This solicitation is for replacing the Building 123 mental health emergency generator and switchboard at the VA Medical Center in Milwaukee, Wisconsin. The solicitation number is 36C25222B0028. The work includes installing a new 600kW bi-fuel diesel emergency generator, 1200A automatic transfer switches, 1200A service entrance equipment, and associated electrical distribution components. Bids are due by February 15, 2022 and the period of performance is 270 calendar days. The solicitation is set aside for verified service-disabled veteran-owned small businesses. The total estimated price is $2,000,000 to $5,000,000. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

A. REFER TO SHEET F000 FOR GENERAL NOTES.

FIRE SUPPRESSION DEMOLITION PLAN NOTES

1. COORDINATE WITH EXISTING FIRE RISER/VALVE FOR SYSTEM SHUTDOWN

PRIOR TO COMMENCING WORK.

2. REMOVE PORTION OF EXISTING FIRE SUPPRESSION PIPING FOR NEW CMU

WALL.

3. REMOVE PORTION OF EXISTING FIRE SUPPRESSION PIPING FOR NEW FIRE

SUPPRESSION PIPING.

4. REMOVE EXISTING RECESSED STYLE FIRE SPRINKLER HEAD AND PREPARE

EXISTING PIPING FOR NEW STYLE HEAD.

5. REMOVE EXISTING FIRE SUPPRESSION PIPING AND FIRE SPRINKLER HEAD

FOR NEW RADIATOR EXHAUST DUCTWORK.

GARAGE

E133

OLD GENERATOR

E108

ELEC.

E107

EXISTING FIRE

SUPPRESSION HEAD (TYP)

EXISTING FIRE SUPPRESSION

BRANCH PIPE (TYP)

EXISTING FIRE SUPPRESSION

MAIN PIPE (TYP)

4 4

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

FXD101

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"FXD101

1 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN

Revisions: Date:

DN

FIRE SUPPRESSION GENERAL NOTES

A. SEE SHEET F000 FOR FIRE SUPPRESSION GENERAL NOTES.

FIRE SUPPRESSION PLAN NOTES

1. COORDINATE WITH EXISTING FIRE RISER/VALVE FOR SYSTEM SHUTDOWN

PRIOR TO COMMENCING WORK.

2. INSTALL NEW FIRE SUPPRESSION PIPING THROUGH NEW CMU WALL.

3. INSTALL NEW FIRE SUPPRESSION PIPING AND FIRE SPRINLER HEAD.

4. INSTALL NEW UPRIGHT FIRE SPRINKLER HEAD AT THIS LOCATION.

5. INSTALL NEW FIRE SUPPRESSION PIPING AND FIRE SPRINKLER HEADS FOR

NEW RADIATOR EXHAUST DUCTWORK.

EXISTING FIRE SPRINKLER

HEAD (TYP)

EXISTING FIRE SUPPRESSION

BRANCH PIPE (TYP)

EXISTING FIRE SUPPRESSION

MAIN PIPE (TYP)

NEW FIRE SUPPRESSION

BRANCH PIPE

NEW FIRE

SPRINKLER HEAD

OLD GENERATOR

E108

ELEC.

E107

GENERATOR

E133A

GARAGE

E133

4 4

NEW FIRE

SPRINKLER HEAD

NEW FIRE

SPRINKLER HEAD

NEW FIRE SUPPRESSION

BRANCH PIPE4

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

FX101

FIRST FLOOR FIRE SUPPRESSION

PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"FX101

1 FIRST FLOOR FIRE SUPPRESSION PLAN

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING

TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING

TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

MECHANICAL ABBREVIATIONS

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIALLY LEFT BLANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL

VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED

BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

GENERAL PIPING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45o OR 90o

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES

SEE DETAIL

FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

SEE DETAIL

THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

SEE DETAIL

THERMOMETER

BOTTOM CONNECTION, 45o OR 90o

PRESSURE GAGE

VENTURI FLOW METER

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE / TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

QUICK-COUPLE HOSE CONNECTOR

DN

DN

UP

UP

DNUP

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 1-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION

SQUARE 2-WAY CEILING DIFFUSERS

FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE REMOVED

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL SECTIONS.)

FLEXIBLE DUCTWORK (INSULATED)

DUCT WITH SOUND LINING

MANUAL VOLUME DAMPER

FIRE DAMPER

BACK DRAFT DAMPER

//FIRE//SMOKE//DAMPER

(VA DOES NOT ALLOW COMINATION FIRE/SMOKE DAMPERS.)

POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC

PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE

CLASS (IN. OF WATER) WHICH WILL ACCOMMODATE

MAXIMUM OPERATING PRESSURE IN THE DUCT

SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT

UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL

APPEARS. A "N" SUPERSCRIPT INDICATES NAGTIVE

PRESSURE.

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

STAINLESS STEEL DUCT

MANUAL SPLITTER DAMPER

STANDARD BRANCH SUPPLY, NO SPLITTER (45O TAP)

STANDARD BRANCH RETURN, NO SPLITTER (45o TAP)

DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)

DUCT MOUNTED COIL (ELECTRIC)

FC

BDD

FD

VD

N 2 1

//F//S// DPR

1/2

SUPPLY

RETURN

45°

45°

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

VIEW TITLE

NORTH ARROW

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

DRAWING SYMBOLS

XX-X X

EQUIPMENT NUMBER

BUILDING NO. WHERE EQUIPMENT IS LOCATED

EQUIPMENT ABBREVIATION

UNIT NUMBER TAG

MB

AIR TERMINAL SYMBOLS

TERMINAL UNIT WITH REHEAT COIL

DOUBLE DUCT MIXING BOX

FAN POWERED VARIABLE VOLUME. TERMINAL UNIT

WITH HEATING COIL.

PTAC

A

TWU

A FCU

FCU

A

TERMINAL UNIT SYMBOLS

CONVECTOR OR RADIATOR (RECESSED)

CONVECTOR OR RADIATOR (WALL HUNG)

FLOOR MOUNTED VERTICAL RECESSED FAN COIL

UNIT. LETTER INDICATES UNIT SIZE.

FLOOR MOUNTED VERTICAL CABINET FAN COIL UNIT.

LETTER INDICATES UNIT SIZE.

THRU WALL AIR CONDITIONING UNIT. LETTER

INDICATES UNIT SIZE.

WINDOW TYPE AIR CONDITIONING UNIT. LETTER

INDICATES UNIT SIZE.

FLOOR MOUNTED HEAT PUMP. LETTER INDICATES

UNIT SIZE.

AIR CURTAIN

UNIT HEATER (HORIZONTAL)

UNIT HEATER (VERTICAL)

2'x2' RADIANT CEILING PANEL

2'x4' RADIANT CEILING PANEL

PTACA

T

TT

M

MT

PT

TT

FT

IT

CT

SPS

SD

PDT

KR

TSL

HS

ZC

LC

LT

PDS

TSH

MECHANCAL CONTROL SYMBOLS

ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT

ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL

MOUNT

TEMPERATURE TRANSMITTER

TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRASMITTER

STATIC PRESSURE SENSOR

FLOW TRANSMITTER

CURRENT TRANSMITTER

CONDUCTIVITY TRANSMITTTER

SMOKE DETECTOR

PRESSURE DIFFERENTIAL TRANSMITTER

PRESSURE DIFFERENTIAL SWITCH

HAND SWITCH (HAND-OFF-AUTO SWITCH)

VALVE OR DAMPER POSITION CONTROLLER

LOCAL RECORDING TIME CLOCK (RUNTIME)

TEMPERATURE SWITCH, LOW (FREEZESTAT)

TEMPERATURE SWITCH, HIGH (FREEZESTAT)

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SWITCH HIGH

PRESSURE SWITCH LOW

ELECTRONIC TO PNEUMATIC TRANSDUCER

CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

OCCUPANCY SENSOR

LOCAL TEMPERATURE CONTROL PANEL

HVAC CONTROL PANEL

VARIABLE SPEED MOTOR CONTROLLER

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TEMPERATURE CONTROLLER. SEE SEQUENCE OF

OPERATION

PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION

SPEED CONTROLLER. SEE SEQUENCE OF OPERATION

FLOW CONTROLLER. SEE SEQUENCE OF OPERATION

FLOW SWITCH HIGH

FLOW SWITCH LOW

TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE

TEMPERATURE SENSING ELEMENT FOR TRANSMITTING

TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM

LENGTH IN DUCT WHEN SPACE PERMITS.)

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

MOTOR STARTER

ELECTRIC OPERATED CONTROL DAMPER / OR VALVE

PSH

PSL

EPT

AT

CO2

AT

CO

AT

OC

KC

FSL

FSH

FC

SC

PC

TC

LTCP

HVAC

ECC

VSMC

A

M

LC

M

VALVE SYMBOLS

GATE VALVE - THREADED / FLANGED

GLOBE VALVE - THREADED / FLANGED

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE

CONNECTOR

FLEXIBLE CONNECTION

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

CIRCUIT SETTER VALVE

PRESSURE SAFETY VALVE

GATE VALVE WITH GLOVE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLED

FLOW METER

A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.

B. THE FIRST FIGURE OF DUCT SIDE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.

DUCT SIZES ARE NET INSIDE DIMENSIONS.

C. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,

DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH

MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

D. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

E. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

F. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF

CEILING DIFFUSERS, REGISTERS, AND GRILLES.

MECHANICAL GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONSGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

T

MECHANICAL DEMOLITION GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

MECHANICAL DEMOLITION PLAN NOTES

1. REMOVE EXISTING FUEL OIL PUMP, PIPING, CONTROLS AND ACCESSORIES.

2. REMOVE EXISTING RADIATOR EXHAUST DUCTWORK AND SHROUD. REMOVE

EXISTING CONTROL DAMPERS, ACTUATORS, ASSOCIATED PNEUMATIC

PIPING, AND ACCESSORIES.

3. REMOVE EXISTING GENERATOR ENGINE EXHAUST AND DRAIN PIPE THROUGH

ROOF. COORDINATE PATCH AND REPAIR AS REQUIRED.

4. REMOVE EXISTING CONTROL DAMPER, ACTUATOR, AND ASSOCIATED

PNEUMATIC PIPING COMPLETE.

5. REMOVE EXHAUST GRILLE AND ASSOCIATED DUCTWORK SERVING EXISTING

GENERATOR ROOM. CAP AND SEAL DUCT AT MAIN.

6. REMOVE EXISTING DUCTWORK AND ASSOCIATED HANGERS, SUPPORTS, AND

ACCESSORIES FOR NEW WALLS.

7. REMOVE AND RELOCATE EXISTING GARAGE UNIT HEATER, VALVES AND

CONTROLS.

8. REMOVE EXISTING GARAGE UNIT HEATER, VALVES AND CONTROLS.SALVAGE

BACK TO OWNER.

9. REMOVE EXISTING HEATING HOT-WATER PIPING AS SHOWN..

10. UTILIZE EXISTING HEATING HOT-WATER VALVES FOR SYSTEM SHUTDOWN.

11. REMOVE AND RELOCATE GARAGE HEATER THERMOSTAT.

12. EXISTING UNIT HEATER TO REMAIN.

13. RELOCATE EXISTING STORM PIPING FOR NEW LOUVER IN THIS LOCATION.

EX

123-UH-3

EX

123-UH-2

EX

123-UH-1

x x

24x24

6 6

16x16 EA

16x16 EA

EX 16x16 EA

UP TO EF

EX 24x24 EA

UP TO EF

EX 4"ST

VERTICAL PIPING

EX 18x6 EA

VERTICAL DUCT

EX 18x6 EA

VERTICAL DUCT

24x12

EX FUEL OIL PIPING TO

UNDERGROUND TANK

x E

A

3/4"

3/4"

3/ 4" 3/

4"

3/4"

3/4"

3/ 4"

3/ 4"

EX 1"HHWS/R

EX 3/4"HHWS/R

6 6

GARAGE

E133

OLD GENERATOR

E108

ELEC.

E107

EX

123-UH-4

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

MD101

FIRST FLOOR MECHANICAL

DEMOLITION PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"MD101

1 FIRST FLOOR MECHANICAL DEMOLITION PLAN

N

123-EF-1

EX 24x24

EA DN

EX

123-EF-2

EX 16x16

EA DN

EX 8Ø

EA DN

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

MECHANICAL DEMOLITION GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

MECHANICAL DEMOLITION PLAN NOTES

1. REMOVE AND RELOCATE EXISTING ROOF-MOUNTED EXHAUST FAN.

2. EXISTING EXHAUST FAN TO REMAIN.

3. REMOVE EXISTING GENERATOR EXHAUST THROUGH ROOF. REMOVE ALL

ASSOCIATED COMPONENTS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

MD102

ROOF MECHANICAL DEMOLITION

PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MD102

1 ROOF HVAC PLAN

MECHANICAL HVAC GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

MECHANICAL HVAC PLAN NOTES

1. NEW 24x18 EXHAUST DUCT THROUGH SIDEWALL AND UP THROUGH ROOF.

RESTORE ORIGINAL GARAGE EXHAUST OPERATION.

2. CONNECT NEW EXHAUST DUCTWORK TO EXISTING EXHAUST DUCTWORK IN

THIS LOCATION.

3. INSTALL 24x12 EA DN WALL AND TERMINATE AT 12" A.F.F. PROVIDE VERTICAL

DUCT SUPPORTS AND MIDSPAN AND BOTTOM OF VERTICAL DUCT. INSTALL

VERTICAL DUCT EAST OF EXTERIOR WINDOW.

4. RELOCATED GARAGE UNIT HEATER. PROVIDE NEW HANGERS SECURED TO

STRUCTURE.

5. LOUVER PLENUM WITH MOTORIZED AMCA CLASS 1A LOW LEAKAGE CONTROL

DAMPERS.

6. INSTALL 2'-0" LONG 12x12 EA DUCT FROM ROOF MOUNTED EXHAUST FAN.

7. INSTALL NEW UNIT HEATER ALONG WALL AT 10'-0" A.F.F.

8. ENTIRE GENERATOR ENGINE EXHAUST DUCTWORK SHALL BE AN

ENGINEERED SYSTEM. COORDINATE WITH GENERATOR MANUFACTURER.

PROVIDE NECESSARY EXPANSION JOINTS, CLEANOUTS, FITTINGS,

EXPLOSION RELIEF, DRAIN, FIRESTOPS, ETC. REFER TO DIVISION 26

SPECIFICATIONS AND DETAIL ON SHEET MM600.

9. SLOPE BOTTOM OF DUCT TO DRAIN LOCATION.

24x18 EA x E

A E

X x E

A

24x12 EA x E

A

EX

123-UH-3

MM600

EX

123-UH-2

123-UH-5

ELEC.

E107

OLD GENERATOR

E108

GENERATOR

E133A

GARAGE

E133

16x16 EA

16x16 EA

EX 16x16 EA

UP TO EF

x E

A

EX

123-UH-4

24x18 EA

UP TO EF

24x12 EA DN

54x46 EA UP TO

ROOF HOOD

8Ø GENERATOR

EXHAUST UP

GENERATOR

SILENCER

8Ø EA DN TO

GENERATOR

54x46 EA TO

GENERATOR

12x12 EA UP TO

EXHAUST FAN

GAS METER

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

MH101

FIRST FLOOR MECHANICAL HVAC

PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"MH101

1 FIRST FLOOR MECHANICAL HVAC PLAN

123-RH-1

EX

123-EF-1

8Ø GENERATOR EXHAUST OUTLET,

8Ø GENERATOR EXHAUST DN

EX

123-EF-2

24x18 EA DN

EX 16x16

EA DN

54x46 EA TO 123-RH-1, 54X46 EA DN

123-EF-3

12x12 EA DN

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

MECHANICAL HVAC GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

MECHANICAL HVAC PLAN NOTES

1. NEW LOCATION FOR EXISTING EXHAUST FAN. CONNECT NEW DUCTWORK TO

EXISTING FAN IN SAME MANNER AS EXISTING CONDITION.

2. NEW RELIEF HOOD FOR GENERATOR RADIATOR AIRFLOW REQUIREMENT.

CONNECT NEW DUCTWORK TO HOOD. ALIGN HOOD TO NORTH LINE OF

DUCTWORK FOR TRANSITION/OFFSET TO KEEP HOOD FURTHER AWAY FROM

ROOF EDGE.

3. NEW GENERATOR EXHAUST OUTLET. REFER TO SECTIONS AND DETAILS FOR

SCOPE OF WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \a s w a n s o n \D o c u m e n ts

\1 .1

.1

M E

P v a s w a n s o n Q

P Z

X

.r v t

/1

/2

:5

:1

P

M

MH102

ROOF MECHANICAL HVAC PLAN

GUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MH102

1 ROOF HVAC PLAN

T

MECHANICAL PIPING GENERAL NOTES

A. REFER TO SHEET M000 FOR G ENERAL NOTES.

MECHANICAL PIPING PLAN NOTES

1. RELOCATED GARAGE UNIT HEATER THERMOSTAT.

2. RELOCATED EXISTING GARAGE UNIT HEATER.

3. GAS CONNECTION SHALL INCLUDE DRIP LEG AND FLEX CONNECTION IN

ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

4. PROVIDE STEP DOWN REGULATOR (1 PSI) WITH MINIMUM 10' PIPING LENGTH

BETWEEN REGULATOR AND GENERATOR CONNECTION.

5. INSTALL 3/4" DRAIN FROM BOTTOM OF RADIATOR EXHAUST DUCT TO

OUTDOORS. SLOPE MINIMUM 1/8"/FT. PROVIDE WIRE SCREEN AT BUILDING

WALL TERMINATION.

6. LOCATE NEW NATURAL GAS PIPING ABOVE EXHAUST DUCT IN THIS AREA.

7. LOCATE NEW NATURAL GAS PIPING ALONG WALL AND NOT ABOVE NEW

ELECTRICAL EQUIPMENT FOOTPRINT IN THIS AREA.

8. RELOCATED STORM PIPING FOR NEW LOUVER. ROUTE TO EXISTING

LOCATION BELOW LOUVER.

EX

123-UH-3

EX

123-UH-2

123-UH-5

3/4" C

ELEC.

E107

OLD GENERATOR

E108

GENERATOR

E133A

GARAGE

E133

3/4"HHWS/R

EX 1"HHWS/R

EX 3/4"HHWS/R

3/4"HHWS/R

3/4"HHWS/R

3/4"HHWS/R

GAS METER

1 1/4" NG 67

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/1

/2

:0

:4

P

M

MP101

FIRST FLOOR MECHANICAL

PIPING PLANGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"MP101

1 FIRST FLOOR MECHANICAL PIPING PLAN

Level 1 100' - 0"

Level 2 114' - 0" x E

A

123-UH-5

123-RH-1

CATALYZED EXHAUST

SILENCER BY GENERATOR

MANUFACTURER

STAINLESS STEEL FLEXIBLE

WYE CONNECTION TO

GENERATOR EXHAUST BY

GENERATOR MANUFACTURER

123-EF-3

ø

E A ø

E A

12x12 EA

NOTES:

1. EMERGENCY GENERATOR SHALL BE INTERLOCKED WITH D3. WHEN EMERGENCY

GENERATOR IS ENERGIZED D3 SHALL OPEN. WHEN EMERGENCY GENERATOR IS

DE-ENERGIZED D3 SHALL CLOSE, PROVIDED ROOM EXHAUST FAN IS OFF.

2. ROOM EXHAUST FAN SHALL BE INTERLOCKED WITH D3 & ROOM THERMOSTAT T1.

WHEN ROOM THERMOSTAT RISES ABOVE 85°F ROOM EXHAUST FAN SHALL

RUN & D3 SHALL OPEN. WHEN ROOM THERMOSTAT DROPS BELOW 80°F

ROOM EXHAUST FAN SHALL STOP & D3 SHALL CLOSE, PROVIDED EMERGENCY

GENERATOR IS DE-ENERGIZED.

3. POWER OPERATED, OPPOSED BLADE, DAMPERS D1 & D2 SHALL BE INTERLOCKED

WITH ROOM THERMOSTAT T2 SET AT 60°F. ON A RISE IN ROOM

TEMPERATURE ABOVE 60°F D1 SHALL MODULATE OPEN & D2 SHALL

MODULATE CLOSED. ON A DROP IN ROOM TEMPERATURE BELOW 60°F, D1

SHALL MODULATE CLOSED & D2 SHALL MODULATE OPEN.

4. UNIT HEATER SHALL BE INTERLOCKED WITH ROOM THERMOSTAT T3 SET

AT 65°F. ON A DROP IN ROOM TEMPERATURE BELOW 63°F ELECTRIC

UNIT HEATER SHALL BE ENERGIZED & ON A RISE IN ROOM TEMPERATURE ABOVE 67°F.

UNIT HEATER

INTAKE

LOUVER

ROOM

EXHAUST

FAN

FLEXIBLE

CONNECTION

D2

PLENUMD1

EXHAUST

LOUVERS

EMERGENCY

GENERATOR

ACD

T-1

T

T-3

T

T-2

T

DAMPERS SEQUENCE OF CONTROLS:

OPEN RADIATOR INTAKE DAMPERS AND DISCHARGE DAMPERS TO

LOUVERED PENTHOUSE UPON GENERATOR ACTIVATION. THE DISCHARGE

PLENUM RECIRCULATION DAMPERS SHALL BE CLOSED.

WHEN THE OUTDOOR REFERENCE TEMPERATURE IS BELOW 40 F

(ADJUSTABLE), THE DISCHARGE PLENUM RECIRCULATION DAMPERS SHALL

MODULATE OPEN AND THE RADIATOR INTAKE DAMPERS SHALL MODULATE

CLOSED TO MAINTAIN A ROOM TEMPERATURE OF 60 F (ADJUSTABLE). THE

DAMPER POSITIONS SHALL BE CALIBRATED TO AVOID

OVERPRESSURIZATION OF THE ROOM.

D3

COIL

TEST PLUG (TYP.)

REDUCER, IF REQUIRED

WATER

RETURN

MANUAL AIR VENT

UNION CONNECTIONS

(TYP.)

WATER

SUPPLY

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

MV

MODULATION CONTROL

VALVE

RAIN SHIELD

ROOF

ENGINE EXHAUST PIPE

SIZE AS RECOMMENDED

BY MANUFACTURER

MUFFLER, SIZE AS

RECOMMENDED BY

MANUFACTURER

THIMBLE OUTER SLEEVE

EXHAUST PIPE, SIZE AS

RECOMMENDED BY

MANUFACTURER.

305mm (12") LONG

DRIP

LEG WITH DRAIN

VALVE

FLASHING & ROOF

OPENING

BY ARCHITECTURE

THIMBLE INNER SLEEVE

CLEARANCE AS REQUIRED BY

THIMBLE MANUFACTURER &

ARCHITECT

45° 45°

(1

M

IN

m m

(1

M

IN

m m

NOTE:

1.

2.

SECURE HOOD TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm] ON CENTER.

SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION

BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS (MENTAL DECK & BAR

JOIST ROOF).

GRAVITY BACKDRAFT

DAMPER.

SEE

NOTE

PREFABRICATED ROOF

CURB

WOOD NAILING STRIP

TRANSITION DUCT TO

FULL SIZE OF

DAMPER SUPPLIED

WITH HOOD

ROOF

SEE NOTE 2

SEE NOTE 1

CURB CAP

FACTORY ASSEMBLED

HINGED HOOD WITH

LATCH & BIRD

SCREEN

DUCT (WHEN

SHOWN)

1 1/4" NG

GAS METERGENERATOR

3000 MBH

2 PSI GAS METER

TOTAL CONNECTED LOAD: 3000 MBH

TOTAL EQUIVALENT LENGTH (WITH 25% FOR

FITTINGS): 50 FEET

SIZED PER NFPA 54 ANSI Z223.1, 2021 EDITION, TABLE

6.2.1(E), 2.0 PSI INLET PRESSURE WITH 1.0 PSI DROP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/1

/2

:0

:4

P

M

MM600

MECHANICAL SCHEDULES,

DETAILS, AND SECTIONSGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 CDH AJS

100% BID

DOCUMENTS

FULLY SPRINKLERED

REMARKS:

1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.

2. PROVIDE WITH BIRDSCREEN AND 18 INCH ROOF CURB.

3. PROVIDE WITH ALUMINUM CONSTRUCTION. OVERALL SIZE IS 108" x 54" x 68" HIGH (WITH CURB).

SCALE: 3/8" = 1'-0"MM600

1 GENERATOR ROOM MECHANICAL SECTION 1

NOT TO SCALEMM600

3 EMERGENCY GENERATOR ROOM CONTROLS

NOT TO SCALEMM600

TERMINAL UNIT WATER COILS - PIPING

CONNECTIONS

HOOD SCHEDULE

IDENTITY DATA AIRFLOW DATA

REMARKSMARK MANUFACTURER MODEL

OPERATING

WEIGHT (LBS) LOCATION AIRFLOW (CFM) THROAT SIZE (IN) SERVICE

PRESSURE DROP

(IN WC)

123-RH-1 GREENHECK WRH-40x94 350 E133A GENERATOR 30,100 40 x 94 EXHAUST 0.20 1 - 3

UNIT HEATER SCHEDULE

IDENTITY DATA AIRFLOW DATA HEATING DATA ELECTRICAL DATA

REMARKSMARK MANUFACTURER MODEL

OPERATING

WEIGHT (LBS) AIRFLOW (CFM) ESP (IN WG) EAT (°F) LAT (°F)

CAPACITY

(BTUH) EWT (°F) LWT (°F)

FLOWRATE

(GPM)

WPD (FT

WG)

VOLTAGE /

PHASE FLA MCA / MOCP

123-UH-5 STERLING HS-118A 200 500 0.10 60 90 16,200 160 140 1.75 3 120 / 1 1 1 / 15 1 - 2

REMARKS:

1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.

2. PROVIDE WITH WALL SUPPORTS FOR INSTALLATION.

EXISTING MECHANICAL EQUIPMENT

MARK TYPE LOCATION SERVES

EX 123-EF-1 EXHAUST FAN E133 ROOF E133 GARAGE

EX 123-EF-2 EXHAUST FAN E108 ROOF E108 STORAGE

EX 123-UH-2 UNIT HEATER E133 GARAGE E133 GARAGE

EX 123-UH-3 UNIT HEATER E133 GARAGE E133 GARAGE

EX 123-UH-4 UNIT HEATER E108 GARAGE E133 GARAGE

EXHAUST FAN SCHEDULE

IDENTITY DATA AIR DATA SOUND DATA ELECTRICAL DATA

REMARKSMARK MANUFACTURER MODEL TYPE DRIVE WEIGHT (LBS) AIRFLOW (CFM) ESP (IN WG) RPM INLET (SONES) VOLTAGE / PHASE BHP NOM HP

123-EF-3 GREENHECK G-090-VG CENT UPBLAST DIRECT 50 500 0.50 1600 7.8 120 / 1 0.10 0.10 1 - 5

REMARKS:

1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.

2. PROVIDE WITH EC MOTOR WITH DIAL ON EXTRACTOR HOUSING (MOUNTED AND WIRED).

3. PROVIDE WITH INTEGRAL NEMA-1, TOGGLE DISCONNECT SWITCH (MOUNTED AND WIRED).

4. PROVIDE WITH GRAVITY BACKDRAFT DAMPER (SHIPPED LOOSE).

5. PROVIDE WITH 18 INCH INSULATED ROOF CURB.

Revisions: Date:

NOT TO SCALEMM600

5 EMERGENCY GENERATOR EXHAUST

NOT TO SCALEMM600

6 LOW-SILHOUETTE EXHAUST OR INTAKE HOOD

NOT TO SCALEMM600

2 NATURAL GAS PIPING SCHEMATIC

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPS

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

AUTOMATIC TRANSFER SWITCH

CEILING

CIRCUIT BREAKER

COLOR TEMP CONTROL

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

MAIN SWITCHBOARD

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WALL PHONE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

ATS

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

MSB

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

W

WR

XFMR

ZSI

A. FOR 120V, 20A BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS. RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8

AWG CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780

AND UL 96A REQUIREMENTS.

D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

G. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

H. OVERCURRENT PROTECTIVE DEVICE (OCPD) COORDINATION STUDY, AVAILABLE SHORT CIRCUIT CURRENT CALCULATIONS, AND ARC FLASH ENERGY CALCULATIONS AND EQUIPMENT LABELING REQUIREMENTS:

a. CONTRACTOR SHALL PROVIDE AND RECEIVE APPROVE FOR OCPD COORDINATION STUDY BEFORE ANY

ELECTRICAL EQUIPMENT SHOP DRAWINGS ARE SUBMITTED FOR REVIEW.

b. CONTRACTOR SHALL SURVEY ALL EXISTING TO REMAIN ELECTRICAL POWER DISTRIBUTION EQUIPMENT, SPECIFIC OCPD MANUFACTURER, MODEL AND SETTINGS; TRANSFORMERS, CABLE TYPES AND LENGTHS, AND OTHER INFORMATION REQUIRED TO PROVIDE A COMPLETE OCPD COORDINATION STUDY IN

BUILDING 123 FOR NEW AND EXISTING EQUIPMENT.

c. OCPD COORDINATION STUDY SHALL START ON PRIMARY SIDE OF 13.2 KV MEDIUM VOLTAGE

TRANSFORMER FEEDING THE BUILDING AND ANALYSIS DOWN TO ALL PANELS, AND EQUIPMENT

DISCONNECT SWITCHES 100 AMPS OR LARGER.

d. CONTRACTOR MAY ASSUME THE AVAILABLE FAULT CURRENT ON THE PRIMARY SIDE OF 13.2 KV MEDIUM

VOLTAGE SERVICE TRANSFORMERS IS 8,000 AMPS.

e. AT ALL PANELS THE OCPD COORDINATION STUDY SHALL PROVIDE A TIME CURRENT CURVE (TCC) GRAPH INCLUDING THE LARGEST BRANCH/FEEDER CIRCUIT BREAKER IN PANEL, PANELS MAIN CIRCUIT BREAKER, AND AT LEAST THE MAIN CIRCUIT BREAKER OF DISTRIBUTION PANEL FEEDING PANEL.

f. NEW CIRCUIT BREAKER TYPES AND SETTINGS SHALL BE CHOSEN TO PROVIDE A SELECTIVELY

COORDINATED POWER DISTRIBUTION SYSTEM.

g. CONTRACTOR SHALL CREATE CALCULATIONS USING SKM POWER TOOLS FOR WINDOWS PROGRAM AND SHALL PROVIDE ALL SKM FILES CREATED TO PRODUCE THE (OCPD) COORDINATION STUDY WITH

SUBMITTAL FOR COORDINATION STUDY.

h. ARC FLASH WARNING LABELING SHALL BE PROVIDED BY CONTRACTOR FOR ALL NEW AND EXISTING

ELECTRICAL POWER DISTRIBUTION EQUIPMENT IN BUILDINGS 123.

I. IF A SINGLE NEUTRAL CONDUCTOR IS USED FOR MORE THAN ONE SINGLE PHASE CIRCUIT (SHARED NEUTRAL FOR MULTIWIRE BRANCH CIRCUIT) ALL THE 1-POLE CIRCUIT BREAKERS ASSOCIATED WITH THE SHARED NEUTRAL MULTIWIRE BRANCH CIRCUIT SHALL BE REPLACED WITH A SINGLE MULTIPLE POLE CIRCUIT BREAKER OF THE SAME AMPERAGE RATING THAT WILL DISCONNECT ALL CIRCUITS THAT SHARE A NEUTRAL CONDUCTOR AS REQUIRED BY NEC 210.4(B). FOR BIDDING PURPOSES CONTRACTOR SHALL ASSUME THERE ARE 6 SINGLE POLE CIRCUIT BREAKERS THAT WILL BE COMBINED TO TWO 3 POLE CIRCUIT BREAKERS IN EACH PANEL BEING REPLACED. CONTRACTOR SHALL VERIFY BEFORE ORDERING PANELS HOW MANY MULTIWIRE BRANCH CIRCUITS ARE RUN FROM EACH PANEL AND ORDER CORRECT NUMBER AND

TYPE OF BRANCH CIRCUIT BREAKERS FOR EACH PANEL.

J. ARC FLASH WARNING LABELING SHALL HAVE FOLLOWING INFORMATION PRINTED ON LABELTHAT CONTRACTOR SHALL PROVIDE ON EQUIPMENT: FLASH PROTECTION BOUNDARY DISTANCE, MIN. ARC RATING ENERGY, FLASH HAZARD DISTANCE, SHOCK HAZARD VOLTAGE, SHOCK LIMITED APPROACH DISTANCE, SHOCK RESTRICED APPROACH DISTANCE, PANEL NAME, AND AVAILABLE FAULT CURRENT AT EQUIPMENT;

SIMILAR TO ARC FLASH LABELS IN BUILDING 70.

K. SCHEDULING POWER OUTAGES: CONTRACTOR SHALL SUBMIT SCHEDULED POWER OUTAGE PLAN TO VA FOR REVIEW AND APPROVAL. FOR WORK THAT CAN BE COMPLETED IN LESS THAN 11 HOURS, CONTRACTOR TO DO WORK BETWEEN 6PM AND 5AM ON WEEKDAYS AND/OR WEEKENDS. WORK THAT WILL REQUIRE MORE THAN 11 HOURS TO COMPLETE SHALL BE LIMITED TO WEEKENDS WHICH SHALL BE ALLOWED TO BEGIN ON FRIDAYS AT 6PM AND MUST BE COMPLETE BY MONDAYS AT 2AM. CONTRACTOR TO COORDINATE THE

POWER OUTAGE WITH COR 3 WEEKS MINIMUM PRIOR TO THE WORK.

L. VERIFY VITAL LOADS: CONTRACTOR TO IDENTIFY VITAL LOADS ON PANEL SCHEDULE AND ENSURE PROPER NOTIFICATION IS GIVEN TO ALL PARTIES BEFORE ANY POWER OUTAGES. VITAL LOADS INCLUDE:

a. COMPUTER SERVERS

b. LAB EQUIPMENT

c. REFRIGERATORS AND FREEZERS

d. EMERGENCY ALARM AND COMMUNICATIONS EQUIPMENT

e. LIFE SAFETY DEVICES

M. FOR NEW OR REPLACED PANELS OR SWITCHBOARDS:

a. NO SPARE CIRCUIT BREAKERS SHALL BE FURNISHED IN PANELS.

b. A SURGE PROTECTION DEVICE (SPD) SHALL BE PROVIDED AT ALL ELECTRICAL SERVICE ENTRANCE

POWER DISTRIBUTION EQUIPMENT.

c. ALL CIRCUIT BREAKERS THAT ARE 200A OR LARGER SHALL HAVE AN ELECTRONIC TRIP UNIT WITH

ADJUSTABLE TRIP SETTINGS FOR: LONG TIME PICKUP, LONG TIME DELAY, SHORT TIME PICKUP, SHORT

TIME DELAY, AND INSTANTANEOUS TRIP.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

01/13/2022

B

IM

/2

V

A M ilw a u k e e

E m e rg e n c y G e n e ra to r B ld g

/2

V

A M ilw a u k e e

E m e rg e n c y G e n e ra to r B ld g

S E

S

.r v t

/1

/2

:2

:4

A

M

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONSGUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 KSB JMP

100% BID DOCUMENTS

SUBMITTAL

FULLY SPRINKLERED

ELECTRICAL FIXTURE

SYMBOLS

PLAN SYMBOL NAME

RECEPTACLE - DUPLEX - CONV

ELECTRICAL FIXTURE SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

ELECTRICAL GROUND BAR PROVIDE LENGTH AS REQUIRED TO ACCOMMODATE TERMINATIONS, MINIMUM 20" IN LENGTH. REFER TO

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

FIRE ALARM SYMBOLS

PLAN SYMBOL NAME

FIRE ALARM CONTROL PANEL -

SURFACE MOUNT

HORN AND STROBE

COMBINATION - WALL

MANUAL PULL STATION

MONITORING MODULE

LIGHTING DEVICE SYMBOLS

PLAN SYMBOL NAME

LIGHT SWITCH

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

SWITCHED RECEPTACLE

LIGHTING FIXTURE

SYMBOLS

PLAN SYMBOL NAME

EMERGENCY HATCH

INDUSTRIAL STRIP LIGHT

DATA SYMBOLS

PLAN SYMBOL NAME

WIRELESS ACCESS POINT -

CEILING

ONE LINE SYMBOL

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

CONTINUATION

ENCLOSED CIRCUIT BREAKER

GENERATOR

GENERATOR CONNECTION BOX

GROUND BAR

GROUNDING ELECTRODE

KEY INTERLOCK

PANEL BOARD

SURGE PROTECTIVE DEVICE

SWITCHBOARD

SWITCHBOARD/SWITCHGEAR

TRANSFORMER

ELECTRICAL EQUIPMENT SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

GENERATOR DOCKING STATION PROVIDE TRYSTAR, INC. DUAL-PURPOSE GENERATOR/LOADBANKNDOCKING STATION (OR PRIOR APPROVED EQUIVALENT) WITH VOLTAGE AND CURRENT RATINGS TO MATCH GENERATOR OUTPUT CIRCUIT BREAKER. PROVIDE ENCLOSURE WITH NEMA 3R CONSTRUCTION. PROVIDE WITH INTEGRAL CIRCUIT BREAKER SERVED FROM PERMANENT GENERATOR SOURCE KIRK KEY INTERLOCKED WITH ACCESS DOOR PROTECTING PORTABLE GENERATOR MALE 16 SERIES PANEL MOUNTS (CAM-LOKS). PROVIDE LOAD BANK FEMALE 16 SERIES PANEL MOUNTS (CAM-LOKS). PROVIDE WITH THE FOLLOWING OPTIONS: 2 WIRE AUTO START, BATTERY CHARGER NEMA 5-20 GFCI RECEPTACLE, AND BLOCK HEATER NEMA L5-30 RECEPTACLE. PROVIDE SEPARATE ELECTRICAL CONNECTIONS FROM PANEL UL-E1-123-6, CIRCUITS 9,11 TO SERVE BATTERY CHARGER AND BLOCK HEATER RECEPTACLES.

PROVIDE SIGN ON FRONT OF CABINET STATING THE FOLLOWING:

MAXIMUM GENERATOR CIRCUIT BREAKER SIZE: 1200 AMPS

GENERATOR SYSTEM IS A SEPARATELY DERIVED SYSTEM. BOND GENERATOR NEUTRAL AND GROUND

DATA SYMBOLS

PLAN SYMBOL NAME

WIRELESS ACCESS POINT -

CEILING

ST

PE

R

PL

AN

PER PLAN

PER PLAN

PE

R

PL

AN

F L O O R

. 9

F

LO

O R

. 9

F

LO

O R

.8

F L O O R

. 3

11"

11"

5"

8"

8"

E

LE

C P

IP

E

AR

T

WO

RK

E

C O N C R

ETE W

A

LK

ASPHALT

C

ON

C

RE

TE

C O N C R E T E

#5

HU

B

#5

HU

B

BU

ILD

ING

BU

ILD

ING

TRANSFORMER

EXISTING MEDIUM VOLTAGE CONDUIT

MATCHLINE - AREA E

M A

T C

H

LI

N E

A

R E

A C

MATCHLINE - AREA E

M A

T C

H

LI

N E

A

R E

A E

MATCHLINE - AREA B

M A

T C

H

LI

N E

A

R E

A A

MATCHLINE - AREA D

M A

T C

H

LI

N E

A

R E

A E

BUILDING 123 KEY PLAN

N

E

A

B

D

C

PROJECT LOCATION:

FIRST FLOOR

SHADE INDICATES AREA

NOT IN PROJECT SCOPE

DUCTS PER PLAN

AND SPECIFICATIONS

INTERMEDIATE SPACER

CONCRETE ENCASEMENT

BASE SPACER

3"

3"

3"

3" 3"3"3"

3"

3"

3"3"

DUCTS PER PLAN

AND SPECIFICATIONS

CONCRETE ENCASEMENT

BASE SPACER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

01/13/2022

B

IM

/2

V

A M ilw a u k e e

E m e rg e n c y G e n e ra to r B ld g

/2

V

A M ilw a u k e e

E m e rg e n c y G e n e ra to r B ld g

S E

S

.r v t

/1

/2

:2

:1

A

M

ES001

ELECTRICAL SITE PLAN

GUIDON

1221 N. PENSYLVANIA ST.

SUITE 200

INDIANAPOLIS, IN 46202

317.800.6388

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIR

OMAHA, NE

402.991.5520

REPLACE BUILDING 123 MENTAL

HEALTH EMERGENCY

GENERATOR AND SWITCHBOARD

5000 West National Avenue, Milwaukee, WI 53295

695-21-104

01/13/2022 KSB JMP

100% BID DOCUMENTS

SUBMITTAL

FULLY SPRINKLERED

SCALE: 3/64" = 1'-0"ES001

1 Site Plan - Electrical N

SHEET NOTES:

1. BUILDING SERVICE FED FROM 13.2KV SWITCHGEAR LOCATED IN BUILDING 115. REFER TO ONE-LINE FOR

SERVICE FEEDER SIZING. REFER TO DEMO POWER PLAN E WING FOR PHASING REQUIREMENTS. PLACE TRANSFORMER AND SECONDARY CONDUIT PRIOR TO FEEDING TRANSFORMER FROM BUILDING 115.

PROVIDE BOLLARDS AROUND TRANSFORMER COORDINATE WITH CIVIL FOR BOLLARD LOCATION AND

QUANTITY. COORDINATE DIRECTION OF TRANSFORMER SO THAT OPENING FACES SOUTHWEST.

TRANSFORMER TO CONTAIN NO PCBS IN OIL.

2. PROVIDE 1 - 5" CONCRETE ENCASED CONDUITS FOR MEDIUM VOLTAGE CABLING. PROVIDE SLACK AROUND MANHOLE TO SATISFY BEND RADIUS. VA STANDARD MEDIUM VOLTAGE CABLING IS 250KCMIL CU WITH 4/0 GROUND CU. REFER TO MEDIUM VOLTAGE SPEC FOR MORE INFORMATION. REFER TO SINGLE CONDUIT

DUCT BANK DETAIL ON THIS SHEET.

3. PROVIDE 6 - 4" CONCRETE ENCASED CONDUITS FOR TRANSFORMER SECONDARY. PULL CONDUITS TO EXISTING FLOOR PULL CABINET IN ELECTRICAL ROOM INDICATED ON POWER FLOOR PLANS. UTILIZE 6-WAY DUCT BANK WHEN ENTERING ELECTRICAL ROOM. REFER TO DUCT BANK DETAIL ON THIS DRAWING. TWO 4"

CONDUITS ARE FOR SPARE CAPACITY.

4. PROVIDE 200A, 15KV, TERMINAL JUNCTIONS BAR FOR EACH PHASE LOCATED IN MANHOLE. EACH TERMINAL JUNCTION BAR WILL HAVE TWO LOAD BREAK BUSHINGS WITH AVAILABLE SPACE FOR AN ADDITIONAL TWO BUSHINGS. PROVIDE 200A LOADBREAK ELBOWS FOR BUSHINGS. JUNCTION BAR, LOADBREAK ELBOWS, AND

ALL ACCESSORIES TO BE RATED TO BE SUBMERGED IN WATER 24/7.

5. EXTEND EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF TO NEW ROOF MOUNTED EQUIPMENT AND

GENERATOR EXHAUST.

6. REFER TO DETAIL 3 ON SHEET CS501 FOR TRANSFORMER PAD DETAIL.

7. EXISTING MV CABLE FROM BLDG. 123 SHALL BE PULLED BACK AND A MINIMUM OF 20 FEET OF SPARE CABLE

LOOPED AND SUPPORTED IN MANHOLE NEAR TOP OF MANHOLE. NEW MV CABLE SUPPORT BRACKETS WILL NEED TO BE INSTALLED IN MANHOLE TO SUPPORT SPARE MV CABLE. PROVIDE LOADBREAK ELBOWS FITTED TO THE CONDUCTORS AND TERMINTED ON MEDIUM VOLTAGE JUCNTION BARS LOCATED IN MANHOLE.

8. PROVIDE 120V/1 TO NEW EXHAUST FAN LOCATED ON THE ROOF IN THIS AREA. COORDINATE EXACT LOCATION WITH MECHANICAL ROOF PLAN. DISCONNECT PROVIDED BY MECHANICAL ENGINEER. CONTROLS

TO BE CONTINUOUS. PROVIDE 20A FEEDER AND BREAKER FROM PANEL DL-E1-123-1.

NO SCALE

DUCT BANKS

F

F

A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK.

PROVIDE DEMOLITION FOR ITEMS AS SHOWN.

B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).

C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION.

SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING

CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .