S06 - 6b - 695-21-104 DrawingsPart-2.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Replace Building 123 Mental Health Emergency Generator and Switchboard 695-21-104 (VA-22-00055186)
- Solicitation number
- 36C25222B0028
About this file
This solicitation is for replacing the Building 123 mental health emergency generator and switchboard at the VA Medical Center in Milwaukee, Wisconsin. The solicitation number is 36C25222B0028. The work includes installing a new 600kW bi-fuel diesel emergency generator, 1200A automatic transfer switches, 1200A service entrance equipment, and associated electrical distribution components. Bids are due by February 15, 2022 and the period of performance is 270 calendar days. The solicitation is set aside for verified service-disabled veteran-owned small businesses. The total estimated price is $2,000,000 to $5,000,000. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25222B0028 0007.docx | DOCX document | |
| S06 - Wage Determination effective 10.14.22.pdf | ||
| 36C25222B0028 0006.docx | DOCX document | |
| S06 - 695-21-104 SOW_UPDATED 10.18.22.pdf | ||
| 36C25222B0028 0005.docx | DOCX document | |
| S06 - 231123 Appendix A.pdf | ||
| S06 - Wage Determination effective 8.5.2022.pdf | ||
| S06 - 23 09 23 - Direct-Digital Control System for HVAC.pdf | ||
| 36C25222B0028 0004.docx | DOCX document | |
| 36C25222B0028 0003.docx | DOCX document | |
| 36C25222B0028 0002.docx | DOCX document | |
| S06 - 695-21-104 - SPECS - 2022-04-11.pdf | ||
| 36C25222B0028 0001.docx | DOCX document | |
| S06 - 6b - 695-21-104 DrawingsPart-1.pdf | ||
| S02 - 695-21-104 - SPECS - 2022-04-11.pdf | ||
| S02 - Wage Determination effective 7.15.22.pdf | ||
| S02 - Single Source Justification_Fire Alarm_695-21-104.pdf | ||
| 36C25222B0028_3.docx | DOCX document | |
| S02 - 6b - 695-21-104 Drawings.pdf | ||
| S02 - Single Source Justification_Firestop_695-21-104.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
A. REFER TO SHEET F000 FOR GENERAL NOTES.
FIRE SUPPRESSION DEMOLITION PLAN NOTES
1. COORDINATE WITH EXISTING FIRE RISER/VALVE FOR SYSTEM SHUTDOWN
PRIOR TO COMMENCING WORK.
2. REMOVE PORTION OF EXISTING FIRE SUPPRESSION PIPING FOR NEW CMU
WALL.
3. REMOVE PORTION OF EXISTING FIRE SUPPRESSION PIPING FOR NEW FIRE
SUPPRESSION PIPING.
4. REMOVE EXISTING RECESSED STYLE FIRE SPRINKLER HEAD AND PREPARE
EXISTING PIPING FOR NEW STYLE HEAD.
5. REMOVE EXISTING FIRE SUPPRESSION PIPING AND FIRE SPRINKLER HEAD
FOR NEW RADIATOR EXHAUST DUCTWORK.
GARAGE
E133
OLD GENERATOR
E108
ELEC.
E107
EXISTING FIRE
SUPPRESSION HEAD (TYP)
EXISTING FIRE SUPPRESSION
BRANCH PIPE (TYP)
EXISTING FIRE SUPPRESSION
MAIN PIPE (TYP)
4 4
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
FXD101
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"FXD101
1 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN
Revisions: Date:
DN
FIRE SUPPRESSION GENERAL NOTES
A. SEE SHEET F000 FOR FIRE SUPPRESSION GENERAL NOTES.
FIRE SUPPRESSION PLAN NOTES
1. COORDINATE WITH EXISTING FIRE RISER/VALVE FOR SYSTEM SHUTDOWN
PRIOR TO COMMENCING WORK.
2. INSTALL NEW FIRE SUPPRESSION PIPING THROUGH NEW CMU WALL.
3. INSTALL NEW FIRE SUPPRESSION PIPING AND FIRE SPRINLER HEAD.
4. INSTALL NEW UPRIGHT FIRE SPRINKLER HEAD AT THIS LOCATION.
5. INSTALL NEW FIRE SUPPRESSION PIPING AND FIRE SPRINKLER HEADS FOR
NEW RADIATOR EXHAUST DUCTWORK.
EXISTING FIRE SPRINKLER
HEAD (TYP)
EXISTING FIRE SUPPRESSION
BRANCH PIPE (TYP)
EXISTING FIRE SUPPRESSION
MAIN PIPE (TYP)
NEW FIRE SUPPRESSION
BRANCH PIPE
NEW FIRE
SPRINKLER HEAD
OLD GENERATOR
E108
ELEC.
E107
GENERATOR
E133A
GARAGE
E133
4 4
NEW FIRE
SPRINKLER HEAD
NEW FIRE
SPRINKLER HEAD
NEW FIRE SUPPRESSION
BRANCH PIPE4
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
FX101
FIRST FLOOR FIRE SUPPRESSION
PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"FX101
1 FIRST FLOOR FIRE SUPPRESSION PLAN
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
MECHANICAL ABBREVIATIONS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL
VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45o OR 90o
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES
SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES
SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES
SEE DETAIL
THERMOMETER
BOTTOM CONNECTION, 45o OR 90o
PRESSURE GAGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE / TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
DN
DN
UP
UP
DNUP
DUCTWORK SYMBOLS
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
SQUARE 2-WAY CEILING DIFFUSERS
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE REMOVED
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL SECTIONS.)
FLEXIBLE DUCTWORK (INSULATED)
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACK DRAFT DAMPER
//FIRE//SMOKE//DAMPER
(VA DOES NOT ALLOW COMINATION FIRE/SMOKE DAMPERS.)
POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC
PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE
CLASS (IN. OF WATER) WHICH WILL ACCOMMODATE
MAXIMUM OPERATING PRESSURE IN THE DUCT
SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT
UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL
APPEARS. A "N" SUPERSCRIPT INDICATES NAGTIVE
PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
STAINLESS STEEL DUCT
MANUAL SPLITTER DAMPER
STANDARD BRANCH SUPPLY, NO SPLITTER (45O TAP)
STANDARD BRANCH RETURN, NO SPLITTER (45o TAP)
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
DUCT MOUNTED COIL (ELECTRIC)
FC
BDD
FD
VD
N 2 1
//F//S// DPR
1/2
SUPPLY
RETURN
45°
45°
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
VIEW TITLE
NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
MB
AIR TERMINAL SYMBOLS
TERMINAL UNIT WITH REHEAT COIL
DOUBLE DUCT MIXING BOX
FAN POWERED VARIABLE VOLUME. TERMINAL UNIT
WITH HEATING COIL.
PTAC
A
TWU
A FCU
FCU
A
TERMINAL UNIT SYMBOLS
CONVECTOR OR RADIATOR (RECESSED)
CONVECTOR OR RADIATOR (WALL HUNG)
FLOOR MOUNTED VERTICAL RECESSED FAN COIL
UNIT. LETTER INDICATES UNIT SIZE.
FLOOR MOUNTED VERTICAL CABINET FAN COIL UNIT.
LETTER INDICATES UNIT SIZE.
THRU WALL AIR CONDITIONING UNIT. LETTER
INDICATES UNIT SIZE.
WINDOW TYPE AIR CONDITIONING UNIT. LETTER
INDICATES UNIT SIZE.
FLOOR MOUNTED HEAT PUMP. LETTER INDICATES
UNIT SIZE.
AIR CURTAIN
UNIT HEATER (HORIZONTAL)
UNIT HEATER (VERTICAL)
2'x2' RADIANT CEILING PANEL
2'x4' RADIANT CEILING PANEL
PTACA
T
TT
M
MT
PT
TT
FT
IT
CT
SPS
SD
PDT
KR
TSL
HS
ZC
LC
LT
PDS
TSH
MECHANCAL CONTROL SYMBOLS
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL
MOUNT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRASMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
VALVE OR DAMPER POSITION CONTROLLER
LOCAL RECORDING TIME CLOCK (RUNTIME)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW
ELECTRONIC TO PNEUMATIC TRANSDUCER
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR VALVE
PSH
PSL
EPT
AT
CO2
AT
CO
AT
OC
KC
FSL
FSH
FC
SC
PC
TC
LTCP
HVAC
ECC
VSMC
A
M
LC
M
VALVE SYMBOLS
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE
CONNECTOR
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
PRESSURE SAFETY VALVE
GATE VALVE WITH GLOVE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLED
FLOW METER
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
B. THE FIRST FIGURE OF DUCT SIDE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
C. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
D. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
E. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
F. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF
CEILING DIFFUSERS, REGISTERS, AND GRILLES.
MECHANICAL GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
T
MECHANICAL DEMOLITION GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
MECHANICAL DEMOLITION PLAN NOTES
1. REMOVE EXISTING FUEL OIL PUMP, PIPING, CONTROLS AND ACCESSORIES.
2. REMOVE EXISTING RADIATOR EXHAUST DUCTWORK AND SHROUD. REMOVE
EXISTING CONTROL DAMPERS, ACTUATORS, ASSOCIATED PNEUMATIC
PIPING, AND ACCESSORIES.
3. REMOVE EXISTING GENERATOR ENGINE EXHAUST AND DRAIN PIPE THROUGH
ROOF. COORDINATE PATCH AND REPAIR AS REQUIRED.
4. REMOVE EXISTING CONTROL DAMPER, ACTUATOR, AND ASSOCIATED
PNEUMATIC PIPING COMPLETE.
5. REMOVE EXHAUST GRILLE AND ASSOCIATED DUCTWORK SERVING EXISTING
GENERATOR ROOM. CAP AND SEAL DUCT AT MAIN.
6. REMOVE EXISTING DUCTWORK AND ASSOCIATED HANGERS, SUPPORTS, AND
ACCESSORIES FOR NEW WALLS.
7. REMOVE AND RELOCATE EXISTING GARAGE UNIT HEATER, VALVES AND
CONTROLS.
8. REMOVE EXISTING GARAGE UNIT HEATER, VALVES AND CONTROLS.SALVAGE
BACK TO OWNER.
9. REMOVE EXISTING HEATING HOT-WATER PIPING AS SHOWN..
10. UTILIZE EXISTING HEATING HOT-WATER VALVES FOR SYSTEM SHUTDOWN.
11. REMOVE AND RELOCATE GARAGE HEATER THERMOSTAT.
12. EXISTING UNIT HEATER TO REMAIN.
13. RELOCATE EXISTING STORM PIPING FOR NEW LOUVER IN THIS LOCATION.
EX
123-UH-3
EX
123-UH-2
EX
123-UH-1
x x
24x24
6 6
16x16 EA
16x16 EA
EX 16x16 EA
UP TO EF
EX 24x24 EA
UP TO EF
EX 4"ST
VERTICAL PIPING
EX 18x6 EA
VERTICAL DUCT
EX 18x6 EA
VERTICAL DUCT
24x12
EX FUEL OIL PIPING TO
UNDERGROUND TANK
x E
A
3/4"
3/4"
3/ 4" 3/
4"
3/4"
3/4"
3/ 4"
3/ 4"
EX 1"HHWS/R
EX 3/4"HHWS/R
6 6
GARAGE
E133
OLD GENERATOR
E108
ELEC.
E107
EX
123-UH-4
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
MD101
FIRST FLOOR MECHANICAL
DEMOLITION PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"MD101
1 FIRST FLOOR MECHANICAL DEMOLITION PLAN
N
123-EF-1
EX 24x24
EA DN
EX
123-EF-2
EX 16x16
EA DN
EX 8Ø
EA DN
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
MECHANICAL DEMOLITION GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
MECHANICAL DEMOLITION PLAN NOTES
1. REMOVE AND RELOCATE EXISTING ROOF-MOUNTED EXHAUST FAN.
2. EXISTING EXHAUST FAN TO REMAIN.
3. REMOVE EXISTING GENERATOR EXHAUST THROUGH ROOF. REMOVE ALL
ASSOCIATED COMPONENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
MD102
ROOF MECHANICAL DEMOLITION
PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MD102
1 ROOF HVAC PLAN
MECHANICAL HVAC GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
MECHANICAL HVAC PLAN NOTES
1. NEW 24x18 EXHAUST DUCT THROUGH SIDEWALL AND UP THROUGH ROOF.
RESTORE ORIGINAL GARAGE EXHAUST OPERATION.
2. CONNECT NEW EXHAUST DUCTWORK TO EXISTING EXHAUST DUCTWORK IN
THIS LOCATION.
3. INSTALL 24x12 EA DN WALL AND TERMINATE AT 12" A.F.F. PROVIDE VERTICAL
DUCT SUPPORTS AND MIDSPAN AND BOTTOM OF VERTICAL DUCT. INSTALL
VERTICAL DUCT EAST OF EXTERIOR WINDOW.
4. RELOCATED GARAGE UNIT HEATER. PROVIDE NEW HANGERS SECURED TO
STRUCTURE.
5. LOUVER PLENUM WITH MOTORIZED AMCA CLASS 1A LOW LEAKAGE CONTROL
DAMPERS.
6. INSTALL 2'-0" LONG 12x12 EA DUCT FROM ROOF MOUNTED EXHAUST FAN.
7. INSTALL NEW UNIT HEATER ALONG WALL AT 10'-0" A.F.F.
8. ENTIRE GENERATOR ENGINE EXHAUST DUCTWORK SHALL BE AN
ENGINEERED SYSTEM. COORDINATE WITH GENERATOR MANUFACTURER.
PROVIDE NECESSARY EXPANSION JOINTS, CLEANOUTS, FITTINGS,
EXPLOSION RELIEF, DRAIN, FIRESTOPS, ETC. REFER TO DIVISION 26
SPECIFICATIONS AND DETAIL ON SHEET MM600.
9. SLOPE BOTTOM OF DUCT TO DRAIN LOCATION.
24x18 EA x E
A E
X x E
A
24x12 EA x E
A
EX
123-UH-3
MM600
EX
123-UH-2
123-UH-5
ELEC.
E107
OLD GENERATOR
E108
GENERATOR
E133A
GARAGE
E133
16x16 EA
16x16 EA
EX 16x16 EA
UP TO EF
x E
A
EX
123-UH-4
24x18 EA
UP TO EF
24x12 EA DN
54x46 EA UP TO
ROOF HOOD
8Ø GENERATOR
EXHAUST UP
GENERATOR
SILENCER
8Ø EA DN TO
GENERATOR
54x46 EA TO
GENERATOR
12x12 EA UP TO
EXHAUST FAN
GAS METER
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
MH101
FIRST FLOOR MECHANICAL HVAC
PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"MH101
1 FIRST FLOOR MECHANICAL HVAC PLAN
123-RH-1
EX
123-EF-1
8Ø GENERATOR EXHAUST OUTLET,
8Ø GENERATOR EXHAUST DN
EX
123-EF-2
24x18 EA DN
EX 16x16
EA DN
54x46 EA TO 123-RH-1, 54X46 EA DN
123-EF-3
12x12 EA DN
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
MECHANICAL HVAC GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
MECHANICAL HVAC PLAN NOTES
1. NEW LOCATION FOR EXISTING EXHAUST FAN. CONNECT NEW DUCTWORK TO
EXISTING FAN IN SAME MANNER AS EXISTING CONDITION.
2. NEW RELIEF HOOD FOR GENERATOR RADIATOR AIRFLOW REQUIREMENT.
CONNECT NEW DUCTWORK TO HOOD. ALIGN HOOD TO NORTH LINE OF
DUCTWORK FOR TRANSITION/OFFSET TO KEEP HOOD FURTHER AWAY FROM
ROOF EDGE.
3. NEW GENERATOR EXHAUST OUTLET. REFER TO SECTIONS AND DETAILS FOR
SCOPE OF WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \a s w a n s o n \D o c u m e n ts
\1 .1
.1
M E
P v a s w a n s o n Q
P Z
X
.r v t
/1
/2
:5
:1
P
M
MH102
ROOF MECHANICAL HVAC PLAN
GUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MH102
1 ROOF HVAC PLAN
T
MECHANICAL PIPING GENERAL NOTES
A. REFER TO SHEET M000 FOR G ENERAL NOTES.
MECHANICAL PIPING PLAN NOTES
1. RELOCATED GARAGE UNIT HEATER THERMOSTAT.
2. RELOCATED EXISTING GARAGE UNIT HEATER.
3. GAS CONNECTION SHALL INCLUDE DRIP LEG AND FLEX CONNECTION IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
4. PROVIDE STEP DOWN REGULATOR (1 PSI) WITH MINIMUM 10' PIPING LENGTH
BETWEEN REGULATOR AND GENERATOR CONNECTION.
5. INSTALL 3/4" DRAIN FROM BOTTOM OF RADIATOR EXHAUST DUCT TO
OUTDOORS. SLOPE MINIMUM 1/8"/FT. PROVIDE WIRE SCREEN AT BUILDING
WALL TERMINATION.
6. LOCATE NEW NATURAL GAS PIPING ABOVE EXHAUST DUCT IN THIS AREA.
7. LOCATE NEW NATURAL GAS PIPING ALONG WALL AND NOT ABOVE NEW
ELECTRICAL EQUIPMENT FOOTPRINT IN THIS AREA.
8. RELOCATED STORM PIPING FOR NEW LOUVER. ROUTE TO EXISTING
LOCATION BELOW LOUVER.
EX
123-UH-3
EX
123-UH-2
123-UH-5
3/4" C
ELEC.
E107
OLD GENERATOR
E108
GENERATOR
E133A
GARAGE
E133
3/4"HHWS/R
EX 1"HHWS/R
EX 3/4"HHWS/R
3/4"HHWS/R
3/4"HHWS/R
3/4"HHWS/R
GAS METER
1 1/4" NG 67
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.1
M E
P v c h a w k D
D
W
.r v t
/1
/2
:0
:4
P
M
MP101
FIRST FLOOR MECHANICAL
PIPING PLANGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"MP101
1 FIRST FLOOR MECHANICAL PIPING PLAN
Level 1 100' - 0"
Level 2 114' - 0" x E
A
123-UH-5
123-RH-1
CATALYZED EXHAUST
SILENCER BY GENERATOR
MANUFACTURER
STAINLESS STEEL FLEXIBLE
WYE CONNECTION TO
GENERATOR EXHAUST BY
GENERATOR MANUFACTURER
123-EF-3
ø
E A ø
E A
12x12 EA
NOTES:
1. EMERGENCY GENERATOR SHALL BE INTERLOCKED WITH D3. WHEN EMERGENCY
GENERATOR IS ENERGIZED D3 SHALL OPEN. WHEN EMERGENCY GENERATOR IS
DE-ENERGIZED D3 SHALL CLOSE, PROVIDED ROOM EXHAUST FAN IS OFF.
2. ROOM EXHAUST FAN SHALL BE INTERLOCKED WITH D3 & ROOM THERMOSTAT T1.
WHEN ROOM THERMOSTAT RISES ABOVE 85°F ROOM EXHAUST FAN SHALL
RUN & D3 SHALL OPEN. WHEN ROOM THERMOSTAT DROPS BELOW 80°F
ROOM EXHAUST FAN SHALL STOP & D3 SHALL CLOSE, PROVIDED EMERGENCY
GENERATOR IS DE-ENERGIZED.
3. POWER OPERATED, OPPOSED BLADE, DAMPERS D1 & D2 SHALL BE INTERLOCKED
WITH ROOM THERMOSTAT T2 SET AT 60°F. ON A RISE IN ROOM
TEMPERATURE ABOVE 60°F D1 SHALL MODULATE OPEN & D2 SHALL
MODULATE CLOSED. ON A DROP IN ROOM TEMPERATURE BELOW 60°F, D1
SHALL MODULATE CLOSED & D2 SHALL MODULATE OPEN.
4. UNIT HEATER SHALL BE INTERLOCKED WITH ROOM THERMOSTAT T3 SET
AT 65°F. ON A DROP IN ROOM TEMPERATURE BELOW 63°F ELECTRIC
UNIT HEATER SHALL BE ENERGIZED & ON A RISE IN ROOM TEMPERATURE ABOVE 67°F.
UNIT HEATER
INTAKE
LOUVER
ROOM
EXHAUST
FAN
FLEXIBLE
CONNECTION
D2
PLENUMD1
EXHAUST
LOUVERS
EMERGENCY
GENERATOR
ACD
T-1
T
T-3
T
T-2
T
DAMPERS SEQUENCE OF CONTROLS:
OPEN RADIATOR INTAKE DAMPERS AND DISCHARGE DAMPERS TO
LOUVERED PENTHOUSE UPON GENERATOR ACTIVATION. THE DISCHARGE
PLENUM RECIRCULATION DAMPERS SHALL BE CLOSED.
WHEN THE OUTDOOR REFERENCE TEMPERATURE IS BELOW 40 F
(ADJUSTABLE), THE DISCHARGE PLENUM RECIRCULATION DAMPERS SHALL
MODULATE OPEN AND THE RADIATOR INTAKE DAMPERS SHALL MODULATE
CLOSED TO MAINTAIN A ROOM TEMPERATURE OF 60 F (ADJUSTABLE). THE
DAMPER POSITIONS SHALL BE CALIBRATED TO AVOID
OVERPRESSURIZATION OF THE ROOM.
D3
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER
RETURN
MANUAL AIR VENT
UNION CONNECTIONS
(TYP.)
WATER
SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
MV
MODULATION CONTROL
VALVE
RAIN SHIELD
ROOF
ENGINE EXHAUST PIPE
SIZE AS RECOMMENDED
BY MANUFACTURER
MUFFLER, SIZE AS
RECOMMENDED BY
MANUFACTURER
THIMBLE OUTER SLEEVE
EXHAUST PIPE, SIZE AS
RECOMMENDED BY
MANUFACTURER.
305mm (12") LONG
DRIP
LEG WITH DRAIN
VALVE
FLASHING & ROOF
OPENING
BY ARCHITECTURE
THIMBLE INNER SLEEVE
CLEARANCE AS REQUIRED BY
THIMBLE MANUFACTURER &
ARCHITECT
45° 45°
(1
M
IN
m m
(1
M
IN
m m
NOTE:
1.
2.
SECURE HOOD TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm] ON CENTER.
SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION
BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS (MENTAL DECK & BAR
JOIST ROOF).
GRAVITY BACKDRAFT
DAMPER.
SEE
NOTE
PREFABRICATED ROOF
CURB
WOOD NAILING STRIP
TRANSITION DUCT TO
FULL SIZE OF
DAMPER SUPPLIED
WITH HOOD
ROOF
SEE NOTE 2
SEE NOTE 1
CURB CAP
FACTORY ASSEMBLED
HINGED HOOD WITH
LATCH & BIRD
SCREEN
DUCT (WHEN
SHOWN)
1 1/4" NG
GAS METERGENERATOR
3000 MBH
2 PSI GAS METER
TOTAL CONNECTED LOAD: 3000 MBH
TOTAL EQUIVALENT LENGTH (WITH 25% FOR
FITTINGS): 50 FEET
SIZED PER NFPA 54 ANSI Z223.1, 2021 EDITION, TABLE
6.2.1(E), 2.0 PSI INLET PRESSURE WITH 1.0 PSI DROP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.1
M E
P v c h a w k D
D
W
.r v t
/1
/2
:0
:4
P
M
MM600
MECHANICAL SCHEDULES,
DETAILS, AND SECTIONSGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 CDH AJS
100% BID
DOCUMENTS
FULLY SPRINKLERED
REMARKS:
1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.
2. PROVIDE WITH BIRDSCREEN AND 18 INCH ROOF CURB.
3. PROVIDE WITH ALUMINUM CONSTRUCTION. OVERALL SIZE IS 108" x 54" x 68" HIGH (WITH CURB).
SCALE: 3/8" = 1'-0"MM600
1 GENERATOR ROOM MECHANICAL SECTION 1
NOT TO SCALEMM600
3 EMERGENCY GENERATOR ROOM CONTROLS
NOT TO SCALEMM600
TERMINAL UNIT WATER COILS - PIPING
CONNECTIONS
HOOD SCHEDULE
IDENTITY DATA AIRFLOW DATA
REMARKSMARK MANUFACTURER MODEL
OPERATING
WEIGHT (LBS) LOCATION AIRFLOW (CFM) THROAT SIZE (IN) SERVICE
PRESSURE DROP
(IN WC)
123-RH-1 GREENHECK WRH-40x94 350 E133A GENERATOR 30,100 40 x 94 EXHAUST 0.20 1 - 3
UNIT HEATER SCHEDULE
IDENTITY DATA AIRFLOW DATA HEATING DATA ELECTRICAL DATA
REMARKSMARK MANUFACTURER MODEL
OPERATING
WEIGHT (LBS) AIRFLOW (CFM) ESP (IN WG) EAT (°F) LAT (°F)
CAPACITY
(BTUH) EWT (°F) LWT (°F)
FLOWRATE
(GPM)
WPD (FT
WG)
VOLTAGE /
PHASE FLA MCA / MOCP
123-UH-5 STERLING HS-118A 200 500 0.10 60 90 16,200 160 140 1.75 3 120 / 1 1 1 / 15 1 - 2
REMARKS:
1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.
2. PROVIDE WITH WALL SUPPORTS FOR INSTALLATION.
EXISTING MECHANICAL EQUIPMENT
MARK TYPE LOCATION SERVES
EX 123-EF-1 EXHAUST FAN E133 ROOF E133 GARAGE
EX 123-EF-2 EXHAUST FAN E108 ROOF E108 STORAGE
EX 123-UH-2 UNIT HEATER E133 GARAGE E133 GARAGE
EX 123-UH-3 UNIT HEATER E133 GARAGE E133 GARAGE
EX 123-UH-4 UNIT HEATER E108 GARAGE E133 GARAGE
EXHAUST FAN SCHEDULE
IDENTITY DATA AIR DATA SOUND DATA ELECTRICAL DATA
REMARKSMARK MANUFACTURER MODEL TYPE DRIVE WEIGHT (LBS) AIRFLOW (CFM) ESP (IN WG) RPM INLET (SONES) VOLTAGE / PHASE BHP NOM HP
123-EF-3 GREENHECK G-090-VG CENT UPBLAST DIRECT 50 500 0.50 1600 7.8 120 / 1 0.10 0.10 1 - 5
REMARKS:
1. PROVIDE LISTED MANUFACTURER AND MODEL OR EQUAL.
2. PROVIDE WITH EC MOTOR WITH DIAL ON EXTRACTOR HOUSING (MOUNTED AND WIRED).
3. PROVIDE WITH INTEGRAL NEMA-1, TOGGLE DISCONNECT SWITCH (MOUNTED AND WIRED).
4. PROVIDE WITH GRAVITY BACKDRAFT DAMPER (SHIPPED LOOSE).
5. PROVIDE WITH 18 INCH INSULATED ROOF CURB.
Revisions: Date:
NOT TO SCALEMM600
5 EMERGENCY GENERATOR EXHAUST
NOT TO SCALEMM600
6 LOW-SILHOUETTE EXHAUST OR INTAKE HOOD
NOT TO SCALEMM600
2 NATURAL GAS PIPING SCHEMATIC
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPS
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
CEILING
CIRCUIT BREAKER
COLOR TEMP CONTROL
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
MAIN SWITCHBOARD
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
ATS
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
MSB
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. FOR 120V, 20A BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS. RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8
AWG CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780
AND UL 96A REQUIREMENTS.
D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
G. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
H. OVERCURRENT PROTECTIVE DEVICE (OCPD) COORDINATION STUDY, AVAILABLE SHORT CIRCUIT CURRENT CALCULATIONS, AND ARC FLASH ENERGY CALCULATIONS AND EQUIPMENT LABELING REQUIREMENTS:
a. CONTRACTOR SHALL PROVIDE AND RECEIVE APPROVE FOR OCPD COORDINATION STUDY BEFORE ANY
ELECTRICAL EQUIPMENT SHOP DRAWINGS ARE SUBMITTED FOR REVIEW.
b. CONTRACTOR SHALL SURVEY ALL EXISTING TO REMAIN ELECTRICAL POWER DISTRIBUTION EQUIPMENT, SPECIFIC OCPD MANUFACTURER, MODEL AND SETTINGS; TRANSFORMERS, CABLE TYPES AND LENGTHS, AND OTHER INFORMATION REQUIRED TO PROVIDE A COMPLETE OCPD COORDINATION STUDY IN
BUILDING 123 FOR NEW AND EXISTING EQUIPMENT.
c. OCPD COORDINATION STUDY SHALL START ON PRIMARY SIDE OF 13.2 KV MEDIUM VOLTAGE
TRANSFORMER FEEDING THE BUILDING AND ANALYSIS DOWN TO ALL PANELS, AND EQUIPMENT
DISCONNECT SWITCHES 100 AMPS OR LARGER.
d. CONTRACTOR MAY ASSUME THE AVAILABLE FAULT CURRENT ON THE PRIMARY SIDE OF 13.2 KV MEDIUM
VOLTAGE SERVICE TRANSFORMERS IS 8,000 AMPS.
e. AT ALL PANELS THE OCPD COORDINATION STUDY SHALL PROVIDE A TIME CURRENT CURVE (TCC) GRAPH INCLUDING THE LARGEST BRANCH/FEEDER CIRCUIT BREAKER IN PANEL, PANELS MAIN CIRCUIT BREAKER, AND AT LEAST THE MAIN CIRCUIT BREAKER OF DISTRIBUTION PANEL FEEDING PANEL.
f. NEW CIRCUIT BREAKER TYPES AND SETTINGS SHALL BE CHOSEN TO PROVIDE A SELECTIVELY
COORDINATED POWER DISTRIBUTION SYSTEM.
g. CONTRACTOR SHALL CREATE CALCULATIONS USING SKM POWER TOOLS FOR WINDOWS PROGRAM AND SHALL PROVIDE ALL SKM FILES CREATED TO PRODUCE THE (OCPD) COORDINATION STUDY WITH
SUBMITTAL FOR COORDINATION STUDY.
h. ARC FLASH WARNING LABELING SHALL BE PROVIDED BY CONTRACTOR FOR ALL NEW AND EXISTING
ELECTRICAL POWER DISTRIBUTION EQUIPMENT IN BUILDINGS 123.
I. IF A SINGLE NEUTRAL CONDUCTOR IS USED FOR MORE THAN ONE SINGLE PHASE CIRCUIT (SHARED NEUTRAL FOR MULTIWIRE BRANCH CIRCUIT) ALL THE 1-POLE CIRCUIT BREAKERS ASSOCIATED WITH THE SHARED NEUTRAL MULTIWIRE BRANCH CIRCUIT SHALL BE REPLACED WITH A SINGLE MULTIPLE POLE CIRCUIT BREAKER OF THE SAME AMPERAGE RATING THAT WILL DISCONNECT ALL CIRCUITS THAT SHARE A NEUTRAL CONDUCTOR AS REQUIRED BY NEC 210.4(B). FOR BIDDING PURPOSES CONTRACTOR SHALL ASSUME THERE ARE 6 SINGLE POLE CIRCUIT BREAKERS THAT WILL BE COMBINED TO TWO 3 POLE CIRCUIT BREAKERS IN EACH PANEL BEING REPLACED. CONTRACTOR SHALL VERIFY BEFORE ORDERING PANELS HOW MANY MULTIWIRE BRANCH CIRCUITS ARE RUN FROM EACH PANEL AND ORDER CORRECT NUMBER AND
TYPE OF BRANCH CIRCUIT BREAKERS FOR EACH PANEL.
J. ARC FLASH WARNING LABELING SHALL HAVE FOLLOWING INFORMATION PRINTED ON LABELTHAT CONTRACTOR SHALL PROVIDE ON EQUIPMENT: FLASH PROTECTION BOUNDARY DISTANCE, MIN. ARC RATING ENERGY, FLASH HAZARD DISTANCE, SHOCK HAZARD VOLTAGE, SHOCK LIMITED APPROACH DISTANCE, SHOCK RESTRICED APPROACH DISTANCE, PANEL NAME, AND AVAILABLE FAULT CURRENT AT EQUIPMENT;
SIMILAR TO ARC FLASH LABELS IN BUILDING 70.
K. SCHEDULING POWER OUTAGES: CONTRACTOR SHALL SUBMIT SCHEDULED POWER OUTAGE PLAN TO VA FOR REVIEW AND APPROVAL. FOR WORK THAT CAN BE COMPLETED IN LESS THAN 11 HOURS, CONTRACTOR TO DO WORK BETWEEN 6PM AND 5AM ON WEEKDAYS AND/OR WEEKENDS. WORK THAT WILL REQUIRE MORE THAN 11 HOURS TO COMPLETE SHALL BE LIMITED TO WEEKENDS WHICH SHALL BE ALLOWED TO BEGIN ON FRIDAYS AT 6PM AND MUST BE COMPLETE BY MONDAYS AT 2AM. CONTRACTOR TO COORDINATE THE
POWER OUTAGE WITH COR 3 WEEKS MINIMUM PRIOR TO THE WORK.
L. VERIFY VITAL LOADS: CONTRACTOR TO IDENTIFY VITAL LOADS ON PANEL SCHEDULE AND ENSURE PROPER NOTIFICATION IS GIVEN TO ALL PARTIES BEFORE ANY POWER OUTAGES. VITAL LOADS INCLUDE:
a. COMPUTER SERVERS
b. LAB EQUIPMENT
c. REFRIGERATORS AND FREEZERS
d. EMERGENCY ALARM AND COMMUNICATIONS EQUIPMENT
e. LIFE SAFETY DEVICES
M. FOR NEW OR REPLACED PANELS OR SWITCHBOARDS:
a. NO SPARE CIRCUIT BREAKERS SHALL BE FURNISHED IN PANELS.
b. A SURGE PROTECTION DEVICE (SPD) SHALL BE PROVIDED AT ALL ELECTRICAL SERVICE ENTRANCE
POWER DISTRIBUTION EQUIPMENT.
c. ALL CIRCUIT BREAKERS THAT ARE 200A OR LARGER SHALL HAVE AN ELECTRONIC TRIP UNIT WITH
ADJUSTABLE TRIP SETTINGS FOR: LONG TIME PICKUP, LONG TIME DELAY, SHORT TIME PICKUP, SHORT
TIME DELAY, AND INSTANTANEOUS TRIP.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
01/13/2022
B
IM
/2
V
A M ilw a u k e e
E m e rg e n c y G e n e ra to r B ld g
/2
V
A M ilw a u k e e
E m e rg e n c y G e n e ra to r B ld g
S E
S
.r v t
/1
/2
:2
:4
A
M
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 KSB JMP
100% BID DOCUMENTS
SUBMITTAL
FULLY SPRINKLERED
ELECTRICAL FIXTURE
SYMBOLS
PLAN SYMBOL NAME
RECEPTACLE - DUPLEX - CONV
ELECTRICAL FIXTURE SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
ELECTRICAL GROUND BAR PROVIDE LENGTH AS REQUIRED TO ACCOMMODATE TERMINATIONS, MINIMUM 20" IN LENGTH. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
FIRE ALARM SYMBOLS
PLAN SYMBOL NAME
FIRE ALARM CONTROL PANEL -
SURFACE MOUNT
HORN AND STROBE
COMBINATION - WALL
MANUAL PULL STATION
MONITORING MODULE
LIGHTING DEVICE SYMBOLS
PLAN SYMBOL NAME
LIGHT SWITCH
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
SWITCHED RECEPTACLE
LIGHTING FIXTURE
SYMBOLS
PLAN SYMBOL NAME
EMERGENCY HATCH
INDUSTRIAL STRIP LIGHT
DATA SYMBOLS
PLAN SYMBOL NAME
WIRELESS ACCESS POINT -
CEILING
ONE LINE SYMBOL
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
CONTINUATION
ENCLOSED CIRCUIT BREAKER
GENERATOR
GENERATOR CONNECTION BOX
GROUND BAR
GROUNDING ELECTRODE
KEY INTERLOCK
PANEL BOARD
SURGE PROTECTIVE DEVICE
SWITCHBOARD
SWITCHBOARD/SWITCHGEAR
TRANSFORMER
ELECTRICAL EQUIPMENT SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
GENERATOR DOCKING STATION PROVIDE TRYSTAR, INC. DUAL-PURPOSE GENERATOR/LOADBANKNDOCKING STATION (OR PRIOR APPROVED EQUIVALENT) WITH VOLTAGE AND CURRENT RATINGS TO MATCH GENERATOR OUTPUT CIRCUIT BREAKER. PROVIDE ENCLOSURE WITH NEMA 3R CONSTRUCTION. PROVIDE WITH INTEGRAL CIRCUIT BREAKER SERVED FROM PERMANENT GENERATOR SOURCE KIRK KEY INTERLOCKED WITH ACCESS DOOR PROTECTING PORTABLE GENERATOR MALE 16 SERIES PANEL MOUNTS (CAM-LOKS). PROVIDE LOAD BANK FEMALE 16 SERIES PANEL MOUNTS (CAM-LOKS). PROVIDE WITH THE FOLLOWING OPTIONS: 2 WIRE AUTO START, BATTERY CHARGER NEMA 5-20 GFCI RECEPTACLE, AND BLOCK HEATER NEMA L5-30 RECEPTACLE. PROVIDE SEPARATE ELECTRICAL CONNECTIONS FROM PANEL UL-E1-123-6, CIRCUITS 9,11 TO SERVE BATTERY CHARGER AND BLOCK HEATER RECEPTACLES.
PROVIDE SIGN ON FRONT OF CABINET STATING THE FOLLOWING:
MAXIMUM GENERATOR CIRCUIT BREAKER SIZE: 1200 AMPS
GENERATOR SYSTEM IS A SEPARATELY DERIVED SYSTEM. BOND GENERATOR NEUTRAL AND GROUND
DATA SYMBOLS
PLAN SYMBOL NAME
WIRELESS ACCESS POINT -
CEILING
ST
PE
R
PL
AN
PER PLAN
PER PLAN
PE
R
PL
AN
F L O O R
. 9
F
LO
O R
. 9
F
LO
O R
.8
F L O O R
. 3
11"
11"
5"
8"
8"
E
LE
C P
IP
E
AR
T
WO
RK
E
C O N C R
ETE W
A
LK
ASPHALT
C
ON
C
RE
TE
C O N C R E T E
#5
HU
B
#5
HU
B
BU
ILD
ING
BU
ILD
ING
TRANSFORMER
EXISTING MEDIUM VOLTAGE CONDUIT
MATCHLINE - AREA E
M A
T C
H
LI
N E
A
R E
A C
MATCHLINE - AREA E
M A
T C
H
LI
N E
A
R E
A E
MATCHLINE - AREA B
M A
T C
H
LI
N E
A
R E
A A
MATCHLINE - AREA D
M A
T C
H
LI
N E
A
R E
A E
BUILDING 123 KEY PLAN
N
E
A
B
D
C
PROJECT LOCATION:
FIRST FLOOR
SHADE INDICATES AREA
NOT IN PROJECT SCOPE
DUCTS PER PLAN
AND SPECIFICATIONS
INTERMEDIATE SPACER
CONCRETE ENCASEMENT
BASE SPACER
3"
3"
3"
3" 3"3"3"
3"
3"
3"3"
DUCTS PER PLAN
AND SPECIFICATIONS
CONCRETE ENCASEMENT
BASE SPACER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
01/13/2022
B
IM
/2
V
A M ilw a u k e e
E m e rg e n c y G e n e ra to r B ld g
/2
V
A M ilw a u k e e
E m e rg e n c y G e n e ra to r B ld g
S E
S
.r v t
/1
/2
:2
:1
A
M
ES001
ELECTRICAL SITE PLAN
GUIDON
1221 N. PENSYLVANIA ST.
SUITE 200
INDIANAPOLIS, IN 46202
317.800.6388
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIR
OMAHA, NE
402.991.5520
REPLACE BUILDING 123 MENTAL
HEALTH EMERGENCY
GENERATOR AND SWITCHBOARD
5000 West National Avenue, Milwaukee, WI 53295
695-21-104
01/13/2022 KSB JMP
100% BID DOCUMENTS
SUBMITTAL
FULLY SPRINKLERED
SCALE: 3/64" = 1'-0"ES001
1 Site Plan - Electrical N
SHEET NOTES:
1. BUILDING SERVICE FED FROM 13.2KV SWITCHGEAR LOCATED IN BUILDING 115. REFER TO ONE-LINE FOR
SERVICE FEEDER SIZING. REFER TO DEMO POWER PLAN E WING FOR PHASING REQUIREMENTS. PLACE TRANSFORMER AND SECONDARY CONDUIT PRIOR TO FEEDING TRANSFORMER FROM BUILDING 115.
PROVIDE BOLLARDS AROUND TRANSFORMER COORDINATE WITH CIVIL FOR BOLLARD LOCATION AND
QUANTITY. COORDINATE DIRECTION OF TRANSFORMER SO THAT OPENING FACES SOUTHWEST.
TRANSFORMER TO CONTAIN NO PCBS IN OIL.
2. PROVIDE 1 - 5" CONCRETE ENCASED CONDUITS FOR MEDIUM VOLTAGE CABLING. PROVIDE SLACK AROUND MANHOLE TO SATISFY BEND RADIUS. VA STANDARD MEDIUM VOLTAGE CABLING IS 250KCMIL CU WITH 4/0 GROUND CU. REFER TO MEDIUM VOLTAGE SPEC FOR MORE INFORMATION. REFER TO SINGLE CONDUIT
DUCT BANK DETAIL ON THIS SHEET.
3. PROVIDE 6 - 4" CONCRETE ENCASED CONDUITS FOR TRANSFORMER SECONDARY. PULL CONDUITS TO EXISTING FLOOR PULL CABINET IN ELECTRICAL ROOM INDICATED ON POWER FLOOR PLANS. UTILIZE 6-WAY DUCT BANK WHEN ENTERING ELECTRICAL ROOM. REFER TO DUCT BANK DETAIL ON THIS DRAWING. TWO 4"
CONDUITS ARE FOR SPARE CAPACITY.
4. PROVIDE 200A, 15KV, TERMINAL JUNCTIONS BAR FOR EACH PHASE LOCATED IN MANHOLE. EACH TERMINAL JUNCTION BAR WILL HAVE TWO LOAD BREAK BUSHINGS WITH AVAILABLE SPACE FOR AN ADDITIONAL TWO BUSHINGS. PROVIDE 200A LOADBREAK ELBOWS FOR BUSHINGS. JUNCTION BAR, LOADBREAK ELBOWS, AND
ALL ACCESSORIES TO BE RATED TO BE SUBMERGED IN WATER 24/7.
5. EXTEND EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF TO NEW ROOF MOUNTED EQUIPMENT AND
GENERATOR EXHAUST.
6. REFER TO DETAIL 3 ON SHEET CS501 FOR TRANSFORMER PAD DETAIL.
7. EXISTING MV CABLE FROM BLDG. 123 SHALL BE PULLED BACK AND A MINIMUM OF 20 FEET OF SPARE CABLE
LOOPED AND SUPPORTED IN MANHOLE NEAR TOP OF MANHOLE. NEW MV CABLE SUPPORT BRACKETS WILL NEED TO BE INSTALLED IN MANHOLE TO SUPPORT SPARE MV CABLE. PROVIDE LOADBREAK ELBOWS FITTED TO THE CONDUCTORS AND TERMINTED ON MEDIUM VOLTAGE JUCNTION BARS LOCATED IN MANHOLE.
8. PROVIDE 120V/1 TO NEW EXHAUST FAN LOCATED ON THE ROOF IN THIS AREA. COORDINATE EXACT LOCATION WITH MECHANICAL ROOF PLAN. DISCONNECT PROVIDED BY MECHANICAL ENGINEER. CONTROLS
TO BE CONTINUOUS. PROVIDE 20A FEEDER AND BREAKER FROM PANEL DL-E1-123-1.
NO SCALE
DUCT BANKS
F
F
A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK.
PROVIDE DEMOLITION FOR ITEMS AS SHOWN.
B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).
C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION.
SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING
CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .