S06 - 231123 Appendix A.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Replace Building 123 Mental Health Emergency Generator and Switchboard 695-21-104 (VA-22-00055186)
- Solicitation number
- 36C25222B0028
About this file
This document contains a work request and accompanying appendix for a natural gas service installation project. Key details include:
-
The project involves installing new natural gas service and a 2" polyethylene main line running 528' to connect a new service tee to an existing main line in Milwaukee, Wisconsin. Environmental and erosion control notes specify requirements for working near wetlands, waterways, and threatened/endangered species habitat.
-
An appendix provides a "natural gas ready for service" card requiring the customer to complete items like locating and marking underground facilities, preparing the ground around the building, and framing the exact meter location before installation can begin. Additional winter charges may apply for installations scheduled between December 1st and March 31st.
-
Relevant contacts include the customer, plumber/HVAC contractor, electrician, and We Energies personnel. The project location is listed as the VA Medical Center campus along W National Ave. Completion dates and pricing information are not included in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25222B0028 0007.docx | DOCX document | |
| S06 - Wage Determination effective 10.14.22.pdf | ||
| 36C25222B0028 0006.docx | DOCX document | |
| S06 - 695-21-104 SOW_UPDATED 10.18.22.pdf | ||
| 36C25222B0028 0005.docx | DOCX document | |
| S06 - Wage Determination effective 8.5.2022.pdf | ||
| S06 - 23 09 23 - Direct-Digital Control System for HVAC.pdf | ||
| 36C25222B0028 0004.docx | DOCX document | |
| 36C25222B0028 0003.docx | DOCX document | |
| 36C25222B0028 0002.docx | DOCX document | |
| S06 - 695-21-104 - SPECS - 2022-04-11.pdf | ||
| 36C25222B0028 0001.docx | DOCX document | |
| S06 - 6b - 695-21-104 DrawingsPart-1.pdf | ||
| S06 - 6b - 695-21-104 DrawingsPart-2.pdf | ||
| S02 - 695-21-104 - SPECS - 2022-04-11.pdf | ||
| S02 - Wage Determination effective 7.15.22.pdf | ||
| S02 - Single Source Justification_Fire Alarm_695-21-104.pdf | ||
| 36C25222B0028_3.docx | DOCX document | |
| S02 - 6b - 695-21-104 Drawings.pdf | ||
| S02 - Single Source Justification_Firestop_695-21-104.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACCOMPANYING 36C25222B0028 0005
W N
A T
IO
N A
L A
V E
S 53RD ST CL
CL
R /W
R /W
8, 27
ENV
8, 27
ENV
8, 27
ENV
M
M M
M
M
14'
W
A Y F
E E
D
23'
N O
R T
H
JOB OWNER: ROBERT BARZACK - 414-944-5779
SECTION / TOWN / RANGE: SW1/4 SEC35, T7N, R21E
JOB INFO:
SITE VISIT COMPLETED BY: ANDREW GLATZEL
X
CONTRACTOR/BUILDER: CHRIS AT GUIDON - 402-304-4936
PLUMBER/ HVAC:
CUSTOMER: BILL AT VA MEDICAL - 414-712-8063
ELECTRICIAN:
MAIN CONTACTS
CUSTOMER'S SIGNATURE OF APPROVAL DATE
steel main. Questions call Larry Van Bogelen at 262-945-8914.
Connect the new PE service tracer wire to the existing
This is a rectified system. No 17# anodes needed.
CORROSION/CATHODIC PROTECTION NOTES:
CUSTOMER IS REQUIRED TO LOCATE ALL PRIVATE
WE ENERGIES WILL COMPLETE LAWN / PAVEMENT REPAIR ON:
ROAD ROW NEIGHBORING PROPERTY
NONE CUSTOMER PROPERTY
ROAD ROW NEIGHBORING PROPERTY
NONE CUSTOMER PROPERTY
WE ENERGIES WILL HAUL SPOIL FROM:
WE ENERGIES IS NOT RESPONSIBLE FOR ROOT DAMAGE
UNDERGROUND FACILITIES PRIOR TO INSTALLATION
X
CONTINGENCIES & COMMENTS:
DIGGERS HOTLINE REQUIRED
M
V10634
V10633
" S
T
D
W
ALK
DRIVEWAY
PARKING LOT
GRASS
W A L K
P R
IV
A T E R
O A
D
B O
C
B O
C
C U
C
SEW 4' S OF GAS MAIN
24" WAT MAIN 3' S OF N CURB LINE
#5000
BORE 528' OF 2" PE
INSTALL 3M AT 2PSIG L/R
MAIN TO L/L - 43'
L/L - METER - 485'
SHEET NO.
OF1 1
6/23/2021 1:48:42 PM U:\Data\@Work Management\Milwaukee\MSSC\@MSSC 4660000 - 4679999\4665353\4665353_C142248-4665353-1622217171325.dgn
FT. OF CORNER
SERV PIPE SIZE: MATERIAL:
CATV JOINT USE #: TEL JOINT USE #:
OPER MAP #: FEEDER/LINE #:
PREPARED BY:
OFFICE #: CELL #:
E-MAIL:
PAGER #:
EFV
CURB VLV
RELIGHT
ELECTRIC INFORMATION
PROPOSED GAS SERVICE INFORMATION
ELEC WR
GAS WR
CITY / TOWN / VILLAGE:
PROJECT ID: CGS #:
COMMON INFORMATION
STAKING REQUIREMENTS:
EASEMENT:
MAIN / SERVICE IN
SURVEYOR
DESIGNER
STAKED
NOT NEEDED
YES NO
RESTORE PRIVATE PROPERTY: WE ENERGIES CUSTOMER
WORK IS APPROX FT, DIRECTION OF CL OF
NEAREST CROSS STREET
(ALSO FOR GAS SERVICE TEE)
MTR LOC:
TIE IN PIPING
CUST/PROJ NAME:
PROJECT LOCATION:
WORK DESCRIPTION:
DATE PREPARED: DATE REVISED: CONSTRUCTION TYPE:
IO #:
MTR SIZE: MTR TYPE: PRES:
PHONE #:
X
MILWAUKEE / C
VA MEDICAL CENTER
5000 W NATIONAL AVE
INSTALL NEW SERVICE
ANDREW GLATZEL
ANDREW.GLATZEL@WECENERGYGROUP.COM
414-540-5839 414-588-4107
SNG012500
6-18-2021 BRICK
12 N SE
PE2"
S 53RD ST
14 E
X RAILROAD PERMITTING/FLAGGING REQUIRED YES NO RR NAME
3M AMR 2psig
CORROSION CONTACT: LARRY VAN BOGELEN 262-945-8914
MS 4665353
BY DESIGNER
ROUTE PRE STAKED
ACCOMPANYING 36C25222B0028 0005
E24030 Highlight
M
R
FT
REC
M
B
P
RI
T
NOTES:
Existing facilities should be field verified prior to excavation.
Utility information shown are from plans and have not been field verified.
Maintain 12" min vertical clearance at crossing of existing electrical facilities.
Maintain 6" min vertical clearance at crossing of other existing facilities.
Maintain 18" min vertical clearance at crossing of existing storm sewer pipes.
Maintain 5' clearance from storm sewer inlets.
Staking of route or ROW by surveyor required prior to construction.
Clearances shown are min distances - reference permit for specific clearance requirements.
Additional information on excavation, backfilling & clearances can be found in the Gas CRS 201.
Restore all pavement, ROW, sidewalks, and customer's private property.
12" WATTLE or 12"/20" SEDIMENT LOG or 9.5"/20" EROSION EEL
SILT FENCE
VEGETATIVE BUFFER
ENV
8, 27
A/B/C/D restoration of pre-construction soil stratification, and restoration to pre-construction elevations.
surface.
Waterways navigable waterways/streams.
Threatened and Endangered Species harass, harm, or kill a protected species under state and federal regulations. Proper precautions shall be taken to ensure harm to individuals is avoided.
between November 5 and March 15.
Invasive Species
Council on Forestry Transportation and Utility Rights-of Way Best Management Practices
Cultural and Historical Resources, cont.
potentially having Native American artifacts, burial mounds or burial sites, which could be encountered during construction.
immediately. Contact the Environmental Department who will contact the State Burial
Sites Preservation Office and determine the next steps that must be taken in order to comply with state law. Work at that site MAY NOT PROCEED until the Environmental
Department authorizes it.
Code HS 2.04 (6), must be present to monitor all ground disturbing activities.
Frac-out Contingency Plan contingency plan shall incorporate the following components.
and appropriately.
b. Containment materials (e.g. silt fence, straw bales, sand bags, etc.) shall be on site
13. All excess spoils shall be removed from wetlands and placed in a suitable upland location.
27. A frac-out contingency plan shall be on-site and implemented accordingly. The
25. If human bone or any artifacts are discovered during construction, work must cease
24. The project is within or adjacent to an area that is identified by the State of Wisconsin as precautions are legally required to prevent the spread of these species. The Wisconsin
22. A qualified biologist must be present when conducting work at this location.
21. Exclusion fencing must be installed at the work area prior to March 15.
20. In order to protect the threatened or endangered species, work must be conducted
19. Threatened or endangered species are known to occur in the work area. It is illegal to
18. Any disturbed soil within 75-feet of the ordinary high water mark of any navigable waterways/streams shall be stabilized within 24 hours of construction completion.
15. Poles scheduled to be removed, and that occur within wetland, shall be cut at the ground
a. Continuously inspect the bore paths for frac-outs in order to respond quickly
26. A "qualified archaeologist," as specified under Wis. Stats 157.70 (1) (i) and Wis. Admin.
23. State regulated invasive species are known to occur in the work area. Reasonable and available should a frac-out occur.
14. Trenching and pit excavations within wetlands shall include soil segregation to facilitate should be followed: (http://council.wisconsinforestry.org/invasives/transportation/).
17. No crossing of navigable waterways with equipment can occur. Foot traffic is allowed.
16. No work can be performed within the banks or below the ordinary high watermark of any
WE ENERGIES WORK REQUEST ENVIRONMENTAL NOTES (Notes 1 through 7 apply to ALL work requests)
APPENDIX A
Spills
Notes 8 through 27 apply as noted at specific points within each work request:
Dewatering
Wetlands
1. If WDNR and/or USACE permits were obtained for the project, all permit conditions shall be met during construction of the project.
2. If soil disturbance occurs on slopes or channels/ditches leading to wetlands or waterways, or within wetlands, the disturbed areas shall be stabilized and appropriate erosion control
Best Management Practices (BMP's) shall be implemented.
3. Erosion Control BMR's shall meet or exceed the approved WDNR Storm Watter Management
Technical Standards (http://dnr.wi.gov/topic/stormwater/standards/const_standards.html).
Refer to We Energies Construction Site Sediment and Erosion Control Standards.
4. Inspect installed erosion control BMP's at least one time per week and after 12" rain events:
repair as necessary.
5. When temporary stabilization is required (e.g. for winter or short-term construction) prior to final restoration, soil stabilizer shall be installed wherever possible. Erosion mat shall be used temporarily only where appropriate, in accordance with state standards, and when approved by the
Operations Supervisor.
6. Whenever soil exhibiting obvious signs of contamination (e.g., discoloration, petroleum or solvent odor, free liquids other than water, buried containers or tanks, or other obvious signs of environmental impacts) is encountered during excavation or installation, cease work immediately, take appropriate immediate precautions to ensure worker health and safety, and contact the Operations Supervisor or Inspector.
7. If an oil spill occurs during construction, call the Environmental Incident Response Team
(EIRT) at 414-430-3478:
a. Any quantity of oil is spilled into surface water;
b. Any oil spill greater than 50 ppm PCB into a sewer, vegetable garden, or grazing land;
c. Any oil spill containing greater than 500 ppm PCB;
d. Five gallons or more of oil spilled to the ground;
e. Any oil spill involving a police department, fire department, DNR, or concerned property owner.
8. Dewatering of pits or trenches shall be done in accordance with state standards. Use an approved sediment bag, a straw bale dewatering basin, a combination of both, or equivalent.
9. As much as practicable, the majorityof the work shall be staged from the public roadways and road shoulders, keeping equipment out of adjacent wetlands.
10. All work shall be conducted to minimize soil disturance. No rutting will be allowed within the wetlands.
11. If soils are not frozen or stable to a point that avoids rutting, timber mats, mud tracks, or equivalent shall be utilized to access pole locations.
12. Excavated soils cannot be stockpiled in wetlands.
General
Erosion Control
Contaminated Soils
EROSION CONTROL LEGEND
INLET PROTECTION, TYPE
STONE DITCH CHECK
SOIL STABILIZER, TYPE B
TIMBER MAT
SAND or ROCK BAG
SURFACE WATER FLOW
TRACKING PAD
EROSION MAT CLASS I, TYPE A
EROSION MAT CLASS I, TYPE B
EROSION MAT CLASS I, TYPE B URBAN
EROSION MAT CLASS II
MULCH
EROSION MAT CLASS III
EROSION MAT CLASS I, TYPE A URBAN
WE ENERGIES - GAS OPERATIONS
APPROXIMATE LOCATION FOR
UNDERGROUND FACILITY EXCAVATION
DW
BASIN LOCATION
APPROXIMATE DEWATERING
CONVENTIONAL SYMBOLS
- Outside Meterset
- Inside Meterset
- Valve (Boxed)
- Valve (Buried)
- Transition Fitting
- Reducer
- Support Clamp or Squeeze Point
- Coupling
- End of Main
- Regulation Pit
- Insulator
- Bottom/Side/Half Line Stopper Fitting
- Save-A-Valve
- No Blow/Punch/HVTT/MVTT/EF Tee
- Anode
- Cap with Anode
- Cap
- Retirement Symbol
- Full Open Tee
- 45° Elbow
- 90° Elbow
- Depth Change Elbow
- Marker Post
- Multi Wire Test Stand
- Single Wire Test Stand
- Main Jump Symbol
- Valve Pit
- Regulation Station
- Farm Tap
- Blow Down
- Pressure Monitoring Device
- Riser Used for Corrosion Reads
- Test Stand
- Rectifier
- River Weight - Pressure Point
Cleared a minimum 10-foot-wide path along the service route from the property line to the meter location on my building. I've made sure things like dirt piles and construction materials aren't in the way.
l Submitted payment, if applicable.
re you ready for natural gas service? we
Important! The natural gas ready for service card must be completed when you are ready for natural gas service and returned to us before we can begin your new service installation.
I understand that the following items need to be completed before installation begins.
ck Located, marked or exposed any private buried obstructions or under-ground facilities — such as a well, drain tiles, septic/mound system and/or underground yard lighting — with stakes, spray paint or flags.*
Note to customer: We Energies and/or its agents will not be held responsible for damage that occurs to customer-owned underground facilities that are not properly located and marked before natural gas service installation.
QiPrepared the ground around my building and along the service route to within 4 inches of final grade.
cliBuilt/framed wall and marked exact location on the building with spray paint, flag or stake to identify where the natural gas meter will be placed.
Sent my signed sketch Of applicable) and informed We Energies of any planned decks, patios or pools before my service is installed.
Once my service is installed, it would be my responsibility to pay any costs to move my natural gas facilities to accommodate future structures. Note: Building over the top of natural gas facilities (including the natural gas meter) may cause serious safety or code violations.
* If you are unable to properly locate and mark your privately owned buried facilities, you can hire a contractor to do it for you.
Natural gas ready for service card Please complete, sign and return this card when all of the items above have been completed.
Name:
(please print)
Installation address:
City:
(please print)
State: ZIP code:
Daytime phone:
certify that I am the owner or authorized representative of the owner.
Signature:
QOPlease hold my ready for service card and schedule installation after March 31.
(For We Energies office use only) Order number:
Date:
Additional charges for natural gas service installation apply from Dec. 1 through March 31.
For new service questions, visit www.we-energies.com/newservice or call 262-574-6400 or 866-423-0364 (toll free).
WR 4665353
| 4665353_C142248-4665353-1622217171325 |
| 4665353_C142248-4665353-1622217171325 |
File details come from the government source that posted it. Updated .