.12 Corrective Action Documents X X X X

1.12 Preliminary Commissioning Report Submittal X X X X

1.12 Final Commissioning Report Submittal X X X X

1.12 Data for Commissioning X X X X X

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys

1.3 B Survey Drawings X X

02 41 00 Demolition

1.2 B Related Work Section 01 35 26 Accident Prevention Plan - - - - - - - - - - - - -

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 92 00 Joint Sealants

1.3 A, C, D Quality Assurance X X

1.4 A Certification X

1.5 B Sustainable Design Submittals X X

1.5 C Installer Qualifications X

1.5 D Contractor Certification X

1.5 E Manufacturer’s Instructions X

1.5 F Samples X

1.5 G Manufacturer's Literature and Data X

1.5 H Manufacturer’s Warranty X

1.9 B Manufacturer’s Warranty X

3.5 A. 10 Installation X

DIVISION 10 – SPECIALTIES

10 73 43 Transportation Stop Shelters

1.3 Shop Drawings, Manufacturer’s Instructions & Product Data X X X X X

1.3 Samples X X X

1.5 Manufacturer’s Instructions X X

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installation

01 33 00 - 2

1.12 H. Electrical Samples X X

26 05 19 Low-Voltage Electrical Power Conductors and Cables

1.4 A. 1. b. 1) Conductor and Cable Electrical Ratings and Insulation Type Data X

1.4 A. 1. b. 2) Splicing Material and Pulling Lubricant Data X

1.4 A. 2. a. Certification by Manufacturer X

1.4 A. 2. b. Certification by Contractor X

1.4 A. 1. b. 1) Conductor and Cable Electrical Ratings and Insulation Type Data

26 05 26 Grounding and Bonding for Electrical Systems

1.4 A. 1. Shop Drawings – Data and Plans X X

1.4 A. 2. Test Reports – Ground Resistance X

1.4 A. 3. Certifications X

26 05 33 Raceway and Boxes for Electrical Systems X

1.4 A. 1. a. Shop Drawings: Size and Location of Main Feeders X

1.4 A. 1. b. Shop Drawings: Size and Location of Main Panels and Pull Boxes X

1.4 A. 1. c. Shop Drawings: Layout of Conduit Penetrations through Structural Elements X

1.4 A. 1. d. Product Data: Raceway, Conduit Bodies, Fittings, Junction and Pull Boxes X

1.4 A. 2. a. Certification by Manufacturer X

1.4 A.2. b. Certification by Contractor X

26 05 41 Underground Electrical Construction

1.4 A. 1. a. Shop Drawings: Demonstrate Compliance X

1.4 A. 1. b. Shop Drawings: Pull boxes, Ducts and Hardware X X

1.4 A 2. a. Certification by Manufacturer X

1.4 A. 2. b. Certification by Contractor X

26 56 00 Exterior Lighting

1.4 A. 1.

Shop Drawings: Demonstrate Compliance including Lighting Fixture Data including Material and Construction, Dimensions, Wiring

Diagrams, Installation Details, Energy Efficiency Data, Photometrics, LED Driver Data, and US DOE Lighting Facts Label and IES L70

Rated Life. X X X X X X

1.4 A. 1. j.

Site Plans: Submit Site Plans Showing All Exterior Lighting Fixtures with Fixture Tags. Show Computer Generator Point-by-Point

Illumination Calculations. Include Lumen and Light Loss Factors in the Calculations X X X X X X

1.4 A. 2. a.

Complete Maintenance and Operation Manuals including Technical Data Sheets, Wiring Diagrams Factory Recommendations for

Ordering Replacement Parts X X X X X X X

1.4 A. 3. a. Certification by Contractor X

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations

1.7. A Parts List X

1.7. B Manufacturer Product Information X

1.7.C Source Quality Control X

1.7. D Installer Qualifications X

1.7. E Delegated Design Submittals X

1.7. F Equipment Anchor and Supports X

1.7. G Test Equipment List X

1.7. H.1 Telecom Space Drawings (Plans/Elevations) X

1.7. H.2 Telecom Logical Drawings X

1.7. H.3 Access Panel Schedule X

1.7. I Sustainable Design Submittals X

1.7. J Electronic Certified Test Reports X

1.8. A.1 Warranty Certificate X

1.8. A.2 Inspection Reports X

1.8. A.3 Record Documents X

1.8. A.4 Instruction Manuals X

1.8. B O&M Manuals X

1.8.C Record Wiring Diagrams X

01 33 00 - 3

1.8. D Service Qualifications X

1.9 Maintenance Material Submittals X

1.1 Quality Assurance Submittals X

27 05 26 Grounding and Bonding for Communications Systems

1.5 Riser Diagrams X X

1.5 Busbar Test Reports X X

2.1 Bonding Busbar X X X

2.3 Telecommunications Bonding Backbone X X X

2.4 Bonding Conductors X X X

2.5 Overvoltage Surge Protectors X X X

27 05 33 Raceways and Boxes for Communications Systems

1.3. A.1 Size and Location of Cabinets, Splice Boxes, and Pull Boxes X

1.3. A.2 Conduit Penetrations Through Structural Elements X

1.3. A.3 Catalog cuts marked with specific item proposed and area of application identified X

1.3. B Final Inspection Certification Letter X

2.1. B Conduits X

2.1.C Conduit Fittings X

2.1. D Conduit Supports X

2.1. E Outlet, Splice, and Pull Boxes X

2.1 F Warning Tape X

2.1. G Flexible Nonmetallic Communications Raceway (Innerduct) and Fittings X

2.1. I Weatherproof Outlet Boxes X

27 10 00 Control, Communication, and Signal Wiring

2.1 Computer Room Backbone Structured Cabling X

2.2 Computer Room Horizontal Structured Cabling X

2.3 Facility Backbone Structured Cabling X

2.4 Facility Horizontal Structured Cabling X

27 15 00 Communications Structured Cabling

1.2 Certification X X

1.2 Closeout Submittal X X

DIVISION 31 – EARTHWORK

31 20 00 - Earthwork

1.6 SHOP DRAWINGS X X X

1.6 PRODUCT DATA X X X X

1.6 SAMPLES X X X X

DIVISION 32 – EXTERIOR IMPROVEMENT

32 05 23 Cement and Concrete for Exterior Improvement

1.5 A-D Shop Drawings, Product Data, & Samples x X X

1.5 E. Test Reports X

1.5 F Certifications X

1.5 G. Qualifications X

1.5 H-I. Concrete and Subbase Job-mix Design X

1.5 J. Hot/Cold Weather Methods X

1.5 K. Surveyor’s Staking Notes X

32 12 16 Asphalt Paving

1.5 A-B. Shop Drawings, Product Data, & Samples X X X

1.5 C. Test Reports X

1.5 D. Certificates X

1.5 E. Safety Data Sheets X

01 33 00 - 4

32 14 16 Brick Unit Paving

1.4 Shop Drawings, & Samples X X X X X

1.4 Manufacturer’s Instructions &Product Data X X

32 17 23 Pavement Markings

1.4 A-D. Submittal Drawings, Product Data, and Samples X X X X X

1.4 E-F. Certifications and Qualifications X X

01 33 00 - 5 image2.emf

BM: 698.27

COL.

FENCES

WALL

HILL DR.

IS

E E

WWWWW

T W W

15' BC TO BC

13.75' FOC TO FOC

PER 5/CS502

PER 12/CS501

PER 11/CS501

6 6

6 8

17 7

8 6

222323 232323

5'5'

R60' R40

R35'

CS102 CS101

CS103

CS104

S1

CS101

SITE DEVELOPMENT PLAN

SITE DEVELOPMENT PLAN KEYNOTES

NOTE: CONTRACTOR SHALL REPLACE ANY ADA RAMPS DAMAGED DURING

DEMOLISHING PER MOST APPLICABLE RAMP DETAILS IN SHEET CS501 AND CS502.

SUBMIT RFI IF NOT CLEAR.

1. INSTALL ADA RAMP

2. FULL DEPTH ASPHALT PAVEMENT, SEE DETAIL 2/CS501

3. ADJUST CASTING TO GRADE

4. ASPHALT PAVEMENT OVERLAY, SEE DETAIL 1/CS501

5. INSTALL CURB INLET, SEE DETAIL 1/CS502

6. INSTALL CONCRETE CURB AND GUTTER, SEE DETAIL 8/CS501

7. INSTALL CONCRETE SIDEWALK, SEE DETAIL 13/CS501

8. TRAFFIC ARROW, THERMOPLASTIC, WHITE

9. REINSTALL SIGN

10. REINSTALL LIGHTING POLE PER MANUFACTURER'S RECOMMENDATIONS

11. INSTALL CATCH BASIN, SEE DETAIL 2/CS502

12. EXTEND EXISTING STORM PIPE

13. ROLL CURB DETAIL WITH REVERSED SLOPE GUTTER, SEE DETAIL 4/CS501

14. 12" CONCRETE SLAB ON 12" COMPACTED GRANULAR FILL

15. 6' x 12' ALUMINUM PREFABRICATED BUS SHELTER WITH BENCH, SEE

SPECIFICATION 10 73 43 AND CUT SHEETS IN APPENDIX 08 FOR MORE

INFORMATION

16. FILL GAP B/W CURB AND SIDEWALK WITH CAULK

17. PEDESTRIAN CROSSING SIGN, SEE DETAIL 14/CS501

18. INSTALL CONCRETE CURB, SEE DETAIL 9/CS501

19. INSTALL BRICK ENTRANCE MONUMENT AND PLACARD, TO MATCH THE

EXISTING

20. VALEY CURB AND GUTTER, SEE DETAIL 3/CS502

21. REINSTALL TENT AND HANDRAIL

22. STOP BAR, PAINTED, WHITE, 12" WIDE, THERMOPLASTIC

23. PAVEMENT MARKING, PAINTED, DOUBLE YELLOW, 4" WIDE

24. PEDESTRIAN CROSSING PAVEMENT MARKING, THERMOPLASTIC, WHITE, 24"

WIDE

25. RETAINING WALL, SEE DETAIL 10/CS502

26. 6 FT LONG CONCRETE CURB PARKING STOPS 9" X 5.5" HIGH

27. HANDICAP SIGN INSTALLED IN BOLLARD, SEE DETAIL 11/CS502

14177

Polygon image3.emf